Loading...
HomeMy WebLinkAbout1469 Bernal Avenue - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 September 9, 2014 Alicia Ader Dreiling Terrones Architecture, Inc. 1103 Juanita Avenue Burlingame, CA 94010 Re: 1469 Bernal Avenue Dear Ms. Ader, � GITY �rr i � �� � ��_, •.���,. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the August 11, 2014, Planning Commission approval of your application for Conditional Use Permits became effective August 21, 2014. This application was to modify an existing detached garage and add a new attic storage space above the garage at 1469 Bernal Avenue, zoned R-1. The August 11, 2014, minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped July 25, 2014, sheets A1.0 through A5.1, and that any changes to footprint or floor area of the accessory structure shall require an amendment to this permit; 2. that if the accessory structure is demolished or the envelope changed at a later date the Conditional Use Permits, as well as any other exceptions to the code granted here, will become void; 3. that the attic storage space above the detached garage shall not include a kitchen, bathtub, or interior shower and shall not be used for sleeping purposes; 4. that the conditions of the Building Division's August 1, 2014 and May 30, 2014 memos, the Engineering Division's June 19, 2014 memo, the Fire Division's June 2, 2014 memo, the Parks Division's June 5, 2014 memo and the Stormwater Division's June 4, 2014 memo shall be met; 5. that any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and 7. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame. v� Register online to receive City of Burlingame e-mail updates at www.burlingame.org CC September 9, 2014 1469 Bernal Avenue Page 2 All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, / / William Meeker Community Development Director c. Ranjan Prasad and Monisha Deshpande, property owners 1469 Bernal Avenue Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (LOT 3 BLOCK 45 EASTON ADD BURLINGAME NO 4 RSM A/45; APN: 026-044-030) File :C Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: � ; Project Comments Date: July 30, 2014 To: � Engineering Division (650) 558-7230 X Buiiding Division (650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 StafF Review: No further comments. All conditions of approval as stated in the review dated 5-30-2014 will apply to this project. �_���---� / .� . Reviewed by: \1 �` Date: 8-1-2014 �,,. . �, . . � �� Project Comments Date: To: From: May 30, 2014 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 Staff Review: June 2, 2014 1) On the plans specify that this project will comply with the 2013 California Building Code, 2013 California Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 California Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California Building Codes. 2) Specify on the plans that this project will comply with the 2013 California Energy Efficiency Standards. Go to http://www.enerqv.ca.qov/title24/2013standards/ for publications and details. 3) The GreenPoints Checklist will no longer be required beginning July 1, 2014. Compliance with the Mandafory Measures of the 2013 California Green Building Code (CAL Green) is required. Provide two completed copies of the attached Mandafory Measures with the submittal of your plans for Building Code compliance plan check. In addition, replicate this completed document on the plans. Note: On the Checklist you must provide a reference which indicates where each Measure can be found on the plans. 4) Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) �On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 8) Provide existing and proposed elevations. 9) Provide a complete demolition plan that includes a leqend and indicates existing walls and features to remain, existing walls and features to be demolished, and new walls and features. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 10) Show the distances from all exterior walls to property lines or to assumed property lines 11) Show the dimensions to adjacent structures. �The plans show that the right side of the garage structure is less than three feet from the property line. Revise the plans to show that attic ventilation will be achieved through other means. 2013 CBC §705.8.1 and Table 705.8 � The plans show that the structure is three feet from the property line. To comply with the opening protection required in 2013 CBC, Table 705.8 the building face must be more than three feet from the property line or the gable end venting must be eliminated and attic ventilation must be achieved through other means. �On the plans specify that the roof eaves will not project within two feet of the property line. '� Provide details on the plans which show that all roof projections which project beyond the point where fire-resistive construction would be required will be constructed of one- hour fire-resistance-rated construction per 2013 CBC §705.2. �Indicate on the plans that exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. (2013 CBC, Table 602) 17 � dicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 18) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 19) Provide handrails at all stairs where there are four or more risers. 2013 CBC §1009. 20) Provide lighting at all exterior landings. C�lace the following statement on each page of the plans: "The space above the garage described as Attic Storage shall not be used for human habitation." NOTE: A written response to the items noted here and plans that specifically address items 5, 12, 13, 14, 15, 16, 17, and 21 ust be re-submitted before this project can move forward for Planning Commiss o�ij a�tion. Reviewed by: �J / Date: 5-30-2014 Joe , O � 650-5 - 270 Project Comments Date: May 30, 2014 To: X Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 Staff Review: June 2, 2014 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. Replace all displaced/damaged sidewalk, driveway, curb and gutter. Reviewed by: V V Date: 6/19/2014 Project Comments,=. Date: May 30, 2014 To: � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff ❑x Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 Staff Review: June 2, 2014 No comment at this time. Reviewed by: Date: �.�� `� �� Project Comments Date: To: From: May 30, 2014 � Engineering Division (650) 55&7230 � Building Division (650) 558-7260 � Parks Division (65�) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 Staff Review: June 2, 2014 1. Existing City Stre�t Tree may not be cut, trimmed or removed without permit from Parks Di�ision (558-7330). 2. No existing tree over 48 inches in circumference at 54 inches from base of tree may be removed without a Protected Tree Permit from the Parks Division (558-7330). � Completed landscape must include 3 landscape trees existing or new. Identify species on site plan. Reviewed by: B Disco Date: 6/5/14 Project Comments Date: To: From: May 30, 2014 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260. � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 X Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Conditional Use Permit for a second story addition and renovation to an existing detached garage at 1469 Bernal Avenue, zoned R-1, APN: 026-044-030 Staff Review: June 2, 2014 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://flowstobay.org/files/privatend/MRPsourcebk/Section5/ConstBMPPIanJun2012. pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://flowstobay.org/files/privatend/M RPsourcebk/Section8/Arch itectu ralcopperB M Ps .pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD Date: 6/4/14 �� �onstruction Best Management Practices (B1VIPs) SAN MATEO COUNTYWIDE Water Pollution Prevention Program Clean Water. Healtihy Cmnmunity. Construction projects are required to implement tbe stormwater best management practices (BMP) on this page, as they apply to }�our project, all year long. i��Iaterials 3c ��'aste �'Ianagement �� �� � y •1f � , �,��;, �,, .�; , .,� , `.�, �,� , -� +••"��e � y�s��' C� . ��` ,.. � ` r .- � 1 e ��I .} NomFluzarAous �1nlcrials ❑ Ecmi u�id roccr smckpila of smid, Airt or m6cr cansvucfim� maicrial ��'iU� IlryS ��hen rnin i5 forecnst or il' noI ncli�'eh' bcing uscd �vilhin 14 dnps. ❑ Use (bui Aon'i o��cruse) rtchimed ���nicr lur dus� control. aivaraous ntaccrims ❑ L�bel all hanrdous nmicrinls and hnznrdous o�asies (such as pes�icidcs. paints. ihinncrs. sohcnis. f �el. oil. mid amiGcuc) in accurdm�ce a�iih cit�. cuunry�, siaic aiul fcdcml rcgulations. ❑ Slore Lo»rtlous mnlcriak and maztcs in rvalcr Iisht conlaiiwrs. slore in appmpria�e secondaq� conlnimnenL mid co�•er diem at tlie end of cvcn� �wrk da}� or during e�ci ivcmhcr or u�hcn min is Forecns�. � Follo�v mnnnG cNrcr's applicntion insvuaions for h�znrdous malcriaL and bc cnrcful nai lo usc nmrc than nccessan�. Do noi I� h•mi�al ulJoars whcn rain is farccasi �viihin 2J hours apprc� ., so . ❑ Arrangc for approprimc dispuml of oll Immrdous iraslcs. lYuslc �'fanagcmcn� i7 Cacc nnsm �ispazal canlnin<rs sccu`cly wi�h inrys nt Ihe cnd of c��cnr.rerk day and during wc1 �vu thcr. ❑ ChccA �rastc disposal wnlainei5 fmqucnllp For laal-s nnd Io wnkc sivc lhc�� arc nut oecrfillcd. Ncccr hosc do�cn a dumpstcr on dm �rstru[lion silc. O Clcan ur rcplaec ponablc ioilcLs. and inspcct Ihcm Gcquenllr lor I �ks and spills. ❑ Disyasc or,u ���„s«s ���i a�nd� ��o��p�. a�o>�d� �,��«�ois ���a ases tl�o1 cm� bc ren�ckA (snch ns nsphnle concre�c. asgmgam bou mntcrinls o�aod. ��p bwrd. pipc. cic.l ❑ Disposc af Iiquid residucs froin P�����s. ILim�ers. soWenls. glucs nnd dcaning Iluids os I�azordous �rosm. Conslruc�inn Enlranccs:md Pcrimr(cr ❑ Establish and mninoin effecli��c perimeier conUols and slabilize all ens�nmtion enlrunces nnd exiu io sufTcicn�lp conirol emsion anJ sedimau dischnrgcs fram sitc and imeking all'si�c. ❑ S�rccp or �aamm any svcc[ IracAing immcdiolcly and scqirc scAimcro sonrcc lo prcvcnl futlhcr Iracking. Nm�cr how do���n slrccls �u c�cnn np nacking. �quipment 114nnagement & Spill Control ai� �: "r� �r� ��+ 1 +'�3 �! ���� n7nintcn:mcc:md Purkine ❑ Desig�wic a�� arcu. f ncd wiN� oppmpriate BM1fPs, fur rchicic ond cqnipmcnt parking nnd sloragc. ❑ Pedomi mojor maimm�nncq mpairjobs, and vchidc and cquipmcnl �vul�ing o(Csitc. ❑ 1C ¢fucling or cchidc nminmwncc musl bc done onsile. irork in a 6cmicd nrco o�ra}' Gom srom� dmins nnd mxr a drip pan big cnough ro collec� flnids. Rmpdc or dispose oi Ilnids ns La�nrdous e�uste. ❑ 11 rehicle orequipmenl cleoning musl be do� m�sile. clran n•ilh �volcr only in n bcnncd orca Oiat �cill mt allow rinsc .��nter lo run into guucrs, sviceLS, swnn drnu�s. or srtface �trorers. ❑ Do no� cleon celiicle orcquipment onsile using sanps, sulcems. degreasers. s�eum dw�iing equipmcnl, ac. Spill PrcrCntinn anJ Cnndul ❑ Keep spill ciconup maleriols (mgs. absorben�s, elc.) xenilable a� �he cons�maion siie at nll times. ❑ Inspect cehicles miA equipmenl frcquently for nnd rcpnir Icals pmmptly. Usc drip pans ro caich Icaks unlil repnirs a�c mnda. ❑ Clwn up spills or Icak immedialely and disposc of cicuuup malcrials pmp^.dp. ❑ Do nm ho •c d�t� �rf �� o i si ��es vl�crc Onids haec spillcd. Use dn' cle:mup melhals (ubsorbenl matwials. eat littcr, m�d!or ngs7. ❑ Sn�ccp up spillcd drc matcrials inunedinrely. Do not �ry to n�nsh ��em m.ay .��ith �votcr, or biuy O�cm. ❑ Clcan up spills an din nroaslp� digEin@ up and pmpedy disposing oPcnmaminamd soil. ❑ Repurt sig�dficanl spills immcdiatcly. You ore requircd by la�e m repon oll signifiwnt mlcoscs othn nrdous mnrerials, includiug oil. To reporc n spilL i) Din1411 r vour loc.l emergency respanse nwnbec 2) Call the Gu�romor's OILcc of L-mcrgcnc�� Scrviccs 1Y"umiug c�����c Bon> vz-�sso �za i,o�rs>. �artl�n-m•It & Pa��ing/Asphalt Work Contaminafed Soils :� ` � - ° ;: !�. , ���� ���� � . � y)'_ '� y�. �,�ry�� t'f..-...-+L-.41�L�.��y �^ �•`-T1�� L• msian Conlrol ❑ Schcdulc gmding and esearmion a�ork for dn� ��•cather only. ❑ SL bilizc nll dcn�dcd arcu, insl.ill nnd main�ain tempomn� erasian conrtols (such as wsion wnlml fobrie or bonded f ber matrL<1 muil vegclotion is establishcd. ❑ Secd ar plant i•egelnlion (or crosion coniml on slopa nr ���hcrc cnns�nwtion is no1 immedioldy plmmed. Scdimcnt Contml ❑ Proicct sionn dmin inlcls, guuers, diichcs. und drainage cm�rscs �vi�i ap��upriolc BMPs, such ns mrel ba � fibcr rolls. 5 6-, benns,em. ❑ Preventscdimenrfronnnipiatingollsite be insL Ilin� and m�inlaining scdimcm cenlrols. such as fibcr mlls. sill (enccs, ur udimem bosins. ❑ Kecp c�cncateA mil on the site �vhere ii �cill nol collcc� inb d�c strcet. ❑ Tra i fc .. i s r e�cnrnled mntennls m Awn P IfIlC�:9 011 �IC 911C, IIOI IIl [hC SIICCI. ❑ CommnimuedSoils ❑ 1Fom• of ��e follo�ei�4 eondi�ions are obscn•ttl, ms� For conmminarian and conmct ihc Rcgionol l4n�cr Qualil�� Concrol BwrJ: ■ Unusual soil wndi�ions. discoloration, or odor. ■ Abendoned nnderLaounA r.ud:s. ■ Abondoned wclls ■ Buricd barrels. dcbris. or vash. ❑ Avaid paving and seal coaling u� �ce� cotha. or »�Len rein is forecxst b:fore fresh paremnn w�ill hnFr �ime ro cure. ❑ Covcr slorm drain inlets rnd maN�oles �vhen nppl}�ing scal coa1. cack cooi, slurty scnl. fog scal, cic. ❑ Collect and recycic or uppmpria�cly dispose of e� ess nbrasirx �m.el or sand. Do NOT s��ecp or nash ii inio guucrs. ❑ Do �mt usc w�amr Io mnsh do�vn frcsh osphnh concrcic poccmcnl. San�cutcinF FAsphalt/ConcmlcRcmo�:tl ❑ Camplemk co��cr or bartiwdc swnn (�fa111 InICfS 1v�121� S.11\•Gu �n IU �. Use filter 6 fnbric, cn�ch buiu u�let filmrs, or gnvel bag-., m kccp slurq� out oF�hc siomi dnin 51'SICItt. ❑ Shoccl, a6osurb, or ��ocuum sx�c�m slurx�• wid dispose oCull ���sle ns soon ns pou nre finished in onc lowtion or a1 thc cnd ofcoeh worA day (�eltiehcrcr is snoncrl). ❑ If sa�rcut slum• cn�crs a catdi basi�� dcnn il up immcdimcly. Concrete, Grout & �lortar .�pplicntion ❑ S�ore con<fc�c. prau� ond monnr i ndcr er. on pallas aud an�ar fmm drainagc arcas. lLcu mo�criols musi ncccr rw<h a stvnn dmin. ❑ Wash out wncmtc equipnicn�hn¢ks oRsi�e or in o conuined area. sa �hcrt is na disclurgc inlo �hc widcdping soil ar omo surtoundine arcas. La concrcic hnrden and dispose of os garbagc. ❑ Colleel tlro �cesh oarer Crom �rasLiny c�poscd agsrcyok concreic and remncc it for oppmprio�c disposal offsiic. De�vatering � :' � � � ' �a >"�- ��?�e,l � � ,:� i _ ; ,:_t � i. ��::. � � � �''q�,�''�`..�, ❑ Eliceti�<ly manage all mn-on, all runofin�itLin tl�e siie and all runafl'iha� dischnrges Gmn �hc silc. Dirrn run�on ��aier from ofl'site mcac Gom nll dismrbed amas or olLcnvisc rnsurc wm f� p m �cc. ❑ U�icn dc�valcring, nolif � and obi�in �Vvrorol from �I�c lucnl municipoliip before disclmrgin� wmer io a strtei euucr ar swm� draia Filvoiiaii or divcrsiun ihmugh o 6asia mnk. or scdimcm imp may bc rcquircd. ❑ In a¢as ofA �o��•n conmminaiion. �rsiinp is rcquircd prior lo rcuu ar discham,c of gm�md�coccr. Cvnsul� ivilh Ou Enginecr m dctemiinc ��'hell�er ieninp is mqnimA and hm�� to intcrpcc� reulis. Conwuinmcd gmundwmer mus� 6e ne��ed or hauled oQ sire for proper disposal. Stonn drain polluters may be liable for fines of up to $10,000 per day! Painting & Paint Removal , r j. ..✓, � ("j'�4 q..'j` ;i �' g:"; ` f _ i� =�:�� � .� � �� , .�Y--' Paintin� Ucunup ❑ Ncvcr cica�i bmshcs or nnsc paint wnleincrs �n10 a slfC[I, gullcr, slom� dflin, or A f(acv �valers. ❑ For n�xtcr bascd paints, pnni ouI brusl�cs Io ihc c<�cni passiblc Rinsc l0 11�c Sd�lll.ln' SCI�'C� OIICC )'OY �1dvC sDllltd pcm�is5ion Gom Ihc laal rvaslrnatcr Ireauncm nuthoriq�. Ncvcr pour painl do���n a drain. ❑ For oil-bascd paims. paim om bnishes �a ilw c�icm possiblc mid ckan ���iih �hinncr ur salvcm in o proper mnmincr. Filt.r and rcusc Uiinners nnd solvcnls. Disposc of rcsiduc and w�usablc thinncrisah•enis us fiararJmrs n'ulc. Pain1 rcmm�al ❑ Chcmiwl paim strippinp residut and chips nnd dusl Imm �wrinc painu or paints conmiuing I<ud or iribmphin mus� 6c disposcd ofas hnnrdous was¢. O Pnin� cl�ips ond dusi fmm nun-hv.irdous dn� slripping anA sand blaning maa In s�rcpi up �r colkcicd in plas�ic Jmp do�hs and dispoccd of ns �msh. Landscapc A4atcrials ,`..� ��t Y �'� .,� � �ryt� �; .�i G. �.y .:`' �� r-� -�; �•y . , .� -�,-. ;�. � � S �r C'�ry� l. �.r,. ':f �+��� �� j �' �'V:.']�/'��' l_�� ❑ Coniain s�ock�iilcd Iandswping ma�criols ny s�oring Ihem unAcr mrps ,ehrn IL.r ,m nat nnicclp hcing usW. ❑ Sw<A aodiblc londscapc mmuial on pallas. Covcr or smrc �hcse mmcrinls .el�rn il�ci� are nai aaircl�� being u�ed or o��r�a. ❑ Discomimm npplicmian efanp crWiblc landswpc mnlonal ���ilhin 2 daes 6cfore a forecosi nin cecnt or dunng �cci �rca�hcr. � ��.� SAN HATEOC611NTYM'Ip[ WaterPo��ution �eventaon Program Clo�pWater. Ho�Rhy�o+*nunhy. Requirements for Architectural Copper Proiect water quality during installatian, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper, Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) discharges to storm drains. must be implemented fo prevent prohibited During /nsta//ation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse vvater does not ilow fo the street or storm drain. Bloc.l: oi�F sform drain inl�f i� necdec�. o Collect rinse water in a fank and pump to the sanifary se�n�er. Coniact your local� sanitary sewer agency before discharging to rhe sanitary sewer. o Collect the rinse water in a tank and haul off-site for proper disposal. • Consider coating the copper materiafs with an impervious coating that prevents further. corrosion and runoff. This wifl also mainiain the desired cofor for a longer time, requiring less maintenance. During Maintenance Impiement fhe following BMPs during routine mainfenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water fo landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). lf this is not an option, haul the wash water off-sife for proper disposal. Proteci fhe �ay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generafed by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject fo a fine. Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.orq (click on "Business", then "New Development", then "local permitting agency"). FINAL February 29, 2012 Building with copperflashing, gutter and drainpipe. prohibited discharge. The waPer must be pumped and disposed of properly.