Loading...
HomeMy WebLinkAbout1243 Cabrillo Avenue - Approval LetterCITY OF BURLINGAME City Hail — 501 Primrose Road Burlingame, California 94010-3997 iG ET �rj� l.i ' r� ' -�� � •te ' : °..e •D � COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Corrected Copy December 22, 2010 August 28, 2007 Mark Robertson 918 E. Grant Place San Mateo, CA 94402 Dear Mr. Robertson, Since there was no appeal to or suspension by the City Council, the August 13, 2007, Planning Commission approval of your application for an Amendment to Design Review became effective August 23, 2007. This application was to allow for a first story addition to a single family dwelling at 1243 Cabrillo Avenue, zoned R-1. The August 13, 2007 minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Department, Sheets A1, A2, A6, A7, L1.0 and Sheet 1, Boundary Survey (date stamped July 24, 2006) and Sheets A3 through A5 (date stamped July 16, 2007); and that any changes to building materials including window type, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; that 6" x wood knee braces and 2" x 4" corner trim shall be used; that the citrus trees along the left side property line adjacent to the concrete patio at the rear of the house shall be replaced with large scale evergreen shrubs, such as Bay Laurel; 2. that the conditions of the Chief Building Official's April 10, 2006, memo, the City Engineer's April 10, 2006, memo, the Fire Marshal's April 7, 2006 and July 30, 2007 memos, Recycling Specialist's April 24,2006, memo, and NPDES Coordinator's April 10, 2006, memos, shall be met; 3. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 4. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; 5. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: August 28, 2007 1243 Cabrillo Avenue Page 2 the certification under penalty of perjury. Certifications shall be submitted to the Building Department; 6. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; 7. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; 10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and 11. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. One extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, , ^ ,��� ��� '�, William Meeker Community Development Director C. Frank Knifsend 1243 Cabrillo Avenue Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (LOT 12 BLOCK 30 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-171-060) File :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: , Project Comments Date: To: From: Subject: Staff Review: July 26, 2007 ❑ City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 ❑ Recycling Specialist (650) 558-7271 d Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Planning Staff Request for application for design review for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-050 July 30, 2007 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Reviewed by: '' � Date: � - 3 a - b� Project Comments Date: To: From: 04/07/2006 ❑ City Engineer X Chief Building Official ❑ City Arborist ❑ City Attorney ❑ Recycling Specialist ❑ Fire Marshal ❑ NPDES Coordinator Planning Staff Subject: Request for design review, parking variance, side setback variance and front setback variance for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-060 Staff Review: 04/10/2006 1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame Municipal and Zoning Codes, and all other State and Federal requirements. 2) Provide fully dimensioned plans. 3) Provide existing and proposed elevations. 4) Provide a legend that indicates the existing walls, walls to be demolished, and new walls. 5) According to the City of Burlingame Municipal code "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." Therefore, this building must comply with the 2001 California Building Code for new structures. 6) Comply with the new, 2005 California Energy Efficiency Standards for low-rise residential buildings. Go to http�//www enerqv.ca.qov/title24 for publications and details. 7) Roof eaves must not project within two feet of the property line. 8) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. 9) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable floor area. Consult the Planning Department for details if your project entails landings more than 30" in height. 10) Provide handrails at all stairs where there are more than four risers. 11) Provide lighting at all exterior landings. 12) The fireplace chimney must terminate at least two feet above any roof surface within ten feet. Note: Show compliance on the plans with items #7 &#8 above prior to moving forward for Planning Commission approval. Reviewed bt��-------'—" � (? .'� ��/� Date: /��o �o � Project Comments Date: To: From: 04/07/2006 r� City Engineer ❑ Chief Building Official ❑ City Arborist ❑ Recycling Specialist ❑ Fire Marshal ❑ NPDES Coordinator ❑ City Attorney Planning Staff Subject: Request for design review, parking variance, side setback variance and front setback variance for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-060 Staff Review: 04/10/2006 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. Replace all displaced/damaged sidewalk, driveway, curb and gutter. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 4/10/2006 Project Comments 04/07/2006 Date: �� ❑ City Engineer ❑ Chief Building O�cial ❑ City Arborist ❑ City Attorney Planning Staff From: ❑ Recycling Specialist [� Fire Marshal ❑ NPDES Coordinator Subject: Request for design review, parking variance, side setback variance and front setback variance for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-060 Staff Review: 04/10/2006 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide double backflow prevention. 3. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Reviewed by: ��-- � Date: ��',,,���� 0 Project Comments Date: To: From 04/07/2006 ❑ City Engineer ❑ Chief Building Official d City Arborist ❑ City Attorney X Recycling Specialist ❑ Fire Marshal ❑ NPDES Coordinator Planning Staff Subject: Request for design review, parking variance, side setback variance and front setback variance for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-060 Staff Review: 04/10/2006 Applicant shal! submif a Recycling and Waste Reduction Plan for approval, and pay a recycling deposit for this and all covered projects prior to construction or permitting. Reviewed by: Date: '� � a � Project Comments 04/07/2006 Date: � � City Engineer � Chief Building Official � City Arborist � City Attorney Planning Staff From: � Recycling Specialist � Fire Marshal � NPDES Coordinator Subject: Request for design review, parking variance, side setback variance and front setback variance for a first and second story addition at 1243 Cabrillo Avenue, zoned R-1, APN: 026-171-060 Staff Review: 04/10/2006 1) Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution including but not limited to ensuring that all contractors implement construction Best Management Practices (BMPs) and erosion and sediment control measures during ALL phases of the construction project (including demolition). Include appropriate stormwater BMPs as Project Notes. These BMPs include but are not limited to the following: • Store, handle, and dispose of construction materials and wastes properly to prevent contact and contamination of stormwater; • Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, wash water or sediments, and non-stormwater discharges to storm drains and watercourses; • Use sediment controls or filtration to remove sediment when dewatering site and obtain all necessary permits; • Avoid cleaning, fueling, or maintaining vehicles on-site except in a designated area where wash water is contained and treated; • Protect adjacent properties ar�d undisturbed areas from construction impacts using vegetative buffer strips, sediment barriers or filters, dikes, mulching, or other measures as appropriate; • PerForm clearing and earth moving activities only during dry weather; • Limit and time applicaiion of pesticides and fertilizers to prevent polluted runoff; . Limit construction access routes and stabilize designated access points; • Avoid tracking dirt or other materials off-site; clean off-site paved areas and sidewalks using dry sweeping method; • The Contractor shall train and provide instruction to all employees and subcontractors regarding the construction BMPs. 1 of 2 . ' ' f Project Comments — Con't- 1243 Cabrillo Ave.-'1� and 2"d story addition. 2) The public rigk�t o� way/easement shall not be used as a construction staging and/or storage area and shall be free of construction debris at all times. 3) Implement Erosion and Sedimentation Controls: a. Install and maintain all temporary erosion and sediment controls continuously until permanent erosion control have been established; b. Address method(s) for diverting on-site runoff around exposed areas and diverting ofF-site runoff arount the site; c. Address methods for preventing erosion and trapping sediment on-site. 4) Provide notes, specifications, or attachments describing the following: a. Construction, operation and maintenance of erosion and sediment control measures, including inspection frequency; b. Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared material. Brochures and literatures on stormwater pollution prevention and BMPs are available for your review at the Planning and Building departments. Distribute to all project proponents. For additional assistance, contact Eva J. af 650/342-3727. Reviewed by: �� Date: 04/10/06 2of2