Loading...
HomeMy WebLinkAbout1361 Bernal Avenue - Resolution�� RECORC�ING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL T0: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 ��� `�-`� ,��7�� .. �:�_: . , .e � ,-,_,�: �lo ��E : .t . 1 ,�r 7z }_"^ .':!-. ;r �;it'..,+i':��fc;r�i1S •t�, ;,:,r . . ., . . r.�,��, . ��� ,-.,, , - �t� '.i-`:k,K ;r.�c,� af ; ,' , it� �S', !g � �: � 1 � � � i� 3 ( � "�!. e �' �E � ���'� � i , 4;,�; �` k� ( 1 j�,� �f 71 : • . .. ' �, . . .� . ., . A Resolution No. 22-2013-b 1361 BERNAL AVENUE — APN 026-058-060 TITLE OF DOCUMENT � I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. • ,, , , :, ,�.. Date: December 20, 2013 �f `�` , ' '� � �i�,it �.` �'� ' kl � �' , '- - ! Willia ee , C uni y Development Direc#or' _ , ,; �< _ �:� .a..,E�i.. �.:_:s._.-, ' Corrected Copy 22-2013-b Amends references to negative declaration on page 1 of resolution �2 CORRECTED COPY RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, AND SPECIAL PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review and a Special Permit for Heiqht for a first and second-story addition to an existinq two-story house at 1361 Bernal Avenue, Zoned R-1, Charles Vestner and Mary Thibaut propertv owners APN: 026-058-060; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on April 22, 2013, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section 15301 (e)(2), which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 10,000 SF in areas where all public services and facilities are available and the area in which the project is located is not environmentally sensitive. 2. Said Design Review and Special Permit are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Special Permit are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. C irman I, � u�'"�� V,4� ,�ka�'r�'� �/� I;�,,; , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 22"d dav of Aqril, 2013, by the following vote: 1361 BERNAL AVENUE - RESO 22-2013-b AYES: Auran, Cauchi, Davis, Gaul, Sargent, Terrones NOES: None ABSENT: Yie RECUSED: None `���� �-l-�__ Secretary EXHIBIT "A" CORRECTED COPY Conditions of Approval for Categorical Exemption, Design Review, and Special Permit. 1361 Bernal Avenue Effective May 2, 2013 Page 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 11, 2013, sheets 1 through 9; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 3. that any changes to the size garage, which would include amendment to this permit; or envelope of the basement, first or second floors, or adding or enlarging a dormer(s), shall require an 4. that the conditions of the Chief Building Official's February, 26, 2013 memo, the Fire Marshal's and the Stormwater Coordinator's February 25, 2013 memos, the City ArborisYs February 27, 2013 memo, and the City Engineer's March 5, 2013, memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; EXHIBIT "A" CORRECTED COPY Conditions of Approval for Categorical Exemption, Design Review, and Special Permit. 1361 Bernal Avenue Effective May 2, 2013 Page 2 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 12. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Project Comments Date: February 22, 2013 To: � City Engineer {650) 555-7230 X Chief Building OfFicial (650) 558-7260 � City Arborist (650) 558-7254 From: Planning Staff � Recycling Speciafist (650) 558-7279 0 Fire Marshal (650) 558-7600 0 NPDES Coordinator (650) 342-3727 � City Attorney Subject: Request for Design Review and Speciaf Permit for building height for a 1st and 2nd story addition to an existing single family dwefling at 1361 Bernal Avenue, zaned R-1, APN: 026-058-06d Staff Review: February 25, 2013 1) Anyone who is doing business in the City musf have a current City of Burlingame business license. 2) Provide fully dimensioned plans. 3) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 4) Provide existing and praposed elevations. 5) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is io occur until a new Certificate of Occupancy has been issued. 6} Provide a complete demolition plan that indica#es the existing wafls, walls to be demolished, new walls, and a legend. NOTE: A condii[on of this project approval is that the Demolition Permit will not be issued and, and no work can begin (inc[uding the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or perfarmed. 7} Show the distances from all exterior walls to property fines or to assumed property iines 8) Show the dimensions to adjacent struc#ures. 9) Rooms that can be used for sleeping purposes rnust have at least one window or door that corr�plies with the egress requirements. Specify fhe location and fhe net clear opening height and width of a!1 required egress windows on the elevation drawJnqs. 10) Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 11) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calcu[ating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30° in height. 12) Provide handrails at all stairs where there are four or more risers. 13) Provide lighting at ail exterior landings. .- ��- � . _- --� -� ' �.--- --� _- . _. �_„_ �.�—�_ .- 1� � �OTE: When plans are submitted for Building Code comp�iance plan check prov[de the following ormation on the first page of the plans: 14) On the plans specify that this pro}ect will compiy with the 2010 California Building Code, 2010 Califomia Residential Code (where applicable), 2010 California Mechanical Code, 2010 Cafifomia Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00 p.m. on December 31, 2010 #hen the building permit application for that project may use the pravisions found in the 2d07 California Building Codes including all amendments as adopted in Ordinance 1813. 15) On the pla�s provide a copy of the GreenPoints checklist for this project at full scale. 16) Specify on the plans that this praject will comply with the 2008 California Energy Efficiency Standards. . Go to http:/lwww.enerqv.ca.gov/title24/2008standards/ for publicaiions and details. 17) Place the following information on the first page of the pfans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p,m. Sundays and Holidays: '50:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 73.04.100 for details.) 1�8)On the first page of the plans specify the following: "Any hidden conditions that require work ta be performed beyond the scope of tF►e building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project des ner, and/or contractor must submit a Revision to the City for any work not graphically ' u rated on th_�...lca�i Copy of the�ags-prior to performing the work. s Reviewed _. ,, ,., . ._ _ _ _.. , _ _ _ ._ ._ --- -- ....... Project Comments Date: February 22, 2013 To: � City Engineer � Recycling Specialist (650j 558-7230 (650} 558-7279 0 Chief Building Official OFire Marshal (650} 55&7260 (650) 558-7600 � City Arborist � NPDES Coordinator (85Q} 558-7254 {650) 342-3727 � City Attorney From: Planning Staff Subject: Request for Design Review and Special Permit for building height for a 1st and 2nd story addition to an existing singfe family dwelling at 1361 Bernal Avenue, zoned R-1, APN: 026-058-060 Staff Review: February 25, 2013 While the project appears fio not require sprinklers based upon proposed addition and remodel, the project is close. Be advised where more than one (1) addition and/or alteration for which building permits are required are made within a two (2) year period and said alterations are made to the premises of the same occupant. fn such circumstances, the sum of these additions and/or alterations construction costs during this two (2) year period shall be aggregated for the purpose of calculating the replacement cost value formula. Final determination will be made and the plan review phase of the project. It is very important that you understand the threshold indicated by BMC §'f7.04.030. Designer, contractor, and owner should communicate specifically the extent of demolition and remodel. Keeping in mind any change orders and addendums which increase the total amount of square footage added or remodeled after plan review would be applied to the sprinkler ordinance. Reviewed by: � - Date: -.�,s �'`�Qrr � � Date: Project Gommenfs February 22, 2013 To: � City Engineer (650) 558-7230 � Chief Buitding Official (650) 558-7260 X City Arborist (650) 558-7254 From: Planning Staff Subject: Request for Design Review and Special Permit for building height for a 1st and 2nd story addition to an existing single famrly dwelling at 936'1 Bemal Avenue, zoned R-1, APN: 026-058-060 Staff Review: February 25, 2013 1. Existing landscape to remain with the addition of one 24in box Magnolia grandiflora in rear of property as indicated on landscape plan.. 2. Adequate amount of new and existing trees. 3. No tree over 48" in circumference may be removed without permit fram Parks Division. � Recycling Specialist (630) 558-7271 � Fire Marshal (650} 558- 760Q � NPDES Coordinator {650) 342-3727 0 City Attorney � Reviewed by: B Disco Date: 2127113 4. No further commer�ts i ;.,. i.'. Date: Project Commen#s February 22, 2013 To; X City Engineer {650) 558-7230 � Chief Building O�cial �s�o� 5ss-�2so � City Arborist (650) 558-7254 from: Planning Staff � Recycling Specialist (fi50) 558-7279 0 Fire Marshal (650} 558-7600 � NPDES Coordinator (650) 342-3727 � City Attorney Subject: Request for Design Review and Special Permit for building height for a 1st and 2nd story acfdition to an existing singfe family dwelling at 1361 Berna! Avenue, zoned R-1, APN: Q26-058-060 StafF Review: February 25, 2013 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain sys#em. 2. Replace all dispfaced/damaged sidewalk, driveway, curb and gutter. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 3105I2013 Project Comments Date: February 22, 2013 To: 0 City Engineer (650) 558-7230 0 Chief Building Official (650) 558-7260 � City Arborist (650j 558-7254 From: Planning Staff Subject: Request for Design Review and Special Permit for building height for a 1st and 2nd story addition to an existing single family dwelling at 136'[ Bernal Avenue, zoned R-1, APN: U26-058-060 Staff Review: February 25, 2813 1} Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to preven# stormwater pollution from construction ac#ivities. Project proponent shall ensure ali contractors implement appropriate and effective BMPs during afl phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project nates on a separate full size plan shee#, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http:/lwww.flowstobay.org/documents/businesslconstruction/Cou ntywide_Program_B MP_Plan_Sheet Jun2012.pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To fearn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay.org/documents/mun icipalitieslnd/Materialsl2012%20Materials/ Architectural_copper_BMPs_FI NAL.pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD �� � Recycling Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 X NPDES Coordinator {65Q) 342-3727 � City Attorney Date: 2l25/2013 � �,.,,,� Construction Best Management Practices (BMPs) SAN MATEO COUNTYWI�G Water Pollution Prevention Program Clean Wacer. Healthy Community. Construction projects are required to implement the stonnwater best management praciices (BMP) on this page, as they apply to your project, all year long. b9aterials 8c V1'aste �Ianagement i� j, � �. , .� ry ��-- :4,�.i � �'*' « t !i'{ i'^�: � Y.•i �;+Xy i E„J •�'•'� f V � �1', [Yun-Itn�.nrJous Mvtrrfnl.t U Bcrm nnd co.cr ziocl:pi(cs oCz�nd, din or olher consvucuon mawinl n�i�A uryo whcn min ie forcnsi w inw� uuivclp bcing usd �.��O�in t � e.,r,. ❑ Utt fb��� dan�� m�cn�re) Rclai�n.J o�u�er for Jus� ronlml. Huanfuus M1Llrrials ❑ lah.:l nll lio �ous maicnols md hn»rdo�is rvns�cs (nwh ss pes�icides. O�in�s. Ihinncrs. sdven�s. fucl. oil. �nd anUtn:ve) in aaada¢c �ciiA cin•. coun�v, s�uic ond 2d:n1 rcpWc�iom. � O S�erc hoardmi5 ma��riale nnd �cesms u� avmr 6gln canaa�as. sma enpyrop;otc sccondmr co�n�inman. and covcr Ihum a� fAc cntl of �rJc .�rrk day or J�uing u�ct �+mlM1er ur ���hon nm is fweeasi. 4 Folio..� mnuufacaitir"s a�lkm�an ins�nmiions for ha>u.dous m.11erinli enE hc cnrcfitl nof �o use mort IAan n<eessnn�. Do nu� �vl�� chemicals awAoas w6en nio u fwmn �.�i�hin 2e hova. ❑>mngc la npp�oMiom di�pu�al ofall hn:nrdo�u �raA�s. Wactt M;tna�uncn� Ct Cuvar xm�e disposal cuniaim:rs seeurclp ieilh mryF s� Un: cnd of nYn� »rork day and d�uine «n[ n�nJ�cr. . d Cherk n�nse disposal conininers Gcquemlv �or leob nnd io moke Ake �hcr a�e not orerfrlkd. Ne��cr Frose duan a dw�p.aer on 1hc conswuion sitr. ❑ CICH� w rcpincc pertablc IoikLc, anG iusprd tlw•m frc��rn�k for Icals and xp:Ils. ❑ �isyvse of afl irmtce end Aelrris properl<. Itxrek nmteriola end �+ssms dm� can 6,: ren�r-kd (siK6 aa uplu�h. coxrcla egpegom tux malcd»Is. nroad. �y bo..d pipe. uc.) . ❑ Dis�ms� of liqnid reaid.�es Gpn paints. �hinnvs. :oleents, �luez md eluning fh�iJe os Imzardons �vosle. Cunctrur�ian Eurnncn und Perio.ctcr � Gsmblish m�J moiwfn cRccfirc pcnmeicr conwis and sobilir.c nll wns�n�ccion cmmnccs nnA evm m z�ffic�entl. couvo� uos;au and sNimeni tlischarncs hon� vm atG �acking olT�ile. U Swccp or �vcunm am� sntci uao4ng'vumedialcly m�d sccwx sediment sou¢e m pmmi fuN�cr vxki�g. Nc.�cr hose duwn sueca to dcm� up Iraking. Equipment 11�Ianagement & Spill Control . ,:. � , ,� StHintcnnnce anJ ParklnC ❑ Desigoek a¢ arcy LnW niUi nppmpriarc HMPs, Fo� ��ehick artd cquipneni yuLiup ard siorope. ❑ PcrC m �mahxnmmz, �rpa'vjoM, snd vehide and equipmeni k'�shin5 oB vle_ ❑ 11�efooliugoc.¢ltickmeinienn�uam��sibedane onsiie. ��mA irt a 6em¢A area aMar Ran nvnn draina and oeer p�ip p.n bit �nauah ro eolket �oide, . rs«.�i� o� a;,�e or e�� o, n.�dw: w.:��. ❑ If re[ucle or eq�ipnux elmning mnsl be doM ora4e, cicen rviJ� nzier a�J7 in a 6er�ued arn d�W i�ill mt n1lon� rinu �vaier ia nw inb gune�s, �Ireef; stom dlvi��s,orcmf ..a�. ❑ Oo nd cican +<hic)c or cqnipm<at waim usng soapy, ml.tnn, deg�aws, �Icum clenninQ equlpmm�, ek. spill Prcrc�uln�ann conwl ❑ Kcep y0ii1 ekamp mntcriol� (nm. �bsprbonu. ete.) n•�'tla6k at lM1c canshuetion yiic u nl� tinw. "� L�s�el �ehiola a�equiPmenl Go9ue�Ur tor nrd .cpnir leolro p'omptl�. Use drip Vau �o carcL lwY.v umil rtpain om made. O Clean up spills a lea;s iuwrcdia�cl�� and dispoce of eknnup marcriob pmpedy. ❑ Do �rn hose ecm�n smincm whert Ou�d� hn�x spilled. Uie dq eleanup mciMJ� (�bsabad matsra�ls. ce� ie�cr..nd/or my), ❑ Srvccp up apillcd drt materiale immediaceh•. Do uol vp �o nnsL �hem ncsy mih armr, or bury Nem. O CMoaupspillsondirtnrcasb��di�eingupand prvperly diequia� ofmnnminoted soil. � Rcporl sigd5nnt spill� immad7amlc. You we requiad b� law w rcpm el1 sign;Gwnl mJeoses of kaurdom mamriaLs, Inchidmg oil. To mport a spill: 1) Diel 9tl ���mv locol e�verye�y� rtspo�ue mimbcr, 3j Cell the Qovemor's OtSce o[Emuganer $�,oix� Wy`y1�e Ccmer (8tqj S32_7530 (141wius). Garthwork & Paving/Asphalt Work Contami¢ated. 3oils _u_.� __�.,;,��...._ . 'I-. i., , `r � ' .�E� i; ,�r . �.Z. ;�` �i • ( ' � 1 w ♦ I Erasiun Cumml ❑ SeficdNe pading nnA ezcm7um nrorl for dry aYuthn ong. ❑ Siahillu oll dewded arzas, ins�oll md maimnin hmponn' e�m�o� wntrofs (wch m emaion em¢v1 tabric or bonJed fibet mu`ris) u,Nil veeem�iwi u esm6lished. ❑ Secd ar plpn� �s�euuon 7 elosirn conUd on ck,pes or where conzwuion is noi Inunedi�¢ly planrcd SeA4umt Contml ❑ Pcaecl etorm drain inlat� 6wiqs, ditchcs, DiN dreinag! Caurm w'Ith approp`ieR Br�lPs. aav6 ae �..ni 6�61 fiber mlls, 6mmq nm. ❑ Prtvcut sed'unentfran mi�eting oBa"ue by inslallin� aM nunuhtioQ eediroert canvols suaY u Bbtt rolls, slt fe�,rs, or sedin�l6ns'un. . . O Kcepexeaverednoilw+U�esilaw�6erc6 .riLL na collrot uro �x �keee ❑ Tmnsfu � caw�ed metnialt to dmnp rturl:s mi ��c site. nal'm 1he etrae4 ❑ Caimoina�ed Soi4 ❑ Bm7 of lhe follonmp condiuons am 04 n�ed.vstttrcwramivaiooaM w��c� dm Reeiand Woler Qmlin Control Bm�d: ■ Unusuul ioii mnditions. diso)antipt, ar ador. ■ Ahaodnnedw.defymmd im1:R . � Abundo�d wdls ■ Buried borteis, de6[fs, ot ttasli. ❑ Avoid pm•ing andua! cooting in.act weaJu:r. or �vLert nn� u Fuewtt befeee iMsh pa.emou will Mw �ime ro cme. O Co�er sNm� drnin ink�s anJ nuuholee �v6rn npplymg seol conG uok meS alnm� eql, foQ anl, aa. ❑ Colleecm�draydeornppropriately tlispox aPexcass eEnsi.e ya�rl or saud, Do NOTmeep or nvsh a inm gunrls. ❑ Do not mx �r�1u ro nesh dmw frtsh ul�t co�rcue�e pavmuenC Saw cot[ing & A.pLalUCuncrete Arn�o�•:� ❑ Campinely co.xr or he.r'sadc etami Min inleu ai�cn s�v evuinF Use fiLer (abric, ee¢6 6asn� inlet fillc4 or grvcl bags ro L'ap dmn� oul oltYe s�o�m drain sys�em. ❑ Siw.al, abowrb. m ixuom smv�a� thmy ud diapem N�� w-as¢ u aoon �s ya� arc Gniehod.in onc location a �t �ha end of e�eA �rork dar (whicir�rr is soonccq. ❑ It�ewcut slnrt}� eu�ea o careh boeia, elaon if up inlmNitfdy. Storm drazr� polluters may be liable for fines of Concrcte, Grout & Nlorfar A��pliratioir � g�om conaerc, grun and morlor nnda Wi'V, On pallet[ and nw�ap fiom dninnge arexi Thac m.wials mun Rcer.cach n uam dn;n. ❑ Was6 oW eonaelc CquipmenUvucis adii¢ or u� a eonmined area, ao lhert �� �ro diechtrge uxo ITe mderlpink wii wa AnrounlinR uras_ Le[ rqnuete hndrn and disposc of u gmba�e. ❑ Collcer IIu � a�fi N�x�r fiom n�asLiog ezpo'ed apgfeyu,e r.oacre� eud rtmo.ro ir . Corapp�opriale disposN offsile. DewaYering �, i m:� ❑ Effectivel�� mmugeall mno�t a�l N110��v11�1111 dIC 61IC, 311d i�� MIp�[(�M diee7mrtes frrnn d�e sac. biLertrw�an n'ucr fivm oftailc away fiao �II Qii�i�rbaf are a pr pthenrise rnsurc compliooce. O When dea��cnnp, �rorilp and a6ain aPP�'y �� du lo�l m�midpolip. hafom discharging wrtv fp s strrcl gullcr w corta dn�n. Filwiioa ordi��o�sion Nvaigh n bui0. �:. or sedana�i trap nuy Lc rtqui�ed. ❑ Li meaf oFkno�rn counminatioq resung is requi`cd priw m rcusc or dnchuge o( Wonuda�uc. Cou��lt with t6c Fngincer tu detrnnine mhether tciting is rcqui�ed and I�mv lo ino-iprol �esWu. Contvnica'ed aroundwelcr must be teca�e,1 or twled oS site tpr pmper dispn.ml. �0 �1�,��� Paintiog Rc !'xint Removal . r-�..----r r � �. � `�,;:, ,� "x` - _ ,� :;. I ,�.`�,, �° 4 „r � ; � � �� �r..y . �,�-�"'� PvintlnR dcanup ❑ Ne�u clean b.,.shn o�..�s� pa'v�� �����., ��Ho. ���. �»�v..��� dnin. orwrfiec w�a�crs. . ❑ For uala-Insed paiuis, pnim om bmshcs [o Um e<Irn( posstble, Rinsc lo the fnni�ery uw•eronce �-on hmx 6nined pcnn ou fiom �Le laol w-.sMwtu trcatmau� audwrirv. Na��cr p�wr peinl - dona a dr�ui. O For p�l-bascQ Oain�s. pni�il ou[ Mushrs Io ihe e�enl punibic end ckw� iritL tlwner or solvcnt iu a pinper couav�cr. Flmr and musc Ihinacrs wd so���enh. Dispose of rtsidue vid wi iDle �4innri/mlveun oc luzardous irastc. Pn3nt rtmuvN ❑ Ciien�ical p�ini atrippingmiduc ond eh�m aad dusr Gam niu'v�c paints or p�inh wnloining I��d or mbmy W n mun bc disposed oF u haardou� rcasm. ❑ Pain� cl��ps and dus[ fNm non•haanlaus � d4'stripping and aand biexuig mop ire nmpt np or cdluned in pin+tic drop c7ala wid disposed of m vnsk. Landscape Materials ��y �� ^ t �` ��. a Canmin rtockpiled I�nduap:ng ma�rn'ak �y qoring U�em.u�der tarpy n•hcn they ue �a auvdr� beiu6 tued. ❑ Smc1; crodible landscape mataiwl o0 pallccs. Cerera sw.c ilrorc ma�al�ls ���hcn ILer areua activek beiug uud a oPPlied. O D"uconunue appli�atlon oEnYy [rodi6k lnndfnpe malerial ivitAin 2 da�a beWce a losqst ram creit( �r dunns SeCt u�eplGec , -`� � SAA NAiE9 CLItNT91FE�F Water Pollutian Preventton Program Gean W,xer. Hoalchu Laiesamr,i:y. Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic fifie in San Francisco Bay. Water that comes into contact with architectural copper may c�ntribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants: Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Use Best Management Practices (BMPs) The foilowing Best Management Practices (BMPs) discharges to storm drains. Buildrng with copper gutter and drainpipe. must be implemented to prevent prohibited During )nstallation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm d�ain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact yaur local sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off-site for proper disposal. • Consider coating the copper mate�ials with an impervious coating that prevents further corrosion and runoff. This will aiso maintain the desired colar for a longer time, requiring less maintenance. During Maintenance lmpfement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer {with permission from the local sanitary sewer agency). If this is not an option, haul the wash water off-site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine, Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flawstobay.orq (click on "Business", then "New Development", then "local permitting agency"). FlNAL February 29, 2092 Storm drain inlet is blocked fo prevent prohrbifed discharge. The water must be pumped arrd disposed of properiy.