HomeMy WebLinkAbout1825 Castenada Drive - Approval LetterCITY OF BURLINGAME
Planning Departrnent
City Hall - 501 Prirtvose Road
Burlingame, Califomia 94010-3997
Tel. (650) 696-7200
February 6, 2001
G&B Contractors, Inc.
1498 Carroll Avenue
San Francisco CA 94124
Dear �&B Contractors,
At their meeting of February 5, 2001 the City Council held an appeal hearing on your application for design
review, special permit, and a hillside area construction permit. This application was to allow for a new, two-
story residence with attached garage at 1825 Castenada Drive, zoned R-1. Following a public hearing
Council approved your application with the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Department date
stamped October 30, 2000, Sheets 1-4, and 6 and December 21, 2000, Sheets 5 and 7;
2. that the height of the story poles shall be verified by a licensed surveyor during the framing of
each floor, second story plate line and roof ridge and be submittted to the City Engineer for
verification at each step, and that the surveyor shall provide a photographic survey at different
angles conducted before and after the construction, and that if either the framing or photographs
are different than the approved plans the construction shall be corrected or the project shall be
reviewed by the Planning Commission;
3. that the project shall comply with the proposed demolition recycling ordinance recently approved
by the City Council;
��
4. that the conditions of the City Engineer's November 6, 2000 memo shall be met;
5. that any changes to the size or envelope of the first or second floors, which would include
expanding the footprint or floor area of the structure, replacing or relocating a window(s), adding
a dormer(s) or changing the roof height or pitch, shall be subject to design review; and
6. that the project shall meet all the requirements of the California Building and Fire Codes, 1998
edition, as amended by the City of Burlingame.
' February 6, 2001
1825 Castenada Drive
-2-
All site improvements and consiruction work will require separate application to the Building Deparhrient.
This approval is valid for one year during which time a building permit must be issued. One extension of
up to one year may be considered by the P1a11ning Commission if application is made before the end of the
first year.
�1! �
Reimbursement of the unspent portion of your design review deposit has been processed and will be mailed
to the property owner under separate cover.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely yours,
6�1�-�c�,�-1� �
Margaret Monroe
City Planner
smg
1825cast.cca
c. Richard and Lylian Kelly
1821 Castanada Drive
Burlingame CA 94010
Robert A. Williams
307 South B Street, Suite 2
San Mateo CA 94401
Dean Fantham and Yvette Gorotiague
1536 Alturas Drive
Burlingame CA 94010
Chief Building �nspector
Chief Deputy Valuation, Assessor's Office
(LOT 4 BLOCK 35 MILLS ESTATE NO 9 RSM 46/33; APN: 025-051-040)