Loading...
HomeMy WebLinkAbout1349 Bernal Avenue - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 September 22, 2015 Daryl Buckingham 338 Ridge Road San Carlos, CA 94070 Re: 1349 Bernal Avenue Dear Ms. Buckingham, CITY '�� : � i _ � �<° �o,.., COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the July 27, 2015, Planning Commission approval of your application for Design Review Amendment became effective August 6, 2015. This application was for a first and second story addition to an existing two-story dwelling (detached garage retained) at 1349 Bernal Avenue, zoned R-1. The July 27, 2015, minutes of the Planning Commission state your application was approved with the following conditions: 1 2 that the project shall be built as shown on the plans submitted to the Planning Division date stamped February 11, 2014, sheets A.0 through A1.2, A3.2 and A-7, and date stamped July 6, 2015, sheets A-3, A3.1, A0.2, and A-1; that the windows shall be aluminum-clad wood windows with either simulated true divided lites, or true divided lites; 3. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 4. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 5. that the conditions of the Building Division's October 25, 2013, January 3 and January 31, 2014 memos, the Parks Division's November 5, 2013 memo, the Engineering Division's October 30, 2013 memo, the Fire Division's October 24, 2013 memo, and the Stormwater Division's October 31, 2013 and January 6, 2014 memos shall be met; 6. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; �: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: September 22, 2015 1349 Ber�al Ave. Page 2 7. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 8. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 11. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shail use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water ru noff; 12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 13. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 14. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: September 22, 2015 1349 Bernal Ave. Page 3 16. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, ; ,� � � i �_ William Meeker Community Development Director c. Sonia Wadhawan and Deepak Chugh, 1349 Bernal Avenue, Burlingame, CA 94010, property owners. Chief Deputy Valuation, Assessor's Office (LOT 9BLOCK 44 EASTON ADD BURLINGAME NO 3 RSM C/23; APN: 026-064-010) � �: Register online to receive City of Burlingame e-mail updates at www.burlingame.org .d Project Comments Date: �� From: January31, 2014 0 City Engineer (650) 558-7230 x Chief Building Official (650) 558-7260 � Parks Supervisor (650) 558-7334 � Recycling Specialist (650) 558-727� � Fire Marshal (650) 558-7600 � NPDES Coordinator (650) 342-3727 � City Attorney Erika Lewit, Planning Subject: revised plans for 1349 Bernal Avenue, zoned R-1, APN: 026-064- ►",10 - your most recent comments and revised plans are in your In- Box Staff Review: No further comments. All conditions of approval as stated in all previous reviews of the project will apply to this p roj ect. � �__—� f :: Reviewed by: ��f� � � �'�, Date: 1-31-2014 ���, � _ Project Comments Date: To: From: Subject: Staff Review: December 30, 2013 � City Engineer (650) 558-7230 x Chief Building Official (650) 558-7260 0 Parks Supervisor (650) 558-7334 Erika Lewit, Planning 0 Recycling Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 � NPDES Coordinator (650) 342-3727 � City Attorney revised plans for 1349 Bernal Avenue, zoned R-1, APN: 026-064- 010 - original comments and revised plans are in your In- Box Re-check comment: �� ��. RESIDENTIAL: Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify fhe locafion and fhe nef clear opening heighf and widfh of alI required egress windows on ffre elevation drawinqs, 2013 Califomia Residential Code (CRC) §R310. Response not found on the plans. NOTE: A written response to the ite item must be re-submitted before tt Commission action. Reviewed r, iied here and plans that specificalfy address this roject can move forward foc..Planning '" Date; 1-3-2014 7270 = Project Comments Date: To: From: October 24, 2013 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subjecf: Request for Design Review and Special Permit for building height for a first and second story addition to an existing single family dwelling with a detached garage at 1349 Bernal Avenue, zcned R-1, APN: 026-064-010 Staff Review: October 28, 2013 �n the plans specify that this project wifl comply with the 2013 Cafifornia Building Code, � 2013 California Residential Code (where applicable), 2013 Cafifornia Mechanical Code, � 2013 California Electrical Code, and 2013 California Plumbing Code, inciuding all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project priorto 5:00 p.m. on December 31, 2013 then this project must omply with the 2013 Cafifornia Building Codes. ,��`�`'pecify on the plans that this project will compfy with the 2013 California Ener9Y Efficiency Standards. Go to http�//wv��w.energy.ca.qov/title24/2013standards/ for publications and details. �lace the foliowing information on the first page of the plans: f "Construction Hours" , Weekdays: 7:00 a.m. -- 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holida��s: 10:00 a.m. — 6:00 p.m. �(See City of Burlingame Municipal Code, Section 13.04.100 for details.) �On the first page of the plans specify the following: "Any hidden conditions that require f work to be performed beyond the sc�pe of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any �vork not graphically illustrated on the Job Copy of the plans prior to performing the work. 5) Anyone who is doing business in the City must have a current City of Burlingame business license. 6) Provide fully dimensioned plans. 7) Provide a fully dimensioned site p�an which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 8) Provide existing and proposed elevations. 9) This project will be considered a New Building because, according to the Cify of Burlingame Municipal code, "when additions, alterations or repairs within any twelve- month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2013 California Buiiding Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved plans. � 10) Due io fhe extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy witl be issued after the project has been finaled. No occupancy of the building is to occur until a new Ceriificate of Occupancy has been issued. 11) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demclition Permit will not be issued and, and no work can begin (including the removal of an building components), until a Building Permit has been issued for the projeci. The property owner is responsible for assuring ihat no work is authorized or perFormed. 12) Show the distances from all exterior walls to property lines or to assumed property lines 13�.�how the dimensions to adjacent structures. �Indicate on the plans that exterior bearing wafls less than five feet from the property line ! will be built of one-hour fire-rated construction. (2013 CBC, Table 602) �ESIDENTIAL: Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the /ocafion and ffre net clear opening f�eigf�t and widff� of all required egress windows on fhe levation drawin s. 2013 California Residential Code (CRC) §R310. dicate on the plans that a Grading Permit, if required, will be obtained from the f, Department of Public Works. 17) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than ?�0° in height. 18) Provide handrails at all stairs where there are four or more risers. 2013 CBC �1009. 19) Provide lighting at all exterior landings. �B �The fireplace chimney must terminate at least two feet higher than any portion of the f- building within ten feet or must be retrofit with a fireplace insert (not a log lighter.) 2013 CRC �1003.9. NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 3, 4, 14, 15, 16, and 20 m 9i be re-submitted before this project can move forward for Planning Commission a��ion. � Reviewed by: � ����: / � �� Date: 10-25-2013 J� Cvr. CBO'T 0-5�-7270 Project Gomments Date: To: From: October 24, 2013 � Engineering Division (650) 558-7230 � Building Division (65Q) 558-�260 X Parks Division (65�� 558-7334 P{anning Staff � Fire Division �s5o� 5�s-7soo � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review and Special Permit fior buiiding height far a first ar�d second sfory addition to an existing single fiamily dwelling w�th a detached garage �t 1349 Bernal Avenue, zoned R-1, APN: Q26-064-01Q Staff Review: October 28, 2Q13 1. No existing tree over 48 inches in circumference at 54 inches from base af tree may be removed withaut a Protected Tree Permit from the Parks Division (558-7330). lden�Eify tree an landscape plan that is proposed for removal Revievved 5y: B DiscQ Date: 11/5I'i 3 Project Comments Date: To: From: October 24, 2013 X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Special Permit for buiiding height for a first and second story addition to an existing single family dwelling with a detached garage at 1349 Bernal Avenue, zoned R-1, APN: 026-064-01 U Storm drainage shafl be designed to drain towards the street frontage or to the City storm drain system. The project shali, at its own cost, design and construct frontage public improvements inciuding curb, gutter, sidewalk, driveway and other necessary appurtenant work. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: Staff Review: October 28, 2013 Project Comments Date: To: From: October 24, 2013 0 Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 OFire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Desigr Review and Special Permit for building height for a first and second story addition to an existing single family dwelling with a detached garage at 1349 Bernal Avenue, zoned R-1, APN: 026-064-010 Staff Review: October 28, 20'[ 3 No comments at this time. �. `� �-.� . -+�-�+ t � � �L _ Y� rr�_. Lc�V 4 t .�L���' �' ` � `r1 `�c __ � -F � `.G L,I`:�� i�'•�L:.'�.�i`:;'�� `•� �� i � ' �' ��� 4 `' _.C_D-i'I_. ., .'�'�, . � , . Reviewed by: � � l� � ��� Date: �� �.� i 3 Project Comments Date: To: From: Subject Staff Review: December 30, 2013 0 City Engineer (650) 558-7230 � Chief Buiiding Official (650) 558-7260 Q Parks Supervisor (650) 558-7334 � Recycling Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 x NPDES Coordinator (650) 342-3727 � City Attorney Erika Lewit, Planning revised plans for 1349 Bernal Avenue, zoned R-1, APN: 026-064- 010 - original comments and revised plans are in your In- Box 1) The Stormwater Requirements Checklist has been filied out and refurned. It indicates that the project does trigger the new stormwater requirements. The checklist indicates that measures B.2.b.c.d.e. (patios) will be used to satisfy requirements (onfy one measure is required). 2} Other comments included in earlier review shou{d be incorporated during building permit issuance. For assistance please contact Stephen D. at 650-342-3727 � � _ ������� �� �� " J�'`� ^ �; Z;�;� t4 �.iv Fr� ` F 1 C.F�.; C' y ( Cc ,-' ��N,�"�,r3, DiV, �n�-�=1.�. Reviewed by: SD �� Date: 1/612014 :"`� N �1ATED CQUNT'1ti10E �'a:er Pollu:ion F;avention Program Sformwater Checkiist for Smafl Projects Municipal Regional Stormwater Permit (MRP) Order No. R2-2009-0074 ; Order No. R2-2D11-0083 NPDES No. CAS612008 INSERT CITY SPECIF[C INFO HERE ADDRESS PHONE FAX WEB (for those who allow download etc) Compfete this form for individual single farriily home prajecfs of any size, other pro,iects that create and/or replace less than 10, 000 square feet of impervious surface, and projects in the following categones that create and/or replace less than 5,000 square feet of impervious surface: resfauranfs, retail gasoline out(efs, auto service facilities', and parlcing lots (stand-alone or part of another use). A. Project Information - A.1 Project Name: A.2 Project Address: A.3 Project APN: B. Select Appropriate Site Design Measures �/ B.1 Does the project create and/or replace 2,500 square feet or more of impervious surfaceZ? IQ Yes ❑ No ➢ If yes, and fhe project wil! receive frna! discretionary approval on or afrer December 9, 2012, the projecf must inc(ude one of Site Design Measures a thraugh f.3 Fact sheefs regarding site design measures a through f may be dov✓nloaded af http;//www.flowstobay.org/bs new development.php#ilyers. i If no, or the project will receive final discretionary approval before December 1, 2012, the p�ject is encouraged fo implement sffe design measures�, which may be required at municipality discrefion. Consulf with municipal sfaff abouf requi�ements foryourproject. B.2 Is the sife design measure included in the project plans? Plan Yes No I She�t No ❑ ❑ I � i b. Direct roof runoff onto vegetated areas. a. Direct roof runoff into cisterns or rain barrels and use rainwater for i7igation or other non-potable use. c. Direct runoff Trom sidewalks, walF�vays, and/or patios onto vegetated areas. d. Direct runofi from driveways and/or uncovered parking lots onto v2getated areas. e. Construct sidewalks, walkways, and/or patios with permeable surfaces. f. Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces. � � � � ��lc�iP�1 ° ❑ � ❑ � ❑ � g. Minimize land disturbance and impervious surface (especialfy parking lots). h. Maximize permeability by clustering development and preserving open space. i. Use micro-detention, including distributed landscape-based detention. j. Protect sensitive areas, including wetland and riparian areas, and minimize changes to the natural topography. k. Self-treating area (see Section 4.2 of the C.3 Technica� Guidance) ❑ l4 ❑ ,� ❑ � ❑ � ❑ ,� m. Plant or preserve interceptor trees (Section 4.1, C.3 Technical Guidance) 1 See Standard Industrial Classification (SIC) codes here. �-., ;-_� ,---. ;.- _ ; � - -�_ �.� � Complete the C.3/C.6 Development Review Checklist if the project is not an individual single family home, and it� i�eat�s andior�re��aces �.� 10,000 square feet or more of impervious surface; or if it is a restaurant, retail gzsoline outlet, auto service facility,`or parking`lof'proj�crtTiat- - creates and/or replaces 5,000 square feet or more of impervious surtace. I I T ' See MRP Provision C.3.i. � = -� � � ` ` -' 4 See MRP Provision C.3.a.i.(6). 1 Appro.ved. Uec�mtier'�; �`2012 =-�--._-...,...� �;;�1. I. 5elf-retaining area (see Section 4.3 of the C.3 Technical Guidance) b?�� -b��� - � �a Stormwater Checklisf ior Small Projecis G Select appropriate source controfs (Encouraged for a!1 projects; may be required at municipal discre6on. Consulf municipal staff.$) Are these Feat�res ihat features in require source control project? measures Yes No ❑ Storm Drain ❑ � Floor Drains ❑ Parking garage � ❑ Landscaping � � Pool;Spa/Fountain ❑ [�" Food Service Equipment (non- residential) ❑ ❑ ❑ �' Outdoor Equipment/ Materials Storage ❑ I � Vehide/ Equipment Cleanin Vehicle/ Equipment Repair and Maintenance �' I Refuse Areas �' Outdoor Process Activities � ❑� ❑ I �' I Fuel Dispensing Areas ❑ I ,� I Loading Docks �] � [�� Fire Sprinklers 0 r�� ► Source control measures (Refer to Local Source Control List for detailed requirements) • I�iark on-site inlets with the words "No Dumping! Flows to Bay" or equivalent. - Plumb interior floor drains to sanitary sewer [or prohibit]. ■ Plumb interior parking garage floor drains to sanitary sewer.6 • Retain existing vegetation as practicable. - Select diverse species appropriate to the site. Include plants that are pest- andlor disease-resistant, drought-tolerant, and/or aitract beneficial insects. � Minimize use of pesticides and quick-release fertilizers. • Use efficient irriqaiion system� desiqn to minimize runofF. • Provide connection to the sanitary sewer to facilitate draining.6 Is source control measure included in project pians? Plan Yes No Sheet No_ ❑ � ❑ � ❑ ,� � � �- � �'L ❑ ,� ❑ � �I ❑ � ❑ �I ❑ � ❑ � ❑ � ❑ � ❑ � ❑ � 0� Provide sink or other area for equipment cleaning, which is: • Connected to a grease interceptor prior to sanitary sewer discharge.6 • Large enough for the largest mat or piece of equipment to be cleaned. • Indoors or in an outdoor roofed area designed to prevent stormwater run-on and run-o�f, and si�ned to require equipment washing in this area. • Provide a roofed and enclosed area for dumpsters, recycling containers, etc., designed to prevent stormwater run-on and runoff. • Connect any drains in or beneath dumpsiers, compactors, and tallow bin areas servin food service facilities to the sanita sewer.6 ■ Perform process activities either indoors or in roofed outdoor area, designed ' to revent stormwater run-on and runoff, and to drain to t`�e sanita sewer.E • Cover the area or design to avoid pollutant contact with stormwater runoff. • Locate area only on paved and contained areas. ,■ Roof storage areas fhat will contain non-hazardous liquids, drain to sanitary I sewer5 and contain by berms or similar. I• Roofed, pave and berm wash area to prevent stormwater run-on and runoff, plumb to the sanitary sewer6, and sign as a designated wash area. ■ Commercial car wash facilities shall dischar e to the sanita sewer.6 • Designate repair/maintenance area indoors, or an outdoors area designed to prevent stormwater run-on and runoff and provide secondary containment. Do not install drains in the secondary con;ainment areas. • No �loor drains unless pretreated prior fo discharge to the sanitary sewer. s • Connect containers or sinks used for parts cleaning to the sanitary sewer. 6 • Fueling areas shali have impermeable surface that is a) minimally graded to prevent ponding and b) separated from the rest of the site by a grade break. � Canopy shall extend at least 10 ft in each direction from each pump and drain awa from fuelin area. • Cover and/or grade to minimize run-on to and runoff from the loading area. • Position downspouts to direct stor�-::::.�ater away from the loa ding area. • Drain water from loading dock areas to the sanitary sewer. • Insfall door skirts between the trailers and the buildin . • Design for discharge of fire sprinkler test water to landscape or sanitary sewer6 �' Miscellaneous • Drain condensate of air conditioning units to landscaping. Large air Drain or VVash conditioning units may connect to the sanitary se�ver.6 Water • Roof drains shall drain to unpaved area where practicable. • Drain boiler drain lines, roof top equipment, all washwater fo sanitary sewers. �' Architectural • Drain rinse water to landscaping, discharge to sanitary sewer 6, or collect and Copper dispose properly offsiie. See flyer "Requirements for Architectural Copper." 5 See tJ�RP Provision C.3.a.i(7). 6 Any connection to the sanitary sewer system is subject to sanitary district approval. � Businesses that may have outdoor pro�ess acii•��ities/equipment include machine shops, auto repair, industries with pretreatment facilities. 2 Approved December4, 2012 Stormwater Checklist for Sma/l Projects D. impiement construction Best Management Practices (BMPs) (Required forall projects.) D.1 Is the site a"High Priority Site"? (Municipa! sfaff will make this determination; if the answeris yes, Yes ❑ No ❑ the projecf will be referred fo consfrucfion site inspection staff for monthly stormwater inspections dunng fhe wet season, October 9 through Apnl 30.) -"High Priority Sites" are sites that require a grading permit, are adjacent to a creek, or are otherwise high priority for stormwater protection during construction per MRP Provision C.6.e.ii(2). D.2 All projects require appropriate stormwater BMPs during construction, indicate which BMPs are inr.luded in the project, below. Yes No Best Manaqement Practice (BM �❑ Attach the San Mateo Countyv✓ide Water Pollution Prevention Program's construction BMP plan sheet to project plans and require contractor to implement the applicable BMPs on the plan sheet. ❑�i Temporary erosion controls to stabilize all denuded areas until permanent erosion controls are established. ��j% Delineate with field markers clearing limits, easements, setbacks, sensitive or critical areas, buffer zones, trees and drainaqe courses. �❑ Provide notes, specifications, or attachments describing the following: • Construction, operation and maintenance of erosion arid sediment controis, inciude inspection frequency; • tJlethods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared material; • Specifications for vegetative cover & mulch, include methods and schedules for planting and fertilization; � Provisions for temporary andlor permanent irrigation. _ ,� ❑ Periorm clearing and earth moving activities only during dry weather. ❑ � Use sediment controls or fiitration to remove sediment when dewatering and obtain all necessary permits. �❑ Protect ali siorm drain inlets in vicinity of site using sediment conirols such as berms, nber rolls, or filters. � �I ■ i � Trap sediment on-site, using BMPs such as sediment basins or traps, earthen dikes or berms, silt fences, check dams soil blankets or mats, covers for soil stock piles, etc. Divert on-site runoff around exposed areas; divert off-site runoff arourd the site (e.g., swales and dikes). Protect adjacent properties and undisturb2d areas from construction impacts using vegetative buffer strips, sediment barriers or filters, dikes, mulching, or other measures as appropriate. _ �❑ Limit construciion access routes and stabilize designated access points. �' ❑ No cleaning, iueling, or maintaining vehicles on-site, except in a designated area where washwater is contained and treated. �❑ Store, handle, and dispose of construction materials/wastes properly to prevent contact with stormwater. �❑ Contractor shall train and provide instruction to ail employees/subcontractors re: construction BMPs. �' � Controi and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, washwater or sediments, rinse water from architectural copper, and non-stormwater discharges to storm drains and watercourses. Name of applicant completing the Date_.�' (i � I,_� � E. Comments (for municipal staff use only): F. NOTES (for municipal staff use only): Section A Notes: Section B Notes: Section C Notes: Section D Notes: Approved December4, 2092 Project Comments Dafe: To: From: Subject: Staff Review October 24, 2013 Q Engineering Division (650) 558-7230 Q Building Division (650) 558-7260 � Fire Division (650) 558-7600 - -- _ _ _ _ - -- � X Stormwater Division "� " J,� "`-��" 4"� j (650) 342-3727 , ,` ; ' _� _< <_ L� � � � Parks Division � City Attorney (650) 558-7334 (650) 558-7204 �' � '� ��_ ` � :'�'_;;,� --_�'�';F r� -. =.. :,.��; . �G ,_;; � Planning Staff Request for Design Review and Special Permit for building height for a first and second story addition to an existing single family dwelling with a detached garage at 1349 Bernal Avenue, zoned R-1, APN: 026-064-010 October 28, 2013 1� Stormwater requirements are required to be implemented at stand-alone single family home projects that create and/or replace 2,500 sq.ft. or more of impervious su�ace. These requirements are in addition to any City requirements. To determine if this project is subject to those requirements complete and return the attached "Stormwater Checkfist for Small Projects." For additional information about these requirements please refer to the attached flyer "New Stormwater Control Requirements Effective 12/1/12" and by visiting the San Mateo Couniy Stormwater Poliution Prevention Program (SMCWPPP) website at: http://flowstobay.org/files/privatend/MRPsourcebk/Section4/C3iNewRegsSmProjSep 2012.doc To obtain a checkiist electronically, the document is avaifable at: http://flowstobay.org/files/privatend/MRPsourcebk/Section4/StormChecklistSmallProj Dec2Q12.doc 2) Any construction project in the City, regardless of size, shall compiy with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during ail phases of construction, including demolition. When submitting pians for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent rnay use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://flowstobay.org/fileslprivatend/MRPsourcebk/Section5/ConstBMPPIanJun2012. pdfi 3) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://flowstobay.org/files/privatend/MRPsourcebk/Section8/ArchitecturalcopperBMPs .pdf ' For assistance please contact Stephen D. at 650-342-3727 Reviewed bv: SD J� Date: 10/3112013