Loading...
HomeMy WebLinkAbout1145 Cortez Avenue - ResolutionRECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL T0: PLANNING DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2006-115377 09:53am 08/02l06 R1 Fee: NO FEE Count of pages 8 Recorded in Officia! Records County of San Mateo Warren Slocum Assessor-Courtty Clerl�-Recorder '�ii�!i ��i!� ii!'i ii�ii i�!I� i��i� �lii! i�i�i i�'ii i�'�' �ioi� �iu�� li ii �I � t 2 4 0 5 0 1 1 5 3� II�IIII 7 A R * Resolution No. 049-2006 1145 CORTEZ AVENUE, APN: 026-163-030 TITLE OF DOCUMENT I hereby certify this to be a full, true and corrzct copy of the document it purports to be, the original of which is on file in my office. Date: June 2, 2006 Margaret Mon oe, City Planner �� , RESOLUTION 049-2006 RESOLUTION APPROVING CATEGORICAL EXEMPTION AND AMENDMENT TO DESIGN REVIEW AND SPECIAL PERMITS RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for amendment to desi�n review and �ecial permits for buildinQ height and for reduction of parking spaces on-site for a first floor remodel and second story addition at 1145 Cortez Avenue, zoned R-1 Steve and Courtney Love, propertv owners, APN: 026-163-030; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 22, 2006, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section: 15301 Class 1(e)(2) - additions to existing structures provided the addition will not result in an increase of more than 10,000 SF in areas where all public services and facilities are available and the area in which the project is located is not environmentally sensitive, is hereby approved. 2. Said amendment to design review and special pertnits is approved, subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such amendment to design review and special permits are as set forth in the minutes and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. � h � I, 'C71��C� ��ea-�l , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 22°a day of May ' 2006 by the following vote: AYES: Commissioners: Auran, Brownrigg, Cauchi, Osterling, Terrones, Vistica NOES: Commissioners: NONE ABSENT: Commissioners: NONE ABSTAIN: Commissioners: Deal Secretary EXHIBIT "A" Conditions of approval for categorical exemption and amendment to design review and special permits. 1145 Cortez Avenue Effective June 1, 2006 1. that the project shall be built as shown on the plans submitted to the Planning Deparhnent date stamped May 2, 2006, sheets 1-2, 4 and 6-7, and that any changes to building materials, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; 2. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; 3. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certification under penalty of perjury. Certifications shall be submitted to the Building Department; 4. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; 5. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans; 6. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 7. that the conditions of the Chief Building Official's May 13, 2005, memo, the City Engineer's, Fire Marshal's and Recycling Specialist's May 16, 2005, memos, and the NPDES Coordinator's May 19, 2005, memo shall be met; 8. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; 9. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; EXHIBIT "A" Conditions of approval for categorical exemption and amendment to design review and special permits. 1145 Cortez Avenue Effective June 1, 2006 Page 2 10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and 11. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance. Project Comments Date: To: From: Subject: Staff Review: 05/13/2005 ❑ City Engineer X Chief Building Official O Recycling Specialist ❑ Fire Marshal ❑ City Arborist ❑ City Attorney Planning Staff ❑ NPDES Coordinator Request for design review for lower floor remodel and 2nd floor addition at 1145 Cortez Avenue, zoned R-1, APN: 026-163-030 05/16/2005 1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame Municipal and Zoning Codes, and all other State and Federal requirements. 2) Provide fully dimensioned plans. 3) According to the City of Burlingame Municipal code "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building o�cial, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." Therefore, this building must comply with the 2001 Califomia Building Code for new structures. 4) Obtain a survey of the property lines for any structure within one foot of the property line. 5) Roof eaves must not project within two feet of the property line. 6) Exterior bearing walls less than three feet from the property line must be constructed of one-hour fire-rated construction and no openings are allowed. 7) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. 8) Provide guardrails at all landings. 9) Provide handrails at all stairs where there are more than finro risers. 10)Provide lighting at all exterior landings. 11)The fireplace chimney must terminate at least finro feet above any roof surface within ten feet. .- -� `_._ � �ate: ��S � Date: Project Comments 05/13/2005 To: [� City Engineer ❑ Chief Building Official O City Arborist � City Attorney From: Subject: Planning Staff ❑ Recycling Specialist ❑ Fire Marshal ❑ NPDES Coordinator 1 Request for design review for lower floor remodel and 2nd floor addition at 1145 Cortez Avenue, zoned R-1, APN: 026-163-030 Staff Review: 05/16/2005 1. Storm drainage shall be designed to drain towards the street frontage. 2. Replace all displaced/damaged sidewalk, driveway, curb and gutter. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V � g Date: 5/16/2005 Date: � From: Subject: Project Comments 05/13/2005 ❑ City Engineer � Chief Building Official ❑ City Arborist O City Attorney Planning Staff ❑ Recyciing Specialist d Fire Marshal ❑ NPDES Coordinator Request for design review for lower floor remodel and 2nd floor addition at 1145 Cortez Avenue, zoned R-1, APN: 026-163-030 Staff Review: 05/16/2005 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide double backflow prevention. Reviewed by: � � �`�%�� Date: /6 %?��'f Project Comments Date: To: � City Engineer 0 Chief Bui�ding Official � City Arborist � City Attorney From: Subject: Staff Review: Applicant shall submit a Recycling and Waste Reduction Plan for approval, and pay a recycling deposit for this and all covered projects prior fo construction or permitting. 05/13/2005 Planning Staff Request for design review for lower floor remodel and 2nd floor addition at 1145 Cortez Avenue, zoned R-1, APN: 026-163-030 05/16/2005 X Recycling Specialist 0 Fire Marshal � NPDES Coordinator Reviewed by: � , / � i - Date: 5�/�/D 5 . �,�- Project Comments Date: To: From: Subject: 05/13/2005 � City Engineer � Chief Building Official � City Arborist � City Attorney � Recycling Specialist � Fire Marshai ✓ NPDES Coordinator Planning Staff Request for design review for lower floor remodel and 2nd floor addition afi 1145 Cortez Avenue, zoned R-1, APN: 026-163-030 Staff Revie�v: 05/16/2005 Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution including but not limited to ensuring that all contractors implement construction Best Management Practices (BMPs) and erosion and sediment control measures during ALL phases of the construction project (including demolition). Ensure that sufficient amount of erosion and sediment control measures are available on site at all times. The public right of way/easement shall not be used as a construction staging and/or storage area and shall be free of construction debris at all times. , Brochures and literatures on stormwater pollution prevention and BMPs are aVailable for your review at the Planning and Building departments. Distribute'to all project proponents. For additiona) assistance, contact Eva J. at 650/342-3727. Reviewed by: �� -�� . L.�- Date: 05/19/05 � � ���-�,