RESOLUTION N0.023-2006
1456 BERNAL AVENUE; APN: 026-043-170 �� ^
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 4/13/2006
tLdd4/ IN
argaret Monroe, dity Planner
RESOLUTION 023-2006
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
design review for a new single family dwelling with a new detached garage at 1456 Bernal
Avenue, zoned R-1, Tony Leung, property owner, APN: 026-043-170;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
March 27, 2006, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19. Section: 15303, Class 3 —
(a) construction of a limited number of new, small facilities or structures including (a)
one single family residence or a second dwelling unit in a residential zone. In urbanized
areas, up to three single-family residences maybe constructed or converted under this
exemption.
2. Said design review is approved, subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for design review are as set forth in the minutes and recording of said
meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
CHAIRMAN
I, IN't k bA*C _ B-rt&VJtJrZ L&-6 , Secretary of the Planning Commission of
the City of Burlingame, do hereby certify that the foregoing resolution was introduced and
adopted at a regular meeting the Planning Commission held on the 27th day of March, 2006, by
the following vote:
AYES: COMMISSIONERS: Auran, Brownrigg, Cauchi, Deal, Vistica
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: Osterling, Terr s
ABSTAIN: COMMISSIONERS: NONE
SEC T Y
EXHIBIT "A"
Conditions of approval for categorical exemption and design review
1456 Bernal Avenue
Effective April 6, 2006
1. that the project shall be built as shown on the plans submitted to the Planning Department date
stamped March 7, 2006, sheets A.1 through A.7, L1 and Boundary and Topographic Survey, and
that the roof material above the bay window in the living room shall be copper; and that any
changes to the footprint or floor area of the building shall require and amendment to this permit;
2. that the existing hedge and ivy between this property and the property at 1452 Bernal Avenue
shall not be disturbed or removed before, during or after construction; the existing hedge and ivy
shall be adequately protected during construction;
3. that prior to scheduling the framing inspection, the project architect, engineer or other licensed
professional shall provide architectural certification that the architectural details such as window
locations and bays are built as shown on the approved plans; if there is no licensed professional
involved in the project, the property owner or contractor shall provide the certification under
penalty of perjury; certifications shall be submitted to the Building Department;
4. that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans; all windows shall be simulated true
divided light windows with three dimensional wood mullions and shall contain a stucco -mould
trim;
5. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
6. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Department;
7. that prior to scheduling the foundation inspection a licensed surveyor shall locate the property
corners and set the building footprint;
8. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation of the
new structure(s) and the various surveys shall be accepted by the City Engineer;
9. that during demolition of the existing residence, site preparation and construction of the new
residence, the applicant shall use all applicable "best management practices" as identified in
Burlingame's Storm Water Ordinance, to prevent erosion and off -site sedimentation of storm
water runoff,
10. that the project is subject to the state -mandated water conservation program, and a complete
Irrigation Water Management Plan must be submitted with landscape and irrigation plans at time
of permit application;
-2-
EXHIBIT "A"
Conditions of approval for categorical exemption and design review
1456 Bernal Avenue
Effective April 6, 2006
11. that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District.
12. that the conditions of the Recycling Specialist's December 28, 2005 memo, the City Engineer's
and Chief Building Official's January 3, 2006 memos, the Fire Marshal's January 4, 2006 memo
and the NPDES Coordinator's January 6, 2006 memo shall be met;
13. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction Plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
14. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance; and
15. that the project shall meet all the requirements of the California Building Code and California
Fire Code, 2001 edition, as amended by the City of Burlingame.
-3-
Date:
To:
From:
Project Comments
12/27/2005
®( City Engineer
❑ Chief Building Official
❑ City Arborist
O City Attorney
Planning Staff
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two story single family dwelling
with detached garage at 1456 Bernal Avenue, zoned R-1, APN:
026-043-170
Staff Review: 01/03/2006
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
3. Sheet A.2 shows a portion of the driveway approach to extend over the
property line extension to the street adjacent to Lot 34. The driveway
approach shall be relocated such that the entire approach is located within
property line extension.
Reviewed by: V V /
Date: 1 /03/2005
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS 04W 'iwv— sin^(
Project Names,rW;!�t
Project Address:_ LSb
The following requirements apply to the project
1 A property boundary survey shall be preformed by a licensed . land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building permit issuance.) 5�4019/(( �80*,(_ Wl s 9 &41;
2 _� The site and roof drainage shall be slioan o plans; ould amadeetto��
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 A sanitary sewer lateral 40 is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Pagel of 3
UAprivate development\PLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 —V/— The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 No construction debris shall be allowed into the creek.
20 _� The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re -submit plans
showing the.driveway profile with elevations
Page 2 of 3
UAprivate developmenAPLANNING REVIEW CONDAENTS.doc
a
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
UAprivate developmenAPLANNING REVIEW COMMENTS.doc
Project Comments
Date: 12/27/2005
To: ❑ City Engineer
X Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two story single family dwelling
with detached garage at 1456 Bernal Avenue, zoned R-1, APN:
026-043-170
Staff Review: 01/03/2006
1) All construction must comply with the 2001 California Building Codes (CBC),
the Burlingame Municipal and Zoning Codes, and all other State and Federal
requirements.
2) Provide fully dimensioned plans.
3) Comply with the new, 2005 California Energy Efficiency Standards for low-rise
residential buildings. Go to http://www.energy.ca.gov/title24 for publications
and details.
4) Obtain a survey of the property lines for any structure within one foot of the
property line.
5) Roof eaves must not project within two feet of the property line.
6) Exterior bearing walls less than three feet from the property line must be
constructed of one -hour fire -rated construction and no openings are allowed.
7) Rooms that can be used for sleeping purposes must have at least one window
or door that complies with the egress requirements.
8) Provide guardrails at all landings. NOTE: All landings more than 30" in height
at any point are considered in calculating the allowable floor area. Consult the
Planning Department for details if your project entails landings more than 30"
in height.
9) Provide handrails at all stairs where there are more than four risers.
10)Provide lighting at all exterior landings.
11)The fireplace chimney must terminate at least two feet above any roof surface
within ten feet.
Reviewed
Date:
Project Comments
Date: 12/27/2005
To: ❑ City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
X Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two story single family dwelling
with detached garage at 1456 Bernal Avenue, zoned R-1, APN:
026-043-170
Staff Review: 01/03/2006
Applicant shall submit a Recycling and Waste Reduction Plan for
approval, and pay a recycling deposit for this and all covered projects
prior to construction or permitting.
Reviewed by:
l
Date: -,?a - 5_
Project Comments
Date: 12/27/2005
To: ❑ City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
d Fire Marshal
❑ NPDES Coordinator
Subject: Request for design review for a new, two story single family dwelling
with detached garage at 1456 Bernal Avenue, zoned R-1, APN:
026-043-170
Staff Review: 01 /03/2006
No comment at this time.
Reviewed by:
Date: �S'
C5
Project Comments
Date: 12/27/2005
To:
City Engineer
Chief Building Official
City Arborist
City Attorney
From: Planning Staff
00, Recycling Specialist
1110- Fire Marshal
0 NPDES Coordinator
Subject: Request for design review for a new, two story single family dwelling
with detached garage at 1456 Bernal Avenue, zoned R-1, APN:
026-043-170
Staff Review: 01/03/2006
1) Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not
limited to ensuring that all contractors implement construction Best Management
Practices (BMPs) and erosion and sediment control measures during ALL phases
of the construction project (including demolition). Include appropriate stormwater
BMPs as Project Notes. These BMPs include but are not limited to the following:
• Store, handle, and dispose of construction materials and wastes properly
to prevent contact and contamination of stormwater;
• Control and prevent the discharge of all potential pollutants, including
pavement cutting wastes, paints, concrete, petroleum products, chemicals,
wash water or sediments, and non-stormwater discharges to storm drains
and watercourses;
• Use sediment controls or filtration to remove sediment when dewatering
site and obtain all necessary permits,
• Avoid cleaning, fueling, or maintaining vehicles on -site except in a
designated area where wash water is contained and treated;
• Protect adjacent properties and undisturbed areas from construction
impacts using vegetative buffer strips, sediment barriers or filters, dikes,
mulching, or other measures as appropriate;
• Perform clearing and earth moving activities only during dry weather,
• Limit and time application of pesticides and fertilizers to prevent polluted
runoff;
• Limit construction access routes and stabilize designated access points;
• Avoid tracking dirt or other materials off -site; clean off -site paved areas
and sidewalks using dry sweeping method;
• The Contractor shall train and provide instruction to all employees and
subcontractors regarding the construction BMPs.
1 of 2
Y
Project Comments — Con't-1456 Bernal Avenue- New 2-story SFD w/ detach gar.
2) The public right of way/easement shall not be used as a construction staging
and/or storage area and shall be free of construction debris at all times.
3) Implement Erosion and Sedimentation Controls:
a. Install and maintain all temporary erosion and sediment controls
continuously until permanent erosion control have been established,
b. Address method(s) for diverting on -site runoff around exposed areas and
diverting off -site runoff arount the site;
c. Address methods for preventing erosion and trapping sediment on -site.
4) Provide notes, specifications, or attachments describing the following:
a. Construction, operation and maintenance of erosion and sediment control
measures, including inspection frequency;
b. Methods and schedule for grading, excavation, filling, clearing of
vegetation, and storage and disposal of excavated or cleared material.
Brochures and literatures on stormwater pollution prevention and BMPs are available for
your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: � Date: 01/06/06