HomeMy WebLinkAbout1529 Bernal Avenue - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 June 25, 2014 Randy Grange TRG Architects 205 Park Road, Suite 203 Burlingame, CA 94010 Re: 1529 Bernal Avenue Dear Mr. Grange, r4, ciry � � ,1 �. e .-" � `+.o.� COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the June 9, 2014, Planning Commission approval of your application for Design Review and Special Permit for a basement became effective June 19, 2014. This application was for a new, two-story single family dwelling and detached garage at 1529 Bernal Avenue, zoned R-1. The June 9, 2014, minutes of the Planning Commission state your application was approved with the following conditiar�: that the project shall be built as shown on the plans submitted to the Planning Division date stamped May 29, 2014 sheets A1.1 through A4.,1, L1.0, L2.0 and PW.1; and that the two trees along the rear property line shall be a Quercus agrifolia (Coast Live Oak) and a Pittosporum undulatum (Victorian Box) and shall be 24-inch box size when planted, as shown on the Landscape Plan, sheet L1.0, date stamped May 29, 2014; 2 3 that the windows in the stair tower shall be revised as reflected on the 3-d images for the project; that the plant materials under the Red Oak tree in the front yard shall be revisited; 4. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 5. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 6. that the conditions of the Building Division's March 31, 2014 memo, the Parks Division's April 7, 2014 rnemo, the Engineering Division's May 6, 2014 memo, the Fire Division's March 28, 2014 merno and the Stormwater Division's May 8, 2014 memo shall be met; :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org s d June 25, 2014 1529 Bernal Avenue Page 2 7. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 8. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 9. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included anc!_a�proved in the construction plans before a Building permit is issued; 11. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION 13. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 14. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 15. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �: June 25, 2014 1529 Bernal Avenue Page 3 16. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 17. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, William Meeker Community Development Director c. Steven Crooks and Helen Miranda, property owners 1529 Bernal Avenue Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (LOT 15 BLOCK 10 BURLINGHOME SUB RSM 9/49 50; APN: 026-034-050) File :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :� Project Comments Date: To: March 28, 2014 � Engineering Division (650) 558-7230 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff Subject: Request for Design Review for a new, �rrvo-story single family dwelling with a detached garage and a special permit for basement ceiling height at 1529 Bernal Avenue, zoned R-1, APN: 026-034-050 Staff Review: March 31, 2014 3} 4) 1) On the plans specify that this project will comply with the 2013 Califomia Building Code, 2013 Califomia Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 Califomia Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this praject must comply with the 2013 California Building Codes. 2) Specify on fhe plans that this project wiil comply with the 2013 Caiifomia Energy Efficiency Standards. Go to http://www.enerqv.ca.govltitle24/2013standards/ for publications and details. Specify that this project will comply with the 20Q8 Califarnia Energy Efficiency Note: The California Building Standards Commission has delayed implementaiion of the 2013 Energy Codes. if an application is subrnitted for this project prior to July 1, 2014 then the project will be required to comply with the 2008 California Energy Efficiency Standards. When plans are submitted for Building Code compliance pian check specify the method by which the standing seam roof on the dwelling and the flat roaf on the garage will comply with Cool Roof requirements of the 2013 California Energy Code. 2013 CEC §110.8. The 2013 Residential and Non-Residentiaf Comp(iance Manuals are available on fine at htt ://www.ener .ca. ov/title24/2013standards/ Place the foflowing information on the first page of the plans: "Construction Hours" Weekdays: 7:Q0 a.m. — 7:40 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 1Q:04 a.m. — 6:00 p.m. (See Ciiy of Burtingame Municipal Code, Section 93.04.100 for details.) 5) On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require furiher City approvals incfuding review by the Planning Commission.n The building owner, project designer, and/or contractor mus# su bmit a Revision to the City for any work not graphically illus#rated on the Job Copy of the plans prior to perfarming the work. 6) Anyone who is doing business in the City must have a current City of BurEingame business license. 7} Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the frue property boundar{es, the location af all structures on the property, existing driveways, and on-site parking. 9} Provide a complete demolition plan that indicates the existing walls, walls to be demalished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin {including the removal of a� building components}, uniil a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 10)When yau submit your plans to the Building Division for p{an review provide a cornpleted Supplemental Demoli#ion Permii Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 11)Show the distances from all exterior wafls to property lines or to assumed property lines 12)Show the dimensions to adjacent structures. 13)Obtain a survey o# the property lines. 14)Indicate on the plans that exteriar bearing walls less than five feet from the property line will be built of one-hour fre-rated construction. (2013 CBC, Tab[e 602) 15}RESIDENTIAL: Rooms that could be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the Iocation and the nef clear opening height and widfh of al! required egress windows on the elevafion drawinas. 2013 California Residential Code (CRC} §R310. Note: The area fabeled "Craft° is a room that can be used for sleeping purposes and, as such, mus# comply with this requirement. 16)Indicate on the plans that, at #he time of Building Permit application, plans and engineering will be submitted for shoring as required by 2013 CBC, Chapter 31 regarding the protection of adjacent property and as required by OSHA. On the plans, indicate that the fallowing will be addressed: a. The walls of the proposed basement shall he pmperly shored, prior to construction activity. This excavation may need temporary shoring. A competent contractor shall be consulted for recommendations and desi�nn of shoring scheme for the t• excavation. The recommended design type of shoring shall be approved by the engineer of record or soils engineer prior to usage. b. AIl appropriate guidelines of OSHA shall be incorporated into the shoring design by the contractor. Where space pemnits, temporary canstruction slopes may be utilized in lieu of shoring. Maximum allowable vertical cut for the subject project will be five (5) feet. $eyond that horizontal benches of 5 feet wide will be required. Temporary shores shall not exceed 1 to 1(horizontal to vertical). In some areas due to high moisture content / water table, flatter slopes will be required which will be recommended by the soils engineer in the field. c. If shoring is required, specify on the plans who's sole responsibility it is to design and provide adequate shoring, bracing, formwork, etc. as required for the protection of life and properiy during construction of the bnilding. d. Shoring and bracing shall remain in place until flaors, roof, and wall sheathing have been entirely constracted. e. Shoring plans shall be wet-stamped and signed by the engineer-of-record and submitted to the city for review prior to construcrion. If applicable, inciude surcharge loads from adjacent structures that are within the zone of influence (45 degree wedge up the slope from the base of the retaining wall) and / or driveway surcharge loads. 17)lndicate on the pfans thai an OSHA permit will be obtained for the shoring* at the excavation in the basement per CAL / OSHA requirements. See the Cal / OSHA handbook at: http://wvuw.ca-osha.comlpdfpubs/osha userquide pdf * Constructian Safetv Orders : Chapter 4, Subchapter 4, Article 6, Section 1541.1. 18)Indicate on the plans that a Grading Permit, if required, will be obtained from the Depar�ment of Public Works. 19)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable la# caverage. Consult the Planning Department for details if your project entails (andings mare than 30" in height. 20)Provide handrails at all stairs where there are four or more risers. 2013 CBC § 1009. 21)Provide lighting at all exterior la � i . _ _.. t , _-.•-�__._.__...._. `; ; / Reviewed b�""�� �` --�. Date: 3-31-2014 Joe r-,--eBO ; � � 65�58-7270 G�' Project Gomments Date: To: From: March 28, 201� � Engineering DivFsion (650) 55�7230 0 Building Divisior� (65U} 558-72� X Parks DNision (650J 558-7334 Planning Stafi� � Fire Division (650) 558-760�? 0 Stormwater Division (65�) 342-3727 � Ci#y Attorney (850) 558-7204 Subject: Reques# #or Design Review for a new, fiwo-story single family dwelEing with a detached garage and a special permit for basement ceiling heigtrt at 1529 Bemal Avenue, z���d R-1, APW: 026-034050 Staff Review: March 3'[, 2014 1. No e�tisting tree over 48 inches in circumference at 54 inches from base of tree may be removed withoui a Protecfed Tree Permit #rom the Parks Division (558-7330). �2. Provide separate irrigation (drip or bubbler) to new landscape frees. 3. Existing City Street Tree may not be ceat, trimmed or removed without permit from Parks Divisian (5�8-7330) %.� Garage and House construction is within drip line of existing tr�s_ Provide a �� Tree Protection Plan to protect trees during all phases of construction. �. Any root pruning o# roots 2' or larger during excavation of new garage and house founda�ion wil{ require a documenfed inspection from an on-siie independent arborist to ensure survival of neighbors oaic and rear neighbors trees. C^7�. Complete Water Conservatiort che,Gclist (attached) J B Disco 4R/'{4 4_ If Public Vllorks requires sidewalk replacement, Policy for Expanding Wid#h o# Planter Strip needs io be implemented. ,... _. _... . . . ;.. _.,... _ _ . .. . . _ _. . .. ; .. --.. _ . , .. :_. ... . _ ,._. .. -. , ::-- �- � - - � � - OUTD�{3R WA►T�R U�E EFFICIEP�CY GHEGKLlSi :- o:- o-- e o i o e . , t cert3fy ih ect ets the speciFied requiremencs of the Water Co ervatfa 'n landscaping Orciinance. i ' i ture � i .; � Date � ��. - .t. ,..Mi: 1`[�r'.' 4C='ra:ar.��•-�"t'�''�": �. 1c.S3'i'.. ! i Fj:.3: �R _ . 6 Ef 0 `�'�E 'p'� ,`,T�,�:?��i�•'..iti,,.ui�q�7`r}y..:sy:,�j'.�r'�4fy- ��k,:`;.,;•Kf �,tS -a1�*;'�7;' ir 7�i-, :�,tic ..,., •-�h:.l:f.v,:—;,,�� - - • . r �k���l�i`"��:x� . � .1. t.� .;�. �f� S�cv T!;: '•t�.j.i!tlte�* ,( ���Y��r„".�. ����,.��` .F.?�:}� ',�.it:�..-:�•'.�i. ��:�' � ��::: " �-'�i`:ti �.�' .o.cu.[.,'�'i-r.. _ 1:� _ ..e_ }r.. .;! '�t .� _i��� �• '',;'�� • ' t 4.:5•.r�.i•3._?...J7:?�.'; j?.:::..�_�-:'%,:�"' n le Fam)i 11i�Gi �,{' , • y .ne} ..i=:i' .1;7.is.:- :�::,.,ti.. . L�tYLYt�'i':,�::a.:tl..��:::t:�';:;1... _ .:t.�% L':c:.r .,�, �.r.:.�:':+.1-.:f:.c... l:C�iL_.:�'���.' rn g y � ti-F y Commer ia! C� Instftu o a!' D.Irrigatian only O trtdustria! O Other: AppJicanE Name (printj: Contart Phone H: �•'� Z� � Praject Site Address: � :;=A�e�cy'}ie�+[eVv: ; . Praject Area (s .f#. ��,� ��, .~.:.,,i :=:-, � q or acre): of U�its: q of '�' _` ' _ I }� Meters: '(Passj : [�ailj : I ���-,1����`•�ilf.`�1��'���1?�':�; Tata! tandscape Area (sq.Et.)' 1." '-jj=t � .J � ' +�. . r ' �a ' -�: ,�,��. , ,rr ��; ;�?r�3,�r�. ,[���� ��aJ�t���.��i : �- �, EZ , j ����t/�,�,r{� ( .�3 ir....� `.Y �ic� s i , � Y. � 1 � � �'� t��{�f���i��i4::-.;tt � I`I`l�r`�d�':.�1���:/"��i4��� r1� .1 ; . �t���r,�s�3�t���-.�}�� Turf Irrigatec� Area {sq.ft.j: �• r - • � : �;fil �i II'�_ ye i�1 I ��:n `� � � ;�� � ���`'��5�����.� Nan-7urf fe�i :- �. r y�- � gated Area s ft . - : r ��:1- jLi��'T��;h�,"�i��='�-��� { 4. .}: _,��. .._,._�..I.. ��.�.(ry�^� 4}�`r'��.�{t�E�. �� t�� s' Speciai Lanciscape Area {SLA) {sq.ft.}; +— -�ry '. "3. ^•-r�'S:� 4ry ,�'.. ����.f3 iy � ,.. '.���y ��; i i�L�.��;�'��;�=r.�i�;;� ���'�.�� Water Feature5urfate Area (sq.ft.}: ,•f� ,:•= s,,• i f �f�1,� �s���j -� I � ,2".�y` -5� �j r:e�;�(�{�- t=' ':: � 1q..._...:. .. , _ l- `..�: + � I � �: �.�:.L�S��.��1.� tJ.���a' �3.3�.�:1 � V ��S!� �� 1 C .•,: i ��.[r` (�•4. �� . . j �� . . . . . r' •. . <� : � � �.-2i.i f •.��i f. �:ti.4� .C� `.4� C�-.J.Fi .`����f.,{, ' .L 1 C .a�Y� 1 :�'::�.: i : Turf Less th�n 25% af tE�e (andscape area Is s :s+_�;; �;. �t y�.��� t� O N o, S e e W a t e r B u d g e t ,��:,�� ;f= �`'�;O',- ��� A€i turf areas are > B teet wide es •��'� r� ��,; »� �'�;�;�ti•- t�O..: ' Att tur! is p(artted csn sbpes < 2595 es -:;�=�`; �. `�. ; f�EEonTurf Atleast8ti%oinon-turf - � N.� �� ° acea is nati+re s - .:�. ',: �_ . ... � nr law water use plants 0 No, See Water 8udget '-�.- :' ''�" _ o.'t� �w ' Hydrazones nts ar `-,'::+��," ��;;� '�� „� ;�,. Pla e grouped hy Nydr�zones es ;� � .� . ��:a::�'`�:�:q,:��� t_::: M�icf► �t least Z-(nthesnf rnulch on exposed s .�s0r:��:�:,'!, J,::. sail wrEac� `:_�-�:,�: - - trrigatiort System Efflcfency 7a9b ETo (iptp°,6 ETo forSLAsj YeS ,( ������ .�.<�� � - ?�f.�::r�Q;. aversprayorrunotf Yes �.;���3-� ;��• frrlgatEon 5ystem Desl n 5ystem �� �_ "� �I� . L� - � B e#flcfenry > 7ii°�6 s :E� r�'<-`-;'t3�:: ]ii: 5': -. . =,• - "• ._.::�t7.''.......,,;�s . Autamatfc, seit-adjusting irrigation o, nat required for Tier 1 �;"•�a:-�>�:.;;.:: n::='.�:; cantro�lers O Yes ='` Moisture sertsor/cain sensa� shutaHs Yes _s��; .p.,._��.��:;.,.0...,-.. No sprayheads in < S-it �fde area Yes .���}. ,;�� Irr{gatlopTlrne Systerr� onfy operaEes behveen 8 PM Yes �_;�p::;�^=,-,.0�.;, and 10 AM =;�` " - - - _ =;:�':'`:t�':_=:;: _::' Meterin� Separafe 6rrigation rrseter o, nat required berause < 5,000 sq.h, ::'-:p::'_- :i:; ; p:" ., O Ye5 . : •+., _, ,::;,=: y-.:_:; ; : 5w[mming Pools / Spas Cnver F►ighly recomrnertded 0 Y � �T . �-�� � � � - �1�. � e5 �C1> _ �; ;O'.> :� � No, noc requfred -�� �'-`����"'-;� `::. Wate� Features RecfrculaGng Yes ^ � +�� ��~ � �` �� Less than 1090 oi landscape area Yes � q-�� �''~^_p;. ��, ,.,; :'�1�: :,�: Gacumentation Checklist �.yQs ;�` `�� ; -:.:.�: _...: `: Landscape aad Errigation Des'rgn Atan O Prepared by applicant :'p.; =�:;�.'��:;;�� repa�ed by prafessianal ';����:`°:�'=• - =„g�'•.:: Water f3udget(optionalj � Q Arepared by applicant .=; �:';:.;:�:S�j ,:;; : ::s:-:-._�. .:... _- Prepared by proFessianal >�;�.:, ��;;:;;�^��:;;'?:''. Atrdlt Post-lnstaElatissn audit completed K ❑ Completed by applicant :p: :""'', p'_ • _ Campleted by prafessional . . � _ - _ _. . . , ,.. _ .. , ::. -- ,: ,._.. I Project Comments Date: March 28, 2014 ; To: X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558- 7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 From: Planning Staff Subject: Request for Design Review for a new, two-story single family dwelling with a detached garage and a special permit for basement ceiling height at 1529 Bernal Avenue, zoned R-1, APN: 026-034-050 StafF Review: March 31, 2014 1, See attached review comments #1, 2, 5, 14 and 20. 2. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. 3. Applicant is advised to catl City Arborist regarding potential relocation of sidewalk area around trees in the planter strip. 4. Geotechnical report is required to identify adverse impacts on subject property and adjacent properties and provide mitigation measures for new basement. 5. Identify seasonal groundwater fluctuations and provide statement of groundwater levels for the wet and dry seasons. 6. Provide basement perimeter drainage design and potential groundwater pumping requirements with power backup (if needed). Reviewed by: V V Date: 5/06/2014 PUBLIC WORKS DEP.A,RTMENT ENGINEERING DIVISION PLANNING REVIEW COMMENTS ,� '(�- �J Project Name:��.Yd,� ,(p�c�'�,,�c,r;�— , Project Address: -- �� .�t� The following requirements apply to the project 1 �_ A property boundary survey shall be preformed by a lacensed land swrveyor. The survey sha11 show aIl praperty lines, property corners, easements, topographical fea.tures and utiiities. (Reqnired prior to the building permit issuance.) �c� A,ti,l,u,�- �� �,�,� �, � ��.�+ts�i ��.�-�D �rLv�c'�-• 2 �_ The site and roof draivage shall be shown on plans and should be made to drain towards the Frontage Streei. (Requ.ired. prior to the building permit issuance.) 3• The applicant sha11 submit project grading and drainage plans for approval prior to the issuance of a Building pez•mit� 4 The project site is in a flood zone, the project shall comply with the City's flood zone requirements. 5 �_ A sanitary sewer lateral'!is required far the project in accordance with the City's standards. � 6. The project plans shall show the required Bayfront Bike/Pedestrian trail and necessary public access improvements as required by San Fraucisco Bay Conservation and Development Coxnmission. 7. Sanitary sewer analysis is required for the project. The sewer analysis shall identify the project's impact to the City's sewer system and any sewer pump sta.tions and identify mitigation mea.sures. g Submit traffic trip generation analysis for the pzoject. 9. Submit a traffic impact study for the projec� The traffic sfizdy should identify the project generated impacts and recommend mitigation measures to be adopted by the project to be approved by the City Engineer. 10. The project shall file a parcel map with the Public VJorks Engineering Division. The parcel map sha1l show aIl existing property lines, easements, monuments, and new property and 3ot lines proposed by the map. Page 2 of 3 U:\private development�PLANNING REVIEVJ COMMEN'I'S.doc . . .. ._..._. ,, . -._. _ . _.... .-. _ _ _. . � „ �. � PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION I 11 12 A latest preiiminary title report of the subject parcel of land shall be sub�.itted to the Public Works Engineering Division with the pazcel map for reviews. Map closure/lot closure calculations shall be submitted with the parcel map. 13 The project shall submit a condominium map to the Engineering Divisions in accordance with the requirements of tlie Subdivision Map Act. 14 _� The project shall, at its own cost, design ancl construct frontage public improvements including curb, gutter, sidewalk and other necessary appurtenant work. 15 The project shall, at its own. cost, design and construct frontage stxeetscape improvements including sidewallc, curb, gutters, parking meters and poles, trees, and streetlights in accordance with streetscape master plan. 16 By the preliminary review of plans, it appears that the project may cause adverse unpacts during construction to vehicular tr�c, pedesfxian traffic and public on street parking. The project sha11 identify these impacts and provide mitigation measure acceptable to the City. 17 Tbe project shall submit hydrologic calcnlations from a registered civil engineer for the proposed creek enclosure. The hydraulic calculations must show that the proposed creek enclosure doesn't cause any adverse i�mpact to both upstream and downstream properties. The hydrologic catculations sha11 accompany a site map showing the area of the 100-year flood and e�sting improvements with proposed improvements. 1 S Any work within the drainage area, creek, or creek banks requires a Sta.te Department of Fish and Game Permit and Army Corps of Engineers Permits. 19 No construction debris sha11 be atlowed into the creek. 20 _�� The project shail comply with the City's NPDES perm.it requirement to prevent s�orm water pollution. 21 T'he project does not show the dimensions of existing driveways, re- submit plans with c�riveway dimensions. Also clarify if the project is proposing to widen the driveway. Any widening of the driveway is subject to City Engineer's approval. 22 Tb.e plans do not indicate the slope of the driveway, re-submii plans showing tl�e driveway profile with elevations Page 2 of 3 U:\private development�PLANNING REVIEW COMMEN'I'S.doc � PUBLIC W4RKS DEPARTMENT ENGlNEERING DIVISION 23 The bacl� of the driveway/sidewalk appr�ach shall be at Ieast 12" above the flow line of the frontage curb in the street to prevent overflow of storm water from the street into priva#e properiy. 24. For the takeout service, a garbage receptacle shall be placed in fron� The i sidewalk fronting the store shali be kept clean 20' from each side of the properiy. 25. For commercial projects a designated garbage bin space and cieaning area shall be located inside the building. A dxain connecting the garbage area to ' the Sanitazy Sewer System is required. I ■ � � Page 3 of 3 U:\private developmentlPLAI�'NING REVIEW COMIvv�EIvTS.doc - .I ... l _:-_- :. . .. . Project Comments Date: March 28, 2414 To: � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 55& 7334 �Fire Division {650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 From: Planning Staff Subject: Request for Design Review for a new, two-story single family dwelling with a detached garage and a special permit for basernent ceilinq. height at 1529 Bernai Avenue, zoned R-1, APN: 026-Q34-050 � Staff Review: March 31, 2014 Provide a residential fire sprinkfer throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shal! be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. All sprinkler drainage shall be placed into landscaping areas. 4. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shal! be approved by the Fire Department prior to installation. � Reviewed b ��--- � Y� r~<� �G�%'�� Date: �.,, � ���" � Project Comments � Date: May 7, 2014 To: � Engineering Division (650) 558-7230 0 Building Division {650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � Ciiy Attorney {650) 558-7204 Subject: Request for Design Review and Special Permit for basement for a new two-story singie family dwelling and detached garage at 1529 Bernal Avenue, zoned R-1, APN: 026-034-054 S#aff Review: 1) The Stormwater Requirements Checklist has been filled out and �eturned. ft indica#es that the project does firigger the new stormwater requirements. Site design measures B.2.c.,d. will be utifized for compliance. 2) The Best Managemen# Practices (BMPs) has been included in the design plans, include in the building permit submittal also. 3) There is no architectural copper used in the project. 4) These issues were discussed with Casey Darcy, project manager, on 5I8/14. Afso discussed was the need to Iabel impervious and pervious surFaces in the future. For assistance please contact Stephen D. at 65Q-342-3727 Reviewed by: SD �� Date: 5/8l14 r '�'v AN MATEO COUNTYWiDE WaterPollutlon FrevernionProgram Stormwater Checklisi for Small Projects Municipe1 Regional Stormwater Permit (MRP) Order No, R2-2009-0074 ; Order No. R2-2011-Oa83 NPDES No. CAS612008 Clty of Burlingarne — Office of Environmentaf Compliance 1'!03 Airport Btvd Office: (650} 342-3727 Fax: {650) 342-3712 Complete fhrs form for individual singfe family home proJects of any size, other projscis fhaf create and/or replace less fhan 10,000 square feet af impervious surface, and projects in fhe fo!lowing cafegones that creafe and/or replace less than 5, 000 square feet of impervlous surface: resfaurants, retail gasoline ouflets, auto service facilities�, and parking lois {sfand-alone or par� of anoiher use), A. Project Information A.1 Project Name: �i����� ��s /D�NC.� A.2 Project Address: • �� y G) R�� �� !t V� �cJ �1 A.3 Project APN: �Z � �� �^ O�.� B. Select Appropriate Site Design Measures B.1 Does the project create and/or replace 2,500 square feet or more of impe;vious surfacez? � Yas ❑ No ➢!f yes, and the project wrl! receive frna! drscrefionary approval on or after December 9, 2012, fhe projecf musf include one of Sife Design Measur2s a through f.3 Facf sheets regarding site desrgn measures a through f may be downloaded af hftp:l/www.flowsto6ay.org/bs new developmentphp#flyers. , ➢!f no, or fhe project will receive4final discretionary approval before December 1, 2012: fh� project is ancouraged to imptement site design measures , which may be required at municipalify discrefion. Consult wifh municipaf staff abouf requirements for your project. B.2 Is the site design measure included iti fhe project plans? a. Direct roof runoff into cisterns or rain barrels and use rainwater for irrigatfan or other non-potable use. . b. Direct roof runoff onto vegetated areas. Yes No � � ❑ � I�I ❑ � ❑ c. Direct runoff from sidewalks, wafkways, andlor patios onto vegetated areas. d. Direct runoff from driveways and/or uncovered parking fots onto vegetated areas. e. Construct sidewatks, waHcways, and/or patios with permeabie surfaces. f. Construct bike lanes, drivewaqs, andlor uncovered parking lots with permeable surfaces, ❑ � ❑ � ❑ � ❑ L� g. Minimize land disturbance and impervious surtace (especially parking tatsj. h. Maximize permeabifity by clustering development and preservinq open snace. Use micro-detenfion, inc�uding distributed landscape-based detention j. Protect sensitive areas, incfuding wetland and riparian areas, and minimize changes.to fhe natural topograohy. k. Self-treating area (see Section 4.2 of the C,3 Technical Guidance) ❑ � ❑ � u -� ❑ � ❑ r� 1. Self-retaining area {see Section 4.3 of the C.3 7echnical Guidance) m. Plant or preserve interceptor trees (Section 4.1, C.3 Technical Guidance) 1 See Standard Industrial Classification (S!C) codes here. z Complete the C.3/E.6 Development Revlew Cheok(!st lf the project is not an individual single famlly.home, and iJ,.creates and/or replaces 1 D,000 square feet or more of irnpervious surfaca; or if it is a res.taurant, retal! gesolirie outia�, ;auto s�ni3oe faei�iiy or�arking lot projac: that creetes and/or replaces 5,000 square ieet or more of imperv3ous surface, - 3 See MRP Provlslon C,3.i. � �� 4 See MRP Provision C.3.a.i.(6), � .. ;�, 1 _,_ ..,., b � P ��r�`� � C,+� `��`� � � ����� !� � ����� � �� ����4 _ _ Approved December4, 2012 � Storm Drain Fioor Drains Parking garage Landscaping , C. Select appropriate source conErols (Encouraged for all projecfs; may be requrred af municipal discretion. Consu(f municipal sfaffSJ Are these �eatures thai features �n require source Source control measures Is source conirol project? controi (Refer to Locai Source Confro! List for detailed requirements) measure fncluded measures in ro'e t I . v �.� 0 � 0 ►: 1: ■ � a� ■� i:� 'oouspa/Fo untafn Food Service Equipmeni (non- residential) Stormwater Check(isf for Sma!! Projects ■ Mark on-site inlets with the words "No Dumping! Flaws to Bay" or equivafent. ■ Plumb interior floor drains to sar�itary sewer [or prohibit]. ■ Plumb interior parking garage fioor drains to sanitary sewer,s ■ Retain existing vegetation as practicable. ■ Select diverse species appropriate to the site. Include planfs thaf are pesf- andlor disease-resistant, drought-tolerant, and/or attract beneficial insects. ■ Minimize use of pesticides and quick-reiease fertilizers. • Use efficient irriqation system• desiqn to minimize runoff ■ Provide connection to the sanitary sewer fo facifitate draining.6 Provide sink or other area for equipment cleaning, which is: ■ Connected to a grease intercepfor prior to sanitary sewer discharge.s ■ Large enough for the largest mat or piece of equipment to be cleaned. ■ Indoors or in an outdoor roofed area designed to prevent sformwater run-on and run-off, and si ned to re uire e ui ment washin in this area. • Provide a roofed and enclosed area for dumpsters, rscycling containers, etc., designed to prevent stormwater tun-on and runoff. ■ Connect any drains in or beneath dumpsters, compactors and Yallow bin areas servin food service facifities to the sanitary sewer � ■ Per#orm process activities either fndoors or in roofed outdoor area, designed to prevent stormwater run-on and runoff and to drain to the sanitary sewer 6 ■ Gover fhe area or design to avoid pollutanf contact with stormwater runoff. ■ Locate area only on paved and contalned areas. • Rooi storage areas that will contain non-hazardous liquids, dtain to sani:ary sewers, and coniain b berms or similar • Roofed, pave and berm wash area to prevent stormwater run-on and runoff, piumb to the sanifary sewera, and sign as a designated wash area. • Commercial car wash facifities shall discharQe to the sanitary sewer 6 ■ Designate repaidmaintenance area indoors, or an outdoors area designed to prevent stormwafer run-on and runoff and provide secondary containment. Do not install drains in the secondary containment areas. ■ No floor drains unless pretreated prlor to discharge to the sanitary sewer. 6 ■ Connecf containers or sinks used fior parts cfeaning ta the sani�ary sewer. fi ■ Fueling areas shall have (mpermeable surface that is a) minimally graded to prevent ponding and b) separated from the resf of fhe s�e by a grade break. ■ Canopy shall extend ai least 10 ft in eech direction from each pump and drain r.���.�...[��.Y L._�._. ❑ j� Refuse Areas ❑ � Outdoor Proce Activities � ❑ � Oufdoa; Equipmentl Materials Siorage ❑ (� Vehicle/ Equipment Cleanin ❑ I � Vehicle( Equipmenf Repair and Maintenance ❑ j� Fuef Dispensing Areas -1 �� !I � Loading Doc4cs ■ Cover and/or grade to minimize run-on to and runoff fram the loading area. ■ Posiiion downspouts #o direct stormwater away from the loading area, ■ Draln water from loading dock areas to the sanitary sewer.fi ■ Install door skirts between the trailers and the buildin , Fire Sprink�ers ■ Design for discharge of fire sprinkler test wafer to landscape or sanitary sewer� Miscellaneous ■ Drain condensate of �ir conditioning units to landscaping. Large air Drain or Wash conditioning units may conne�t to the sanitary sewer.6 Water ■ Roof drains shafl drain to unpaved area where practicable, ■ Drain boiler drain lines, roof top equipment, ali washwater to sanitary sewers. Architectural ■ Drain rinse water to landscaping, discharge to sanitary sewers, ar co(lect and Copper dispose properly offsite. See flyer "Requirements for Architecfuraf Copper," 5 See MRP P�ovision C.3,a.i(7). p � c p ans? Pian Yes No Sheet No. O �1 � ❑ �i ,u,� ❑ ,I� -- �� � � l._L. , � ❑ � ' ❑ ❑ [� � a � � � /i11� ❑ � ❑ � ❑ � ❑ � � � � ❑ � ❑ ❑ � � 2 App; oved December 4, 20 i 2 i _ s Sformwafer Checklisf for Smalf Projects , D'. Implement construction Best Management Practices (BMPs) {Required for a!lprojecfs.) D.1 fs the sife a"Fiigh Priority Site"? (Municipal sfaff will make this determinatian; if the answeris yes, Yes ❑ No� fhe project wrll be referred fo constructron site inspecfion sfaff for monfhly stannwafer inspections during fhe wet season, Ocfober 1 through Apri! 30.) "High Priority Sites" are sltes that require a grading permit, are adjacent to a creek, or are othenvise high priority for stormwater protec#ion during construction per Mf2P Provision C.6.e.ii(2). � �.2 All projects require appropnate starmwater BMPs during construction, indicate which HMPs are included in the project, below, Yes No 8est Management Practice (BMP) � ❑ Attach the San Mateo Countywide Water Polfution Prevention Program's construction BMP plan sheet to project plans and require contractor to implement the applicab3e BMPs �n the plan sheet � ❑ Temporary erosion controls to sfabilize all denuded areas until permanent erosion controfs are established. � ❑ � Delineate wifh field markers clearing iimits, easements, setbacks, sensitive or critical areas, buffer zones, trees and drainags courses. ❑�] Provide notes, specifications, or attachments describing the following: • Constructiort, operation and maintenance of erosion and sediment contro(s, include inspection frequency; ■ Methods and schedule for grading, excavation, filling, clearing of vegetaklon, and storage and disposal of excsvated or cleared material; • Specifications forvegetafive cover & mulch, include methods and schedules for planting and fertilization; • Provisions for temparary and/or permanent irri ation }� ❑ Pertorm ciearing and earth moving activities only. durin dry weather. ❑ j�, Use sediment controis or filtration to remove sediment when dewafering and obtairi all necsssary permits �❑ Protect all storm drain inlets in vicinity of site using sediment controis such as berms, fiber ra11s, or filters. ❑. � Trap sediment on-site, using BMPs such as sediment basins or traps, earthen dikes or berms, siit fences, check dams, soil blankets or mats, covers for soil stock iles, etc. ❑ � Divert on-site runoff around exposed areas; clivert off-site runoff around the site (e.g., swa(es and dikes). �i ❑ Protecf adjacent propemes and undisturbed areas from construction irnpacts using vegetative buffer strips, sediment barriers or filters, dikes mulchin or other measures as appropriate � ❑ Limit construction access routes and sfabilize designated access points. ❑ j� No cleaning, fuefing, or maintaining vehides on-site, except in a designated area where washwater is contafned and freated. �1 ❑ Store, handle, and dispose of construction materia(s/wasies properly to prevent contact with stormwater �❑ Contractor shall train and provide instruction to all employees/subcontr•acfors re: construct(on BMPs. ' (� ❑ Control and pre�ent the discharge of alf potenfial poflutants, incfuding pavement cuttfng wastss, paints, concrefe, petrvleum products, chemicals, washwater or sediments, rinse water from architectural copper, and non-stormwater dfscharges to s#orm drains and watetcourses. Name of applicant completing fhe form:_[`� PE Signature: �,9� ��f---- Date: � E. CQmmenfs (For municipal staff use only}: --.-. i ,�- �,�-;,�., r i�� ,. �j ,��'ii�# J S� F. h� i Ca tror munic�pai statt use only): v Approved Decem6er 4, 2012 6 Any connection to fhe sanftary sewer system Is subject to sanitary district approval. � Businesses that may have outdoor process activities/equipment include machine shops, auto repair, industries with pretreatment facillfies. 3 Project Comments Date: To: From: Subject: Staff Review: March 28, 2014 0 Engineering Division (650) 558- 7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (65a) 558-7600 X Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Planning Staff Request for Design Review for a new, two-story single family dwelling with a detached garage and a special permit for basement ceiiing height at 1529 Bernal Avenue, zoned R-1, AP N : 026-034-050 March 31, 2014 1� Stormwater requirements are required to be implemen#ed at stand-alone single �'a'mily home projects that create and/or replace 2,500 sq.ft. or more of impervious surface. These requirements are in addition ta any City requirements. To determine if this projec# is subject to those requirements complete and return the attached "Stormwater Checklist for Small Projects." For additional information about these requirements please refer to the attached flyer "New Stormwater Control Requirements Effective 12/9/12" and by visiting the San Mateo County Stormwater Pollution Preven#ion Prograrn (SMCWPPP) website at: http://flowsiobay. org/fileslprivatend/M RPsourcebk/Section4/C3iNewRegsSmProjSep 2012.doc To obtain a checklist electronically, the document is available at: http://flowstobay.org/files/privatendlMRPsourcebklSection4/StormChecklistSmallProj Dec2Q12.doc 2} Any construction project in the City, regardless of size, shal[ comply with the City's NPDES {stormwater} permit to prevent stormwater pollution from construction activities. Project proponent shal! ensure ail contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use ihe attached Construction BMPs plan sheei to comp{y with this requirement. Electronic file is available for download at: http://flowstobay.org/files/privatend/MRPsourcebk/Section5/ConstBM PPIanJun2012. pdf 3) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://flowstobay.orglfiles/privatend/MRPsourcebk/Section8/ArchitecturalcopperBMPs .pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD Date: 4/1 J14 �-.,.,� C�nst�ructio� ��si 1VI�n�. � $AN MA7E0 COUNiYWIOE ������ ���C����js ����� J� .� � Water Pollution Constntction projects aze requu�ed to x�ntplement the stormwater best management racii PreventiQn PrQgram P ��s (BMP) on this pagE, Gean V��2er Hea;;ny cammv�;c�. as they appjy to your project, a11 year Iong. � � i `' • �.��, � � `�� �- ;k � �' i r� � U� �� 3 � .- i'i�, �� . :I•`�� � �.! � � � V � y. 1 � q. Nu1FIWa�Jprs yfalcriala ❑ Bum and eover sloei,yiles of mnd. dirt or aFer consmw�ion mamrini "'�1� u�7�x �.'hrn rain is fwectisi nr if no� a�tivcly y�inp uswl ..;�hq� IY dn.:. � Uae (bxidai t memx) mcVimed �antcr for Ausl camrot. fluaMaus Materiats ❑ Vbd all iwnrAnus marcriais nnd IW�rdmis aas�es (mc6 x� ���, W�s, ihinne� solven�. f I. 07. and alnifreezc) a K�wdance..iA+ ciro „ .. wumr. shm avd fcddn! rcg�ktioiu. O S�ore h�adous matarin� aod mrc�ea ;n n�nmr o6ht canmtners, slom u ayprop��e seeondm�, eonpininrn� pnd cover �Iwm a[ Ihc rnd oC �*em uw4 Uay or Anriup n�n rvoa�ha � R6a� nin is finecost, ❑ FoIWu� roAn�d�� e��Ikafiw in41roo11ons fot hma�dous mn«riWc a�xl be ccsA�I not m ux more uma nttcssm.. Do nd a�plr chem:wl�a„��„ ���� Nn iz facc�[ auhin 29 Irairx. Q M�'ae ��VP�Y+ex disy�nl oCNI I��dam was�es. Wnsfc ManaFcoiant ❑ Covec sxule di��osal cmNnir.ns tcnircly w•ilh wq al lirc rnd of e�cp wwk Qa� u�d durins met n'�nther. D C6eei; xaAe a��pose� �onrnfnenlreqrtcnUy ta Ie�t3 and b make w�e they me nw o�erGlled. Ne�xr 4ase do.rn n dm�Pymr m U�e rmCGncUoo SUC O Cinn aritrlmx poRyblc loilcis. uM inspecf �h¢m Gequealh� for kdu emi sp�lb. ❑ Dispose af sll �vastn md de6ris O�+ti. Reeyclu ma�era4 and �'+�tas thaf mn bc vonxkd (socl� as uphalt. wncrc�c. nggrogn�o h,�c o.aerisb� .rood. GYV 6oad PTS ueJ Q Diapoac ofllquid.esidues Gon p.inb� Wmnen. aol.enn. C7wa. a�J ���g 6uiAs es Lunrdp�s nmk, C^netru<+bn Eoo-xnera anU Pulmeter ❑ Eslabli�h m�d nuiwuin eflLerive pmimqcr mn W Is aml �ta6fliu all �onmuoeoo cohn�a nna nsSts n r�lGcirn�.h connal masion und seaimrn� dieUm�es trom ,tm aud aae�ing ott sim. ❑�O�D °� "°�w+a an3' �hea uacting immcdiwclr a�W eeeu�a ���1 �� w pm�cnt fun6cr vacq ing. Ne•�er hose do�rn �veeu b cic�n up uwky�x. Eqttipment Nlanagement & Spill Control � Mninienanccw�AParking �� O 1Mi�ux un erel Gucd i.i�h aPProP�.te 6MPz Cor �zliwk ond equipnicrtt p�rtku�q end storaQe, O Perf'wm m jor maintenance, reqrirloty. and xhi�k and oqoipn�em wmhing oiFtiic. a u��4ay or �ehicta m�nxa�v�ce mos� be dooe onHle, nork m o bennep un anxT f� �o� �� nnJ o�er e d'ip pen 6i8 nwuQh �o calleet Ilnidy. Run-ck w Aixpme o{evids m h �n{wa �vas�e. ❑ lfvchioleorequqnnen�.ck�ningm�ntbe�ionemrha, ckm W�iN wmm� wil�• in e 6c�med an�n thm niil nm ollmv ri�e �.yecl ro+uu (nm �mcrs. etm�Ix slmm d+�aiz arsurFicc wnters, ❑ Do fwl ckan mhicic or cqWp�qpnc muhe osing aoops. p�ne sol�eu(S, Q�Fn.psen. i[e W� ekanu�N �9��O�trc.nl. o1C 51�� pRYcnNon 0.nA Con{rol ' 4 Ktty�irilfolmmipmaicrials(iaSf..bsa6en�s.cicJ .wikbk ai Um ronsincri� siie a ap fimu � ��spect �ehido and eqiup.�cm fi�qumtly f� a�M �cpuir (� p�pyy. Uso drip pmw to m�ch Irnks Yilll( R�IoiA c�C ItlGd�. � c In,u w N� or ku:, tmmmuhl} wd Nsp„e ur lea�.yip.u.arteb p�rl7_ ❑ Da �rot Iw:c dm.n sm(ncea mh�e uwida M�e spiikd Uu dn� ckanup mqhods (absorhenl mnbi�G. wt cinv, unNa mgs1. . ❑ &Cccpup�pilkddrrmalcriWimmed'ukle.bonol aT m va�� �M1cm nn�a}' wip� wnm. Q Mv' Ihem. ❑ L�Iton p sPillr on dirt Neoe 6�' di8[M6 ��p �d PcopvW dispo�lns otwnmmi�ue� soi1. ❑ ReP�t c(p,mfiqnt apiAa io�medioRly. Yw am retp�cd b�� In. io rcport uU aigiile,nt ieleases AfAarzMons mruia�, i�wloding oll. To �cpon a sPill: q Dial 911 w yoi.. bcii anerty¢r �eqonsa nwnhcr. A Call Sk (3o�xmm'� Of9ce of Emuga�4' Srndca� W nine Crniv. (E00) BJ&7530 (2J 4ours). Storrn drain �arth�vork & Contanainated Soils , , �' �'� a+�:..—� , _ � ���_'�. -_� m� _ = . . n .... ....,. ...�.. �y^C�.�^'bn�:._�' Groslon Caoi�al ❑ SG�W�Je 9mAins md c uentiort ��ar1: Cw �' ��wlhcrm�ly. O Sia6ilae all de�wded omss, insmll and maintain rcmporery woim conwls (such o� wiion eonaof hhit orboaded fibcr mm+bt) unel.egelodu� iumloblialcQ ❑ SeeJ a pl«u �•egemuou for e�os;on mMd on sfopes or Mw� mvyvcy�� Is not Immdirlcl. piumcd. SeAirxm Con�rol ❑ P��Yawm dmin inld�. g�mca. di¢liea, ud Gnirv�ge cwrtn ni�h npprop�m BAiPs. +HeL m Ern��el.ysR- Ghm �olls. bcmis, ok. ❑ P�cveucsediman[6vmmi�r�fnYoflutc DT insinlling �nd maimeining �edi�uat e�W Ii suc6 x 66er 1olls. sill frnees or acdlmco[bevnS ❑ KceO eewvakd soil on We aih ni�erc n ..ili no� cull<q �o We weo� m ❑ Tnn�fer cx.n�ed muerials � dump oacFs on IAe site. np[ in Ihe ehcel. ❑ Con14�IM1ld$p115 � Vnoqof�hcfollo�rSnewndiva�smc u6aared. tea faoonmmineaon and cm�mct Jm Rcglmal Weia Quati[y Condol Boncdd � ■ Uiwa.l soil cuuditio„�, dixalomtiq4 urador s ALudoncdm�derqound tnnks. ■ .tibandoncd am�ls ■ Buried bmek debrie, "w unsli Paving/,�1 sphalt i�ork a awwpovinc.owacot000tineinx2l mn�her. or+vha rain ic fo�eust befo�e trah p��emen� ivlll hnx lime m cure. ❑ cmR:m�,nd�,����,,,,annw,ow ,.6cn opp�y9np sm� omi ncF w.�.k�rc�. � �Og su� etc. o cw�c�a�,�teo�.poroe���y dicpoee OCo;aFf ab.asi.0 pa�d o! furd. Do NOT.m'cep or �vsL It imo euqca, ❑ Do mt nsn ��rotu io rasL down lrcsh n�p)mlt mnc�¢ pe�col Sawt tt6�Y�A+OhalUCanuc(eRcmp�•a1 � Complctelr co�xr or hacricadc smmi amt��..m�nm..�wm�e uRnutr Cabric. c.Ich bn;o ink� fihrn. or �a�•cl MR m lxp clum ovt nf thc sroim drxin a7nem, ❑ Shmx4aboeorb.ar.yeuu�nnn�en� .Lvry.od dicaote oialt n�azrc n won n)'oo .m flniched In orm Ioraiion or �� mc rn3 or mch worl my (v�hicM1cver if roonW). ❑ I(s�nvn[ durt�• �wters e enich haiR clen 111iP NIIIIfdj9lC�f, Concrcte, Crout & Naa�(��� AppLcadon �� �� ��rz,�`s— . " .���.iL����� � s f ❑ S�me eo�k+c+e, 4W� and monar under w. r, an p.11cu.nd a�rny froni ya;,,�ge o�+.'�M1� ma�erials n�ust nc��cr rc�cl� n norn� dru'n. ❑ Wis6 w� emmve eqwp„�rno'wrJ,W offsi¢ a� 7n a contained area, so �hae is no ��.,Sc ii�m ihc m�dcrl��ing mil or onro sa�ra,�� ce aw. L�i �o�rem �uNNc� �d d'npos ofoi �arba6c ❑ CMlcu�hc �casii wamr Gom masl�ing f�0o+ � agkrcga�c wrrc�cte anG rwo�c ii �ropriai<disposal oKsi�e. Dew•atering . ������� n ❑ ElTrai�+elr mau�e dl .un.oa a�i funolT�ritAin 1Fe eit¢. a�y all rarwif(�.� diRJmrg�e fmm 1f�e d�e. Di.�er� rvn.on �vnu fmm oll'ni�c anay from ap diuwbcd areas or ol4crnise ens�uc r4mplianm. ❑ �5'hrn Arn•�krin�, naif anA ohuin +PPa'+I f � ��e IcKal m�micipeli�. Lu �e disclnrpiny na�u ia . saco gmia o s�onn enin. Filaanon ordi.�crsion Wau�y a buv�, nny-, or sedimcni ir p .+� b rcqni¢d. ��nmeavofkno..wco�.c i�uon.�cn;nt rt requircd prwr io renr �� dis�lw�.e of groundwalec Conmh u•iA d�c Hng;nec iu daem, o �.�m� n�e �: roq��roe ��e La�� ia'imemrcl reculu. Con�.v�i;na�rd gm�md.�vlv nos� bc ircaicd a ImW W oe'�ife tor p�opv aupoiei. be liable for fines of up to $Z0,000 pe�- day► Painting & paint Removal - `;;.` ` � .��y\_ '* _ rai���.,x a�an�� � Nc.•v cican bnirl�cs ornnzc piini �OIIIOlIMJy I010 � SUCCC �IIM. Sltyth dni su� cc natcrs. � fxo��Ncrl+areC painls. p.im p�� hmshcs lo Jie e��ta1 pouiblc, µ�nR fo {�o S0"'�'' x^�U o�c �au �e�e gainN pvmi sian fmm U,c lool n��smwvkr immnKm autl�ori�.. Nc�cr pa�r vnim dmrn n drau�. O For d1-Gecd pa;nu wior «n b.us6o �n Ihc oum possihlc and elenn rit6 iku.�cr or w1 ��cm in � �xyn.Y munu�cr. Flicr �Nd ruuc ihim�ers and mlcrnis. Dispvse of ¢sidne end uu�ble Ihinner,'solrems aa 4o..rdouc �aHe Pain� rcreu�.��� � Chemical ptin� spiOpi�B 2sitloe nnd 4�ips ond dun lrmn muinc � in(s nr p�� �x cunmimxC �nd a rribupqan m,m be d"upnsed of.s ha>ardo�s �.vtc a r ��� a,��. ,,,,a d�m r,u�„ �wn-nn»nia�s dry strippinF y,d snnd blonin� n�av 6c n`cv� ��n � coueaca in nL�siic amp .:�e�hs �nd disposW ofu lmslt L.andscapc Materials � ,x..t rR� . . '� '���:\`c :�•j L-,',` ❑ Ca.pin ha{�pflc� L n�ving ma�eriols l+r siorinr J.em w�dtt m�n �rhtn tM1c�' aR �a aniwle bcingiaed. ❑ Smek cro6fAle lan�supe nl�ter'ul ow palicls. Co�c(or ilore �ieu ma��ats n'hcn Ihn' are �W acli�xh• 6cins uscA or appl�cd. ❑ Oisconu„ue appli�vnon afonc crodiblc lmtds�p� mel<�ul u�iJ�in ; Jo�•y p�loR � fo�cun nin crcn� or during .�ct ..c�U�u. � !AN MA7EOCD1INTTM'IDC WaterPo��ution Prever►t�on Program �.,,W,�., H„H„4��„���y Requirements ior Architectural Copper Proiect water quality during instailation, cleaning, treating, and washing! Copper from Buiidings May Harm Aquatic Life Copper can harm aquatic (ife in San Francisco 8ay. Water that comes into contact with architecfural copper may contribute to impacts, especially during installation, cleaning, treafing, or washrng, Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, fhe rinse water is a saurce of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Use Best Management Practices {BMPs) The foliowing Best Management Practices (BMPs) discharges t� storm drains. must be implemented to prevent prohibited During lnsfallation • ff possibie, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the followina BMPs� o Discharge the rinse water fo landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed, o Coflec# rinse water in a tank and pump to the sanitary sewer. Confac� your local� sanitary sewer agency be�`ore discharging to the sanifary sewer. o Coflect the rinse water in a tank and haul off-siie for proper disposal, • Consider coa#ing the copper materiafs with an impervious coating ihat prevents further. corrosion and runoff. This will afso maintain the desired color for a longer time, requiring less main#enance. � During Maintenance Impfement the fo!lowing BMPs during routine maintenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain inlets as needed to prevenf runo�f from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the locaf sanitary sewer agency). If this is not an option, haul the wash water off-site for proper dispasal. Protect ihe BaylOcean and yourself! !f you are responsib(e for a discharge fo tne storm drain of non- stormwater generaisd by installins, cieaning, ireating or washing cepper architecfural features, you are in violation of the municipai stormwater ordinance and may be subject to a�ne. Contact information The San Mateo Countywide Water Pollution Prevention Program fisis municipa! stormwater contacts at www.ffows#obav ora (click on "8usiness", then "New Development°, then "local permitti�g agency"). _ _. _ ... • i il � I FINAL Febr�rary 29, 2012 gurter and drainpipe. proni,ortea a�rscharge. The water must be pumped and disposed of praperly.