Loading...
HomeMy WebLinkAbout1235 Cabrillo Avenue - Approval LetterDocuSign Envelo�e ID: 12577EBD-5895-4461-A415-9013ECC5F4B5 CITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 June 23, 2023 Tim Raduenz Form One 4843 Silver Springs Drive Park City, UT 84098 (via email: tim@formonedesign.com) Re: 1235 Cabrillo Avenue Dear Mr. Raduenz, r ''` SURLINGAME t. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the June 12, 2023 Planning Commission approval of your application for Design Review and Special Permit for second floor balcony became effective June 22, 2023. This application was for a second story addition to an existing single-unit dwelling at 1235 Cabrillo Avenue, zoned R-1. The June 12, 2023, minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped May 31, 2023, sheets T1.0, GN, CG, SW, FAR, and A1.0 through A9.0; 2. that the plans submitted for a building permit shall include exterior light fixtures on either side of the vehicle garage door; the design of the exterior light fixtures shall comply with Burlingame Municipal Code Section 25.31.100 (Outdoor Lighting and Illumination); these exterior light fixtures shall be installed prior to the final inspection; 3 4 5 0 7 that the plans submitted for a building permit shall include an accurate depiction of the vehicle garage door, including glass panels on the top row of the door; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; �`:�: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �; ' DocuSign Envelope ID: 12577EBD-5895-44B1-A415-9013ECC5F4B5 June 23, 2023 1235 Cabrillo Avenue Page 2 8. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approve�d plans throughout the construction process. Compliance with all conditions of approval is requirecl; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a singlE� termination and installed on the portions of the roof not visible from the street; and that thesf� venting details shall be included and approved in the construction plans before a Building permit is issued; 10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste� Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interioi� or exterior, shall require a demolition permit; 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require a separate application to the Building Division. This approval is valid for two years during which time a building permit must be issued (building permit must be issued by June 22, 2025). One extension of up to one year may be considered by the Community Development Director if a written application and filing fee is submitted to the Planning Division at least 30 days prior to the expiration date of the initial Planning approval. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. '; Register online to receive City of Burlingame e-mail updates at www.burlingame.org ;- DocuSign Envelo�e ID: 12577EBD-5895-4461-A415-9013ECC5F4B5 June 23, 2023 1235 Cabrillo Avenue Page 3 Sincerely, �iw Ga��.itn.c,v� Kevin Gardiner, AICP Community Development Director c. Daniel Griffin, property owner Chief Deputy Valuation, Assessor's Office (LOT 14 BLK 30 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-171-350) File F'':� Register online to receive City of Burlingame e-mail updates at www.burlingame.org '-�