HomeMy WebLinkAbout1209 Cabrillo Avenue - Approval LetterDoc�„ign E:?� alope ID: 049C8823-1CC7-4761-9F3C-7D3F30B61616
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
July 23, 2021
Sohan and Sandhya Talwalker
1209 Cabrillo Avenue
Burlingame, CA 94010
Re: 1209 Cabrillo Avenue
Dear Mr. and Mrs. Talwalker,
. •
BURLINGAME
� �:����
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the July 12, 2021, Planning
Commission approval of your application for Design Review and Special Permit for an attached garage
became effective July 22, 2021. This application was for a new, two-story single family dwelling and
attached garage at 1209 Cabrillo Avenue, zoned R-1.
The July 12, 2021, minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped June 30, 2021, sheets A0.1 through A4.8, D.1, and L1.1;
2
3
that prior to issuance of a building permit, an FYI application shall be submitted to include a
sample of the roofing material;
that any final revisions to the fence and landscape hedge details, to address the concerns
expressed by the adjacent neighbor at 1205 Cabrillo Avenue in their correspondence dated
July 12, 2021, shall be reviewed and accepted by Planning Division staff;
4. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf�;
5
�
7
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
"�' Register online to receive City of Burlingame e-mail updates at www.burlingame.org
DocuSign Envelope ID: 049C8823-1CC7-4761-9F3C-7D3F30661B1B
July 12, 2021
1209 Cabrillo Avenue
Page 2
8. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition
of a structure, interior or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer;
14. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
16. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
,ti
Register online to receive City of Burlingame e-mail updates at www.burlingame.org
Doci Sign �_nv�lope ID: 049C8823-1CC7-4761-9F3C-7D3F3066161B
July 12, 2021
1209 Cabrillo Avenue
Page 3
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An
extension of up to one year may be considered by the Planning Commission if application is made
before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
CDocu5lqned by:
��. ���.�
28D6423C2EBB49F...
Kevin Gardiner, AICP
Community Development Director
c. Sohan and Sandhya Talwalker, applicants and property owners
Chief Deputy Valuation, Assessor's Office
(LOT 20 BLOCK 30 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-171-130)
File
Register online to receive City of Burlingame e-mail updates at www.burlingame.org
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
July 12, 2021
Sohan and Sandhya Talwalker
1209 Cabrillo Avenue
Burlingame, CA 94010
Dear Mr. and Mrs. Talwalker,
� CITY
��' ' i i
..
_._ _
"� �..,
9roww�
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
The Planning Division has reviewed your request for a new detached accessory dwelling unit
and determined that the proposed project complies with the requirements set forth in
Burlingame Municipal Code Chapter 25.59 (Accessory Dwelling Units). The legal status of your
new detached accessory living unit at 1209 Cabrillo Avenue, zoned R-1, is subject to the
following conditions of approval:
that the project shall be built as shown on the plans submitted to the Planning Division
and date stamped June 30, 2021 and that the accessory dwelling unit shall be
restricted to no more than 850 SF (for studio/one-bedroom units) or 1,000 SF (for two-
bedrooms or more units);
2. that prior to issuance of a building permit for the new accessory dwelling unit, a deed
restriction shall be filed with the County Recorder. The deed restriction shall state that
the accessory dwelling unit shall not be sold separately from any part of the property
on which it is located; and that it is restricted to the standards specified in the
Accessory Dwelling Unit municipal code provision 25.59;
that demolition or removal of the existing structures and any grading or earth moving
on the site shall not occur until a building permit has been issued and such site work
shall be required to comply with all the regulations of the Bay Area Air Quality
Management District;
4. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame; and
�� Register online for the City of Burlingame list serve at www.burlinpame.orq :C
July 12, 2021
1209 Cabrilio Avenue
Page 2
6. that the accessory dwelling unit permits may be revoked on any one or more of the
following grounds:
a. The accessory dwelling unit requirements are not being met; or
b. The accessory dwelling unit is no longer used for residential purposes; or
c. The parking required is no longer provided; or
d. The primary single family dwelling on the site is purposely demolished.
This approval is valid for one year during which time a building permit must be issued. An
extension of up to one year may be considered by the Community Development Director if
application is made before the end of the first year.
The decision of the Community Development Director is a final administrative decision pursuant to
Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of
competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter
time is required pursuant to state or federal law.
Sincerely yours,
�
�V
K vin Gardiner
Community Development Director
Chief Building Official, Community Development Dept./Building Division
Chief Deputy Valuation, Assessor's Office
(LOT 20 BLOCK 30 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-171-130)
File
:� Register online for the City of Burlingame list serve at www.burlinqame.orq �"