HomeMy WebLinkAbout463 Cumberland Drive - ResolutionRECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
�,�� � �w� � ����
..:G��m'„ }i .�Ar".'•,- �t,C'FFr
...::UP�. .7 r �i4,��, ��.
.. .or�i�r� �n �:�f:s..i::,; �..-:., .
..')t'.lI'! c.'.t J-;r. 10" !C�'-
�=9:�;k i..,:;;,:r
����- � :. � -, �,:� . � ��
i � x� '�';
°� 1 d �9. � 5 � � y $; ,� �� Z � ,�
� �: } � �i �� �� � � � � t �'E�� z � ! i��, �,
f ' �•, ' ,' .. K
Resolution No. 82 - 2014
463 CUMBERLAND ROAD
APN 029-163-070
TITLE OF DOCUMENT
l�
�
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
o�ce.
Date:
October 29, 2014
//% '�7_-+
TY
�RL��'����
"e�e�,..�.. i� _K � q
t Direct '�,c� �K��; � 'j , � -
00
� oAATED Jd1►dg � �,
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW AMENDMENT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review Amendment for chanqes to a previously approved first and second story addition to an existinq
sinqle family dwellinq at 463 Cumberland Road, Zoned R-1, Brian and Barbara Kott, property owners,
APN: 029-163-070;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
September 22, 2014, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (e)(1) of the CEQA Guidelines, which states that additions
to existing structures are exempt from environmental review, provided the addition will not result
in an increase of more than 50% of the floor area of the structures before the addition, is hereby
approved.
2. Said Design Review Amendment is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review Amendment are set forth in the staff report,
minutes, and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
;\,� _,�.�.w��-t ��4,, _�,i. �-�i� (�_�.\
,
Chairman
I, ���� ���, � , Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 22nd dav of September, 2014, by the following vote:
463 CUMBERLAND RD. - RESO 82-2014
AYES: Bandrapalli, DeMartini, Gum, Loftis,
Terrones, Yie
NOES: None
ABSENT Sargent
RECUSED: None
Sec tary
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review Amendment.
463 Cumberland Road
Effective October 2, 2014
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped September 10, 2014 sheets CS, A-3 and A-4 and June 11, 2014, sheets
C-1, A-1, A-2 and L-1;
2. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staf�;
3. that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dormer(s), shall require an
amendment to this permit;
4. that the conditions of the Building Division's June 3, 2014, May 28, 2014 and April 22,
2014 memos, the Parks Division's April 29, 2014 memo, the Engineering Division's May
6, 2014 memo, the Fire Division's April 21, 2014 memo and the Stormwater Division's
April 29, 2014 memo shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition or removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review Amendment.
463 Cumberland Road
Effective October 2, 2014
Page 2
10. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2013 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the
approved plans; architectural certification documenting framing compliance with
approved design shall be submitted to the Building Division before the final framing
inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.