Loading...
HomeMy WebLinkAbout1245 Cabrillo Avenue - Approval Letter� � . CITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 February 23, 2018 James Chu Chu Design Associates 55 W. 43"� Avenue San Mateo, CA 94403 Re: 1245 Cabrillo Avenue Dear Mr. Chu, �._ CI_TY. ,;� , r �. �,f\���i�u; � COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the February 12, 2018, Planning Commission approval of your application for Design Review and Special Permit for building height became effective February 22, 2018. This application was for a first and second story addition to an existing single family dwelling and new detached garage at 1245 Cabrillo Avenue, zoned R-1. The February 12, 2018, minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 29, 2018, sheets A.1 through A.8, N.1, L1.0 and Topographic Survey Plan; 2. that the applicant shall submit an FYI for review by the Planning Commission prior to issuance of a building permit with revisions to the dormer on the left side, sheet A5, and with a revised roof plan that more accurately shows the detail of the roof well on the left elevation with the correct framing for the dormer; 3. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 4. � � that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that the conditions of the Parks Division's May 2 and December 27, 2017 memos and the Engineering Division's January 12, 2018 memo shall be met; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� . , � February 23, 2018 129 Bloomfield Road Page 2 7. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 8. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2016 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window lacations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �w � February 23, 2018 129 Bloomfield Road Page 3 The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, William Meeker Community Development Director Eric and Jennifer Lai, property owners Chief Deputy Valuation, Assessor's Office (LOT 11 BLOCK 30 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-171-050) File �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� � � ��T� o �s' ; :� 1 �1� .� o������ qnoNn� Project Address Description: From Project Comments - Planning Application 1245 Cabrillo Avenue, zoned R-1, APN: 026-171-050 Request for Design Revisw for a first and second floor addition to an existing two-story house. Martin Quan Public Works Engineering Please address the following comments at this time; provide a written response and revised plans with your resubmittal: i. . We have not received the Title Report for review. 3. No further comments at this time. The following comments do not need to be addressed now, but you should be aware of them as they will need to be addressed at time of building permit submittal. 4. Based on the scope of work, this is a"Type I" project that requires a Stormwater Construction Pollution Prevention Permit. This permit is required prior to issuance of a Building Permit. An initial field inspection is required prior to the start of any construction (on private property or in the public right-of-way). 5. Any work in the City right-of-way, such as placement of debris bin in street, work in sidewalk area, public easements, and utility easements, is required to obtain an Encroachment Permit prior to starting work. 5. All water lines connections to city water mains for services or fire line protection are to be installed per city standard procedures and material specifications. Contact the city Water department for connection fees. If required, all fire services and services 2" and over will be installed by builder. All underground fire service connections shall be submitted as separate Underground Fire Service permit for review and approval. �. The scope of work is substantial. A remove/replace utilities encroachment permit is required to (1) replace all curb, gutter, driveway and sidewalk fronting site, (2) plug all existing sanitary sewer lateral connections and install a new 4" lateral, (3) all water (ine connections to city water mains for services or fire line are to be installed per city standard procedures and specification, (4) any other underground utility works within city's right-of-way. 8. Please submit an erosion control plan. This plan shall include, but not limited to, delineation of area of work, show primary and secondary erosion control measures, protection of creek or storm drain inlets, perimeter controls, protections for construction access points, and sediment control measures. 9. Because the property abuts a natural creek, please add the following verbiage: Property owner improvements (deck, retaining wall, pool, shed, dwelling foundation, driveway pad, etc.) that are constructed within 25' of the creeks top of bank shall stabilize the surrounding area to prevent erosion due to stormwater discharge from the improvements. In addition, vegetation that may impact the creek must be removed and replaced with stabilized material. Please show all downspouts that are directed to the creek and proposed stabilization measures on the site plan or landscape plan. With the removal of the existing garage over the creek, the expectation is that the applicant shall remove any non-native material along the embankment and take great care not to disturb the hillside. If erosion is evident after removal of the existing garage, the applicant shall submit and detail a plan of action to shore the embankment. Reviewed By: Martin Quan Date: 1/12/18 650-558-7245 F, c�Tv � '`�;�1 ,1 �`,' ��, �o�`�,� 9p Project Comments — Planning Application Project Address: 1245 Cabriilo Avenue, zoned R-1, APN: 026-171-050 Description: Request for Design Review for a first and second floor addition to an existing two-story house. From: Bob Disco Parks Division Please address the following comments at this time; provide a written response and revised plans with your resubmittal: 1. Permit for removal of Port OrFord Cedar was denied in December 2016 because the tree was in good condition and there was no effort to explore a means to preserve the tree and eliminate the tripping hazards. Because improvements are being proposed on the property, the Cedar will be adversely affected by the new construction. The tree will most likely be approved for removal since the demolition and construction of the new garage and patio will damage the roots and cause the tree to decline. A new Protected Tree Removal Permit is required and attach the proposed improvements and landscape plan for review. The permit will not be approved until the Planning Commission reviews and approved the proposed project. The following comments do not need to be addressed now, but you should be aware of them as they will need to be addressed at time of building permit submittal. � Reviewed By; BD Date: 12.27.17 bdisco@burlingame.org � CITY � �� � :�' �� �`;�r� �. ��'— ., _ Project Address Description: From Project Comments - Planning Application 1245 Cabrillo Avenue, zoned R-1, APN: 026-171-050 Request for Design Review for a first and second floor addition to an existing two-story house. Bob Disco Parks Division Please address the following comments at this time; provide a written response and revised plans with your resubmittal: Permit for removal of Port Orford Cedar was denied in December 2016 because the tree was in good condition and there was no effort to explore a means to preserve the tree and eliminate the tripping hazards. The City Arborist cannot approve removal since the tree is in good condition and has good structure. Roots are lifting patio but this tree does not meet the criteria for removal. Planning Commission should discuss options for retaining or removing tree. The following comments do not need to be addressed now, but you should be aware of them as they will need to be addressed at time of building permit submittal. Reviewed By: BD Date: 5.2.17 558.7333