HomeMy WebLinkAbout1444 Bernal Avenue - ResolutionRECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE
CA 94010
2004-206394
10 18am 10/18/04 R1 Fee: NO FEE
Count of pages 8
�r f Cff 0 Records
P:lateo
k-Recorder
I l litjj��j�I
I I' ill jjj�
9 4 A R *
Resolution No. 076-2004
1444 BERNAL AVENUE, APN: 026-043-140
TITLE OF DOCUMENT
�o
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 10/08/2004
Marga et onroe, ty Planner
RESOLUTION 076-04
RESOLUTION APPROVING CATEGORICAL EXEMPTION
AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
design review for a first and second story addition at 144 Bernal Avenue, zoned R-1, David
Crosatto, property owner, APN: 026-043-140;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
September 13, 2004, at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19, Section 15301 Class
1(e)(2) - additions to existing structures provided the addition will not result in an
increase of more than 10,000 SF in areas where all public services and facilities are
available and the area in which the project is located is not environmentally sensitive, is
hereby approved.
2. Said design review is approved, subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such design review is as set forth in the minutes and recording of
said meeting.
It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
hairm
MLW 11ZL
I, ► ey gftt , Secretary of the Planning Commission of the City of Burlingame, do hereby
certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 131" day of September, 2004 by the following vote:
6 - 0 - / (ko,-A 444)
AYES: COMMISSIONERS: Auran, Boju6s, Brownrigg, Keighran, Osterling, Vistica
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: Keele
ABSTAIN: COMMISSIONERS: NONE
EXHIBIT "A"
Conditions of approval for design review.
1444 Bernal Avenue
Effective September 23, 2004
that the project shall be built as shown on the plans submitted to the Planning Department
date stamped August 6, 2004, sheets A0.1, A0.3, A0.4, A1.0, A2.0, A2.1, A3.0, A3.1,
A4.3 and A 5.5 and September 1, 2004, sheets A1.1, A4.1 and A5.1-A5.4; and that any
changes to the footprint or floor area of the building shall require and amendment to this
permit;
2. that two flowering pear trees shall be installed with approval of the City Arborist, by the
Parks Department at the property owners expense in the planter strip in front of the
house;
that any changes to the size or envelope of the first or second floors, which would include
adding or enlarging a dormer(s), moving or changing windows and architectural features
or changing the roof height or pitch, shall be subject to design review;
4. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury; certifications shall be submitted to the
Building Department;
that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project
has been built according to the approved Planning and Building plans;
6. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
7. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department;
8. that the conditions of the City Engineer's, Chief Building Official's, Fire Marshal's and
Recycling Specialist's May 24, 2004 memos shall be met;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction Plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
EXHIBIT "A"
Conditions of approval for design review.
1444 Bernal Avenue
Effective September 23, 2004
Page 2
10. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm
Water Management and Discharge Control Ordinance; and
11. that the project shall meet all the requirements of the California Building Code and
California Fire Code, 2001 edition, as amended by the City of Burlingame.
Project Comments
Date: 05/18/2004
To: 0 City Engineer
❑ Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review for a first and second story addition at
1444 Bernal Avenue, zoned R-1, APN:026-043-140
Staff Review: 05/24/2004
A^ n
(r1�v�gL�an� � 4�vt3.�.�TJ�. i1A2u-,a�z�c
Reviewed by: VU Date: %mot
�.:5'R .Y. s. ._w.,. ..r .. .Fs"-' 19.?' ;�iia.- -a1 .+�¢5'S2fRK:.a'x.•s+:.Y -. ,..:.
Project Comments
Date: 05/18/2004
To: ❑ City Engineer
Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review for a first and second story addition at
1444 Bernal Avenue, zoned R-1, APN:026-043-140
Staff Review: 05/24/2004
- v flj� PAP d/ I J) /Nl ✓! G %�ct'� —��-� /d / fc�f �i / i
Lei 1 bQ / �� �� � a JV&'i ka [�
Reviewed by: Date:
' = di= '• +�A:L'...: ... w; 4::dY,R !f' K .:'S�••;:.�YGF�YFrf�t^•bq �' r i.t4
Project Comments
Date: 05/18/2004
To: ❑ City Engineer
❑ Chief Building Official
ll Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review for a first and second story addition at
1444 Bernal Avenue, zoned R-1, APN:026-043-140
Staff Review: 05/24/2004
Reviewed by:
Date: �,j oy��
Project Comments
Date: 05/18/2004
To: ❑ City Engineer
❑ Chief Building Official
❑ Fire Marshal
recycling Specialist
/❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review for a first and second story addition at
1444 Bernal Avenue, zoned R-1, APN:026-043-140
Staff Review: 05/24/2004
0L7J
2 d
Reviewed by: Da e: