December 4, 2009 Director's Report
Planning Commission Meeting Date: December 14, 2009
Ruben Hurin, Senior Planner
FYI — CHANGES TO A PREVIOUSLY APPROVED DESIGN REVIEW
PROJECT AT 1333 BERNAL AVENUE, ZONED R-1.
Summary: On August 10, 2009, the Planning Commission approved an application for Design
Review and Special Permit for building height for a first and second story addition to a single
family� dwelling at 1333 Bernal Avenue, zoned R-1 (August 10, 2009 Planning Commission
Minutes attached). A building permit was issued on October 22, 2009 and construction is
underway.
During Planning Commission review of the project, the Commission asked that the window
design be studied a bit more. In response, four windows on the front, rear and left sides of the
house were changed from flat-top to curve-top windows; the project was approved with these
window changes. The property owners are now requesting to change the originally approved
curved-top windows back to flat-top windows (see proposed front, rear and left side elevations,
date stamped December 3, 2009). In a letter dated December 3, 2009, the property owners
comment that they received formal bids for the curved-top windows and they are cost
prohibitive. They also note that the proposed change to the windows "maintains the consistency
of design and brings the window budget back to a manageable level." The windows will be
aluminum clad wood units with simulated true divided lites, consistent with the windows
proposed throughout the rest of the house.
Other than the changes listed above, there are no other changes proposed to the design of the
house. Planning staff would note that because of these minor revisions, it was determined that
the project could be reviewed by the Planning Commission as an FYI item.
If the Commission feels there is a need for more study, this item may be placed on an action
calendar for a second review and/or public hearing with direction to the applicant.
Ruben Hurin
Senior Planner
ATTACHMENTS:
August 10, 2009 Planning Commission Minutes
Letter from Joe and Rebecca Lambing, dated December 3, 2009
Previously Approved and Proposed Plans, date stamped December 3, 2009
CITY OF ��RLf►'�GAME PLANNING COMM{SSION — Approved Minutes Augus# 10, 2009
VII. AC710N ITEMS
Consent Calendar - Items on the Consent Calendar are considered to be routine. They are acted upon
simultaneously unless separate discussion and/or action is requested by the applicant, a member of the
public or a Commissioner prior to the time the Commission votes on the motion to adopt.
CommissionerAuran indicated that he would recuse himself from voting on Agenda Item 1a (1333 Bernal
Avenue), since he resides within 500-feet of the property. He left the Council Chambers.
Chair Terrones indicated that he would abstain from voting on Agenda Item 1 a, since he had not reviewed
the recording from the Design Review Study session for the item.
Given that only three (3) members wou/d be able to vote to approve Agenda Item 1a as a Consenf Calendar
Item, Commissioner Vistica pu/led the item from the Consent Calendar so that a fu/l public hearing could be
held; permitting four (4) of the Commissioners present to vote on the item.
VIII. REGULAR ACTION ITEMS
1a. 1333 BERNAL AVENUE, ZONED R-1 —APPLICATION FOR DESIGN REVIEW AND SPECIAL PERMIT
FOR HEIGHT FOR A FIRST AND SECOND STORY ADDITION TO A SINGLE FAMILY DWELLING
(DARYL BUCKINGHAM, APPLICANT AND DESIGNER; AND JOSEPH AND REBECCA LAMBING,
PROPERTY OWNERSI STAFF CONTACT: RUBEN HURIN
Reference staff report dated August 10, 2009, with attachments. Community Development Director Meeker
presented the report, reviewed criteria and staff comments. Twelve (12) conditions were suggested for
consideration.
Chair Terrones opened the public hearing.
Daryl Buckingham, 338 Ridge Road, San Carlos; and Joseph Lambing, 1333 Bernal Avenue; represented
the application.
Commission comments:
Not much proposed for landscaping; what is proposed in front of house? (Lambing — will landscape
the front as a separate project. Buckingham — iwo large trees at the front of the house provide a lot
of shade and visually impact the front of the house. Lambing — will likely install drought tolerant
landscaping.)
Bring a landscape plan back to the Commission as an FYI.
Public comments:
None.
Additional Commission comments:
Good project.
Commissioner Brownrigg moved to approve the application, by resolution, with the following amended
conditions:
2
CITY OF BURLINGAME PLANN/NG COMMISSION — Approved Minutes August 10, 2009
that the project shall be built as shown on the plans submitted to the Planning Division date stamped
July 1, 2009, sheets A-0, A-0.1, A-1, A-1.1, A-1.4 through A-1.6, A-3, A-5 and A-11, and date
stamped August 3, 2009, sheets A-1.2, A-4.1 and A-4.2;
2. that the landscape plan for the property shall be submitted to, and reviewed by, the Planning
Commission as an FYI item, prior to final inspection of the new residence;
3. that any changes to building materials, exterior finishes, windows, architectural features, roof height
or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning
Commission review (FYI or amendment to be determined by Planning staff);
4. that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
5. that the conditions of the Chief Building Official's May 29 and July 6, 2009 memos, the City
Engineer's June 9, 2009 memo and the Fire Marshal's and NPDES Coordinator's May 28, 2009
memos shall be met;
6. that demolition or removal of the existing structures and any grading or earth moving on the site shall
not occur until a building permit has been issued and such site work shall be required to comply with
all the regulations of the Bay Area Air Quality Management District;
7. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved
plans throughout the construction process. Compliance with all conditions of approval is required;
the conditions of approval shall not be modified or changed without the approval of the Planning
Commission, or City Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these venting
details shall be included and approved in the construction plans before a Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which
requires affected demolition, new construction and alteration projects to submit a Waste Reduction
plan and meet recycling requirements; any partial orfull demolition of a structure, interiororexterior,
shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
2007 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION
11. that prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building Division
before the final framing inspection shall be scheduled;
3
CITY OF BURLINGAME PLANN/NG COMMISS/ON — Approved Minutes Augusf 10, 2009
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
The motion was seconded by Commissioner Vistica.
Discussion of motion:
The Special Permit is necessitated by topographical conditions on the property, and assists in the
proper massing of the structure.
Chair Terrones called for a voice vote on the motion to approve. The motion passed 4-0-2-1.
(Commissioners Cauchi and Lindstrom absent, CommissionerAuran recused). Appeal procedures were
advised. This item concluded at 7:15 p.m.
Commissioner Auran returned to the dais.
Commissioner Yie indicated that she would recuse herselffrom participating on Agenda Item 2(9021 Cortez
Avenue) since she resides within 500-feet of the property. She left the Council Chambers.
�
�
� L �� it_:,1, a i�. �
December 3, 2009
Burlingame Planning Commission,
- �, 2009
BUV�L!uGAME
This FYI amendment is to change the design of some of the windows added during
the original design review. At review we were asked to revisit the window choices
to achieve a more consistent look. During that process we modified several
windows, making four windows curve topped. Now that we have received formal
bids for these it is clear that the incorporation of curved top windows is cost
prohibitive for us. This amendment modifies the curved topped windows to the
analogous flat top version. This maintains the consistency of design and brings the
window budget back to a manageable level. All windows are still Marvin, clad,
double pane, low e. This has not changed and is a high-end product.
Sincerely,
Joe and Rebecca Lambing
1333 Bernal Avenue