HomeMy WebLinkAbout1128-1132 Douglas Avenue - Technical Study� ! _"_�
� :
�
'�=+f:. �. �� � •:�'S'R
V '� r � :
} � J y+Ly . . . .. r .. —
'=s;-. . _' _' ' ". ' "
� ,� `� �r�� 7 i� j°�
� �
'� � �,..
�, �
„\ s +.
1� :♦
� f S�
R�
.� • ;' �
Y�R� �', " �•ti
, .T �"rl r a � � .
� n :
_ a . �'. . , k�f�
� ,: t
� � �..'
�'- ., .. . � � ''� R � •��
• . _ �ti ' _ :+yf,
S� �t
w '4 ` �,
v ��� , .t a�
�� .
} �.��`r' . tuC . .. _,
�
�
� , s �` �
�a,� tir. ,
-.c� y� - � � E
✓ •, v
� � yt�
� � �!
�'"" �. .�� �, k�
, � � l4�,." ^ _
r � w.�:_.
_ _ _ 1 __ � ���,.��
�- - Tti �, .
�S�i:':��� � �
� �� s , � � . r a � ���.:�
�
. � : � ;—� .
� . � a .
• .- . �g;n -s �.
. �; � ^ �� � '• ' ��I��/Y
• �-T:� Y� ..�`�� %; �; .. � '
.t i . Y
L� � ' • � !I
♦ -�
s +_�.� . � ? 4.�� '� . �,
� w �_.. {
A
Y *
�' � �' y � i� - . '�" .;� : �,�: :
� 'A'+.. � 1 � _„� 'A 'd�t
� j- '.�' '. . �' . °� •• �
�-�._ t•��.'y'��': . 4� � - i����, .. F .. 1 �.
��.. �y '� iY� � •�' �� � � . '
' � i -, r —,.. _ r �
'YY��� .. � .
� � '�'^ i
'� -�, �.r ��- � l., �.J
�,i0� w+��
'F . �� 5 { E� .� = � Y `���,�•• '. .
$
� x, -
�� - --
_ .� ..� .r
City of Burlingame
Douglas Avenue Multi- Family
Residential Develapment
Addendum to EI R
September 2018
�
City of Burlingame
Douglas Avenue Multi-Family
Residential Development
Addendum to EI R
September 2018
Prepared for:
City of Burlingame
501 Primrose Road
Burlingame, CA 94010
Prepared by:
Panorama Environmental, Inc.
717 Market Street, Suite 650
San Francisco, CA 94103
650-373-1200
laurie.hietter�panoramaenv.com
�Af���RAMA
EI�'b'iRCf�M`N��;��: ]PvC.
717 Market Street, Suite 650 San Francisco CA 94103 650-373-1200 www.panoramaenv.com
0
TABLE OF CONTENTS
TABLE OF CONTENTS
1.1 History ..................................................................................................................................... 1
1.2 Project Revisions .................................................................................................................... 2
1.3 Evaluation .............................................................................................................................. 4
1.4 Determination ....................................................................................................................... 9
1.5 References ...........................................................................................................................10
List of Tables
Table 1 Comparison of Project Revisions to the Approved Project ............................:........ 2
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
TABLE OF CONTENTS
This page is intentionally left blank.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
I�L'�_\�I�7�►1�1�1.'.1
DOUGLAS AVENUE MULTI-FAMILY RESIDENTIAL DEVELOPMENT
EIR ADDENDUM
1.1 HISTORY
Dreiling Terrones Architecture, Inc., representing the property owner (collectively "the
Applicant"), submitted an application to the City of Burlingame (City) Department of
Community Development to demolish two single-family houses and a 4-unit apartxnent
building on two adjacent lots, and construct a 27-unit, 5-story apartment building. The
proposed project also includes moving a historic house from the project site and relocating it to
another location in the City. The proposed project would be located on two adjacent lots at 1128
and 1132 Douglas Avenue. The historic house would be moved from 1128 Douglas Avenue to
524 Oak Grove Avenue. The existing house at the Oak Grove Avenue location would be
demolished to accommodate the historic house. The two project sites are in the City of
Burlingame in San Mateo County.
The Applicant revised the proposed project in response to comments on the Draft
Environmental Impact Report (EIR) to reduce the number of residential units from 29 to 27,
reduce the required parking, incorporate a guest and delivery parking space, and step back the
front fa�ade of the fifth floor. These changes were evaluated in the Final EIlZ and determined to
not constitute significant new information (CEQA Guidelines Section 15088.5(a)) or result in
new significant impacts or a significant increase in the severity of any impacts analyzed in the
Draft EIR (CEQA Guidelines Section 15162) (City of Burlingame, 2017). The Douglas Avenue
Multi-Family Residential Development Project EIR (State Clearinghouse Number 2015062033)
prepared for the proposed project was certified and the proposed project approved by the
Planning Commission in Apri12017. Subsequent to the Planning Commission's action, the
owner of an adjacent property filed an appeal of the Commission's action. The Project EIR was
certified and the proposed project approved by the City Council in June 2017. The Notice of
Determination was circulated in June 2017.
On May 18, 2018 the Applicant submitted a request to revise several aspects of the proposed
project. This Addendum will detail the requested project revisions and identify whether the
revisions would result in new significant impacts or substantially increase the severity of
previously identified significant impacts (CEQA Guidelines Section 15162). The evaluation in
Section 1.3 will identify if the scope of the certified EIR is adequate or if further CEQA
documentation is needed.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
EIR ADDENDUM
1.2 PROJECT REVISIONS
The Applicant requested project revisions that range from moving the surface parking spaces to
a larger underground garage to reducing the size of bedroom windows. The project revisions
compared to the approved project, as analyzed in the certified EIIZ, are presented in Table 1.
Table 1 Comparison of Project Revisions to the Approved Project
. .. -. - - •... -. .- .-
Parking and Ctrculation
Parking
Driveway
• 33 spaces • 34 total parking spaces
• 12 surface spaces (1
guest/delivery space)
• 22 underground spaces
�[�]QiIY
Rear Back-Up -
Aisle
Landscaping and Site layout
Rear -
Landscaping
Community -
Room
Lot
Coverage
Impervious -
Surface
Front
Setback
Pervious
Surface
• Maximum of
50%/7,746 sf
• Minimum 60%
• Variance from the 10'-0"
requirement, for the
shared driveway width
adjacent to the existing
Redwood tree in the front
yard, to be 9'-0"
• 1 1 '-0" wide shared
driveway width beyond
the existing Redwood tree
• Access from shared
driveway to surface
parking
• Surface parking and
narrow strip of vegetation
and trees along
northwestern boundary of
project site
• Enclosed community
room and outdoor water
feature in front of the
building
• 49.4% (7,654 sf/15,492 sf)
• 83% (12,801 sf/ 15,492 sf)
• 39.7% (774 sf/ 1,952 sf) °
• 33 total underground parking
spaces
• 30 of the underground
spaces will be
accommodated by car
stackers
• No need for widening
driveway adjacent to existing
Redwood tree due to
relocation of surface parking
spaces
• 10'-0" wide shared driveway
width beyond the existing
Redwood tree to allow for
more landscaping
• Maintain a 24'-0" rear
driveway back up clearance
onto adjacent property
• Communal space (described
below) and wider strip of
vegetation and trees along
northwestern boundary of
project site
• Enclosed community room,
outdoor communal seating
space, and outdoor water
feature in rear of the building
• 49.7% (7,699 sf/15,492 sf)
• 49.7% (7,697 sf/15,492 sf)
• 40.0% (781 sf/1,952 sf) °•b
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
?
EIR ADDENDUM
Flow-Through
Bioretention
Planters
Building Design
Number of -
Units
Average Unit
Size
Profile
Setbacks
Underground -
Garage
Balcony -
Massing -
Windows -
Construcflon
Trucks -
Excavation -
Depth
Soil Export -
• 4% of
impervious
surface,
reductions per
C3 checklist
• Average
maximum of
1,250 sf
• City:35',
maximum,
75' with
Conditional
Use Permit �
• 2013 CBC: 60' d
• Front setback:
15'
requirement,
19.9' average
setback
• Side setback:
7'
• Rear setback:
20'
• 169 sf . 456 sf
•27 •27
• 950 sf . 948 sf
• Building height: 56'-10" • Building height: 56'-10"
(parapet) e (parapet)
• Garage floor depth: -1 1'- • Garage floor depth: 14'-0"
0" below grade below grade
• Front setback: 19'-11 " f • Front setback: 20'
• Side setback: 11' • Side setback: 11'
• Rear setback: 20' • Rear setback: 20'
• 10'-0" underground • 14'-0" underground garage
garage height height to accommodate car
stackers
• No community balconies • Community balcony at rear
of floors 2 through 5
• Window system at • Window system at corridors
corridors on floors 2 on floors 2 through 5 is inset
through 5 are flush with
aparfments
• Front wall of the Sth floor is • Front wall of the Sth floor is set
set back compared with back further, 7'-6" compared
the bottom floors with the bottom floors
• Medium sized bedroom • Small bedroom windows
windows
• 874 trucks • 991 to 1,024 trucks 9
� 16' '' -- . 17' —
• 6,000 cubic yards • 6,651 cubic yards
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
3
EIR ADDENDUM
Waste
° A variance was granted.
• 2,222 cubic yards • 2,222 cubic yards
b The plans indicate that 60% impervious surfaces are allowed, but according to the zoning code, 40%
are permitted within the front setback. The 60% impervious surfaces will not require another variance
since there is no increase in the impervious area with the project revisions compared to the approved
project.
� Enclosures for stairways and elevators, and equipment are exempted from the height restriction as long
as these features do not comprise more than 5% of the roof area and do not exceed more than 10
feet above top of parapet.
d Stairway and elevator enclosures are exempt from the height restriction.
e A CUP was granted.
f The Project Data summary indicates a front setback of 19'-10", but the plan drawing indicates a front
setback of 19'-11".
9 The increase in trucks is a result of additional soil export, equipment, and construction material import.
h The Final EIR considered excavation to 16' for concrete supports, which is less excavation than for a
slab floor at grade as now proposed.
Source: (DTA, 2017; DTA, 2018�
1.3 EVALUATION
1.3.1 Aesthetics
Construction techniques and equipment used would be the same as those analyzed in the EIR.
The project revisions would involve,construction of a 5-story building similar to the approved
project. General massing and appearance of the building would be similar to the approved
project. The approved mitigation measures would be implemented to reduce impacts on scenic
resources and from lighting and glare. The revisions to the project would not result in new or
substantially more severe significant impacts on aesthetics than those analyzed in the EIIZ.
1.3.2 Agriculture and Forestry Resources
No change to conditions would occur that could result in an impact on agriculture or forestry
resources. The revisions to the project would not result in new or substantially more severe
significant impacts on agriculture or forestry resources than those analyzed in the EIlZ.
1.3.3 Air Qua�ifiy
The project revisions would require deeper excavation and increase the quantity of soil
removed during construction. A minor increase in construction materials, particularly concrete,
would be needed to construct the larger underground garage. Truck trips to and from the
project site would increase by up to 17 percent. A small increase in the number of construction
equipment vehicles or duration of use may be needed to complete the project in 14 months.
Construction emissions analyzed in the EIR constituted less than one percent of the BAAQMD
significance thresholds. The increase in truck trips and earth moving activities would result in
greater criteria air pollutant emissions but would not result in a substantially greater impact. No
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
EIR ADDENDUM
change to the number or type of units constructed as part of the revised project would occur.
Operational criteria air pollutant emissions would not change. The approved mitigation
measures would be implemented to reduce impacts on adjacent sensitive receptors and future
residents. The revisions to the project would not result in new or substantially more severe
significant impacts on air quality than those analyzed in the EIR.
1,3,4 Biological Resources
The number of protected trees that would be removed or trimmed would not change as a result
of the project revisions. No changes to the impacts on nesting birds or bats would occur. The
revised project would comply with the appropriate Downtown Specific Plan Conditions of
Approval. The approved mitigation measures would be implemented to reduce impacts on
special-status bats and protected trees. The revisions to the project would not result in new or
substantially more severe significant impacts on biological resources than those analyzed in the
EIR.
1.3,5 Cultural Resources
The excavation depth would be greater than the approved project but would not significantly
increase the potential for uncovering cultural resources or human remains. The revised project
would comply with the appropriate Downtown Specific Plan Conditions of Approval. The
approved mitigation measure would be implemented to reduce impacts on cultural resources.
The revisions to the project would not result in new or substantially more severe significant
impacts on cultural resources than those analyzed in the EIR.
1.3.6 Geology and Soils
The acreage of project site disturbance would not increase, although the depth of excavation
would be greater. The 5-story building would be generally equivalent to the building analyzed
in the EIR, with a 1-foot deeper foundation. The revised project would be required to comply
with the City's building code and associated protection measures to minimize erosion. The
approved mitigation measure would be implemented to reduce the risk from unstable soil
units. The revisions to the project would not result in new or substantially more severe
significant impacts on geology and soils than those analyzed in the EIR.
1 �3.7 Greenhouse Gas Emissions
More soil would be exported from the project site and the number of truck trips would increase,
due to the deeper excavation depth required to construct the larger underground garage.
Annual greenhouse gas (GHG) emissions analyzed in the EIR were less than 22 percent of the
BAAQMD significance threshold. The up to 17 percent increase in truck trips would not result
in an exceedance of the significance threshold. No changes to the number or type of units that
would be constructed are proposed as part of the revised project. Operational GHG emissions
would not change. The revisions to the project would not result in new or substantially more
severe significant impacts on GHG emissions than those analyzed in the EIR.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
5
EIR ADDENDUM
1.3.8 Hazards and �iarardous Materials
The project revisions would involve deeper excavation, greater soil export, and potentially more
dewatering. Groundwater in the area is not contarninated (Cornerstone Earth Group, 2015).
Additional dewatering would not increase any hazards impacts. Excavated soil exported from
the project site would be tested and handled in accordance with regulations and the approved
mitigation measure. Temporary road closures and need to implement the emergency access
mitigation measures would not change. The revisions to the project would not result in new or
substantially more severe significant impacts on hazards and hazardous materials than those
analyzed in the EIR.
1�3�9 �ydrology and Water Quality
The depth of excavation would increase, potentially resulting in more dewatering. As analyzed
in the EIR, construction dewatering would be required to comply with appropriate permits to
minimize impacts on water quality from discharges. The overall area disturbed during
construction of the revised project would not increase compared to the approved project.
Impervious surfaces would decrease from 83 percent to 50 percent of the project site and the
total size of the flow-through bioretention planters would increase by more than twice (from
169 sf to 456 sf). Stormwater runoff and the potential for siltation of waterways would be
reduced. The approved mitigation measures would be implemented to reduce the impacts on
water quality. The revisions to the project would not result in new or substantially more severe
significant impacts on hydrology and water quality than those analyzed in the EIR.
7.3.10 Land Use and Planning
Several project site layout features would change due to project revisions. The front, rear, and
side setbacks, as well as lot coverage, would comply with the zoning requirements for the R-4
District. Another conditional use permit (CUP) for the building height would not be required
since there is no increase in the building height with the project revisions compared to the
approved project. The variance to permit widening of the shared driveway adjacent to the
existing Redwood tree would no longer be needed with the project revisions. Another variance
for front setback impervious surfaces would not be required since there is no increase in the
impervious area with the project revisions compared to the approved project. No new
environmental impacts would occur. Implementation of the approved mitigation measure to
reduce the shared driveway's impact from inconsistency with the City of Burlingame's
Municipal Code would no longer be needed. The revisions resolve community concerns
regarding the shared driveway. The revisions to the project would not result in new or
substantially more severe significant impacts on land use and planning than those analyzed in
the EIR.
1 o3a1 i Mineral Resovrces
No change to conditions would occur that could result in an impact on mineral resources. The
revisions to the project would not result in new or substantially more severe significant impacts
on mineral resources than those analyzed in the EIR.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
EIR ADDENDUM
1 �3.12 Noise
Equipment used during construction and the types of construction activities would not be
significantly different than those analyzed for the approved project. Greater excavation
activities would occur, but surface paving would be reduced. Construction noise would not
noticeably change compared with what was analyzed for the approved project. Replacing the
surface parking lot with a larger below-ground parking garage would minimize operational
noise associated with vehicles. The increased noise from car doors, alarxns, and driving into and
out of the project site from the proposed northwestern shared driveway would be eliminated by
the project revisions. The project revisions include a communal outdoor space in the rear of the
building. Noise levels from normal speech levels can be as high as 58 dBA at 1 meter (Olsen,
1998). With the ambient noise levels of 59 dBA at the project site, noise levels would attenuate to
below 60 dBA at less than 4 feet away from people conversing. The outdoor communal space
would be set back fizrther (approximately 5.5 feet at the closest point) from the property line
than the approved surface parking lot (approximately 2.5 feet at the closest point). Sounds from
people talking are typical in a suburban environment. The inclusion of an outdoor communal
space would not result in noise levels greater than 5 dBA above the existing ambient noise level
of 59 dBA at the property line (City of Burlingame, 1975). Vegetation and the 6-foot-tall fence
would further minimize the noise from future residents. The approved mitigation measures
would reduce construction and operational noise impacts. The revisions to the project would
not result in new or substantially more severe significant impacts on noise than those analyzed
in the EIR.
1.3.13 Popuiation and Housing
The number of workers needed to construct the revised project would be similar to the
approved project, as analyzed in the EIR. The project revisions do not change the number or
type of units that would be constructed. The maximum number of future residents would
remain the same. The revisions to the project would not result in new or substantially more
severe significant impacts on population and housing than those analyzed in the EIlZ.
1.3.14 Public Services
The project revisions would not change the need for public services analyzed in the EIR, as
there would be no increase in the maximum number of future residents. The revisions to the
project would not result in new or substantially more severe significant impacts on public
services than those analyzed in the EIlZ.
1.3,15 Recreatian
The project revisions include installation of communal outdoor space for residents that was not
a part of the approved project. The outdoor space is within the project footprint analyzed in the
EIR. The number of new units and residents would not change so there is no change to the need
for recreational facilities analyzed in the EIIZ. The revisions to the project would not result in
new or substantially more severe significant impacts on recreation than those analyzed in the
EIR.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
S
EIR ADDENDUM
1,3�i 6 Transportation and Traffic
Construction of the larger underground garage would require more soil export, construction
materials, and construction debris than analyzed in the EIR. An increase of up to 17 percent
more truck trips over the course of the construction period would be required to transport these
materials to and from the project site. The additional truck trips would not substantially
increase congestion on Douglas Avenue and nearby intersections beyond the impacts identified
in the EIR. The approved mitigation measures would reduce any impacts on intersection
operations. The number and type of units constructed would not change. As such, vehicle trips
during operation of the project would not increase. 'The relocation of the surface parking spaces
to the underground parking garage would eliminate any potential traffic hazards associated
with ingress and egress through the 9-foot-wide northeastern driveway. This change is the
project eliminates a community concern about the shared driveway. The approved Mitigation
Measure Traffic-2, parts a. and b. would reduce any traffic hazards impacts associated with the
underground garage driveway. Mitigation Measure Traffic-2, part c. would no longer be
needed because the driveway would not be shared. The revisions to the project would not result
in new or substantially more severe significant impacts on transportation and traffic than those
analyzed in the EIR.
� .3.17 Utili#ies and Service Sys#ems
The project revisions would require construction of a larger underground garage and deeper
excavation. Additional soil and construction debris would be exported from the project site. Soil
disposal could increase by up to 11 percent. It is assumed that ReThink Waste, which provides
waste disposal services to the City of Burlingame, still transports waste to Ox Mountain Landfill
(also referred to as Corinda Los Trancos Landfill). Ox Mountain Landfill has remaining capacity
of nearly 40 percent (approximately 22 million cubic yards) (CalRecycle, 2018). Sufficient
capacity remains to accommodate the increased waste disposal. The number and type of units
that would be constructed would not change. Demand for wastewater treatment facilities,
water, and disposal facilities would not increase during operation of the revised project. The
revisions to the project would not result in new or substantially more severe significant impacts
on utilities and services systems than those analyzed in the EIR.
� .3.18 Energy
Construction of the revised project would require deeper excavation and installation of a larger
underground garage. Truck trips could be expected to increase by up to 17 percent. A nominal
increase in energy consumption, compared to the analysis in the EIR, could occur from
additional truck trips and construction equipment needed to complete these construction
activities in 14 months. As with the approved project, the minimal increase in fuel use during
construction would not result in a significant energy impact. The maximum number of future
residents would remain the same. Energy consumption associated with operation of the revised
project would not change. The revisions to the project would not result in new or substantially
more severe significant impacts on energy than those analyzed in the EIR.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
s4
EIR ADDENDUM
1,3,19 Cu�ulative Ana�ysis
The revised project would not result in new or substantially more severe significant impacts on
any resource that could result in a new or greater contribution to cumulative impacts. The
revisions to the project would not result in new or substantially more severe significant
cumulative impacts on any resource than those analyzed in the EIR.
1.3.20 Other CEQA Topics
The project revisions would not result in a change to the zoning or land use designations of the
project site. The revisions to the project would not commit future generations to significant
changes in land use.
Construction and operation of the revised project would involve use of small quantities of
hazardous materials, similar to the approved project. The revisions to the project would not
result in a new potential for irreversible change as a result of an environmental accident. The
potential would remain low.
As discussed above, the underground garage would be larger and a 17 percent more truck trips
would occur throughout construction compared to the approved project. A small increase in
fuel use and materials used during construction would occur as a result of the project revisions.
The revised project would still be relatively small and would not consume significant quantities
of non-renewable resources.
The revisions to the project would require a similar number of construction workers and the
maximum number of future residents would remain the same as the approved project. The
revisions to the project would not result in growth-inducing impacts.
The revisions to the project would not result in new or substantially more severe significant
impacts on the environment than those analyzed in the EIR.
1.4 DETERMINATION
No new or substantially more severe significant impacts would occur as a result of the project
revisions. No new substantial changes would occur with respect to the circumstances under
which the project would be undertaken. The mitigation measures and determination of
significance for impacts included in the adopted EIR would continue to be valid. None of the
conditions described in CEQA Guidelines Section 15162 requiring the preparation of a
subsequent EIR or CEQA Guidelines Section 15163 requiring preparation of a supplemental EIlZ
have occurred. This addendum to the adopted EIR is an appropriate level of environmental
review for the project revisions, as identified in CEQA Guidelines Section 15164.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
�
EIR ADDENDUM
1.5 REFERENCES
CalRecycle. (2018). Facility/Site Summary Details: Corinda Los Trancos Landfill ( Ox Mtn) (41-AA-
0002). Retrieved from Solid Waste Information System (SWIS):
http://www.calrecycle.ca.gov/SWFacilities/Directory/41-AA-0002/Detail/
City of Burlingame. (1975, September 15). Noise Element. General Plan.
City of Burlingame. (2017, February). Douglas Avenue Multi-Family Residential Development
Project . Final EIR State Clearinghouse No. 2015062033.
Cornerstone Earth Group. (2015, August 31). Phase I Environmental Site Assessment, 1128 and
1132 Douglas Avenue Burlingame, California.
DTA. (2017, Apri124). Site Plan.
DTA. (2018, August 6). Site Plan.
Olsen, W. O. (1998). Average Speech Levels and Spectra in Various Speaking/Listening
Conditions: A Summary of the Pearson, Bennett & Fidell (1977) Report. American Journal
of Audiology, 1059-0889.
Douglas Avenue Multi-Family Residential Development
Addendum to EIR • September 2018
G
1133 Dou�las Avenue Homeowners Association
Emphasis of Specific Items
in the
1128-1132 Douglas Mitigation Monitoring
Program, MMRP
9-24-2018
1. (Page 17) Development of a Plan for providin� Worker Parkin� off site
and �enerally off nei�hborhood streets with shuttle or transportation as
needed.
2. (Page14 &17) Designation of a"Community Liaison" person readily
available who would be responsible for complaints regarding traffic,
parking, construction noise and vibration.
3. (Pages 8& 9) Active monitorin� and enforcement of tree protection
measures.
4. (Page 15) Acknowled�ement of workin� Hours will be from 8am to 6pm,
Monday through Friday and from 9am to 6pm on Saturday.
The 1133 Douglas owners and residents:
A. Su��est periodic updates from the "Community Liaison" be provided to
neighboring residents.
B. (Pages 14 & 15) Request inclusion on the advance notice list for
construction noise and vibration.
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
DOUGLAS AV�NUE
MULTI-FAMILY RESIDENTIAL DEVELOPMENT PROJECT EIR
MITIGATION MONITORING AND REPORTING PROGRAM
INTRODUC�ION
The California Environmental Quality Act requires the adoption of feasible mitigation measures
to reduce tlie severity and magnitude of potentially significant environmental impacts
associated with project development. CEQA Guidelines Section 15097(a) state: "In order to
assure that the mitigation measure and project revisions identified in the EIR...are
implemented, the public agency shall adopt a program for monitoring or reporting on the
revisions which it has required in the project and the measures it has imposed to mitigate or
avoid significant environmental effects."
This MMRP includes the mitigation measures identified in the Environmental Impact Report
(EIR) required to address the significant impacts associated with the project being approved.
The required mitigation measures are summarized in this program.
FORMAT
This MMRP is organized in a table format, keyed to each significant impact and each EIR
mitigation measure. Only mitigation measures adopted to address significant impacts are
included in this program. Each mitigation measure is set out in full, followed by a tabular
summary of monitoring requirements. The column headings in the tables are defined as
follows:
• Mitigation Measure. This column presents the mitigation measure identified in the
Mitigated Negative Declaration.
• Implementation Procedure. This column provides additional information on how
the mitigation measures will be implemented.
• Monitoring and Reporting Actions. This column contains an outline of the
appropriate steps to verify compliance with the mitigation measure.
• Monitoring Responsibility. This column contains an assignment of responsibility
for the monitoring and reporting tasks.
• Monitoring Schedule. The general schedule for conducting each monitoring and
reporting task, identifying where appropriate both the timing and the frequency of
the action.
Dougias Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-1
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
ENFORCEMENT
This MMRP will be incorporated as a condition of project approval. All mitigation measures
must be carried out in order to fulfill the requirements of approval. A number of the mitigation
measures will be implemented during the course of the development review process. These
measures will be checked on plans, in reports, and in the field prior to construction. Most of the
remaining mitigation measures will be implemented during the construction, or project
implementation phase.
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-2
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
MM AES-1: Design Review of the
Proposed Project.
The applicant shall submit revised plans
for the proposed building at 1128-1132
Douglas Avenue to the City of
Burlingame for design review. The
Planning Commission as the responsible
body for design review shall review the
proposed project for compatibility with
the City's guidelines for a residential
apartment building in the Downtown
Specific Plan R-4 Base District.
MM AES-2: Exterior Lighting Plan.
Prior to issuance of a building permit, a
detailed Exterior Lighting Plan shall be
provided to the City of Burlingame for
design review. The lighting plan shall
utilize the following standards:
a) Control stray light through use of
low-brightness fixtures with optical
controls. 3.
b) Fully block all exterior light sources
from off-site views.
c) Do not permit any uplighting from
any outdoor light fixture.
d) Employ on-demand exterior lighting
systems where feasible. Area lighting
and security lighting shall be controlled
by the use of timed switches and/or
motion detectors. Use tinted windows
in all buildinqs to reduce plare from
1. City incorporates
measure as
condition of
approval.
2. The City reviews the
proposed project
for compatibility
with the City's
guidelines.
1. City incorporates
measure as
condition of
approval.
The applicant files a
detailed Exterior
Lighting Plan for
design review.
The contractor
implements the
lighting specified in
the Lighting Plan.
�
1.City adopts City of
condition of Burlingame
approval with
project.
2.City completes
review of the
project design for
compatibility
1. City adopts City of
condition of Burlingame
approval with
project.
2. The City reviews
the lighting plan to
verify it meets the
measure
requirements.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
1. Prior to project
approval
2.During design
review
1. Prior to project
approval
2. During design
review
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-3
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
interior lights.
MM AES-3: Use of Non-reflective
Exterior Paint.
Flat, non-reflective paint or integrated
coloring shall be used in ail exterior
1. City incorporates 1. City adopts
measure as condition of
condition of approval with
approval. project.
City of 1. Prior to project
Burlingame approval
2. During
construction
building materials throughout the 2. Contractor 2. The City conducts
project. implements periodic
measure during inspections to
construction. ensure
compliance and
adds inspection
report to file.
Air Quality _
MM AIR-1: Construction Equipment
Emissions Reduction
The construction contractor shall
implement the BAAQMD Enhanced
Exhaust Emissions Reduction Measures
for Project Construction Equipment
measure that requires project off-road
equipment greater than 25 horsepower
(hp) that operates for more than 20
total hours over the entire duration of
construction activities to meet the
following requirements:
• All backhoes engines shall meet
CARB Tier 4 off-road emission
standards.
• All other equipment engines shall
meet or exceed CARB Tier 3 off-road
emission standards or be retrofitted with
a CARB Level 2 diesel particulate filter
1. City incorporates
measure as
condition of
approval.
2. Contractor
implements
condition during
construction.
1. City adopts Ciry of
condition of Burlingame
approval with
project.
2. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
1. Prior to
project
approval
2. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-4
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORENG AND REPORTING PROGRAM
(DPF).
MM AIR-2: Air Filhation 1. City incorporates 1. City adopts City of 1. Prior to
A standard house heating, ventilation, measure as condition of Burlingame project
and air conditioning (HVAC) system condition of approval with approval
with a permanent filter of a minimum approval. project. 2. During
efficiency reporting value (MERV) of 13 2. Contractor 2. The City conducts construction
or greater shall be installed at the implements periodic
relocated residence at 524 Oak Grove condition during inspections to
Avenue. The MERV13 filter shall provide construction. ensure
one air exchange per hour if the air compliance and
source is outside/unfiltered air or four air adds inspection
exchanges per hour if the air source is reporf to file.
inside/recirculated air to provide an 80
percent or greater reduction of
outdoor fine particulate matter
(including DPMJ.
Biological Resources
MM BIO-l: Pre-conshuction Bat
Surveys
The applicant shall implement the
following measures during demolition
of structures and tree removal or tree
pruning.
City of 1. Prior to
Burlingame project
approval
1. City incorporates 1. City adopts
measure as condition of
condition of approval with
approval. project.
2. Qualified biologist 2. City reviews
conducts surveys for survey report.
2. Prior to
demolition of
existing
Strucfures. Before demolition of existing bat roosts. 3. City conducts structures or
structures, a qualified bat specialist 3. Measures to protect periodic tree removal
shall conduct a day time search for bats are inspections to 3. During
potential roosting habitat and evening implemented, as ensure construction
emergence surveys to determine if the needed. compliance and
structure is being used as a roost. adds inspection
Biologists conducting surveys for roost report to file.
sites shall use naked eye, binoculars,
and a high-power spotlight to inspect
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-5
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
Evening (i.e., dusk) emergence surveys
shall consist of at least one bat
specialist positioned at different
vantage points from the structure,
watching for emerging bats from a half
hour before sunset to 1 to 2 hours after
sunset for a minimum of 2 nights within
the season that construction will be
taking place. Night vision goggles or
full-spectrum acoustic detectors should
be used during emergence surveys to
assist in species identification. All
emergence surveys shall be
conducted during favorable weather
conditions (i.e., calm nights with
temperatures conducive to bat activity
[55° F and above] and no precipitation
predicted).
If roosting, special-status bats are
present, measures developed by the
bat specialist shall be implemented, as
needed. Measures to protect the bats
may include postponing demolition
until after the May 1 st through October
1 st roosting period. Measures may
include monitoring roosting to
determine if the roost site is a maternal
roost by either a visual inspection of the
roost bat pups, or monitoring the roost
after the adults leave for the night and
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-6
buildings features that could house
bats. The surfaces of the structure and
the ground around the structure shall
be surveyed for bat signs, such as
guano, staining, and prey remains.
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
listening for bat pups. Eviction of a
maternal roost cannot occur because
bat pups are not mature enough to
leave the roost. If a roost is determined
not to be a maternal roost, eviction of
bats shall be conducted using bat
exclusion techniques developed by Bat
Conservation International and in
consultation with CDFW that allow the
bats to exit the roosting site, but
prevent re-entry to the site. This work
shall be completed by a BCI-
recommended exclusion professional.
The exclusion of bats shall be timed
and carried out concurrently with any
scheduled bird exclusion activities.
Each roost lost (if any) shall be
replaced in consultation with the CDFW
and may include construction and
installation of BCI-approved bat boxes
suitable to the bat species and colony
size excluded from the original roosting
site. Roost replacement shall be
implemented before bats are
excluded from the original roost sites.
Once the replacement roosts are
constructed and it is confirmed that
bats are not present in the original roost
site, the structures may be removed or
sealed.
Tree Removal. A qualified bat specialist
shall examine trees to be removed or
trimmed for suitable bat roosting
habitat. High quality habitat features
(large tree cavities, basal hollows, loose
Douglas Avenue Multi-Family Residential Development Project MMRP . February 2017
MMRP-7
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
The qualified bat specialist shall
conduct evening visual emergence
surveys of the source habitat feature,
from a half hour before sunset to 1 to 2
hours after sunset for a minimum of two
nights within the season that
construction will be taking place. If it is
found that roosting, special-status bats
are present, measures developed by
the bat specialist shall be
implemented, as needed (see above
for types of ineasures).
MM BIO-2: Tree Protection Measures
Tree protection specifications were
developed by Mayne Tree Expert
Company Inc. for the protected trees
surveyed at the Douglas Avenue and
Oak Grove Avenue project sites. The
applicant shall implement the following
tree protection measures developed
by Mayne Tree Expert Company Inc.
and approved by the Arborist for
protected trees. The Mayne Tree Expert
Company Inc. reports shall be included
on the demolition and construction
plans of the project.
Mulching. A b-inch layer of coarse
mulch woodchips shall be placed
beneath the dripline of protected
1. City incorporates
measure as
condition of
approvql.
2. Contractor
implements
conditions during
construction.
1. City adopts
condition of
approval with
project.
2. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
reporf to file.
City of
Burlingame
1. Prior to
project
approval
2. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-8
or peeling bark, larger snags, etc.) shall
be identified and the area around
these features searched for bats and
bat sign (guano, culled insect parts,
staining, etc.).
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
trees. Mulch is to be kept 12 inches
from the trunk.
Profective Banier. A protective barrier
or 6-foot chain link fence shall be
installed around the dripline of
protected trees. The fencing can be
moved within the dripline if authorized
by the Project Arborist or the City
Arborist, but no closer than 2 feet from
the trunk of any tree. Fence posts shall
be 1.5 inches in diameter and are to
be driven 2 feet into the ground. The
distance between posts shall not be
more than 10 feet. This enclosed area is
the Tree Protection Zone (TPZ).
Cultural Resources
MM CUL-1: Compatible Cladding for
Historic House
New construction on the relocated
historic house shall be differentiated
from the old and shall be compatible
with the historic materials, features, size
scale, and proportion, to protect the
integrity of the property and its
environment consistent with the
Secretary of Interior's standards for
rehabilitation. The choice of materials
shall be submitted to the City for
approval as parf of the design review
process.
1. City incorporates
measure as
condition of
approvai.
2. Applicant submits
materials to the City
during design
review.
3. Contractor
implements during
construction.
1. City adopts City of
condition of Burlingame
approval with
project.
2. City reviews the
choice of
materials.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
reporf to file.
1. Prior to
project
approval
2. During design
review
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-9
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
MM GEO-1: Implementation of 1. City incorporates 1. Ciry adopts City of 1. Prior to
Geotechnical Recommendations measure as condition of Burlingame project
The Applicant and their contractors condition of approval with approval
shall implement the measures outlined approval. project. 2. During
and recommended in the 2. Contractor 2. The City conducts construction
Geotechnical Investigation Report implements periodic
Chapters 5 through 10 for the proposed condition during inspections to
construction at 1128-1132 Douglas construction. ensure
Avenue. compliance and
adds inspection
report to file.
Hazards and Hazardous Materials
MM HAZ-1: Preparation of a Site-
specific Spill Prevention, Conhol, and
Countermeasure Plan
The applicant shall prepare a site-
specific Spill Prevention, Control, and
Countermeasure (SPCC) Plan that will
identify spill prevention and response
measures and Best Management
Practices (BMPs). The plan will
emphasize site-specific physical
conditions to improve hazard
prevention (e.g., identification of flow
paths to nearest drains) and reduce
effects of accidental spilis if they occur.
The Applicant shall designate a
representative to ensure that all
hazardous materials and safety plans
are followed throughout the
construction period. BMPs identified in
1. City incorporates
measure as
condition of
approval.
2. Applicant prepares
and submits SPCC
Plan to City.
3. Contractor
implements
conditions during
construction.
1. City adopts City of
condition of Burlingame
approval with
project.
2. City reviews SPCC
Plan to verify
compliance with
the measure.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
reporf to file.
1. Prior to
project
approval
2. At least 30
days prior to
construction
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-10
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
SPCC Plan shall be implemented during
project construction to minimize the risk
of an accidental release and to
provide the necessary information for
emergency response. A copy of the
project SPCC shall be submitted to the
City for approval at least 30 days prior
to construction. All construction
personnel shall be required to attend
SPCC training prior to conducting any
work on the project site.
MM HAZ-2: Soils Test
Prior to construction, the applicant shall
evaluate shallow soils at all structure
locations for the possible presence of
lead and pesticides. If lead or
pesticides are found within the tested
1. City incorporates
measure as
condition of
approval.
2. Applicant conducts
soils evqluation.
City of 1. Prior to
Burlingame project
approval
2. Prior to
construction
3. During
1. City adopts
condition of
approval with
project.
2. City reviews soils
evaluation.
soils, the applicant shall dispose of the 3. Contractor properly 3. The City conducts construction
soils, consistent with federal, state and disposes of soils in periodic
local laws regarding disposal of accordance with inspections to
hazardous materials. the measure. ensure
compliance and
adds inspection
reporf to file.
Hydrology and Water Quality
MM HYDRO-1: Stormwater Pollution 1. City incorporates 1. City adopts
Prevention Best Management Practices measure as condition of
The applicant will implement the condition of approval with
following best management practices apProval. project.
City of 1. Prior to
Burlingame project
approval
2. During
during construction of the proposed 2. Contractor 2. The Clty conducts construction
project: implements periodic
• Preserve existing vegetation where conditions during inspections to
Douglas Avenue Multi-Family Residential Development Project MMRP . February 2017
MMRP-11
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
MM NOISE-1: Prepare a Relocation Plan
and Obtain Approval from the City for
Historic House Relocation Outside of
Permitted Conshuction Hours
The Applicant shall prepare a
Relocation Plan and obtain approval
from the City under Municipal Code
Section 18.07.110 for historic house
relocation. The Relocation Plan shall
include:
1. Exact procedure for cutting and
dismantling the historic house, and
loading on trucks
2. Specific routes for movement of the
historic house from its existing location
to 524 Oak Grove Avenue
3. Exact procedure for setting the
house in its new location
4. Estimated duration for the various
activities involved in the cutting,
dismantling, loading, and setting of the
house
5. Coordination procedures with
utilities, Caltrain, and appropriate City
Deparfments
6. Advance Notice to residents at each
1. City incorporates
measure as
condition of
approval.
2. Applicant prepares
and submits
Relocation Plan.
3. Contractor
implements
conditions during
construction.
1. City adopts
condition of
approval with
project.
2. City reviews
Relocation to
ensure
compliance with
the measure.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
City of
Burlingame
1. Prior to
project
approval
2. Prior to
construction
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-12
feasible construction ensure
. Limit disturbance to the work site compliance and
• Install silt fences around the adds inspection
perimeter of the project site report to file.
Noise
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
project site and along the route
regarding the start and duration of
power interruption
7. Measures to reduce impacts of
power outage on residents such as:
a. Power interruption phasing to
reduce amount of time houses are
affected
b. Offering affected parties dry ice for
freezers and refrigerators
c. Offering generators for life support
equipment
d. Security lighting
Approval from the City for relocating
the historic house outside of permitted
construction hours would be
contingent on abiding by all the best
management practices required under
Condition of Approval 19, and the
measures included in the Noise
Management Plan for the project.
MM NOISE-2: Compliance with Tifle 24
Prior to issuance of a building permit, a
qualified acoustical consultant shall
review the final building plans to
calculate expected interior noise
levels. The building permit shall not be
issued until the qualified acoustical
consultant has reviewed the acoustical
test reporf of all sound rated windows
and doors and confirmed that the
proposed building treatments will
1. City incorporates
measure as
condition of
approval.
2. Acoustical
consultant reviews
final building plans
3. Contractor
implements noise
treatments during
construction.
1. City adopts
condition of
approval with
project.
2. The City does not
issue building
permit until
acoustical
consultant
confirms the
treatments
City of 1. Prior to
Burlingame project
approval
2. Prior to
issuance of a
building
permit
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-13
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
MM NOISE-3: Noise Management Plan
The applicant shall prepare a noise
management plan that includes:
a. Identified routes for movement of
construction-related vehicles and
equipment developed in conjunction
with the Burlingame Community
Development Deparfment so that
noise-sensitive areas, including
residences and schools, are avoided as
much as possible.
b. A designated "Community Liaison"
for construction activities. The
Community Liaison would be
responsible for responding to any local
complaints regarding construction
noise and vibration. The Community
Liaison would determine the cause of
the noise or vibration complaint and
would implement reasonable measures
to correct the problem.
c. Sending advance notice to
neighborhood residents within 50 feet
of the project site regarding the
1. City incorporates
measure as
condition of
approval.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
1. City adopts City of
condition of Buriingame
approval with
project.
2. Applicant prepares 2. City reviews noise
and submits noise management
management plan. plan.
3. Applicant
designates a
community liaison
and submits
notifications to
residents.
4. Contractor
implements
conditions during
construction.
3. City verifies that
notifications have
been mailed to
residents.
4. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
1. Prior to
project
approval
2. Prior to
construction
3. Prior to
construction
4. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP . February 2017
MMRP-14
adequately reduce interior noise levels comply with the
to 45 dBA or below. measure.
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITiGATION MONITORING AND REPORTING PROGRAM
In the event that construction noise
complaints are not resolved by
scheduling, the applicant shall install
temporary sound absorption barriers,
such as noise control blankets, in
addition to the standard noise barriers
around the construction site required
under Condition of Approval 19, best
management practices. These
additional barriers would be specifically
designed for exterior use and would
reduce the noise level beyond the
fence line by at least 3 dBA.
If noise complaints continue, the
applicant shall install a temporary
sound absorption barrier that wo�ld
reduce the noise level beyond the
fence line an additional 2 dBA, for a
total noise reduction of 5 dBA beyond
the fence line.
MM NOISE-4: Restricted Construction 1. City incorporates 1. City adopts City of 1. Prior to
Hours measure as condition of Burlingame project
Construction hours for exterior condition of approval with approval
construction activities shall be limited to approval. project. 2. During
the hours of 8:00 a.m. to 6:00 p.m. 2. Contractor 2. The City conducts construction
Monday through Friday, and the hours implements periodic
of 9:00 a.m. and 6:00 p.m. on conditions during inspections to
Saturdays, unless a special permit is ensure
C��� a�I��OW S UGir �'D �Qn^ pn Wu�c1Ar�
�
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-15
construction schedule and including
the phone number for the disturbance
coordinator. A notice with the name
and phone number of the Community
Liaison shall be posted at the project
site.
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
Transportotion antl Traffic ;
MM TRAFFIC-1: Construction
Management Plon
The project applicant and its
construction contractor(s) shall
develop a construction management
plan for review and approval by the
City of Burlingame. The plan must
include at least the following items and
requirements to reduce, to the
maximum extent feasible, traffic and
parking congestion during
construction:
a. A set of comprehensive traffic
control measures, including scheduling
of major truck trips and deliveries to
avoid peak traffic hours, detour signs if
required, lane closure procedures,
signs, cones for drivers, and designated
construction access routes;
b. Identification of haul routes for
movement of construction vehicles
that would minimize impacts on motor
vehicular, bicycle and pedestrian
traffic, circulation, and safety, and
1. City incorporates
measure as
condition of
approval.
2. Applicant and
contractor develop
a construction
management plan.
3. Contractor
implements
conditions during
construction.
1. City adopts City of
condition of Burlingame
approval with
project.
2. City reviews
Construction
Management
Plan.
3. The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
1. Prior to
project
approval
2. Prior to
construction
3. During
construction
Douglas Avenue Multi-Family Residential Development Project MMRP • February 2017
MMRP-16
obtained in advance from the City for construction. compliance and
specified activities. No construction adds inspection
shall occur on Sundays or holidays. report to file.
This construction noise restriction shall
not apply to work done within the
building after it is fully enclosed.
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
c. Notification procedures for adjacent
property owners and public safety
personnel regarding when major
deliveries, detours, and lane closures
would occur;
d. Provisions for monitoring surface
streets used for haul routes so that any
damage and debris attributable to the
haul trucks can be identified and
corrected by the project applicant.;
e. A construction parking plan to
provide worker parking off site and
generally off neighborhood streets, with
shuttles or other transporfation as
needed to transport workers to the site;
and
f. Designation of a readily available
contact person for construction
activities who would be responsible for
responding to any local complaints
regarding traffic or parking. This
coordinator would determine the
cause of the complaint and, where
necessary, would implement
reasonable measures to correct the
problem.
MM Traffic-2: Driveway Safety 1. City incorporates 1. City adopts
Enhancements measure as condition of
The project applicant and its condition of approval with
constr�ction contractor(s) shall approval. project.
City of
Burlingame
1. Prior to
project
approval
2. D�rinq
Douglas Avenue Multi-Family Residential Development Project MMRP . February 2017
MMRP-17
specifically to minimize impacts to the
greatest extent possible on streets in
the project area;
DOUGLAS AVENUE MULTIFAMILY RESIDENTIAL DEVELOPMENT
MITIGATION MONITORING AND REPORTING PROGRAM
implement the following safery
enhancements:
a. Flashing light sensors shall be placed
within the project parking garage and
rear surface parking areas to alert
motorists outbound from the project
parking areas that vehicles are
inbound from Douglas Avenue (these
sensors could be video or loop
detected);
b. Signs shail be placed at the
proposed project's Douglas Avenue
entrances that indicate: "Caution—
Watch for Outbound Vehicles"; and
c. The project design shall be modified
to allow for 12-foot access on the
eastern-most driveway; except as
necessary to avoid impact to the two
significant trees. Toward the rear of the
lot, that would require either loss of
landscaping, further setback for the
building (at least on the first floor),
and/or loss of a parking space.
Contractor
implements
conditions during
construction.
�
The City conducts
periodic
inspections to
ensure
compliance and
adds inspection
report to file.
construction
Douglas Avenue Multi-Family Residential Development Project MMRP . February 2017
MMRP-1$