Loading...
HomeMy WebLinkAbout101 California Drive - Resolution� + . � � � RECORDING REQUESTED BY: Planning Department ' City of Burlingame WHEN RECORDED MAIL T0: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2012-089212 11:24 am 06I26112 R1 Fee: O FEE Count of Pages� Recorded in Official Records County of San Mateo Mark Church Assessor-Count Clerk-Recorder ��i����l ���'� ����''� �I��'�� i�ll� I���' i ��� ����� ����'�� �I��'� ����� ��l� ���� * R 0 0 0 1 4 3 6 0 4 2* Resolution No. 25-2012 101 CALIFORNIA DRIVE — APN 029-232-170 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. Date: June 11, 2012 , b; / /C William Meeker, ommunity Development Director RESOLUTION APPROVING CATEGORICAL EXEMPTION AND COMMERCIAL DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Commercial Desiqn Review for chanqes to the fa�ade of an existinq commercial buildinq at 101 California Drive zoned CAR 101 California Drive LLC, 3 California Drive, Burlinqame, CA, 94010, propertv owner, APN: 029-232-170; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 29, 2012, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, if is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section: 15301 - Existing facilities, Class 1(a) of the CEQA Guidelines, which states that interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances are exempt from environmental review, is hereby approved. 2. Said Commercial Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Commercial Design Review are set forth in the staff report, minutes, and recording of said meeting. 3 It is further directed that a certified copy of tl records of the County of San Mateo. I, � � U►1�,��X Ul,c.�,r(,d U�� , rY 9 Y Secreta of the Plannin Commission of the Cit of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 29th dav of Mav, 2012 by the following vote: 101 CALIFORNIA DR. - RESO 25-2C12 AYES: Auran, Gaul, Sargent, Terrcnes, Yie NOES: None ABSENT: Cauchi, Vistica RECUSE: None Secretary EXHIBIT "A" Conditions of Approval for Categorical Exemption amd Commercial Design Review. 101 California Drive Effective June 8, 2012 that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 19, 2012, sheets A.001, D.201, D.301, A.201, A.301 and A.302 and date stamped May 11, 2012, sheets A.101, A.401, A.402 and A.003; any changes to the exterior materials shall require review by the Planning Commission; 2. that the conditions of the Chief Building Official's April 20, 2012 memo, the Park Supervisor's April 24, 2012 memo, the City Engineer's May 14, 2012 memo, the Fire Marshal's April 23, 2012 memo and the NPDES Coordinator's April 24, 2012 memo shall be met; 3. that any changes to the size or envelope of building, which would include changing or adding exterior walls or parapet walls, shall require an amendment to this permit; 4. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 5. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 8. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; EXHIBIT "A" Conditions of Approval for Categorical Exemption and Commercial Design Rev�ew. 101 California Drive Effective June 8, 2012 Page 2 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certification under penalty of perjury. Certifications shall be submitted to the Building Division; and 11. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Project Comments Date: To: From: April 20, 2012 r�( Engineering Division (650) 558-7230 ❑ Fire Division (650) 558-7600 ❑ Building Division (650) 558-7260 ❑ Parks Division (650) 558-7334 Planning Staff ❑ Stormwater Division (650) 342-3727 ❑ City Attorney (650) 558-7204 Subject: Request for Design Review for changes to the fa�ade of an existing commercial building at 101 California Drive, zoned C-2, Subarea D, APN: 029-232-170 Staff Review: April 23, 2012 Replace all displaced/damaged sidewalk, driveway, curb and gutter. Reviewed by: V V Date: 5/14/2012 Project Comments Date: April 20, 2012 To: � Engineering Division (650; 558-7230 � Building Division (6�0) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff ❑x Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review for changes to the farade of an existing commercial building at 101 California Drive, zoned C-2, Subarea D, APN: 029-232-170 Staff Review: April 23, 2012 No comment at this time. , Reviewed by: �� s��G� Date: �� �� ?� Project Comments Date: To: From: April 20, 2012 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 x Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review for changes to the fa�ade of an existing commercial building at 101 California Drive, zoned C-2, Subarea D, APN: 029-232-170 Staff Review: April 23, 2012 Any construction project in the City, regardless of size, shall comply with the City NPDES permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement Best Management Practices (BMPs) during all phases of construction (including demolition). When submitting plans for a building permit include a list of construction stormwater pollution prevention BMPs as project notes and include them as a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction Best Management Practices (BMPs) plan sheet to comply with this requirement. Electronic file is available for download at http://www.flowstobay.org/bs_construction.php (Scroll about half-way down the page and click on Construction BMP Plan Sheet). For assistance please contact Stephen D. at 650-342-3727 �, ,.._, :��, __:t _. ,: �� � _ � :_ _ ...� E�FR � � �.(','' �... �� (��C ���.:i"�I_ii`e��+n cu:�-, �S,c�;rti:��.G c Reviewed bv: SD � Date: 04-24-2012