HomeMy WebLinkAbout1461 Bernal Avenue - Resolution,j Q-
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
:;6648
Fee: NO FEE
s13
I Records
rlateo
urn
k-Recorder
A R
RESOLUTION NO. 099-2005
1461 BERNAL AVENUE; APN: 026-044-050
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 11/15/2005
G
Margaret Monr e, City Planner
�41
RESOLUTION 99-2005
RESOLUTION APPROVING CATEGORICAL EXEMPTION,
SPECIAL PERMITS AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
design review and special permits for height and attached garage for a new, two-story single
family dwelling at 1461 Bernal Avenue, zoned R-1, Mark and Ilka Hosking, property owners,
APN: 026-044-050;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
October 11, 2005, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19, Section 15301, Class 3 —
construction of a limited number of new, small facilities or structures including one
single family residence or a second dwelling unit in a residential zone is hereby
approved.
2. Said design review and special permits are approved, subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such design review and special permits are as
set forth in the minutes and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
Chairman
I, WIifAI ffiaJtJiLlb(�- , Secretary of the Planning Commission of the City of Burlingame,
do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting
of the Planning Commission held on the I I'h day of October, 2005 by the following vote:
AYES: COMMISSIONERS: Auran, Brownrigg, Cauchi, Deal, Keighran, Osterling, Vistica
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
ABSTAIN: COMMISSIONERS: NONE
ecretary
EXHIBIT "A"
Conditions of approval for categorical exemption, special permits and design review.
1461 Bernal Avenue
Effective October 21, 2005
1. that the project shall be built as shown on the plans submitted to the Planning Department
date stamped August 31, 2005, sheets A-1 through A-5, L-1 and C-1, and date stamped
September 28, 2005, Sheet A-6, and that any changes to building materials, exterior
finishes, footprint or floor area of the building shall require an amendment to this permit;
2. that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), moving or changing windows and
architectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
3. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Department;
4. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department;
5. that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project
has been built according to the approved Planning and Building plans;
6. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans before
a Building permit is issued;
7. that the conditions of the Chief Building Official's and Fire Marshal's August 19, 2005,
memos, the City Engineer's and NPDES Coordinator's August 22, 2005, memos, the City
Arborist's August 24, 2005, memo, and the Recycling Specialist's August 29, 2005,
memo shall be met;
8. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2001 Edition, as amended by the City of Burlingame;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit; and
-2-
EXHIBIT "A"
Conditions of approval for categorical exemption, special permits and design review.
1461 Bernal Avenue
Effective October 21, 2005
10. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm
Water Management and Discharge Control Ordinance.
-3-
0
Project Comments
Date: 08/16/2005
To: ❑ City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
X Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
APN: 026-044-050
Staff Review: 08/22/2005
Applicant shall submit a Waste Reduction Plan and recycling deposit for
this and all covered projects prior to demolition, construction or
permitting.
Reviewed by: cc" 1111_�
Date: B/ % D �'
Project Comments
To: of City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
APN: 026-044-050
Staff Review: 08/22/2005
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V .
Date: 8/22/2005
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS qvAl
Project Names 45 N, l y
- Project Address: 14d6 i `L-
The following requirements apply to the project
1 A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building permit issuance.) ;w -06 W$` A*A'O 51-&,WV RY
2 X The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
ro -W coy ktuj
5 sanitary sewer lateral fobs requued for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Pagel of 3
U:lprivate development\PLANNING REVIEW COMMEENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 - IX/ The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 No construction debris shall be allowed into the creek.
20 The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re -submit plans
showing the driveway profile with elevations
Page 2 of 3
UAprivate development\PLANNING REVIEW CMRAENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
UAprivate development\PLANNING REVIEW COMMENTS.doc
Project Comments
Date: 08/16/2005
To:
City Engineer
01
Chief Building Official
City Arborist
City Attorney
From: Planning Staff
Recycling Specialist
Fire Marshal
NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
APN: 026-044-050
Staff Review: 08/22/2005
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not limited
to ensuring that all contractors implement construction Best Management Practices
(BMPs) and erosion and sediment control measures during ALL phases of the
construction project (including demolition).
Ensure that sufficient amount of erosion and sediment control measures are
available on site at all times.
The public right of way/easement shall not be used as a construction staging and/or
storage area and shall be free of construction debris at all times.
Brochures and literatures on stormwater pollution prevention and BMPs are available
for your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: 6f" - Tye
Date: 08/22/05
Project Comments
Date: 08/16/2005
To: ❑ City Engineer
❑ Chief Building Official
City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
APN:026-044-050
Staff Review: 08/22/2005
2� Fe a.E�rQ7�-y a a� /2 E
Q �.2s•s i�.T�" �//� �/.E 34610-"
Reviewed by:
Date:
1 f�
Project Comments
Date: 08/16/2005
To: ❑ City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
® Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
APN: 026-044-050
Staff Review: 08/22/2005
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide double backflow prevention.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by:
Date: di
Project Comments
Date: 08/16/2005
To: ❑ City Engineer
X Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two-story single family dwelling
with attached two -car garage at 1461 Bernal Avenue, zoned R-1,
AP N : 026-044-050
Staff Review: 08/22/2005
1) All construction must comply with the 2001 California Building Codes (CBC),
the Burlingame Municipal and Zoning Codes, and all other State and Federal
requirements.
2) Provide fully dimensioned plans.
3) Roof eaves must not project within two feet of the property line.
4) Exterior bearing walls less than three feet from the property line must be
constructed of one -hour fire -rated construction and no openings are allowed.
5) Rooms that can be used for sleeping purposes must have at least one window
or door that complies with the egress requirements.
6) Provide guardrails at all landings.
7) Provide handrails at all stairs where there are more than four risers.
8) Provide lighting at all exterior landings.
9) The fireplace chimney must terminate at least two feet above any roof surface
within ten feet.
Reviewed