HomeMy WebLinkAbout1516 Howard Avenue - Approval LetterCITY OF BURLINGAME
BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
July 29, 2015
Mark Robertson
Mark Robertson Design
918 E. Grant Place
San Mateo, CA 94402
Re: 1516 Howard Avenue
Dear Mr. Robertson,
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the July 13, 2015, Planning
Commission approval of your application for Negative Declaration, Design Review and Special Permit
for declining height envelope became effective July 23, 2015. This application was for a new two-story
single family dwelling and new detached garage at 1516 Howard Avenue, zoned R-1.
The July 13, 2015, minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped June 26, 2015, sheets 1 through 7, LO and 1_1;
2. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff);
3. that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
4. that the conditions of the Building Division's November 6, 2014, October 24, 2014 and
September 15, 2014 memos, the Parks Division's October 29, 2014 and September 18,
2014 memos, the Engineering Division's November 6, 2014 and October 29, 2014 memos,
the Fire Division's September 15, 2014 memo and the Stormwater Division's October 27,
2014 and September 4, 2014 memos shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
e Register online to receive City of Burlingame e-mail updates at www.burlingame.org
July 29, 2015
1516 Howard Avenue
Page 2
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall not
be modified or changed without the approval of the Planning Commission, or City Council
on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;.
10. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2013 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by
the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
12. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
13. that prior to scheduling the framing inspection the project architect or residential designer,
or another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the approved
plans; architectural certification documenting framing compliance with approved design
shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans.
:G Register online to receive City of Burlingame e-mail updates at www.burlingame.org ro:
July 29, 2015
1516 Howard Avenue
Page 3
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An extension of
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
William Meeker
Community Development Director
C. 1516 Howard LLC, property owner
1499 Bayshore Highway #229
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOT 9 BLOCK 4 BURLINGAME PARK NO 2 RSM B/17; APN: 028-291-040)
File
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::
Project Comments
Date: September
To: X Engineering Division
(650) 558-7230
0 Building Division
(650) 558-7260
0 Parks Division
(650) 558-7334
From: Planning Staff
0 Fire Division
(650) 558-7600
0 Stormwater Division
(650) 342-3727
0 City Attorney
(650) 558-7204
Subject: Request for Environmental Review and Design Review for a new,
two-story single family dwelling and detached garage at 1516
Howard Avenue, zoned R-1, APN: 028-291-040
Staff Review: September 15, 2014
1. See attached review comments #1, 2, 5, 14, 19 and 20.
New garage is being proposed at the top of slope which needs to be
determined by a licensed engineer and supported with engineering
calculations. If there are impacts to the creek, mitigation measures may be
required for 300 feet upstream and downstream of the site.
3. Applicant is advised to call City Arborist regarding potential relocation of
sidewalk area for street trees in the planter strip.
4. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 10/29/2014
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS �,� -TwV—` t"
Project Name: ,40.4 , L $'4Y ( fit f Div
Project Address: ( Isa'c- �V
The following requirements apply to the project
1 \/J A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property comers,
easements, topographical features and utilities. (Required prior to the
building permit issuance.) e/tvwvV� tS:
2_ The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 _%— Aetary sewer lateral iW is required for the project in accordance with
the City's standards. )
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Pagel of 3
U:\private development\PLANNING REVIEW CONM4ENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12 Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 _ The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its 6wn cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19_ No construction debris shall be allowed into the creek.
20 T The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re -submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development\PLANNING REVIEW COMNIENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
UAprivate developmentTLANNING REVIEW COMNMNTS.doc
Project Comments
Date: September
To: U Engineering Division
(650) 558-7230
0 Building Division
(650) 558-7260
0 Parks Division
(650) 558-7334
From: Planning Staff
X Fire Division
(650) 558-7600
0 Stormwater Division
(650) 342-3727
0 City Attorney
(650) 558-7204
Subject: Request for Environmental Review and Design Review for a new,
two-story single family dwelling and detached garage at 1516
Howard Avenue, .zoned R-1, APN: 028-291-040
Staff Review: September 15, 2014
Provide a residential fire sprinkler system throughout:
1. Provide a minimum 1-inch water meter.
2. Provide a backflow prevention device/double check valve assembly — A
schematic of water lateral line after meter shall be shown on Building Plans prior
to approval indicating location of the device after the split between domestic and fire
protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate fire sprinklers shall be installed under a separate deferred fire permit,
approved by the Fire Department prior to installation.
Reviewed by: G1�Date: 9 I j 5 11 �-
t Project Comments -A
Date: October 24, 2014
To: 0 Engineering Division
(650) 558-7230
0 Building Division
(650) 558-7260
0 Parks Division
(650) 558-7334
From: Planning Staff
0 Fire Division
(650) 558-7600
X Stormwater Division
(650) 342-3727
0 City Attorney
(650) 558-7204
Subject: Request for Environmental Review and Design Review, for a new,
two-story single family dwelling and detached garage at 1516
Howard Avenue, zoned R-1, APN: 028-291-040
Staff Review:
1. Project proponent returned a completed and signed Stormwater Checklist;
project proposed several site design measures to comply with Provision 6.3.i.
2. Previous comments shall be addressed during the building permit application.
Reviewed: EJ � Date: 10/27/2014
,AN btATEO COUNIYWIDc
Water Pollution
Prevention Program
Stormwater Checklist for Small Projects
Municipal Regional Stormwater Permit (MRP)
Order No. R2-2009-0074 ; Order No. R2-2011-0083
NPDES No. CAS612008
City of Burlingame —Office of
Environmental Compliance
1103 Airport Blvd
Office: (650) 342-3727
Fax: (650) 342-3712
Complete this form for individual single family home projects of any size, other projects that create and/or replace less than 10,000
square feet of impervious surface, and projects in the fpllowing categories that create and/or replace less than 5, 000 square feet of
impervious surface: restaurants, retail gasoline outlets, auto service facilities, and parking lots (stand-alone or part of another
use).
A. Project Information
A.1 Project Name: NEW RE rj 1 D E" c E
A.2 Project Address: 151c, HOV4A(-�_b Ay I?�L1�4uN�J�Y� tE �� "11%iJiU
A.3 ProjectAPN: O a2� -- 21:1 / — QLO
B. Select Appropriate Site Design Measures
BA Does the project create and/or replace 2,500 square feet or more of impervious surface2? XYes ❑ No
If yes, and the project will receive final 3discretionary approval on or after December 1, 2012, the project must include one
of Site Design Measures a through f. Fact sheets regarding site design measures a through f may be downloaded at
http://www.fiowstobay.org(bs new development.php#flyers.
❑ If no, or the project will receive final discretionary approval before December 1, 2012, the project is encouraged to
implement site design measures4, which may be required at municipality discretion. Consult with municipal staff about
requirements for your project
B.2 Is the site design measure included in the project plans?
Yes
No
Plan
Sheet No.
❑
a. Direct roof runoff into cisterns or rain barrels and use rainwater for irrigation or
other non -potable use.
❑
b. Direct roof runoff onto vegetated areas.
❑
X
c. Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas.
❑
)2
d. Direct runoff from driveways and/or uncovered parking lots onto vegetated areas.
❑
L e. Construct sidewalks, walkways, and/or patios with permeable surfaces. D 4--
❑
L ; f. Construct bike lanes, driveways, and/or uncovered parking lots with permeable 0�
surfaces.
❑
I g. Minimize land disturbance and impervious surface (especially parking lots).
,f
l
❑
h. Maximize permeability by clustering development and preserving open space.
❑
X
i. Use micro -detention, including distributed landscape -based detention.
k,(
Jam(
ElL
/ j. Protect sensitive areas, including wetland and riparian areas, and minimize
I changes to the natural topography.
❑
.k�l
1 k. Self -treating area (see Section 4.2 of the C.3 Technical Guidance)
1 d
1c�
❑
I. Self -retaining area (see Section 4.3 of the C.3 Technical Guidance)
❑
m. Plant or preserve interceptor trees (Section 4.1, C.3 Technical Guidance)
1 See Standard Industrial Classification (SIC) codes here.
2 Complete the C.3/C.6 Development Review Checklist if the project is not an individual single family home, and it creates and/or replaces
10,000 square feet or more of impervious surface; or if it is a restaurant, retail gasoline outlet, auto service facility, or parking lot project that
creates and/or replaces 5,000 square feet or more of impervious surface.
3 See MRP Provision C.3.i.
4 See MRP Provision C.3.a.i.(6).
Approved December4, 2012
Stormwater Checklist for Small Projects
C. Select appropriate source controls (Encouraged for all projects may be required at municipal discretion. Consult municipal staff.5)
Are these
Features that
require source
Source control measures
Is source control
features in
control
(Refer to Local Source Control List for detailed requirements)
measure included
project?
in project plans?
measures
Plan
Yes No
Yes No Sheet No.
❑
Storm Drain
0 Mark on -site inlets with the words `No Dumping! Flows to Bay" or equivalent.
❑
❑
Floor Drains
❑ Plumb interior floor drains to sanitary sewer [or prohibit].
❑
❑
Parking garage
0 Plumb interior parking garage floor drains to sanitary sewers
❑
❑
Landscaping
❑ Retain existing vegetation as practicable.
❑
❑ Select diverse species appropriate to the site. Include plants that are pest -
and/or disease -resistant, drought -tolerant, and/or attract beneficial insects.
L
❑ Minimize use of pesticides and quick -release fertilizers.
❑ Use efficient irrigation system; design to minimize runoff.
❑
Pool/Spa/Fountain
0 Provide connection to the sanitary sewer to facilitate draining.s
❑
❑
Food Service
Provide sink or other area for equipment cleaning, which is:
❑
Equipment
❑ Connected to a grease interceptor prior to sanitary sewer discharges
(non-
❑ Large enough for the largest mat or piece of equipment to be cleaned.
residential)
❑ Indoors or in an outdoor roofed area designed to prevent stormwater run-on
and run-off, and signed to require equipment washing in this area.
❑
Refuse Areas
❑ Provide a roofed and enclosed area for dumpsters, recycling containers, etc.,
❑
designed to prevent stormwater run-on and runoff.
❑ Connect any drains in or beneath dumpsters, compactors and tallow bin
areas serving food service facilities to the sanitary sewer -
outdoor Process
❑ Perform process activities either indoors or in roofed outdoor area, designed
❑
Activities
to prevent stormwater run-on and runoff, and to drain to the sanita sewers
❑
Outdoor
0 Cover the area or design to avoid pollutant contact with stormwater runoff.
❑
Equipment(
❑ Locate area only on paved and contained areas.
Materials
❑ Roof storage areas that will contain non -hazardous liquids, drain to sanitary
Storage
sewers, and contain by berms or similar.
❑
Vehicle/
❑ Roofed, pave and berm wash area to prevent stormwater run-on and runoff,
❑
Equipment
plumb to the sanitary sewers, and sign as a designated wash area.
Cleaning
❑ Commercial car wash facilities shall discharge to the sanitaryr sewes
❑
Vehicle/
0 Designate repair/maintenance area indoors, or an outdoors area designed to
❑
Equipment
prevent stormwater run-on and runoff and provide secondary containment. Do
Repair and
not install drains in the secondary containment areas.
Maintenance
❑ No floor drains unless pretreated prior to discharge to the sanitary sewer. s
❑ Connect containers or sinks used for parts cleaning to the sanitary sewer. s
❑
Fuel
❑ Fueling areas shall have impermeable surface that is a) minimally graded to
❑
Dispensing
prevent ponding and b) separated from the rest of the site by a grade break.
Areas
❑ Canopy shall extend at least 10 ft in each direction from each pump and drain
away from fueling area.
❑
14
Loading Docks
❑ Cover and/or grade to minimize run-on to and runoff from the loading area.
❑
❑ Position downspouts to direct stormwater away from the loading area.
❑ Drain water from loading dock areas to the sanitary sewers
❑ Install door skirts between the trailers and the building.
❑
Fire Sprinklers
ElDesign for discharge of fire sprinkler test water to landscape or sanitary sewers
El
❑
9
Miscellaneous
❑ Drain condensate of air conditioning units to landscaping. Large air
❑
Drain or Wash
conditioning units may connect to the sanitary sewers
Water
❑ Roof drains shall drain to unpaved area where practicable.
❑ Drain boiler drain lines, roof top equipment, all washwater to sanitary sewers.
❑
Architectural
❑ Drain rinse water to landscaping, discharge to sanitary sewers, or collect and
❑
Copper
dispose properly offsite. See flyer "Requirements for Architectural Copper."
See MRP Provision C.3.a.i(7).
Any connection to the sanitary sewer system is subject to sanitary district approval.
Businesses that may have outdoor process activities/equipment include machine shops, auto repair, industries with pretreatment facilities.
Approved December 4, 2012
Stormwater Checklist for Small Projects
D. Implement construction Best Management Practices (BMPs) (Required for all projects.)
DA Is the site a "High Priority Site"? (Municipal staff will make this determination; if the answer is yes, Yes ❑ Nox
the project will be referred to construction site inspection staff for monthly stormwater inspections
during the wet season, October 1 through April 30.)
❑ "High Priority Sites" are sites that require a grading permit, are adjacent to a creek, or are
otherwise high priority for stormwater protection during construction per MRP Provision C.6.e.ii(2).
D.2 All projects require appropriate stormwater BMPs during construction, indicate which BMPs are included in the project, below.
Yes No Best Management Practice IBMP
❑ Attach the San Mateo Countywide Water Pollution Prevention Program's construction BMP plan sheet to
project plans and require contractor to implement the applicable BMPs on the plan sheet
❑ Temporary erosion controls to stabilize all denuded areas until permanent erosion controls are established.
❑ Delineate with field markers clearing limits, easements, setbacks, sensitive or critical areas, buffer zones,
trees, and drainage courses.
❑ X Provide notes, specifications, or attachments describing the following:
❑ Construction, operation and maintenance of erosion and sediment controls, include inspection frequency;
❑ Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of
excavated or cleared material;
❑ Specifications for vegetative cover & mulch, include methods and schedules for planting and fertilization;
❑ Provisions for temporary and/or permanent irrigation.
❑ Perform clearing and earth moving activities only during dry weather.
❑ Use sediment controls or filtration to remove sediment when dewatering and obtain all necessary cermits_
❑ Protect all storm drain inlets in vicinity of site using sediment controls such as berms, fiber rolls, or filters.
❑ Trap sediment on -site, using BMPs such as sediment basins or traps, earthen dikes or berms, silt fences,
check dams, soil blankets or mats covers for soil stock piles etc
❑ Divert on -site runoff around exposed areas; divert off -site runoff around the site (e.g., swales and dikes).
❑ Protect adjacent properties and undisturbed areas from construction impacts using vegetative buffer strips,
_ sediment barriers or filters dikes mulching,or other measures as appropriate
X❑ Limit construction access routes and stabilize designated access points.
❑ No cleaning, fueling, or maintaining vehicles on -site, except in a designated area where washwater is
contained and treated.
X ❑ Store, handle, and dispose of construction materials/wastes properly to prevent contact with stormwater.
❑ Contractor shall train and provide instruction to all employees/subcontractors re: construction BMPs.
❑ Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints,
concrete, petroleum products, chemicals, washwater or sediments, rinse water from architectural copper, and
non-stormwater discharges to storm drains and watercourses.
Name of applicant completing the form:
Signature: %� !��/ �-�� Date: (0 /5
E. Comments (for municipal staff use only):
c fi'a p�V� �,� c('-r�y�, (
F. NOTES (for municipal staff use only):
Section A
Section B
Section C
Section D
a 12
3
Approved December 4, 2012
Project Comments
Date: September
To: U Engineering Division
(650) 558-7230
0 Building Division
(650) 558-7260
0 Parks Division
(650) 558-7334
From: Planning Staff
0 Fire Division
(650) 558-7600
X Stormwater Division
(650) 342-3727
0 City Attorney
(650) 558-7204
Subject: Request for Environmental Review and Design Review for a new,
two-story single family dwelling and detached garage at 1516
Howard Avenue, zoned R-1, APN: 028-291-040
Staff Review: September 15, 2014
"Ve
ormwater requirements are required to be implemented at stand-alone single family
projects that create and/or replace 2,500 sq.ft. or more of impervious surface.
These requirements are in addition to any City requirements. To determine if this project
is subject to those requirements complete, sign and return the attached "Stormwater
Checklist for Small Projects." For additional information about these requirements
please refer to the attached flyer "New Stormwater Control Requirements Effective
12/1 /12" and by visiting the San Mateo County Stormwater Pollution Prevention
Program (SMCWPPP) website at:
http://fiowstobay.org/newdeveIopment
2) Any construction project in the City, regardless of size, shall comply with the City's
NPDES (stormwater) permit to prevent stormwater pollution from construction activities.
Project proponent shall ensure all contractors implement appropriate and effective
BMPs during all phases of construction, including demolition. When submitting plans for
a building permit include a list of construction BMPs as project notes on a separate full
size plan sheet, preferably 2' x 3' or larger. Electronic file is available for download at:
http-1/flowstobay.org/construction
3) Best Management Practices (BMPs) requirements apply on any projects using
architectural copper_ To learn what these requirements are, see attached flyer
"Requirements for Architectural Copper." Electronic file is available for download at:
http-//flowstobay.org/newdevelopment
4) All surfaces must be labeled as to whether it is pervious or impervious. Details must
be provided for impervious surfaces such as driveways, patios, sidewalks, etc.
For assistance please contact Eva J. at 650-342-3727.
Reviewed by: EJ Date: 9/4/2014
of of erosion onsfopes.wdJor areas Qf exposed soi€.-.
n.g sediment on site using perimeter. barriers and storm drain inIet'Pi
-r management of construction materials, chemicals,; and wastes on'
T7777-
Proiecf�
the Cor
Current Stormwater Quality Control Requirements
LID Requirements/Stormwater Treatment Measures apply to:
• Projects that create and/or replace 10,000 square feet or77.7777
Speciat land :Else-CatQgones a re
more of impervious surface, and
• Uncovered parking areas (stand.:
• "Special Land Use Category" projects that create and/or aione or part ofi another use)
)
replace 5,000 square feet or more of impervious surface. Restaurants
If the stormwater treatment requirements apply, you will need to fill out the Auto service faeiliiiesl
feasibility screening portion of the C.3 Regulated Projects Checklist to Retai gasoiirte outlets
determine whether it is feasible to treat the water quality volume of runoff . .
with infiltration, evapotranspiration, or rainwater harvesting and use.
_ r
Sioreterifion system in Dula City, 'y
Where infiltration, evapotranspiration, and rainwater harvesting and use are
infeasible, stormwater may be directed to an on -site biotreatment system, such
as a bioretention area or flow -through planter. Biotreatment systems contain a
specified biotreatment soil and have a surface area that is approximately 4% of
the contributing impervious area. Biotreatment systems should be designed to
maximize infiltration into native soil wherever possible. Vault -based treatment
systems may not be used as stand-alone treatment, except for limited use of
media filters in certain high density and transit -oriented projects.
Hydromodification Management (HM) requirements apply if a project creates and/or replaces 1 acre or
more of impervious surface, increases impervious surface over pre -project conditions AND is located in a
susceptible area.
For More Information:
Contact the San Mateo Countywide Water Pollution Prevention Program at
www.flowstobay.org (For the New Development webpage, click on
"Businesses", then "New Development". For a list of local contacts for new
development, click "local permitting agency".)
The Stormwater Checklist for Small Projects, the C.3 Checklist for Regulated
Projects, the C.3 Technical Guidance Manual, and other guidance
documents are provided on the New Development webpage.
IAuto service facilities include those described bythe following Standard Industrial Classification (SIC) codes:
5013, 5014, 5541, 7532, 7533, 7534,7536, 7537, 7538, 7539.
�rVc tt y t l�lk9Gtr1
r�entE s l Requirements for Architectural Copper
Protect water quality during installation, cleaning, treating, and washing!
Copper from Buildings May Harm Aquatic Life
Copper can harm aquatic life in San Francisco Bay. Water that comes - =;k
into contact with architectural copper may contribute to impacts,
especially during installation, cleaning, treating, or washing. Patination
solutions that are used to obtain the desired shade of green or brown
typically contain acids. After treatment, when the copper is rinsed to
remove these acids, the rinse water is a source of pollutants Y
Municipalities prohibit discharges to the storm drain of water used in the
installation, cleaning, treating and washing of architectural copper. Building with copper flashing,
gutter and drainpipe.
Use Best Management Practices (BMPs)
The following Best Management Practices (BMPs) must be implemented to prevent prohibited
discharges to storm drains.
During Installation
• If possible, purchase copper materials that have been pre-patinated at the factory.
• If patination is done on -site, implement one or more of the following BMPs:
o Discharge the rinse water to landscaping. Ensure that the
rinse water does not flow to the street or storm drain.
Block off storm drain inlet if needed.
o Collect rinse water in a tank and pump to the sanitary
sewer. Contact your local sanitary sewer agency before
discharging to the sanitary sewer.
o Collect the rinse water in a tank and haul off -site for
proper disposal.
Consider coating the copper materials with an impervious
coating that prevents further corrosion and runoff. This will
also maintain the desired color for a longer time, requiring
less maintenance.
Storm drain inlet is blocked to prevent
prohibited discharge. The water must be
pumped and disposed of properly.
During Maintenance
Implement the following BMPs during routine maintenance activities, such as power washing the roof,
re-patination or re -application of impervious coating:
• Block storm drain inlets as needed to prevent runoff -from entering storm drains.
• Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local
sanitary sewer agency). If this is not an option, haul the wash water off -site for proper disposal.
Protect the Bay/Ocean and yourself!
If you are responsible for a discharge to the storm drain of non-
stormwater generated by installing, cleaning, treating or washing
copper architectural features, you are in violation of the municipal
stormwater ordinance and may be subject to a fine.
Photo credit Don Edwards National KriIdlife Sanctuary
Contact Information
The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at
www.flowstobay.org (click on "Business", then "New Development", then "local permitting agency").
FINAL February 29, 2012