October 16, 2007
Victor and Maria Ling
255 Berry Street #114
San Francisco, CA 94158
Re: 1537 Howard Avenue
Dear Mr. and Mrs. Ling,
Since there was no appeal to or suspension by the City Council, the September 10, 2007,
Planning Commission approval of your application for Design Review, a Special Permit for
declining height envelope, and a Special Permit for a detached garage located in the rear 40%
of the lot and exempt from setback requirements became effective September 20, 2007. This
application was to allow for a new two-story single family dwelling and detached garage at 1537
Howard Avenue, zoned R-1.
The September 10, 2007 minutes of the Planning Commission state your application was
approved with the following conditions:
that the project shall be built as shown on the plans submitted to the Planning
Department date stamped August 23, 2007, Sheets 1 through 5, G-1, SF1, T-1, and L-3,
and that any changes to building materials, exterior finishes, footprint or floor area of the
building shall require an amendment to this permit;
2. that the conditions of the Chief Building Official's April 13, 2007 memo, the City
Engineer's April 16, 2007 memo, the Fire Marshal's April 13, 2007 memo, the City
Arborist's May 16, 2007 memo, and the NPDES Coordinator's April 16, 2007 memo shall
be met;
3. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
4. that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dormer(s), moving or changing
windows and architectural features or changing the roof height or pitch, shall be subject
to Planning Commission review;
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �:
October 16, 2007
1537 Howard Avenue
Page 2
5. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
6. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
7. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site
sedimentation of storm water runoff;
8. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2001 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING
INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH
CONDITION:
9. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
10. that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department; and
12. that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.
m: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
October 16, 2007
1537 Howard Avenue
Page 3
All site improvements and construction work will require separate application to the Building
Department. This approval is valid for one year during which time a building permit must be
issued. One extension of up to one year may be considered by the Planning Commission if
application is made before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you
must do so within 90 days of the date of the decision unless a shorter time is required pursuant
to state or federal law.
Sincerely,
��
����i ���%/� � —
William Meeker
Community Development Director
Chief Deputy Valuation, Assessor's Office
(LOT 10 BLOCK 5 BURLINGAME PARK NO 2 RSM B/17; APN: 028-292-190)
File
�o Register online to receive City of Burlingame e-mail updates at www.burlingame.org �m
Project Comments
Date:
April 13, 2007
To: d City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From: Planning Staff
❑ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Subject: Request for design review and special permit for declining height
envelope for new single family dwelling at 1537 Howard Avenue,
zoned R-1, APN: 028-292-190
Staff Review: April 16, 2007
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 4/16/2007
� PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMIVIENTS
The following requirements apply to the project
�_1t� � -�-n�i
Project Name:�r�ru'� P�✓.�( Dv�l��
- Project Address: ���; , � �'�
1 � A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all properly lines, property corners,
easements, topographical features and utilities. (Required prior to the
building pernut issuance.) �;��p lg �u��a1-�.,�.(� �i Su-R�`�`'�7
� • -r
2 �_ The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3, The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project sha11 comply with the City's
flood zone requirements.
5 `� A�s�tary sewer lateral l�tis required for the project in accordance with
the City's standards.
(, The project plans shall show the required Bay&'ont Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
'7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
g Submit traffic trip generation analysis for the project.
9, Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the proj ect to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Page 1 of 3
U:\private development�PLANNING REVIEW COMI��NTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 �_ The project sha11, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
� appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
li The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
1 g Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
1 g No construction debris shall be allowed into the creek.
2p b The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development�PLANNING REVIEW COMIvvIENTS.doc
" PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle sha11 be placed in front. The
= sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
sha11 be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:\private development�PLANl�]ING REVIEW COMI��NTS.doc
Project Comments
Date:
1�
❑ City Attorney
From:
Subject: Request for design review and special permit for declining height
envelope for new single family dwelling at 1537 Howard Avenue,
zoned R-1, APN: 028-292-190
Staff Review: April 16, 2007
April 13, 2007
❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
CJ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
Planning Staff
1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame
Municipal and Zoning Codes, and all other State and Federal requirements.
2) Provide fully dimensioned plans.
3) When you submit your plans to the Building Division for plan review provide a completed
Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be
issued until a Building Permit is issued for the project.
4) Comply with the new, 2005 California Energy Efficiency Standards for low-rise residential
buildings. Go to http�//www enerqy ca.qov/title24 for publications and details.
5) Roof eaves must not project within two feet of the property line.
6) Exterior bearing walls less than three feet from the property line must be constructed of one-
hour fire-rated construction and no openings are allowed.
7) Rooms that can be used for sleeping purposes must have at least one window or door that
complies with the egress requirements.
8) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are
considered in calculating the allowable floor area. Consult the Planning Department for details
if your project entails landings more than 30" in height.
9) Provide handrails at all stairs where there are four or more risers.
10) Provide lighting at all exterior landings.
11) The fireplace chimney must terminate at least two feet above any roof surface within ten feet.
Revi
}
Date: j�• /3�� �
C(�
L �
Project t�omments
Date:
April 13, 2007
To: � City Engineer
(650) 558-723Q
❑ Chief Building Official
(650) 558-7260
�1 City Arborist
{650) 558-7254
From: Planning Staff
❑ Recycling Specialist
{650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650} 342-3727
C1 City Attorney
Subject: Request for design review anddwellin� atr1537 Howa dnAvenluet
envelope for new single famify 9
zoned R-1, APN:028-292-190
Staff Review: April 16, 2007
_ _ __._ __. - --
� ?-wo f3i2cf{ 7'2!�ES d'Q_. F3__�..-- ---
/�Zv��.....5�.2� ..mF_ �H� _
� 4!l�cGS . -----_. ..
lZ�.�Le7 (/�E�. Ik'E'�-�.5--- T° -�� _- Gt S�"�fr�j 6-s�_.1� ------. ..�_._
_.. _-- - ..
� w o i _ a � H TR-'�'��--H'!t �_—B � �l7,� � � va-G �. .. -- ---
_,L �... _ 7'�,!E-- � - _ ._..__3 �__ ------
� R�E �. FL �E as o v,d L -
/ Z E ( ,y �- i� �� i./J e f? [.n � � E 2 __�!-�� � � -7 -- .
_5....__.. �.�.
� c S 5�' - 7 3�� �/� /L �t o�fc ��C
_ ��l� �z .k,`�. t_`�._ �Z �E Q_y�1��� -�? � - �
------- _
• • -- ----- ---
f o 2. ..._. f�� � �: _ _ _t � S f%a v � (fa*5 . ..
-----
-- — _ -- ----- - -__.__ __. __-- -- --
Reviewed k�>y: 5'�� �le-��
-- Date: 5 ( �� ro=� — ______ .
t
6 , '
Project Comments
Date:
To:
❑ City Attorney
From:
April 13, 2007
❑ City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
❑ Recycling Specialist
(650) 558-7271
e� Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
Planning Staff
Subject: Request for design review and special permit for declining height
envelope for new single family dwelling at 1537 Howard Avenue,
zoned R-1, APN: 028-292-190
Staff Review: April 16, 2007
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by: Date: � 3 �� , `07
��� �� 7�
1 ,
Project Comments
Date:
To:
From:
April 13, 2007
� City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
� City Arborist
(650) 558-7254
� Recycling Specialist
(650) 558-7271
� Fire Marshal
(650) 558-7600
� NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Subject: Request for design review and special permit for declining height
envelope for new single family dwelling at 1537 Howard Avenue,
zoned R-1, APN: 028-292-190
��_u o,..,:,,..,. n.,rci � a �nn�
v�u�i .w....... . -r•-• -- -- - - -
1) Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not
limited to ensuring that all contractors implement construction Best Management
Practices (BMPs) and erosion and sediment control measures during ALL phases
of the construction project (including demolition). Include appropriate stormwater
BMPs as Project Notes. These BMPs include but are not limited to the following:
• Store, handle, and dispose of construction materials and wastes properly
to prevent contact and contamination of stormwater;
• Control and prevent the discharge of all potential pollutants, including
pavement cutting wastes, paints, concrete, petroleum products, chemicals,
wash water or sediments, and non-stormwater discharges to storm drains
and watercourses;
• Use sediment controls or filtraiion to remove sediment when dewatering
site and obtain alf necessary permits;
• Avoid cleaning, fueling, or maintaining vehicles on-site except in a
designated area where wash water is contained and treated;
• Protect adjacent properties and undisturbed areas from construction
impacts using vegetative buffer strips, sediment barriers or filters, dikes,
mulching, or other measures as appropriate;
• Perform clearing and earth moving activities only during dry weather;
• Limit and time application of pesticides and fertilizers to pre�vent polluted
runoff;
• Limit construction access routes and stabilize designated access points;
• Avoid tracking dirt or other materials off-site; clean off-site paved areas
and sidewalks using dry sweeping method;
• The Contractor shall train and provide instruction to all employees and
subcontractors regarding the construction BMPs.
1 of 2
Project Comments Con't — 1537 Howard New 2-story Single Family
Dwelling.
2) The public right of way/easement shall not be used as a construction staging
and/or storage area and shall be free of construction debris at all times. The
easement shall be protected from any site runoff.
3) Implement Erosion and Sedimentation Controls (if necessary):
a. Install and maintain all temporary erosion and sediment controls
continuously until permanent erosion control have been established;
b. Address method(s) for diverting on-site runoff around exposed areas and
diverting off-site runoff around the site;
c. Address methods for preventing erosion and trapping sediment on-site.
4) Provide notes, specifications, or attachments describing the following:
a. Construction, operation and maintenance of erosion and sediment control
measures, including inspection frequency;
b. Methods and schedule for grading, excavation, filling, clearing of
vegetation, and storage and disposal of excavated or cleared material.
Brochures and literatures on stormwater pollution prevention and BMPs are available for
your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: � Date: 04/16/07