HomeMy WebLinkAbout101 California Drive - Resolution�
+ . � �
�
RECORDING REQUESTED BY:
Planning Department
' City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2012-089212
11:24 am 06I26112 R1 Fee: O FEE
Count of Pages�
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-Count Clerk-Recorder
��i����l ���'� ����''� �I��'�� i�ll� I���' i ��� ����� ����'�� �I��'� ����� ��l� ����
* R 0 0 0 1 4 3 6 0 4 2*
Resolution No. 25-2012
101 CALIFORNIA DRIVE — APN 029-232-170
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
Date: June 11, 2012
,
b; /
/C
William Meeker, ommunity Development Director
RESOLUTION APPROVING CATEGORICAL EXEMPTION
AND COMMERCIAL DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
Commercial Desiqn Review for chanqes to the fa�ade of an existinq commercial buildinq at 101
California Drive zoned CAR 101 California Drive LLC, 3 California Drive, Burlinqame, CA,
94010, propertv owner, APN: 029-232-170;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
Mav 29, 2012, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, if is hereby found that there is
no substantial evidence that the project set forth above will have a significant effect on
the environment, and categorical exemption, per CEQA Article 19, Section: 15301 -
Existing facilities, Class 1(a) of the CEQA Guidelines, which states that interior or
exterior alterations involving such things as interior partitions, plumbing, and electrical
conveyances are exempt from environmental review, is hereby approved.
2. Said Commercial Design Review is approved subject to the conditions set forth in Exhibit
"A" attached hereto. Findings for such Commercial Design Review are set forth in the
staff report, minutes, and recording of said meeting.
3
It is further directed that a certified copy of tl
records of the County of San Mateo.
I, � � U►1�,��X Ul,c.�,r(,d U�� , rY 9 Y
Secreta of the Plannin Commission of the Cit of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a
regular meeting of the Planning Commission held on the 29th dav of Mav, 2012 by the following
vote:
101 CALIFORNIA DR. - RESO 25-2C12
AYES: Auran, Gaul, Sargent, Terrcnes, Yie
NOES: None
ABSENT: Cauchi, Vistica
RECUSE: None
Secretary
EXHIBIT "A"
Conditions of Approval for Categorical Exemption amd Commercial Design Review.
101 California Drive
Effective June 8, 2012
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped April 19, 2012, sheets A.001, D.201, D.301, A.201, A.301 and A.302 and
date stamped May 11, 2012, sheets A.101, A.401, A.402 and A.003; any changes to the
exterior materials shall require review by the Planning Commission;
2. that the conditions of the Chief Building Official's April 20, 2012 memo, the Park
Supervisor's April 24, 2012 memo, the City Engineer's May 14, 2012 memo, the Fire
Marshal's April 23, 2012 memo and the NPDES Coordinator's April 24, 2012 memo shall
be met;
3. that any changes to the size or envelope of building, which would include changing or
adding exterior walls or parapet walls, shall require an amendment to this permit;
4. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staffl;
5. that demolition or removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
6. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
7. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
8. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
9. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2010 Edition, as amended by the City of Burlingame;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Commercial Design Rev�ew.
101 California Drive
Effective June 8, 2012
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Division; and
11. that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.
Project Comments
Date:
To:
From:
April 20, 2012
r�( Engineering Division
(650) 558-7230
❑ Fire Division
(650) 558-7600
❑ Building Division
(650) 558-7260
❑ Parks Division
(650) 558-7334
Planning Staff
❑ Stormwater Division
(650) 342-3727
❑ City Attorney
(650) 558-7204
Subject: Request for Design Review for changes to the fa�ade of an existing
commercial building at 101 California Drive, zoned C-2, Subarea D,
APN: 029-232-170
Staff Review: April 23, 2012
Replace all displaced/damaged sidewalk, driveway, curb and gutter.
Reviewed by: V V
Date: 5/14/2012
Project Comments
Date:
April 20, 2012
To: � Engineering Division
(650; 558-7230
� Building Division
(6�0) 558-7260
� Parks Division
(650) 558-7334
From: Planning Staff
❑x Fire Division
(650) 558-7600
� Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Subject: Request for Design Review for changes to the farade of an existing
commercial building at 101 California Drive, zoned C-2, Subarea D,
APN: 029-232-170
Staff Review: April 23, 2012
No comment at this time.
,
Reviewed by: �� s��G� Date: �� �� ?�
Project Comments
Date:
To:
From:
April 20, 2012
� Engineering Division
(650) 558-7230
� Building Division
(650) 558-7260
� Parks Division
(650) 558-7334
Planning Staff
0 Fire Division
(650) 558-7600
x Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Subject: Request for Design Review for changes to the fa�ade of an existing
commercial building at 101 California Drive, zoned C-2, Subarea D,
APN: 029-232-170
Staff Review: April 23, 2012
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit to prevent stormwater pollution from construction activities. Project
proponent shall ensure all contractors implement Best Management Practices
(BMPs) during all phases of construction (including demolition).
When submitting plans for a building permit include a list of construction stormwater
pollution prevention BMPs as project notes and include them as a separate full size
plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached
Construction Best Management Practices (BMPs) plan sheet to comply with this
requirement. Electronic file is available for download at
http://www.flowstobay.org/bs_construction.php
(Scroll about half-way down the page and click on Construction BMP Plan
Sheet).
For assistance please contact Stephen D. at 650-342-3727
�, ,.._, :��, __:t _. ,:
�� � _
� :_ _ ...�
E�FR � � �.(',''
�... �� (��C ���.:i"�I_ii`e��+n
cu:�-, �S,c�;rti:��.G c
Reviewed bv: SD � Date: 04-24-2012