Loading...
HomeMy WebLinkAbout1444 Bernal Avenue - Approval LetterCity of Burlingame Plan Review Process Building Department 55B 7260 PLANNING DEPARTMENT 558 7250 Plan Review Comments LNG Job Address NU 1444 BERNAL AVEE Application Number - 0501414 Job Description : REV# 0 5 0 017 6 Appl' n Date : g / 0 6 / a 5 Check Date: R " � 2 ^° S • • • BY � �'�'� [ ]Not Appd Resubl Date: . . . Recheckl Date: .. By : [ ] Not Appd Resub2 Date : . . . Recheck2 Date : .. By : [ Not Appd Resub3 Date : . . . Recheck3 Date: .. By : [ ] Not Appd Plans approved : Without fuyt4er com [ ] With conditions listed. B -- --Date :y Y• • (� l V (Jt" �.�0L(s�i� �a 2-� 'q �) n l,/l 1 AA R v�-e.�( N Q 01, %�1 m vi q �-� •Fu {�-d._ �p71�-,� � V� -i � t''� iJy"� t DURpLNG > > For each correction, 'Cloud' change on original sheet $ Provide a revision marker at each cloud and in revision block with date. < < �CEIVED SEP 0 6 2005 BURIINGAME � City of Burlingame, 501 Primrose Road, Burlingame, CA 94010-3997 Phone: (650) 558-7260 Fax (650) 696- 8 REVISION STATEMENT Approved Permit Application Number: J'O- New Application Number: Applicant:__. -- Job Address: Rit r\J DESCRIBE CHANGES BELOW: �-:� v, I '� �c,� � ;n c l ct �—) a�� "/71 [; V� S �'�" � �7, � `' - c" L,7� � =� !-'� ✓Ls' '� • � ' � 1 � l'�' ' vY �A 1 1 i n ✓� �'vL �' � t q'!t cJ l�' � }•�; �N � 1 �� 11 ; Z �, � � � .y � �•� -}-1,^,ti I, gat � �; � f � �-i,.: � �.� �I CITY O� BURL INGAME m �AwTED DUNE 6 The City of Burlingame CITY HALL 501 PRIMROSE ROAD TEL: (650) 558-7250 PLANNING DEPARTMENT BURLINGAME, CALIFORNIA 94010-3997 FAX: (650) 696-3790 September 24, 2004 Andrew Young, Young and Borlik Architects 261 Hamilton Ave., Suite 218 Palo Alto, CA 94301 Dear Mr. Young, Since there was no appeal to or suspension by the City Council, the September 13, 2004 Planning Commission approval of your application for design review became effective September 23, 2004. This application was to allow the construction of a first and second story addition at 1444 BernalAvenue, zoned R-1. The September 13, 2004 minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Department date stamped August 6, 2004, sheets A0.1, A0.3, A0.4, A1.0, A2.0, A2.1, A3.0, A3.1, A4.3 and A 5.5 and September 1, 2004, sheets A1.1, A4.1 and A5.1-A5.4; and that any changes to the footprint or floor area of the building shall require and amendment to this permit; 2. that two flowering pear trees shall be installed with approval of the City Arborist, by the Parks Department at the property owners expense in the planter strip in front of the house; 3. that any changes to the size or envelope of the first or second floors, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to design review; 4. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certification under penalty of perjury; certifications shall be submitted to the Building Department; 5. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans; 6. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be September 24, 2004 1444 Bernal Avenue Page 2 included and approved in the construction plans before a Building permit is issued; 7. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; 8. that the conditions of the City Engineer's, Chief Building Official's, Fire Marshal's and Recycling Specialist's May 24, 2004 memos shall be met; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction Plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance; and 11. that the proj ect shall meet all the requirements of the California Building Code and California Fire Code, 2001 edition, as amended by the City of Burlingame. Reimbursement of the design review deposit has been processed and will be mailed to the property owners under separate cover. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. One extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely yours, Margaret Monroe City Planner c. David Crosatto 1444 Bernal Avenue Burlingame, CA 94010 Chief Building Inspector Chief Deputy Valuation, Assessor's Office (LOT 32 BLOCK 46 EASTON ADD BURLINGAME NO 4 RSM A/45; APN: 026-043-140) Project Comments Date: 05/18/2004 To: 0 City Engineer ❑ Chief Building Official ❑ Fire Marshal ❑ Recycling Specialist ❑ City Arborist ❑ City Attorney From: Planning Staff Subject: Request for design review for a first and second story addition at 1444 Bernal Avenue, zoned R-1, APN:026-043-140 Staff Review: 05/24/2004 A -)%AV 4 ,.,,mb A5 .9�a2u, ,ems ji !:�pc_coy anw4y�✓z % WA9ZI&419 "3"eVL- A-W apt _.,_.-' V -!lam l "3) [� l,'- Sun.V1�Y ►k c k � lS l.Lu paL Wme OF 9ngA3&r'/ tA�N3r�'^n "O /7 lrl�tyt+��„Gxt. 9�1D S�.r3.+.6t�1�2, b�02�r-,x�.�rs Reviewed by: W Date: % Y F Project Comments Date: 05/18/2004 To: 13 City Engineer Chief Building Official ❑ Fire Marshal ❑ Recycling Specialist ❑ City Arborist ❑ City Attorney From: Planning Staff Subject: Request for design review for a first and second story addition at 1444 Bernal Avenue, zoned R-1, APN:026-043-140 Staff Review: 05/24/2004 Reviewed by: Date: Project Comments Date: 05/18/2004 To: ❑ City Engineer ❑ Chief Building Official 11 Fire Marshal ❑ Recycling Specialist ❑ City Arborist ❑ City Attorney From: Planning Staff Subject: Request for design review for a first and second story addition at 1444 Bernal Avenue, zoned R-1, APN:026-043-140 Staff Review: 05/24/2004 Reviewed by: Date: Project Comments Date: 05/18/2004 To: ❑ City Engineer ❑ Chief Building Official ❑ Fire Marshal WR--ecycling Specialist ❑ City Arborist ❑ City Attorney From: Planning Staff Subject: Request for design review for a first and second story addition at 1444 Bernal Avenue, zoned R-1, APN:026-043-140 Staff Review: 05/24/2004 Awl fcwt "M -(4-444ta et7& 2 � Reviewed by: Da e: