HomeMy WebLinkAbout1440 Cabrillo Avenue - Resolutionr
f
RECORDING,REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2012-140817
11:40 am 09l27112 R1 Fee: NO FEE
Count of Pages 14
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-Count Cierk-Recorder I
������',�����'������I���������� i���'������'����I���������������I���
I IIIII 5 0 0 2 4 1*
* R 0 0 0 1
Resolution No. 44-2012
1440 CABRILLO AVENUE — APN 026-041-130
TITLE OF DOCUMENT
�
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
Date: September 21, 2012
Wi iam Meeker, Community Development Director
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
Desiqn Review for a new, two-story sinqle familv dwellinq and detached qaraqe at 1440 Cabrillo
Avenue, zoned R-1, Otto Miller, P.O. Box 121, Burlinqame, CA, 94011, propertV owner, APN:
026-041-130;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
September 10, 2012, at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commissior that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is
no substantial evidence that the project set forth above will have a significant effect on
the environment, and categorical exemption, per CEQA Article 19, Section 15303 (a),
which states that construction of a limited number of new, small facilities or structures
including orie single family residence or a second dwelling unit in a residential zone is
exempt from environmental review. In urbanized areas, up to three single-family
residences maybe constructed or converted under this exemption.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review are set forth in the staff report,
minutes, and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
Chairman
I, •(�!'i� !� , Secretary of the Planning Commission of the City of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a
regular meeting of the Planning Commission held an the 10th day of September, 2012 by the
following vote:
1440 CABRILLO AVE. - RESO 44-2012
AYES: Auran, Cauchi, Gaul, Terrones, Yie
NOES: None
ABSENT: None
RECUSE: Sargent
ecreta
EXHIBIT "A"
Conditions of approval for Categorical Exemption an� Design Review.
1440 Cabrillo Avenue
Effective September 20, 2012
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped August 29, 2012, sheets A1.1 through A4.1, L1.0, L2.0 and Boundary and
Topographic Survey;
2. that any changEs to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staf�;
3. that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
4. that the conditions of the City Engineer's July 10, 2012 memo, the Chief Building
Official's June 28, 2012 memo, the Parks Supervisor's June 28, 2012 memo and July
27, 2012 memo, the Fire Marshal's June 25, 2012 memo, and the Stormwater
Coordinator's June 26, 2012 memo shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site
EXHIBIT "A"
Conditions of approval for Categorical Exemption and Design Review.
1440 Cabrilla Avenue
Effective September 20, 2012
sedimentation of storm water runoff;
11. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2010 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
14. that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be sr,heduled;
15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
16. that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.
Project Comments
Date:
June 25, 2012
To: � Engineering Division
(650) 558-7230
❑ Building Division
(650) 558-7260
❑ Parks Division
(650) 558- 7334
From: Planning Staff
❑ Fire Division
(650) 558-7600
❑ Stormwater Division
(650) 342-3727
❑ City Attorney
(650) 558-7204
Subject: Request for Design Review for a new, two story single family dwelling
with detached garage at 1440 Cabrillo Avenue, zoned R-1,
APN: 026-041-130
Staff Review: June 25, 2012
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
3. Applicant is advised to call City Arborist regarding possible relocation of
sidewalk area around trees in the planter strip.
Reviewed by: V V
Date: 7/10/2012
P�TTBLIC WORKS DEPARTMENT �I�GII1TEERING I)IVISIOl�I
PLAIVNING REVIEW COMIVIENTS � � I�� �P'�
Project Name: `'����3d.� ��i�'Y c��ct,iw
I' ,
Project Address: 1 � ����'U
The following requirements apply to the project
1 _� A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features a�1d utilities. (Required prior to the
building permit issuance.) 4Vvr"�(�� �.f�tls iti f� ��G! �n I�%
� ��fi�F�/' r�c� S'�t�'�.✓���r� •
2 _� The site and roof drainage shall be s�own on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building peimit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
�� ��-�..�'
5 _��� anitary sewer lateral � is required for the proj ect in accordance with
the City's standards. _ )
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the proj ect.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Page 1 of 3
U:\private development�PLANNING REVIEW COMMENTS.doc
PLTBLIC '6��R.KS I)�PARTMENT ENGI�IEERING DIVISION
11. A latest preliininary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12 Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 ,� The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project inay cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
1 g Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 No construction debris shall be allowed into the creek.
20 �_ The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development\PLANNING REVIEW COMIvIENTS.doc
�'iT�LIC �V�R]KS I)EPARTMIEl�T �NGINEE12Yl�TG T)IVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:\private development�PLANNING REVIEW COMI��NTS.doc
� Project Comments
Date:
1�
June 25, 2012
o Engineering Division
(650) 558-7230
� Fire Division
(650) 558-7600
� Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
X Building Division
(650) 558-7260
Q Parks Division
(650) 558-7334
From: Planning Staff
Subject: Request for Design Review for a new, two story singie family dwelling
with detached garage at 1440 Cabrillo Avenue, zoned R-1,
APN: 026-041-130
Staff Review: June 25, 2012
1)
2)
On the plans specify that this project will comply with the 2010 California Building Code, 2010
California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California
Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in
Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00
p.m. on December 31, 2010 then the building permit application for that project may use the
provisions found in the 2007 California Buiiding Codes including all amendments as adopted in
Ordinance 1813.
With your re-submittal provide documentation (GreenPoints checklist, LEED checklist, or
other , as described below, which shows that this project will comply with the City of Burlingame
Green Building Ordinance. Note: Compliance with the City of Bur[ingame Green Building
Ordinance is required unless specific land use provisions for the project are approved by
the Planning Commission prior to 5:00 p.m. on December 31, 2010.
"A permit applicant is required to submit a completed checklist of the proposed compliance
measures for the project at the initial submittal to the Planning Division for projects requiring
Planning Commission approval. If Planning Commission approval is not required prior to Building
Code plan check, then an applicant must submit a completed checklist of the proposed
compliance measures directly to the Building Division at the time of the initial Building Code plan
check submittal. A GreenPoint Rated checklist, or equivalent, with a minimum of fifty (50) points
shall be accepted as one method of ineeting compliance with this ordinance. Applicants are
encouraged, but not required, to meet with City staff prior to any application submittal to review
the green building program and details to achieve compliance with this ordinance.
The means by which compliance measures are achieved shall be by Build It Green
"GreenPoints", LEEDO, Energy Efficiency Standards, other recognized point systems, or
equivalent approved methods. LEEDO projects must verify that they exceed the 2008 Energy
Efficiency Standards by 15% (Title 24, Part 6.) Compliance measures shall be approved by the
Chief Building Official prior to issuance of a building permit. Projects must show verification of
energy savings which exceed the 2008 Building Energy Efficiency Standards (Title 24, Part 6) of
the California Building Code by 15°/o.
Projects using the performance approach may use an Alternative Calculation Method
(ACM) approved by the California Energy Commission to show verification of the required energy
savings of 15°/o by comparison of the proposed building to the Title 24 standard or "budget"
building."
Green Building information can be found on the City of Burlingarre website in the Green
Building tab of the Building Division page at: http://www.burlinqame.org/lndex.aspx?paqe=1203
3) On the plans provide a copy of the GreenPoints checklist for this project at full scale.
4) Specify on the plans that this project will comply with the 2008 California Energy Efficiency
Standards.
Go to http://www.enerqy.ca.pov/title24/2008standards/ for publications and details.
5) Place the following information on the first page of the plans:
"Construction Hours"
Weekdays: 7:00 a.m. — 7:00 p.m.
Saturdays: 9:00 a.m. — 6:00 p.m.
Sundays and Holidays: 10:00 a.m. — 6:00 p.m.
(See City of Buriingame Municipal Code, Section 13.04.100 for details.)
6) On the first page of the plans specify the following: "Any hidden conditions that require work to
be performed beyond the scope of the building permit issued for these plans may require further
City approvals including review by the Planning Commission." The building owner, project
designer, and/or contractor must submit a Revision to the City for any work not graphically
illustrated on the Job Copy of the plans prior to perForming the work.
7) Anyone who is doing business in the City must have a current City of Burlingame business
license.
8) Provide fully dimensioned plans.
9) This project will be considered a New Building because, according to the City of Burlingame
Municipal code, "when additions, alterations or repairs within any twelve-month period exceed
fifty percent of the current replacement value of an existing building or structure, as determined
by the building official, such building or structure shall be made in its entirety to conform with the
requirements for new buildings or structures." This building must comply with the 2010 California
Building Code for new structures. BMC 18.07.020
Note: Any revisions to the plans approved by the Building Division must be submitted to, and
approved by, the Building Division prior to the implementation of any work not specifically shown
on the plans. Significant delays can occur if changes made in the field, without City approval,
necessitate further review by City departments or the Planning Commission. Inspections cannot
be scheduled and will not be performed for work that is not shown on the Approved plans.
10) When you submit your plans to the Building Division for plan review provide a completed
Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be issued
until a Building Permit is issued for the project.
11) Show the distances from all exterior walls to property lines or to assumed property lines
12) Show the dimensions to adjacent structures.
13) Obtain a survey of the property lines.
14) Indicate on the plans that exierior bearing walls less than five feet from the property line will be
built of one-hour fire-rated construction. (2010 CBC, Table 602)
15) Rooms that can be used for sleeping purposes must have at least one window or door that
complies with the egress requirements. Specify the /ocafion and the nef cfear opening height
and width of all required egress windows on the elevation drawinqs.
16) Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of
Public Works.
17) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are
considered in calculating the allowable lot coverage. Consult the Planning Department for details
if your project entails landings more than 30" in height.
18) Provide handrails at all stairs where there are four or more risers.
19) Provide lighting at all exterior landings.
20) The fireplace chimney must terminate at least two feet higher than any portion of the building
within ten feet. 2010 CBC §2113.
^_,_ .................. ._.., _ � -
Reviewed b`�y�"-` � ��` � �! Date: 6-28-2012
i
[/
Project Comments
Date:
June 25, 2012
To: � Engineering Division
inr_n� �r_n �n�+�
( O�Vf ��O-/ L3V
� Building Division
(650) 558-7260
i� Parks Division
(650) 558-7334
From: Planning Staff
Fire Division
(v�vj ��o-i Svv
� Stormwater Division
(650) 342-3727
� City Attorney
(6501 558-7204
Sub�ect: Request for Desiqn Review for a new, two story sinqle famil_y dwellinq
with detached garage at 1440 Cabrillo Avenue, zoned R-1,
APN: 026-041-130
Staff Review: June 25, 2012
�•�
�,� Site plan needs to include existing trees on property and indicate if any trees
are to be removed.
2. No tree over 48" in circumference measured 54" from ground may be removed
without permit from Parks Division (558-7330)
( 3.j Landscape plan required, and must include three (3) landscape trees, either
�� exisiing or new.
�� Landscape plan is required to meet `Water Ccnservation in Landscape
Regulations" (attached). Irrigation Plan required for Building permit. Audit due
for FinaL
V�/l�►z- �'-G�S�'R�V- Ul-��s-is't �'NP � �iuC� ���$,t/ d�-
D 8 �'r�r� ���1?��" WDt�K. � (�c/ «
��-- I�ti10 �r��.— 6-� �3d � D �-
Revievved by: B Disco
��a� -f i�C�s ,� ! �. I
��� ���� ����
Date: 6/28/1�� '%/� `�-
UUTD04R WATER USE EFF1ClENCY CHECKLISi
t certi �t�bJect proJect ,.e�ts the specifi�d requirements of the Water Con ervation in Landscaping Ordinance.
� .�i� C.'- '" `s► � 4 Gi�
gnature Date
..N2i. 'd': � F.�: i�•;.1�.(:;�� 5!�...�t :1! .^!�� '.1�'S�-�' • 1 c' ' �.��v _ '
p ,.� �ri`j,. :Ir: .l>C�'A�-1��.. .j-r.ia.� .:�1.:��'�• 1;�titi'�\�w.l:: • �:'(�:�:fI4���V,. "'Y.
(� :,=�• i.. '�f!��> . ,j1'i. . �. )i.'"�'(i�� 'r,�. �r Sl:�' :�•'tiiOYt.'r•P����J( .�-J �?u;r': .ti�t' � �:,�� -)'. �i.'...:n'
U � ��V•� a � �nr�;= -�.�n �.�:, c,�.. ..y.:_ ,r� ���ti11<..#�.�,j..j. . �... _ ::1':.i; . �, . .. . ' ,- , _ -
� �.. f `� � . - • - i =_ ;::: .�,� :�., r. _ : �.,, �;
��.. r�tr/3-��.�•i.. ..•��. :f:: ���'..:ay:.�'�fyj]',- _ ',�;�..;,1 ..�. ":.i,,f,-�:.)e. �.L'�f':�;t;u1. r ;l..�%'''=i'�il=:=:4�c�=:e,•;�i:.�
- - ^.f n:' 'i: �'�J7_ .-<i�:� � ��.i:,... _x�.Y;',�., - ,i...
5cn.
Singi2 Famlly 0 Multi-Famlly O Commercial ❑ Inst(tutlo al 0 Irrigation only•❑ Industrial O Other:
Applicant Name {print): Contact Phone tt: . �• Z �
Project Site Address: Q G���( � � :;�Agency'Revl�v+r':
Project Area (sq.ft. or acre): � of Uni[s: u of Meters: � '(F?assl'�- r(Fail}:��
�i° ��t� r I�1;,�1.! J�i( ` <�'�7�. �G�,r0�r1i: TOi landscape Area (s �. _ �.�.�.`7)'f FjC G ��': 6lLiS. e w�� ip.':.:.:.... ">``- :_-. ;' _.
. �' -� � r . � � '�'l' q' 1' . ,S-ri I_?' • � c�-� �''r ❑ ,i;
1.,v• , ,,t 4 � . . }-t� + %� � t r,4'; :. y , i (, � �
��r{ r '" S � � �Jl ri j ' f��;y , t '�•- '�`
)C'_'�����jy�,�.��`?,�1���e���� ���� � � ��1'-r�.��at�Zl ._`�lJe�J.�!f[F�f. .:L '. I.:.� � ;i.��'
-�r /.'^ r
;������:L�,t'���r_�1������i�7i��s?33 Turf Irrigated Area (sq.ft.): � . - .
��'�l���.t�t"� 3��,�'ti<<����C`�l � 4 �• � '
?, � � E �2� � sr y� ;�`t Non-7urf irrigated Area {sq.ft.): i ,, :Q'�'_.,.; ,❑ ;�,,;_
��fi' ��°j.�Cl.���47jt1,E L.{!�,!7 : ...,.-:.
� �` � o f�,��t�� � y� Special Landscape Area (SLAj {sq.ft.): SC9''�� 0��_
�.-�,tl � f�• ��j trr ---- : ;:�",
'"' � ��r;�i �';,°^�::�*:?"?�;=:���'`.l';x�' Water Feature Suriace Area (sq.R.): � '"'t`;;; �;;'�:`�;�_''�-�
�I�.�3;i:r;;..�':.:< �r, �� i s��.l,< .;�r
=t .
- •:: =,. -� —•,i — - �;y.;:• :1�: ":��:' = ��,: - - - - - _ _ -
=r.�-���i'^ - — - 'i-::�: -
�i -
�c� i - .�:
i �� �
)!� { � �i :I:.::l� - "�
; �J'• i��`� -:�-:;r;` ; �� '�'�-c'< <5�'�`s �-,� :-��:,;;::.�:
�-�►l..�x�-.lJ���l��i`i�:��?�: ,:��:�.I,�.�ti,.!_.t..,�:'.,-.;: �,,::.� �i�t� ,.��_j�.�-u, �.Jiia:.2iJ.--.�...���:;:;`:: ":, _
.�.
iurf Less ihan 25°6 of the landscape area is Yes ��;� C�'`�: �,0;�;,
turf 0 No, See Water Dudget ;z�� '} ,���4i� -�::,�<•,•'
All turf areas are > 8 feet wide es ;';;A;;��;;;�_;;;'p [
All turf is planted on slopes < 25% es �:�.�:'•`�� -;.�1'`>:,;
Non Turf At least 8096 of non-turf area is native es "�`"`•';; :;�'_Q:-`'; il
; �: . : . � . 1'_
or low waker use planis O No, See Water Budget �' `��•�' ='� ���`=��<
`•'� _::_.:,,;:,..;,,:;
N drozones Plants are rou ed b H drozones es -.`���:.�; ;'-; :�;,:/.i
Y � P Y v G"'�'
Mul�h At least 2-Inches of mulch on exposed Yes �:�": ��:;t; ;';C�;;`�i
soil surfaces _����,:=::'= ``.'" :.i
IRfgation System Efflciency 70% ETo (10046 ETo for StAs) Yes :-':�`;� �s'.'.Cl:�•;,.:.�
No overspray or runoff es ?�� J r`�<��-`;,:�GI;;:'r;':
IrrigatEon System Desfgn 5ystem efficiency > 70°6 es "`, �=�Q�:;;;
Automatic, self-adjustinQ irriaation �No, not required for Tier I �� `.�';=' _-=:.;::�D,:S�: ;
O Yes �`''"
controllers -
Moisture sensor/rain sensor shutoffs es :��%t�t"`�`;;�;.'';;;;:�7:';;';.
No sprayheads in < 8-ft wlde area es �"C�.'; '.`•;
IrrlgatianTlme Systern only operates behveen 8 PM Yes `�:�'•"T;���':;0`=�.�'.
and 10 AM ` - _
: �:'.
Metering Separate irrigaiion meter o, not required because < 5,000 sq.ft. ::"wt�':;`a :�D;'•; =`•
D Yes -�� ;'���:�"' ';:;
Sw(mming Pools / Spas Cover highly recommended ❑ Yes :�"��=;�;0:`:�'�
No, not required - J'''�_s;� -
WaterFeatures Recirculating D Yes -sc��,��:=:'�Gl�;;.�-
Less than 10% of landscape area Yes :;:s�q'"; ii;.'.;'..�';•'_0?i.:l:
Do�umentatfon Checklist Yes %�?�,I :i;�:
�
Landscape and Irrigation Oesign Plan ❑ Prepared by applicant �`'���`i�;'C]�; .�;
�i'repared by professional 't;:':c_:::=��:">`:'';::��:::'
Water Budget �o tlonal ❑ Prepared by applicant •='U�,�;==i:��:�;�=:;'=
-,:,;:•:-:,. .
0 Prepared by professional �:.r�;;�;a:;:;::=•::�:;:'''�:'=:
Audit Post-installatfon audit tompieted �Completed by applicant --8"�,.`�` �� 0�� .
ta Completed by professional . : ,. .
Project Comments
Date:
To:
From:
June 25, 2012
0 Engineering Division
(650) 558-7230
0 Building Division
(650) 558-7260
� Parks Division
(650) 558-7334
0 Fire Division
(650) 558-7600
Q Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Planning Staff
Subject: Request for Design Review for a new, two story single family dwelling
with detached garage at 1440 Cabrillo Avenue, zoned R-1,
APN: 026-041-130 �
Staff Review: June 25, 2012
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by: ,� ..,� � Date: .�. ,� ��•-�---j�
� .�%''� -
Project Comments
Date: June 25, 2012
To: � Engineering Division � Fire Division
(650) 558-7230 (650) 558-7600
0 Building Division X Stormwater Division
(650) 558-7260 (650) 342-3727
� Parks Division � City Attorney
(650) 558-7334 (650) 558-7204
From: Planning Staff
Subject: Request for Design Review for a new, two story single family dwelling
with detached garage at 1440 Cabrillo Avenue, zoned R-1,
APN: 026-041-130
Staff Review: June 25, 2012
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit to prevent stormwater pollution from construction activities. Project
proponent shall ensure all contractors implement Best Management Practices
(BMPs) during all phases of construction (including demolition).
When submitting plans for a building permit include a list of construction stormwater
pollution prevention BMPs as project notes and include them as a separate full size
plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached
Construction Best Management Practices (BMPs) plan sheet to comply with this
requirement. Electronic file is available for download at
http://www.flowstobay.org/bs_construction.php
(Scroll about half-way down the page and click on Construction BMP Plan
Sheet).
For assistance please contact Stephen D. at 650-342-3727
,i �`,
Reviewed bv: SD --� Date: 6/26/12