Loading...
HomeMy WebLinkAbout1361 Bernal Avenue - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 May 7, 2013 Andrea Van Voorhis 1501 Cortez Avenue Burlingame, CA 94010 Re: 1361 Bernal Avenue Dear Ms.Van Voorhis, �, GITY � � �1�� , ��_, •«�,�, COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the April 22, 2013, Planning Commission approval of your application for Design Review and a Special Permit became effective May 2, 2013. This application was for first and second story additions to an existing two-story house at 1361 Bernal Avenue, zoned R-1. The April 22, 2013, minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 11, 2013, sheets 1 through 9; 2. that any changes tc roof height or pitch, Division or Planning staf�; � building materials, exterior finishes, windows, architectural features, and amount or type of hardscape materials shall be subject to Planning Commission review (FYI or amendment to be determined by Planning 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the Chief Building Official's February, 26, 2013 memo, the Fire Marshal's and the Stormwater Coordinator's February 25, 2013 memos, the City Arborist's February 27, 2013 memo, and the City Engineer's March 5, 2013, memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; ii Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� May 7, 2013 1361 Bernal Avenue Page 2 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not �e modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a- Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 12. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. G: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �_ May 7, 2013 1361 Bernai Avenue Page 3 An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerel , ���`';. G�L^✓� ��=� � William Meeker Community Development Director c. Charles Vestner and Mary Thibaut, property owners Chief Deputy Valuation, Assessor's Office (LOT 6 BLOCK 44 EASTON ADD BURLINGAME NO 3 RSM C/23; APN: 026-058-060) File :� Register online to receive City of Burlingame e-mail updates at www.burlingame.org E� Project Comments �ate: To: Fram: February 22, 2013 0 City Engineer {850) 558-7230 � Chief Building �fficia[ (650} 558-7260 � �ity Arborist (650} 558-7254 � Recycling Specialist (650) 558-7271 � Fire Marshal (650J 558-7600 � NPDES Coordinator (650) 342-3727 � City Attorney Planning Staff Subject: Request for Design Review and Speciaf Permit for building height for a 4st and 2nd story addition to an existing single family dwelling a� '1361 Bernal Avenue, zaned R-1, APN: 026-458-06d Staff Review: February 25, 2013 1) Anyone who is doing business in the City musf have a current City of Burlingame business licer�se. 2) Provide fully dimensioned p(ans. 3) Provide a fully dimensianed site pfan which shows the true property bflundaries, the location of a{I structures on the properry, existing driveways, and on-site parking. 4) Provide existing and proposed elevations. 5) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once constructlon begins. A new Certificate of Occupancy w►ll be issued after the project has been finaled. fJo occupancy of the building is io occur until a new Certificate af Occupancy has been issued. 6} Provide a complete demolition plan that indica#es the existing wa[Is, walls to bs demolished, new walls, and a legend. NOTE: A condiiion of this project approval is that the Demolition Permit wi[I not be issued and, and no work can begin (incfuding the removal of a� 6uilding components), until a Building Permii has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 7} Show the distances from all exterior walls to proper#y lines or to assumed property lines 8) Show the dimensions to adjacent structures. 9) Rooms that can be used for sleeping purposes must have at least one window ar door that complies with the egress requirements. Specify fhe location and fhe net clear opening hefght and width of alI required egress windows on the elevafion drawings. 10) Inciicate on the plans that a Grading Permit, if required, will be obtained from the Qepartment of Public Works. 11} Pravide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calcufating the allowable lot coverage. Consulf the Planning Department for details if your project entails landings more than 30° in height. 12) Provide handrails at all stairs where there are four or more risers. 13) Provide lighting at all exterior landings. -- .. ----1_ ... � � C� C � — � i /�, - j I�OTE: When plans are submitted for Building Code c�mp(iance plan check provfde ihe folfowing i ��formation on the first page af the pians: j i j' 14) On the plans specify that this project will campiy with the 2010 Califarnia Building Code, 2010 ` Califomia Residential Code (where applicable}, 2010 California Mechanical Code, 2010 California ! Eiectrica! Code, and 2010 California Pkumbing Code, including alf amendments as adopted in j Ordinance 1856-2010. Note: If ths Planning Commission has approved the project prior to 5:00 p.m. on December 31, 2010 then the building permit application for that project may use the provisions found in the 2007 Califomia Buifding Codes including all amendments as adopied in I j� Ordinance 1813. ' ' 15) On the plans provide a copy of the GreenPoints checklisf for this project af full scale. � ; 16) Specify on the plans that this project wilf comply with the 2008 Califomia Energy Efficiency ! i Standards. . � Go to http:llwww.enerqy.ca.gov/title24;2d08standardsl for publications and details. �' 17) Pface the following informaiion on the first page of the plans: �-� ,.•��f "Construction H�urs" Weekdays: 7:00 a.m. — 7:00 p.m. Saiurdays: 9:40 a.m. — 6:OQ p.m. � Sundays and Holidays: 10:00 a.m. — 6:00 p.m. �+ (See City of Burlingame Municipal Code, Section 93.04.100 for detaiEs.) % �---7 18)On the first page of the plans spec'�fy the following: "Any hidden conditions that require work to `� ; be performed beyond the scope of the building permit issued for these plans may require further � ! City approvals including review by the Planning Commission.° The building owner, project � des ner, and/or contractor must submit a Revision to the City far any work nat graphicelly '�� '. ' u rated on tt��.le� Copy of the�,la,ns-prior to perf�rming the work. � � - . . �L�Jl7��/ ��F;�sbl�.��Zi►a Project Commenfis Date: Ta: From: February 22, 2013 � City Engineer (650J 558-7230 � Chief Building Official (650) 558-7260 � City Arborist (650} 558-7254 Planning Staff � Recyciing Specialist (65G) 558-7271 OFire Marsha! (650) 558-7600 0 NPDES Coordinator (650) 342-3727 � City Attorney Subject: Request for Design Review and Special Permit for building height for a 1st and 2nd story additian to an existing single family dwelling at 1361 Berna[ Avenue, zoned R-1, APN: 026-058-860 Staff Review: February 25, 2013 While the project appears ta not require sprinklers based upon proposed addition and remodel, the project is close. Be advised where more than one (1} addition and/or alteration far which building permits are required are made within a two (2) year period and said alterations are made to the premises of the same occupant. In such circumstances, the sum of these additians and/or alterations construction costs during this two (2) year period shall be aggregated for the purpose of calculating tfie replacement cost value formula. Final determination will be made and the plan review phase af the project. It is very important that you understand the threshold indicated by BMC §17.04.030. Designer, contractor, and owner should communicate specifically the extent of demolition and remodel. Keeping in mind any change orders and addendums which increase fihe total amount of square footage added or remodeled after plan review would be applied to the sprinkler ordinance. i. ;: Reviewed by: ��`�s��� Date: ��s �`'���-� � � . _. . _ . _ ..- --i; ii. --- �: i' Project Comments Date: February 22, 2013 To: � City Engineer (650) 5�8-7230 � Chief Building Officia! �s5a� s�s-72so X City Arborist (650} 558-7254 From: Planning SfafF U Recycling Specialist (6�0) 558-7279 0 Fire Marshal (650) �58-7600 0 NP�JES Coordinatar �65d} 342-3727 � City Attorney Subject: Request for Design Review and Special Permit for buFlding height for a 1st and 2nd story addition to an existing single family dwelling at 9361 Bernal Avenue, zoned R-1, APN: 026-058-060 Sta#f Review: February 25, 2Q13 1. Existing landscape ta remain with the addition of one 24in box Magnolia grandiflora in rear of property as indicated on landscape plan.. 2. Adequate amount of new and existing trees. 3. No tree over 48" in circumference may be removed without permit fram Parks Division. 4. No further commer�ts Reviewed by: B Disco Date: 2/27/13 Date: To: X City Engineer (fi50) 558-7230 � Chief Building Official �sso� 5sa-Tzso � City Arborist (650) 558-7254 Project Comments February 22, 2013 � Recycfing Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 0 NPDES Coordinator (650) 342-3727 0 City Attorney From: Planning Staff Subject: Request for Design Review and Special Permi# for building height for a 1st and 2nd story addition to an existing single family dwelling at 1361 Bernal Avenue, zoned R-'l, APN: Q26-858-060 Staff Review: February 25, 2013 1. Storm drainage shall be designed to drain towarcis the street frontage or to �he City storm dram system. � Reviewed by: V V Date: 3/05I2013 2. Replace all dispfaced/damaged sidewalk, driveway, curb and gutter. 3. Sewer backwater protection cerEification is required. Contact Public Works — Engineering Divisian at (650) 558-7230 for additional information. Date: Project Comments � February 22, 2013 To: � City Engineer (650) 558-7230 0 Chief Bui{ding Official (650) 558-7260 � City Arborist (650) 558-7254 From: Planning StafiF � Recycling Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 i� NPDES Coordinator (6�0) 342-3727 Q City Attorney Subject: Request for Design Review and Special Permit for building height far a 1st and 2nd story addition to an existing sir�gle family dwelling at 1361 Bernal Avenue, zoned R-1, APN: 026-058-060 Staff Review: February 25, 2013 1) Any construction project in the City, regardless of size, shall comply with ti�e City's NPDES (stormwater) permit to prevent stormwater pollution from construction activi�ies. Project proponent shall ensure ali contractors implement appropriate ar�d effective BMPs during a[I phases of construction, including demolition. When submitting plans for a building perrriit include a list of construction BMPs as project notes on a separate fu61 size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement, Electronic file is available far download at: http://www.flowstobay.org/documents/businesslconstruction/Countywide_Prog ram_B MP_Plan_Sheet Jun2012.pdf 2} Best Management Practices (BMPs) requiremenis apply on any projects using architectural copper. To learn what these requirements are, see attached flyer �Requirements for Architectural Copper." Electronic file is available for download ai: http:/lwww.flowstabay.arg/documents/municipalities/nd/Materials/2012°lo20Materials/ Architectural_copper_BMPs_FINAL.pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD �� Date: 2/25l2013 ,, �,.,,,,,_,, Construction Best Management Practices (13MPs) SAN MATEO COUNTYWIOE Water Poliution Prevention Program Clean Watec Healthy Community. Construction projects are xequired to impleme�it the stonnwater best management practices (BMP) on this page, as they apply to your project, all year long. Niaterials & VVaste D'Ianagement I-; I �, y =,.. � i9�� � -,,�;,�j �,�;` r t :��4 �' � •��°:•:; � �n 'w • . s ,�, ,, q . � , �� � tVun-Iluanlous hiutrrinlx U Bcnn nnd eo.�r sio�:v�les of p,nd. din or oiher eon.vi�euon ine�uiol +.iih urys..hcn min ie forecasi w if noi oUivcly 6ciny uud �.9�l+in 10 d.n'a. ❑ Uulbw dan'� nrcnne) n;claimeJ �ema fm Jus� ronlrvl. kfnxnnlu�.s hlnlcri:ils ❑ Lnb.:l ntl I�o.nrdaun maicriols and nnnrdnus �.aelcs (n�ch ns pce�icidcs. paimt. tl�inn�rs. solvems. fuel. oil. nnd omBrorse) in accordwice �riih cin�, couniy, sm�c ond fi•dural rtpuloiio��s. - O Sierc hez,�dov; mnmrials ond �.�mme L� �.�mar tlgM contei��e, smrc m opyrvprium eccondvn ro�nainm�n, mA coccr Ilrom a� �hc cnd of _��'prk Jny or Omins �. q�•rnlhcr or ���han ro7n is forccacl. ❑ I'vlb.�• mooufuci��nr'1 a�llcniiou Iniin�c�ion. forlm�mdo�s �iieriol<w�tl be core(ul �oi io usc mom ��nn neeessors. �a no �pch- c1¢n�ical: awMor: ,den rnlu u frnco:� o�iihln 2a novrn` ❑.1fiL1yC lur nppm�fl0lc dilpUsil af oll �Iur,,rdOlu I�mt[T. wuaie mnnngun�n� ❑ Cm . mia dsposal roumincrs eeartciq u�ilh rorps m ihc cnd of �Yr�- no�k d,ry and durins �rxi ��enJcc . d C4eek rens�e dispoxnl conminers fmqucnd7� for lealu nnd m mal:a s��c u1ci� nrc noi orc.f Iled, Ne�-cr hox Juar n Jmipe�a on 11m comvucdon eiie. U Cleen or «pincc pertablc loikls, and insptn Ilrcm fmpnontlr far i�at. ��e Fn�i�. O Diepuse ofoll i�nsterand tlel�ris properlr_ Recrcle mnletioleand ��mms dim ean be recyded (s¢L ns osphali, eonerc¢. oggrogam bare malcrinls, �vocN. k y 6w`d, pipe. aic.i . O Dispnsc of liqnid rnidnes (min peu�u. ihinnct. sohints, glues. md cicnnind Iluide ne 6nxordons �cosm. Cunttnrtlian Lntreneer und Perimeler ❑ Lsi,6lish viJ n�niniein c(fecnec pe�n�cierconwls.nd rmbiilrc nll �sin�cuon cmronccs end e.un �u suffioiendr emrtrol uoeiou nnd talimenl �fischoren fFem tllo mItl Lxklnp oR�i1a. ❑ Snecp onncumn anr eireo� unaking iminatintelp aid mcum sMimcro soume iu pre.em R.nLer va�king. N�vcr hose dmo� avec�s �o dcmnip Irakinp, �qnipment Dlanngement & Spill Coqtrol , �_ . ,� 11�un��nnnct anJ ParWn� ❑ Desi�ele marca, fined m�i nppmpria�e BMIPe,ior �'diicie md equipinml parl:ine aM s�onys. ❑ Perfnlm inojormouilennna, �epa'vjoM, and vehicle nnd eqWymcn� wasrying af! ule. ❑ Jlmloelingorveldclemeintene�¢emrtscbedme onsim. i�vrA in o 6emmd arnawwy hom �mnn Mina nnd orcr u drlp pu� biq rnangl� Io collect �vids. . Recr�lc vr di�pv�e ofGuLls m hewdoue wn�le. O Ilvelucle or equipmam clavung mnsl bc doro onsire, eleen rviJ� naeronl� in v 6em�ed srze J�M wID rot ollo.r rL�w wniu iv nm imo pune�s. �1rce�; �brtn a.,�i.u. wr rou.�. O bo `roi clean .ehicla or eqnipment o�im usiog soaps, wivents,depcosus, sirnm ckonhieeq�IpiuenL er. $ptll PmenitonanA Comml ❑ Kcep ypill ckmup mw�riole (rqo, �Mor6enu, etc.) n,�oilaAio nt �hc wnairnetiim silc e�oll iime�. �O b�sp,.<i .xhiala and equipmcm GcqucaUy far nnd mp.,lr leala p�vmptl��. Use drip yvq ro eaceL kata un�l repoin ora made. Ci Cienn up spllls or led.3 imnrcdietalp mid Airy«e of cleanup ma�eriols pmpe�l�•.. O Do �oi Iw�e den�n e�c(ncos.vhsrt Duly ho�e tpilled Ucc dry cicmup mcthala (�bmrbrni motttiols, cn� 1��1cr..nd/or mga). ❑ Sn•cep �ppp'�IIcJ dq mo�eriale InuneJiuclp. Do uol vy �o rvns6 dxm urq• �riUi nnier, orhury ihem. er ❑ Clann up srills an dirt nnro� bp di�eing np mrd pmpcd,v diepwinq ofconbmiaoud soiL � RryralelpiJSnnrspil6(mmediaK(y.Yoiiwerequimd b� la�v W �rpon n11 aigniGcent mJeaxs of Fu�dow ria1� Ineh�ding oil. To ecparc � syill: 1) Dlel 9lt arsonr loeol nnaryenec rospoiuemoi6er, 3) CeU the Oovernar'a Office oCEnierbency� Servia� \Vonilng Crmer. (8n0) 854_7330 (3J Lcu.$). Stoz�an clrair� �aiihwark & Paving/Asphalt Work CnlltAflplAB[C[l. " Soils ,�;;,.� ..i � .I� . r . ��, � � .f'�e ,�,(`, n� � � � � �. �yF`��^t L /L.r. a � � �i Smffon Cunl�nl ❑ SehedNe greding una exwnrim rvr1; Iw dq• w�ealha onl��. ❑ Siabifvt oll denuded ma.s, insinll wd nuinuin hmponry ecmion conholc (ach amion wnaol fabdc or bonJed fibv mnmx) until veQemrimi u eembliehW. O Seed a pinnl �egeuuon fa aosim camrd on slopes oreihere conswe�ion is not Immedi�mly ylmaM. SeAWrnf Conlrvl ❑ Promclemm� dmin loieh, euuvr, di�cMa, a and dmin�ge counq xltfi opp�opriorc eh1Ps, moh m�..el b�be f bor m0a, be�m .nk. ❑ PavencseJhnentfiuu�mi�otinAofGuc by ine�elling eM meinolWnp euiimmrt con'voLs, such ns Bbs roUs, .dll fe�cs, or Sfdlllltlll �6�Rf. . . ❑ Krnp excexe�ed eoli oa Il�e eilo o�M1cro i1 �riLL nol wlleoi n�m tl�c etreee ❑ 7ranxfel e�mve�ed me2rials to ditrnp trucl-s ml tll[ ppe. ppl'm Ne 6trecl ❑ Caiwoinaled Soi4 . ❑ Ifan➢oflhefollm.'ingmndiuonfuc oburvad, l�qt Por cmnnmLiniion and co�ibcl d�c Reeianel Waler Qimlin Control Bm�d: ■ Um�aud roli conditlo�e. discolomuon, arador. ■ A6m�daroil mideRround ud:s. . � Abandaried rvel� ■ BuriedYartels, dcbd; oruaeh. ❑ Avold pm•ing vnd seal coming in.ac� .rraiMer, or.vhan nw u fo`ecaeibclero n�sh p�rrmrnl wJl F��v �iwe io nve. ❑ Co�eratom� tUnu� inlc�s uW nunhalee �vhen opplymq senl moL I�ek woG �lur�. epl, toQ nr�l, ea. ❑ Collcotm�dreeyrJeornppopciar<y diepox ofrseess aAmsi�x gm�rJ o� saud, Do NOTmeep or�vash it imo gune�z. ❑ Uo iwt ax weter ia we� dorvufrtsl� ns�Init cpnvelc pavm�innG 6�wcufNng � M�II��IUCuncrefe Aea�orai ❑ Campinely co.ror or baRicade nomi dnin inien wi�rn s�w nutlinp. Usc filkr fnbdc, puch bazin inlei Lilvt nr gnixl bogt io L•eep slmrp oul oC �ia nonn drun c5'sicm. ❑ Sl�o.eL aboeorb. or iveuwn .o�r-cu� i�lm� Nd dYPMe ofili vi6R 15 LOO� ieyai orc fini�l¢d.in wrc Iwntivo m�1 ihe end o(enoF narA da� (widchneris sooncd} ❑ ICui�xut sln�� enccrs o catcA basin, claon it up immcdieldy. lluters rnay be liable for rnes of Concretc, Gtrout & Moriar Appliratiou N ❑�9�o�e eoue�ero, yoni md monvr midm Carv, on pailets and o�vn� Cmm drainnge uaae. iTew mereriala uun ae.ro� aoch o slamidnin. ' O q�aeli oW eonerele oquipmenVirucls oQzim or u� acoMnined uea, sv IM1ert ic no dissherge "vuo ihe uidedyind soil ur ou�o nnmuMin[ uns. Let coacrem n..ad, .�a at,�,� or:z F..b,o�. ❑ Collecc ilm i b�h ���ucr fmm n�e.liing �eporcd aygmgnm cowrola d�d rtmo�•e ir , fMappmpriole dliposaloRsile. Dewatering T � S .� ❑ ElCecllvcl�� mwugeaU runo�t n11 runolFn�ilhu� dic sim,and ell cv�ro(CUw� diecluryes from d¢aila bi�onrunbn ���etor fivm o7silc a�.ay Itom �II AsN�baf orea� or olherniw enswn crnnpliaoce. ❑ Whe.n dm�y�crinp, norifi� and abnin npryo.�al Gou� Iln loe�l niiwi�ipali�y. hefolc diiw�harging w�aer m a ceecl gulisr ar flmm dnin. Fi4miion ordironion �hra�gL n bc�iq tmk, m zd'm�eni �np tllfy �O RQUIRd. 0 4i meae of knawn caoom(nmion, raung b requi�cd pI{p� ro m�tc or dischargp u(' artmua�vatcr, con:Wtu�im ihc Fngi�e��o dqermine n�hether¢:ting isiequUW �nd Iw�r rn in�iprol tesull�. Conmmimiod afoand�ruln most be.l�ce�eal or hmiled oR tile tor ploper dicpoml. to $10,000 per day! Pain[ing & Paint Removal ���:,., � � i �.,, - � '3; '.'� ._ � � /„r� . �� � ealnung dcanup ❑ Nne� cioan bn�ahs or Mse p�� conminrn imo a�vco� gnuv, s�am� dnln. orsurfiee a�mcrs. . ❑ For webr-bucd poin�s, yaio� ou� bniehu ro il+c e,�(ent poesl6ie. Rin�c �o �he �^i�^�Y � ron ha.z 5nined p��n7evau fiom��e Iocol..�m��err ircntme�u audwriry. Nm�crpourp�inl � don o drnui. ❑ For oil-bnced Daints, peiul ou[ bnnhrl Io Ihe rnenl Pws�61c �nd ekwi Ki�i ihaner .otren� iu a propa conbiner. rlter a`d rc��se Ihlnncrs aod eo���anls. Dizpone of msldue ud waulDle Ihinnedsolveuu ns �uZYld045 �YBSIG Paint remurnl O Chrn�iwl p.in� stripping miduo a1d chip� and dusr Orom u�uinc peinle or painls wntnining Icotl rn rribnlylun must be dtsposed oFae haardom n�aste. ❑ r,��i �a�:.�a a�c w,n non-noa�to� � dn- striPPing w.d iu�d 67na1'vig n�op Fre nrep� up m cdlec�ed in plutic d�op cloJ� n�id di�po�od of m vesli. Lan�scape lY(aterinls ,������"�� ❑ Canmin stockpil<d I,ndaraping maferialc by �lam�g p¢m.under Urpa nhen Ihg ary nIX eGliv�r� beins lued. ❑ Stncl; crodible len�capc malerial on palltts. Curerex sb.o Wcre moiuiale ��tirn 16eq ate ual aclixeh� beiug uerdor oPPlied. ❑ Discontlnue opplicntlon ofmn wdfbk landfnye moleriel n�i�Lln 2 dn�s be[me a foRcast nin cicn� ar dunns t�xf Mcalhcc � ii � _ _ �.�� i �u _::: . `-�� �� ' 9A8 NATE9 C0U'i�T7Wt�lF Wa�er Po�luutic�n Preuention Pragram CJean V9mec Noalthl, Lnnsmur.i:y. Requirements for Architectural Copper Protect water quality during installation, c{eaning, treating, and washing! . Copper from Buildings May Harm Aquatic Life Copper can harm aquatic fife in San Francisco Bay. Water that comes irrto contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade. of green or brown typically contain acids. After treatment, whe� the copper is rinsed to remove these acids, the rinse waier is a source of po�lutants: Municipalities prohibit discharges to the storm drain of water ussd in the installation, c{eaning, treating and washing ofi architectural copper. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) must be implemented to prevent prohibited discharges to storm drains. During lnstaltation • If possible, purchase copper materials that have been pre-pafinated at the factory. • If patination is done on-site, impfement one or more of the following BMPs: o Discharge the rinse wafer to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Coliect rinse water in a tank and pump fo the sanitary sewer. Contact your local sanitary sewer agen�y be#ore discharging to #he sanitary sewer. o Collect the rinse water in a tanic and haul off-site for proper disposal. • Consider caating the copper mate�ials with an impervious coating fihat prevents further corrosion and runoff. This will atso maintain the desired colar for a longer time, requiring less maintenance. During Maintenance Implement the following SMPs during routine maintenance activities, such as power washing #he roof, re-patination or re-application of impervious coating: Block storm drain inlets as nesded to prevent rurroff from entering storm drains. Discharge the wash water to landscaping or to the sanitary sewer (witf� permission from the local sanitary sewer agency). ff this is not an option, haul the wash water off-site for proper disposal. Protect the BaylOc�an and yourself! If you are responsible for a discharge to the storm drain of non- ston-nwater generated by installing, cleaning, �reating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine, Contact Information The San Mateo Countywide Wafer Poliution Prevention Program lists municipal stormwater contacts at www.flowstobay.orq (click on "Business", then "New Development", then "focal permitting agency"). FlNAL February 29, 2072 Burlding with copper ttashing, gutter and drainpipe. S%rm drain inlet is blocked fo pr�vent prohibited discharge. The water musf be pumped and disposed of properly.