HomeMy WebLinkAbout1430 Drake Avenue - Resolutionr
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
Resolution No. 9 - 2017
1430 DRAKE AVENUE
APN 026-052-140
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office. �
Date
I�i�Af
March 10, 2017
Developmen
�
�,� �
— ....a.�.�.,��.,.,,,.u�
����.� �����
�, _
, r , �`; A�
, �_ �, ...�,��
�+k�?3.:�'�S3 J�3IdE �//
2017-083798
3:05 prn 09l25t17 R1 Fee: NO FEE
Caunt of Pages 13
Recorded in Official Records
County of San Mateo
iNark Church
Assessor-County Clerk-Recorder
li i' !�,ii�l''' II�!' ili�� Il;�l'�� � I I��� I���� I� �I'I'il' I II� ,'�� li
*$ R 0 0 0 Z 4 5 b 9 2 0$*
��r�
�
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW
AND SPECIAL PERMITS
RESOLVED, by the Pianning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for a Desiqn
Review and Special Permits for basement ceilinq heiqht and direct exit from a basement to the exterior
of the structure for a new, two-story sinqle family dwellinq and basement at 1430 Drake Avenue, Zoned
R-1, Richard and Jennifer Sargent TR, 1430 Drake Avenue, Burlinqame, CA 94010, property owners
APN: 026-052-140;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
February 27, 2017, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a), which states that construction of a limited number of
new, small facilities or structures including one single family residence or a second dwelling unit
in a residential zone is exempt from environmentai review. In urbanized areas, up to three
single-family residences maybe constructed or converted under this exemption, is hereby
approved.
2. Said Design Review and Special Permits are approved subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such Design Review and Special Permits are set forth
in the staff report, minutes, and recording of said meeting.
3. It is further directed that a certified copy of this resolution be reco ded in the official records of
the County of San Mateo. ,
� �r
Chairman
I, �� �Ci-�,�`;1.�, r'��sretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 27th day of February, 2017, by the following vote:
1430 DRAKE AVE. - RESO 9-2017
Aves: BANDRAPALU, DEMARTINI,
GUM, LOFTIS
NOEs: GAUL
assENr: SARGENT
RecusE�: TERRONES
L�L'll_3��i%Vr
Conditions of Approval for Categorical Exemption, Design Review and Special Permits.
1430 Drake Avenue
Effective March 9, 2017
Page 1
1 that the project shall be built as shown on the plans submitted to the Planning Division
date stamped February 16, 2017, sheets A.2, A.5, A.6 and L.1, and date stamped
January 19, 2017, sheets A.1, A.3, A.4, A.7, N.1, and L.2;
2. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staffl;
3. that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dormer(s), shall require an
amendment to this permit;
4. that the conditions of the Engineering Division's January 26, 2017 memo shall be met;
5. that any recyciing containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a buiiding permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shail be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved pians throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possibie, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2016 Edition, as amended by the City of Burlingame;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review and Special Permits.
1430 Drake Avenue
Effective March 9, 2017
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
12. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first fioor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shail be accepted by the City Engineer;
13. that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
finai framing inspection shall be scheduled;
14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materiais, window type, etc.) to verify that the project has
been buiit according to the approved Planning and Building plans.