HomeMy WebLinkAbout1125 Jackling Drive - Resolution,. � , ,
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE
BURLINGAME, CA 94010
2QC�4-0�836$
� 1.;�;im 0�10��'(?.:� R f Fee: NO �CE
��CUI'It ^Jf �.i�E`�'� �.�i
FZ�z. c�rr+�c! ir; n��ti,:.�,�1 f2e,,.r�rds
<, .,�,�,ry f�� s<��, n��:�t��
'✓�,!:arre�n .Slvcusn
�?S�.er>�c,r-c,�,ur�ty r-1�.r�-Rer.r.:�der
�� � � �� �� � � �� �� � � � � �� � I �I ��i ����! '��
� _ _ _ _ _ � • _ ,', , «
Resolution No. 028-2004
1125 JACKLING DRIVE; APN: 027-154-170
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
�i�
Date: 04/23/2004
Margaiet M nroe, ity Planner
RESOLUTION 028-2004
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND
SPECIAL PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
desi�n review and special permit for an attached ag ra�e for a first floor and lower level addition
at 1125 Jackling Drive, zoned R-1, Maurissa Heffran, 506 Warren Road, San Mateo, CA 94402
propertv owner, APN: 027-154-170;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
April 12, 2004, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19, Section 15303, Class 3—
(a) construction of a limited number of new, small facilities or structures including (a)
one single family residence or a second dwelling unit in a residential zone. In urbanized
areas, up to three single-family residences maybe constructed or converted under this
exemption, is hereby approved.
2. Said design review and special permit are approved, subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such design review and special permit are as set
forth in the minutes and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the
records of the County of San Mateo. ^ ,
I, �I� �'M�'A/� , Secretary of the Planning Commissiori o� the City of B�ingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of
the Planning Commission held on the 12th day of April, 2004 by the following vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
Auran, Bojues, Keele, Keighran, Osterling,
NONE
Brownrigg, Vistica
ABSTAIN: COMMISSIONERS: NONE
Secretary
EXHIBIT "A"
Conditions of approval for categorical exemption, design review and special permit.
1125 Jackling Drive
Effective Apri122, 2004
l. that the project shall be built as shown on the plans submitted to the Planning Department
date stamped March 5, 2004, sheets 1-2, 2A, 3-5, and Topographic and Boundary Survey,
and that any changes to the footprint or floor area of the building shall require and
amendment to this permit; and that the roofing material shall be slate;
2. that prior to the building permit final inspection, the property owner shall record a
permanent cross-access easement on the Hillsborough property to the subject property in
Burlingame;
3. that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), moving or changing windows and
axchitectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
4. that all of the mitigation measures included in the arborist's report, dated March 16, 2004,
shall be installed and inspected by the City Arborist before issuance of a building permit
and shall be complied with during construction; the contractor shall call for the Arborist
to inspect the protection measures installed before a building permit shall be issued, and
that the property owner shall maintain the trees after construction as directed by the
arborist's report;
5. that an "L" footing foundation, facing away from the trunk of the existing 48-inch Coast
Live Oak tree, shall be used for the foundation area along the left side of the house
adjacent to the tree protection zone for the Coast Live Oak tree;
6. that the required tree protection measures shall be monitored during construction by a
Certified Arborist who shall inspect the construction site once a week and certify in
writing to the City Arborist and Planning Department that all tree protection measures are
in place and requirements are being met;
7. that the conditions of the City Engineer's January 7, 2004, memo, the Fire Marshal's
December 24, 2004, memo, the Chief Building Official's and Recycling Specialist's
December 24, 2004, memos, and the City Arborist's February 4, 2004, memo shall be
met;
8. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Department;
EXHIBIT "A"
Conditions of approval for categorical exemption, design review and special permit.
1125 Jackling Drive
Effective Apri122, 2004
Page 2
9. that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project
has been built according to the approved Planning and Building plans;
10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans before
a Building permit is issued;
11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department;
12. that prior to scheduling the foundation inspection a licensed surveyor shall locate the
property corners and set the building envelope;
13. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation
of the new structure(s) and the various surveys shall be accepted by the City Engineer;
14. that during demolition, site preparation and construction of the addition, the applicant
shall use all applicable "best management practices" as identified in Burlingame's Storm
Water Ordinance, to prevent erosion and off-site sedimentation of storm water runoff;
15. that the applicant shall submit an erosion and sedimentation control plan describing
BMPs (Best Management Practices) to be used to prevent soil, dirt and debris from
entering the storm drain system; the plan shall include a site plan showing the property
lines, existing and proposed topography and slope; areas to be disturbed, locations of
cut/fill and soil storage/disposal areas; areas with existing vegetation to be protected;
existing and proposed drainage patterns and structures; watercourse or sensitive areas on-
site or immediately downstream of a project; and designated construction access routes,
staging areas and washout areas;
16. that the erosion and sedimentation control plans should include notes, specifications,
and/or attachments describing the construction operation and maintenance of erosion and
sediment control measures, including inspection frequency; methods and schedule for
- grading, excavation, filling clearing of vegetative cover and mulch, including methods
and schedules for planting and fertilization; and provisions for temporary and permanent
imgation;
17. that off-site runoff shall be diverted around the construction site and all on-site runoff
shall be diverted around exposed construction areas;
EXHIBIT "A"
Conditions of approval for categorical exemption, design review and special permit.
1125 Jackling Drive
Effective Apri122, 2004
Page 3
18. that methods and procedures such as sediment basins or traps, earthen dikes or berms, silt
fences, straw bale dikes, check dams storm drain inlet protection soil blanket or mats, and
covers for soil stock piles to stabilize denuded areas shall be installed to maintain
temporary erosion controls and sediment control continuously until permanent erosion
controls have been established;
19. that fiber rolls and other erosion prevention products are installed around the construction
site as a barrier to prevent erosion and construction runoff into the stream;
20. that oils, fuels, solvents, coolants and other chemicals stored outdoors shall be protected
from drainage by structures such as berms and roof covers; bulk materials stored
outdoors shall be protected from drainage with berms and covers; equipment stored
outdoors shall be stored on impermeable surfaces, shall be covered and shall be inspected
for property functioning and leaks; all storage areas shall be regularly cleaned, including
sweeping, litter control and a spill cleanup plan;
21. that landscape areas shall be designed to reduce excess irrigation run-off, promote surface
filtration and minimize the use of fertilizers, herbicides and pesticides;
22. that the project is subject to the state-mandated water conservation program, and a
complete Irrigation Water Management Plan must be submitted with landscape and
irrigation plans at time of permit application;
23. that demolition of the existing structures and any grading or earth moving on the site
shall be required to comply with all the regulations of the Bay Area Air Quality
Management District;
24. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm
Water Management and Discharge Control Ordinance; and
25. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2001 Edition, as amended by the City of Burlingame.
R T
Project Comments
Date: 12/22/03
To: �City Engineer
❑ Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for an attached garage
for a' at 1125 Jackling Drive, zoned R-1,
APN:027-154-170 C.N ) � - s+p � � S � �
Staff Review: 12/29/03
�,
i;��✓' _�='r: '.,✓ _ - .�-.• ,
� ��i _ cc: �::;.�: � % _
����� >��A�� r.., �. _� v
/ ,.,, , l /. . ._
. — � - -- -
� . � � �.. .�..
� �..�. ,� ,1'� 1 � ��
� � ' .
, � ,
,
� :. , � ;,,.�
► �
. ,,
�ii � ��r.�.�r�c��� ..s.o
� .� �� �.�
�-,�1.�,�i��,�..� �,�
�C���� �
� ��,.
i � .�
.v.
Reviewed by:
��
Date:
���� `�
a: • . ..
, PUBLIC WORKS DEPARTMENT ENGIlVEERING DIVISION
PLANNING REVI�W COMII�NTS � 7y..�_s� .
Project Name:-� S'�e i�+�w�f o��
The foIlowing requirements apply to the project
- Project Address:_ il � .J�n�•'
_ /;�,''�r�
1� � A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show a11 properiy lines, property comers,
easements, topographical features and utilities. (Required prior to the
building permit issuance.)
2 'The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issvauce.)
3. � The applicant shali submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 �_ A sanitary sewer lateral t�t is required for the project in accordance with
the City's standazds. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures. �.
8. Submit traffic trip generation analysis for the project.
9. � Submit a traffic impact study for the project. T'he traffic study should
idenfiify the project generated impacts and recommend mitigation
� measures to be adopted by the project to be approved by the City
Engineer.
14. The project shall file a pazcel map with the Public Works Engineering
Division. The parcel map shall show a11 existing property lines, easements,
monuments, and new properly and lot lines proposed by the map.
Page 1 of 3
U:�private development�PLANNING REVIEW COMMENTS,doc
l " .
' . , PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject pazcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
� 12, Map closure/lot closure calculations shall be submitted with the parcel
� map.
13 The project shall submit a condomuuum map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Aet.
14 'The. project sha11, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
; appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights iri accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular trafiic, pedestrian traffic
and public on street parking. Tlie project shall identify tliese impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the pmposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the azea of the 100-year
� flood and existing improvements with proposed improvements.
18 Y Any work within the drainage area; creek, or creek banks requires a State
�-- ; Deparhnent of Fish and Game Permit and Army Corps of Engineers
Pemuts.
19 _� No construction debris sha11 be allowed into the creek.
20 � The project shall comply with the City's NPDES pernut requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway, dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's appmval.
22 T'he plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development�PLANNING REVIEW CO1��IIvIENTS.doc
i � •
�.�. '� PUBLIC WORKS DEPAR'TMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
watei from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in fron� The
� sidewallc &onting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the gazbage area. to
the Sanitary Sewer System is required.
Page 3 of 3
U:�private developmentlFLANNING REVIEW COr�D1�iENTS.doc
0
Project Comments
Date:
12/22/03
To: O City Engineer
O Chief Building Official
�Fire Ma�shal
❑ Recycling Specialist
� City Arborist
� City Attorney
From: Planning Staff
Subject: Request for design review and special permit for an attached garage
for a single story addition at 1125 Jackling Drive, zoned R-1,
APN:027-154-170
Staff Review: 12/29/03
���� :�.p � ��; ��..�-.��� ��..�.-e
� . � , r / �
�s
Reviewed by:
s
Date:
�� �
�
Project Comments
Date: 12/22/03
To: O City Engineer
�Chief Building Official
❑ Fire Marshal
� Recycling Specialist
O City Arborist
O City Attomey
From: Planning Staff
Subject: Request for design review and special permit for an attached garage
for a single story addition at 1125 Jackling Drive, zoned R-1,
APN:027-154-170
Staff Review: 12/29/03
a
Reviewed by: Date:
�� 12�z j/°�
-�,
�
Project Comments
Date: 12/22/03
To: O City Engineer
� Chief Building Official
O Fire Marshal
�Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: � Request for design review and special permit for an attached garage
for a single story addition at 1125 Jackling Drive, zoned R-1,
APN:027-154-170
Staff Review: 12/29/03
Applicant shall,submit a Waste Reduction Plan and Recycling
Deposit for this and all covered projects and sections of projects
prior to any demolition, construcfion or permitting.
Date:
To:
From:
, �.c._.,.a� . �........ ,.,,r�.�.,. . ...:s.. ,.,.,. . - ex. . . ., „_:.,. , .
� Project Comments
❑ City Engineer
O Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
�City Arborist
❑ City Attorney
Planning Staff
Subject: Request for design review and special permit for an attached garage
for a new one-story single family dwelling at 1125 Jackling Drive,
zoned R-1, APN:027-154-170
Staff Review:
/ �. �• .�. / c , , T �� �•, .�.t!
.•
•
�. '' � :• �� . • ! �i _-r! rr
5'�/T3 �� 2�c6�o'�t�'S 9k.'f7� � �� �+v� .
— /• /�����6A�GQ'Yl /''tfiA'ivlP.FiS ��rE��''47 /�2 �sS5iG3tt�
T!?�► c�io�.� / h (�A
� ( :i.� �/�l�rE rito��r-�. Mb�+Su/L� ��E 6�ltet�op''�✓E
f� �.. � � �wG rt �� c i�( � t C
. �PNn,ov�� m�c l�o.�.,z�s���E Wc.p�.�
— . �e s�- Gen s�ra��r�, �i�� �o;�.�,� p� o.�.�
a
Reviewed by: � ��,/��_��
Date: ����0 �