HomeMy WebLinkAbout1357 Bernal Avenue - Approval LetterDocuSign Envelope ID: 8DFDF8C4-50D9-4D8F-A432-FE1AOEB2FECB
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
.
BURLINGAME
l� ..'
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH:(650)558-7250
FAX:(650)696-3790
February 4, 2022
Hector Estipona
J Deal Associates
337 Beach Road, Suite A, Burlingame, CA 94010
Re: 1357 Bernal Avenue
Dear Mr. Estipona,
Since there was no appeal to or suspension by the City Council, the January 24, 2022, Planning Commission
approval of your application for Design Review and Special Permit for building height became effective February 3,
2022. This application was for a new, two-story single-unit dwelling and detached garage at 1357 Bernal Avenue,
zoned R-1.
The January 24, 2022 minutes of the Planning Commission state your application was approved with the following
conditions:
1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January
04, 2022, sheetsA1.1-A3.1, A5.1, G1, SF, L1-L3 and revised sheets date stamped January 12, 2022, sheets
A4.1 and A4.2;
2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch,
and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission
review (FYI or amendment to be determined by Planning staff);
3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
4. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon
the private property, if feasible, as determined by the Community Development Director;
5. that demolition for removal of the existing structures and any grading or earth moving on the site shall not
occur until a building permit has been issued and such site work shall be required to comply with all the
regulations of the Bay Area Air Quality Management District;
6. that prior to issuance of a building permit for construction of the project, the project construction plans shall
be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission,
or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction
process. Compliance with all conditions of approval is required; the conditions of approval shall not be
modified or changed without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and
installed on the portions of the roof not visible from the street; and that these venting details shall be included
and approved in the construction plans before a Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which
requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and
meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a
demolition permit;
Register online to receive City of Burlingame e-mail updates at www.burlingame.org
DocuSign Envelope ID: 8DFDF8C4-50D9-4D8F-A432-FE1AOEB2FEC6
January 24, 2022
1357 Bernal Avenue
Page 2
9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect
at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO
THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing �inspection the applicant shall provide a certification by the project
architect or residential designer, or another architect or residential design professional, that demonstrates
that the project falls at or below the maximum approved floor area ratio for the property;
11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set
the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the
top of the form boards per the approved plans; this survey shall be accepted by the City Engineer;
12. that prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the architectural
details shown in the approved design which should be evident at framing, such as window locations and
bays, are built as shown on the approved plans; architectural certification documenting framing compliance
with approved design shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge
and provide certification of that height to the Building Division; and
14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural
details (trim materials, window type, etc.) to verify that the project has been built according to the approved
Planning and Building plans.
All site improvements and construction work will require a separate permit application to the Building Division. This
approval is valid for two years during which time a building permit must be issued. An extension of up to one
year may be authorized by the Community Development Director; a written request and filing fee for an extension
must be filed at least 30 days before expiration of the approval.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If
you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of
the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
�.iw �aU�'d.i�n.c,v�
Kevin Gardiner, AICP
Community Development Director
Archimedes Martinez, property owner
1357 Bernal Avenue
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOT 7 BLOCK 44 EASTON ADD BURLINGAME NO 3 RSM C/23; APN: 026-058-070)
File
Register online to receive City of Burlingame e-mail updates at www.burlingame.org