HomeMy WebLinkAbout1104 Clovelly Lane - Approval LetterCITY OF BURLINGAME
BURLINGAME
City Hall — 501 Primrose Road .
Burlingame, California 94010-3997
September 20, 2018
Cornelia Haber
1490 Hult Avenue
Los Altos, CA 94024
Re: 1104 Clovelly Lane
Dear Ms. Haber,
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the August 27, 2018, Planning
Commission approval of your application for Design Review and Special Permit became effective
September 6, 2018. This application was for Design Review and Special Permit for a new, two-story
single-family dwelling at 1104 Clovelly Lane, zoned R-1.
The August 27, 2018 minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the revised plans submitted to the Planning
Division date stamped August 17, 2018, sheets AO through A6;
2. that prior to issuance of a building permit, the applicant shall submit an FYI for Planning
Commission review to address the following items: '
submit a revised landscape plan showing additional landscaping throughout the site,
especially within the front yard; and
■ encourage the applicant to work with neighbor to address privacy concerns regarding
the second floor door and deck along the right side of the house; solutions to consider
include changing the 8 foot wide sliding glass doors in the master bedroom to a single
door with sidelites and/or adding one or two landscape trees to screen the second floor
deck.
3. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff);
4. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
N Register online to receive City of Burlingame e-mail updates at www.burlingame.org N' I
September 20, 2018
1104 Clovelly Lane
Page 2
5. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall not
be modified or changed without the approval of the Planning Commission, or City Council
on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2016 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the project architect or residential designer,
or another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the approved
plans; architectural certification documenting framing compliance with approved design
shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
12. that prior to scheduling the framing inspection the applicant shall provide a certification by
the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
:maRegister online to receive City of Burlingame a -mail updates at www.burlingame.org a.
September 20, 2018
1104 Clovelly Lane
Page 3
14. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Division.
This approval is valid for one year during which time a building permit must be issued. An extension of
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
Kevin Gardiner
Community Development Director
C. Sumagny LLC, property owner
1363 Sanchez Street, SF, CA 94131
Chief Deputy Valuation, Assessor's Office
(LOT 9 BLOCK 8 BURLINGAME VILLAGE RSM 23/31 32; APN: 025-232-450)
File