HomeMy WebLinkAboutMin - PC - 1953.03.12Present
Brown
Harris
Mattock
Mitchell
Perkins
Jtivers
BUR LINGAME CITY PLANNING COMMISSION.
MINUTES
Burlingame, California
March 12, 1953
Study Meeting
Absent Others Present
Henderson Planning Consultant Mann
Councilman Simonds
City Engineer Marr
Meeting called to order at 7:55 p.m. - Chairman Mitchell presiding.
i7nfini.shed Business
Burgermeister Sign erection. After considerable discussion it was moved
by Commissioner Stivers, seconded by Commissioner Mattock that the
proposed plan for the construction of two 48xl4-. signs on top of the
Golden Gate Brands building be refused because of the size of the sign
and by reason of the amount of light representing a nuisance to the
people in the neighboring area. Refusal passed with Commissioner Perkins
casting the dissenting vote.
Concrete Mixing Plant application. The application of Andrew Waechter
to erect a concrete mixing plant and materials yard was seriously
considered following which Commissioner Mattock moved, seconded by
Commissioner Harris that a tentative approval be given of the project
on the basis that the plant would not at this time be considered a
nuisance and recommended approval of a permit upon presentation of
final plans and specifications. In addition, it was recommended that,
and made a part of the recommendation, that water and sewer lines be
brought to the property in accordance with the requirements of the City
Engineer. Notion was unanimously passed.
New Business
A proposed resubdivision of a portion of the Buri-Burs Rancho headed
by A. W. Sorich to be divided into four parcels was presented to the
Commission for study. It was reviewed with the Engineer of Mr. Sorich,
Mr. white and the commission agreed to look at the property and take
action at the regular meeting on March 26, 1953.
Permits and plans for the erection of an apartment house on Lot 9, block
39, Easton Subdivision No. 3 at E1 Camino 'deal and Easton Drive were
presented by David Nicolaides through Building Inspector Watson. After
a review of said plans, it was moved by Commissioner Perkins, seconded
by Commissioner Mattock that the permit be granted.
Study meeting 3112153 pg• 2
Chairman Mitchell outlined a program for the master plan for the
overpass on California Drive and recommended a list of prominent people
from a technical standpoint to act on the committee. It was suggested
that the Chairman present the list for approval to mayor Byrd and the
Mayor to formally ask them to participate.
Planning Consultant Mann advised the Commission that it was in order
at the next meeting to start action to notify the public about hearings
on the new zoning ordinance. Mr. Diann was advised to put the necessary
required motions in written form for presentation at the next regular
meeting.
The meeting adjourned at 10:30 p.m.
Respectfully submitted,
FRANK B. PERKINS
Secretary