HomeMy WebLinkAbout1431 El Camino Real - Staff Report (2)Item No. 9d
Environmental Scoping &
Design Review Study
City of Burlingame
Environmental Scoping and Design Review Study for Proposed
6-Unit Condominium Building
Address: 1431 El Camino Real
Meeting Date: March 27, 2017
Request: Application for Environmental Review, Condominium Permit, Design Review, Parking Variance for
the use of mechanical parking lifts and Front Landscape Variance for a new 3-story, 6-unit condominium
building
Applicant: Levy Design Partners APN: 026-013-110
Property Owner: GGH Investment LLC Lot Area: 7,721 SF
General Plan: Medium -High Density Residential Zoning: R-3
Burlingame Downtown Specific Plan (R-3 Base District)
Adjacent Development: Multifamily Residential to north, south and east/Single Family residential at the rear
(west)
Current Use: 4-unit apartment building
Proposed Use: 6-unit condominium building
Allowable Use: Multifamily, duplex, and single family residential
Environmental Review: The Planning Commission should review the proposed project for areas of potential
significant environmental effects. The Commission should add any additional effects of the project that they
anticipate might be potentially significant. The areas of investigation for environmental evaluation as defined by
CEQA are listed on the attached sheet for your reference. These potential environmental effects which will be
considered in the CEQA document include:
• Aesthetics
• Air Quality
• Biological Resources
• Cultural Resources
• Geology and Soils
• Greenhouse Gas Emissions
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use
• Noise
• Transportation
• Utilities and Service Systems
• Energy
• Cumulative Impacts
The issues identified by the Commission will be incorporated into the environmental documents for the project.
At this time, staff notes that based on preliminary analysis, it appears that the type of CEQA document required
will be a (Mitigated) Negative Declaration. However, the type of CEQA document will be finalized during the
environmental review process. The City is currently awaiting submittal of proposals from CEQA consultants for
the preparation of the CEQA document.
Environmental Scoping and Design Review Study 1431 El Camino Real
Project Summary: The applicant is proposing to demolish the existing 4-unit apartment building and the
detached garage structure at the rear and construct a new, three-story, 6-unit residential condominium
building.
The subject property is zoned R-3 and has a General Plan land use designation of Medium -High Density
residential with 21-50 dwelling units per acre, which allows up to 8 units. The application is for 6 units which is
a density of 35 dwelling units per acre.
The proposed condominium building will have 6 units side by side and will be 3-stories. Each unit will have a
ground level parking garage that will include a mechanical automobile stacker so that 2 parking spaces could
be accommodated inside of the garage; one on top of the other. There will be two living levels located above
the garage. The overall proposed height is 35 feet. There will be 2 at -grade, guest parking spaces located in
the right rear corner. There is also a dedicated service vehicle space located in the front setback area. The
entrance to each of the units is located on the north facing (driveway) side of the project.
The project includes 6 two -bedroom, 2.5 bathroom condominium units. The average unit size proposed is
1,114 SF, with the units ranging from 1,083 SF through 1,190 SF. Condominium projects are required to
provide 100 SF of common open space per unit and a minimum of 75 SF of private open space per unit. The
proposed project meets these requirements with 1,000 SF of common open space in the rear yard and a
minimum of 75 SF of private open space per unit with private balconies.
During preliminary review Planning staff identified that the following applications will be required for this project
■ Design Review for construction of a new three-story, 6-unit condominium building (C.S. 25.28.020);
■ Condominium Permit required for construction of new condominium building (C.S. 26.30.020);
• Parking Variance for the use of mechanical parking lifts to provide the required parking spaces (C.S.
25.70.032); and
■ Front setback landscape variance to have 34.2% of the front setback landscaped where 50% of the
front setback is required to be landscaped.
Off -Street Parking: Code Section 25.70.032 requires parking based on the number of bedrooms. Each 2
bedroom unit is required to provide 2 off-street parking spaces, 80% of which must be covered spaces. The
proposed project will provide 12 on -site parking spaces that will be provided in the form of mechanical, stacked
auto lifts (parking lifts). The subject property is not located within the boundaries of the plan area for the
Downtown Specific Plan, where parking options, such as lifts, are allowed by right. Therefore a parking
variance is required for the parking lifts.
Code Section 25.30.070 (a)(2) requires 2 on -site guest parking spaces for new condominium project with 5-15
units. The two guest parking spaces meet all dimensional standards and are located in the right rear corner of
the property. In addition, Code Section 25.30.070(a)(3) requires one on -site service and/or delivery vehicle
space, which is provided in the front setback on grass cell porous pavers. Except for the service/delivery
vehicle space, all of the on -site parking will be accessed from a 12-wide driveway.
The proposal includes a request for a front setback landscaping variance because 34.2% of the front setback
will be landscaped where 50% is required (C.S. 26.30.070(e)(1)). While the service/delivery vehicle space is
provided on grass cell porous pavers, this area is not counted in the front setback landscaping calculation and
therefore triggers the need for the landscape variance request. Given the location along El Camino Real, with
Environmental Scoping and Design Review Study
1431 El Camino Real
no street parking, the applicant decided to provide the service/delivery space rather than provide the required
front landscaping.
1431 El Camino Real
Front (1st fir):
(2"d fir):
(3rd fir):
(4rh fir):
(5rn fir):
............................................................................................
Left Side (1st fir):
(2nd fir):
(3rd fir):
rians aate stamped: t-ebruary 14, 2017
PROPOSED ALLOWED/REQUIRED
20'-7" (all floors) i20'-7" (block average)
5'-0"
I 5'-011
6'-0"
1
61-01
7'-0"
71-01 l
Right Side (1st fir): 1214" 5'-0"
(2nd fir): 10'-01, 6'-0"
(3rd flr): 10'-01, 7'-0"
Rear (Is' fir):
(2nd fir):
(3rd fir):
20'-0" (all floors) 20'-0"
20'-0"
20'-0"
Lot Coverage: I 3,708 SF 3,860 SF
48.0% 1 50%
Building Height: 35'-0" 55'-0" maximum/
CUP required to exceed 35'-0"
Off -Street Parking:
Driveway Width:
.........................................................................................................................................................
Front Setback
Landscaping:
1
12 condo unit spaces
(6 spaces + 6 spaces provided in lifts)'
2 Guest Spaces
1 Service Vehicle Space
.......................................................................................................................................................................................................
12'-0"
......................................................................................................................................................................................................
34.2%2
352 SF
6 (2-bdr units) x 2 = 1
Guest spaces = 2*
Service Vehicle = 1 *
Total = 15 spaces*
12'-0" required
..........................................................................
50%
514 SF
r al nll ly VaIlalluu lul uslrly Inecnarncai panung 117 to provide code required number of spaces (C.S.
25.70.032).
2 Front setback landscaping variance requested to provide 34.2% landscaping where 50% the front setback
is required to be landscaped (C.S. 26.30.070(e)(1))
3
Environmental Scoping and Design Review Study
1431 El Camino Real
Staff Comments: See attached comments from the Chief Building Division, Parks Division, Engineering
Division, Stormwater Division and Fire Division.
Design Review: Design review is required for new construction of multi -family residential developments in the
R-3 and R-4 Districts. The following considerations shall be reviewed by the Planning Commission (Code
Section 25.57.010(b):
(1) Compatibility with the existing character of the neighborhood;
(2) Respect the mass and fine scale of adjacent buildings even when using differing architectural styles;
(3) Maintain the tradition of architectural diversity, but with human scale regardless of the architectural style
used; and
(4) Incorporate quality materials and thoughtful design which will last into the future.
Required Findings for Variance: In order to grant a Variance the Planning Commission must find that the
following conditions exist on the property (Code Section 25.54.020 a-d):
(a) there are exceptional or extraordinary circumstances or conditions applicable to the property involved
that do not apply generally to property in the same district;
(b) the granting of the application is necessary for the preservation and enjoyment of a substantial property
right of the applicant, and to prevent unreasonable property loss or unnecessary hardship;
(c) the granting of the application will not be detrimental or injurious to property or improvements in the
vicinity and will not be detrimental to the public health, safety, general welfare or convenience; and
(d) that the use of the property will be compatible with the aesthetics, mass, bulk and character of existing
and potential uses of properties in the general vicinity.
Planning Commission Action:
1. Environmental Scoping: As the first discussion item, the Planning Commission should review and
take public comment on the proposed project and the areas of potential environmental effects as listed
in the staff report. The Commission should add any additional effects of the project that it believes
should be addressed in the CEQA document. The areas of investigation for environmental evaluation
as defined by CEQA are listed in the attached Initial Study Checklist for your reference.
2. Design Review Study: As the second discussion item, the Commission should comment on the design
of the project as required by Chapter 25.57 of the Zoning Ordinance, Design Review, and to the
following design criteria for multi -family residential projects:
a. Compatibility with the existing character of the neighborhood;
b. Respect the mass and fine scale of adjacent buildings even when using differing architectural
styles;
c. Maintain the tradition of architectural diversity, but with human scale regardless of the
architectural style used; and
d. Incorporate quality materials and thoughtful design which will last into the future.
Because a CEQA document is being prepared for this project, it is important that any changes to the building
envelope be made early enough in the process so that any changes are reflected in the environmental review.
C!
Environmental Scoping and Design Review Study
1431 El Camino Real
Catherine Keylon
Senior Planner
c. Brian Siu Yang, Levy Design Partners, applicant and architect
GGH Investment LLC property owners
Attachments:
Application to the Planning Commission
Parking Variance Application
Front Setback Variance Application
Environmental Information Form, submitted by the applicant
Staff Comments
Environmental Checklist from Appendix G of the CEQA Guidelines
Notice of Public Hearing — Mailed March 17, 2017
Aerial Photo
k
COMMUNITY DEVELOPMENT DEPARTMENT - 501 PRIMROSE ROAD - BURLINGAME, CA 94010
p: 650.558.7250 • f: 650.696.3790 - www.burlingame.org
APPLICATION TO THE PLANNING COMMISSION
Type of application:
Design Review ❑ Variance ❑ Parcel #: OZ (/—
❑ Conditional Use Permit ❑ Special Permit ❑ Zoning / Other:
PROJECT ADDRESS: 0 3� 1 e-U C "A-M )1? F— A --
APPLICANT PROPERTY OWNER
Name: Sir C crtc G-F D'&C_%(P*j l2 Name: (& kA 1r�JVEST Ly%-GrJ-r L. -C
Address: Address: 14 R V13� A�
City/State/Zip: City/State/Zip: ` 'dyo t V
Phone: Phone:
E-mail: E-mail: QLACt Lk— 1Cir1ci `�,4i-� 00• co
ARCHITECT/DESIGNER
Name:
Address: ✓1-1-'i- plllr -,�L
City/State/Zip:
Phone: 415 --7.77 - a 14,11 fi ECEIVtU
E-mail: 1 0&y C0 i-C—\ty '1>E310 • coc,l SEP 3 4 2016
Burlingame Business License #: 2-0 3 I '_1 CITY OF BURLINGAME
Authorization to Reproduce Project Plans: CDD-PLANNING DIV.
I hereby grant the City of Burlingame the authority to reproduce upon request and/or post plans submitted with this
application on the City's website as part of the Planning approval process and waive any claims against the City
arising out of or related to such action. t S �- (Initials of Architect/Designer)
PROJECT DESCRIPTION:
2 - 9,tV
-V 1'iuk\_'piN
CONSt"C C,,UP 0(=
5:-x-Ff-t
Nttov+nE-�.
AFFIDAVIT/SIGNATURE: I hereby certify under penalty of perjury that the information given herein is true and correct to the
best of my knowledge and belief.
Applicant's signature: Date: Z `'� 1,
I am aware of the propose a plication and hereby authorize the above applicant to submit this application to the Planning
Commission. f
Property owner's signature: Date:
Date submitted:
S: I HANDOUTS PC Application. doc
COMMUNITY DEVELOPMENT DEPARTMENT - 501 PRIMROSE ROAD - BURLINGAME, CA 94010
p: 650.558.7250 - f: 650.696.3790 - www.burlingame.org
CITY OF BURLINGAME
VARIANCE APPLICATION
�c,vlc.lI—i E=-4-5
v
The Planning Commission is required by law to make findings as defined by the City's Ordinance
(Code Section 25.54.020 a-d). Your answers to the following questions can assist the Planning
Commission in making the decision as to whether the findings can be made for your request.
Please type or write neatly in ink. Refer to the back of this form for assistance with these questions.
a. Describe the exceptional or extraordinary circumstances or conditions applicable to
your property which do not apply to other properties in this area.
Open space, service delivery, and setback requirements limit ground floor square footage
available for parking. Variance for vehicular lifts helps project meet planning requirements
while minimizing visual impact on neighborhood in comparison to other properties in area
(who use exposed parking solutions).
b. Explain why the variance request is necessary for the preservation and enjoyment of a
substantial property right and what unreasonable property loss or unnecessary
hardship might result from the denial of the application.
Variance would reduce square footage to be used to meet on -site parking requirements.
Higher efficiency allows for more "softscape" landscaping improvements and reduces
negative visual impact on neighborhood.
C. Explain why the proposed use at the proposed location will not be detrimental or
injurious to property or improvements in the vicinity or to public health, safety,
general welfare or convenience.
Variance allows for better efficiency and minimum square footage used for parking. In
comparison, existing adjacent buildings, use more space for parking and expose cars to
street. With vehicular lifts, all residential unit parking can be provided in private garages
hidden from street. Vehicular lifts would improve overall aesthetics and negative affect
building has on surrounding neighborhood.
d. Now will the proposed project be compatible with the aesthetics, mass, bulk and
character of the existing and potential uses on adjoining properties in the general
vicinity?
Project is similar in mass, bulk, and character to existing adjacent buildings. However,
vehicular lift variance would allow for improvements in overall aesthetics as cars would
use less space allowing them to be hidden from street in private, covered garages.
Variance would improve overall impact of project on adjoining properties.
HandoutsWariance Application.2008
Page 1of5
SingleVario 2061
}-80---�501
} 45 { Free
r—
through
Q) Dimensions Al, A2 and A3 must be
coordinated with the door supplier.
0 If the total height is greater, the max.
vehicle height for the upper parking
space increases accordingly.
0 Potential equalization from foundation
grounding connection to system
(provided by the customer).
0 In compliance with DIN EN 14 010, 10 cm
wide yellow -black markings compliant to
ISO 3864 must be applied by the customer
to the edge of the platform in the access
area to mark the danger zone in front of
the supporting surface of the upper
platform edge (see »Load Plan(c, Page 3)
a Variable steel pillar bases in two sizes
(see »Load Plan«, Page 3).
0 Maximum load of 2,500 kg for extra
charge.
Product Data C E
SingleVario _.SE
2061 r r
Dimensions: W
All space requirements are minimum
finished dimensions. Tolerances for space
requirements *3 Dimensions in cm.
EB (single platform) = 2 vehicles
t• •t 320 160
t• �f 340 180
�• •� 350 190
t. It 360 200
t t 370 210
`=standard type_ *'=without car
Suitable for:
Standard passenger car,
station wagon/Van/SUV.
Height and length
according to concur.
t• •r 320 150."150
1. t
MINE t 340 150 170"
t • • t 350 150'> 180 `
W? TFTt 360 150 190
t• t 370150 200
' =. standard type
190 cm
max. 2000/2500 kg
M1, max. 500/625 kg
Standard passenger car
160 —1 65 145
95 — 500 (520) T 125
Standard station wagon/Van/SUV
♦— 160 3p
}
P
y O
1 -100-* 500 (520) —12s�
Standard passenger cars are vehicles
without any sports options such as
spoilers, low -profile tyres etc.
Klaus Multiparking GmbH
Hermann-Krum-Strage 2
D-88319 Aitrach
Phone +49-75 65- 5 08-0
Fax +49-75 65- 5 08-88
E-Mail infoQmultiparking.com
Internet www.multiparking.com
n
Page 2
Width
dimesions
Page 3
Approach
Load plan
Installation
Page 4
Electrical
installation
Technical
data
Page 5
To be perfor-
med by the
customer
Description
SingleVario 20611 Code number 584.69.890-0021 Version 09.2009 Page 2 of 5
Dividingivalls
Single Platform (EB)
EB
B1
usable platform width, , 81 ,
230 *
260
240
270
250
„ 280
260
290
270
„ 300 ,
Double arrangement (2 x EB)
EB I EB
i
B1
usable platform width, , Bi
230 * 520 ,
240 „ 540 ,
250 „ 560 ,
260 „ 580 ,
270 600
Tripple arrangement (3 x EB)
I I
ES EB EB
1 Bt Carriageway in
accordance with
usable platform width, , Bi local regulations
230* 780 ,
240 810 ,
250 „ 840
260 „ 870 ,
270 900
Single Platform (EB) Double arrangement (2 x EB) Tripple arrangement (3 x EB)
xo xo xo
E~ E~ E�
4 EB EB EB EB EB EB EB i EB i EB EB i EB i EB ,
>2 0 0
my
E��+
I B2 11 M B3 11min.20 B2 63 min. 20 1 B2 h I �min. 20
Carriageway in
accordance with
usable platform width, , B2 , r 63 usable platform width, , B2 , , B3 usable platform width, , B2 , , B3 local regulations
230* 255 ,, 250 , 230* 515 ,, 510 , 230* 775 770 ,
240 265 , , 260 , 240 535 , , 530 240 805 , , 800 ,
250 275 270 , 250 555 550 250 835 „ 830 ,
260 285 280 260 575 , , 570 , L 260 865 , , 860 ,
270 „ 295 290 270 595 590 270 „ 895 890 ,
Single Platform (EB) Double arrangement (2 x EB) Tripple arrangement (3 x EB)
EB i EB i EB EB i EB EB i EB EB i ES i EB EB i EB
134 Bs min.20 1 64 B5�i1min. 20 Ba 4 BS 4 0
Carriageway in
accordance with
usable platform width„ B4 BS usable platform width, B4 B5 usable platform width„ B4 B5 local regulations
230 * 250 , 240 , 230* 510 , , 500 , 230* 770 , L760 ,
240 260 250 , 240 530 „ 520 240 „ 800 790 ,
250 270 „ 260 250 550 „ 540 , 250 830 „ 820
260 280 , 270 260 570 „ 560 260 „ 860 „ 840
270 290 ,, 280 , 270 590 ,, 580 , 270 , 890 860
A3 = seat -engaging
surface (dimensions
require coordination
ES EB I EB I with door supplier.) EB I EB EB I EB EB EB
Allround door
dimensions require
o ® coordination between ra o
L DF L L DF SDF S ocalagedoor nl�oFnd L DF L L DF S DF S
Klaus Muttiparking.
Carriageway in
accordance with
usable platform width„ door entrance width DF, L S usable platform width„ door entrance width DF, L S ,local regulations
230 * 2375 121 25 230 * 475 221 45 ,
240 250 121 ,, 25 240 500 L20 40
250 250 15 , 30 250 j 5200 j 1 20 , 40
260 260 15 ,, 30 260 5400 20 40 ,
270 270 15 30 270 5600 20 40 ,
* = standard width (parking space width 2.30 m) ! = no standard width for doors!
End parking spaces are generally more difficult to drive into. Therefore we recommended for end parking spaces our wider platforms.
Parking on standard width platforms with larger vehicles may make getting into and out of the vehicle difficult. This depends on type
of vehicle, approach and above all on the individual driver's skill.
SingleVario 20611 Code number 584.69.890.0021 Version 09.2009
Page 3 of 5
Page 1
Section
Dimensions
Car data
Page 2
Width
M
Page 3
Approach
Load plan
Installation
Page 4
Electrical
installation
Technical
data
Page 5
To be perfor-
med by the
customer
Description
maximum maximum
descending ascending
slope 4 % slope 14 %
The illustrated maximum approach angles must not be exceeded. Incorrect approach angles will cause
serious maneouvring & positioning problems on the parking system for which the local agency of Klaus
accepts no responsibility.
Option 1: short steel pillar base
platform load Fi F2 F3 , 4 c Fs F6
2,000 kg 30 , , 1.1 , 7.4 , , 0.5 , , 7.7 , t1
, 2,500 kg 1 1 35 1.3 8.9 0.6 , , 9.3 tl
Forces in M
Option 2: long steel pillar base
® The steel pillar base can be selected optionally (short or long). Please make sure to note the corresponding forces that apply!
Units are dowelled to the floor. Drilling depth: approx. 15 cm.
Floor and walls are to be made of concrete (quality minimum C20/25)!
6insta[[atton` (at It M
Free space for longitudinal and vertical ducts (e.g. ventilation)
Bt'o B1.22.5 61.2 5
�(265) (262.5) (262.5)
35 10+ 35 1 35 10
V ME 100
B1, B2 = (see table on page 2)
Free space for vertical pipelines,
ventilation branch canals
Free space for horizontal
ducting
M Size 15 cm is reduced to 5 cm
for type 2061-160
Free space only applicable if vehicle
is parked forwards = FRONT FIRST
and driver's door on the left side.
( ) = Dimensions in brackets
illustrate an example for usable
platform width 230 cm.
Example for ventilation branch
canal and/or vertical pipelines.
I B2 f 1 B2
(255) z26 (515)
SingleVario 20611 Code number 584.69.890-0021 Version 09.2009
Page 4 of 5
Page 1
Section
Dimensions
Car data
Page 2
Width
dimesions
Page 3
Approach
Load plan
Installation
Page 4
Electrical
installation
Technical
data
Page 5
To be perfor-
med by the
customer
Description
Conduit EN 25 -
(M25)
height: + 1.70 in
10 it
Conduit EN 25 (M25)
height: + 1.10 m
14
to the next
system
Generally, this parking system is not suited for short -time parkers
(temporary parkers). Please do not hesitate to contact your local
KLAUS agency for further assistance.
, No. Qunatlty, Description
Position
Frequency ,
1 1 Electricity meter
in the supply
,_i ,
line
2 1 Main fuse: 3 x fuse 16 A (slow)
in the supply
1 per unit
or circuit breaker 3x16A
line
(trigger characteristic K or Q
3 1 Supply line 5 x 2.5 mm'
to main switch
i perunit
(3 PH + N + PE) with marked wire
u and protective conductor
i
4 1 Lockable main switch
defined at the
1 per unit
plan evaluation ,
5 1 Supply line 5 x 2.5 mm'
from main
1 perunit
(3 PH+N+PE) with marked wire
switch to unit
u and protective conductor
6 every Foundation earth connector
corner pit
u to m
Lfloor
7 1 Equipotentiai bonding in accordance
1 per
with DIN EN 60204 from foundation
system
u earth connector to the system
,
No. Description
8 , Terminal box
9 „Control line 3x0.75mm'(PH +N+PE)
10 , Control line 7x 1.5 mm' with marked wire and protective conductor
11 „ Operatingdevice
12 , , Control line 5 x 1.5 mm' with marked wire and protective conductor
13 , , Hydraulic unit 3.0 kw, three-phase current, 400 V / 50 Hz
14 , Control line 5 x 1.5 mm' with marked wire and protective conductor
15 „ Chain control
insulationSound
According to DIN 4109 (Sound insulation in buildings), para. 4,
annotation 4, Klaus Multiparkers are part of the building services
(garage systems).
Normal sound insulation:
Low -noise power units mounted to rubber -bonded -to metal DIN 4109, para. 4, Sound insulation against noises from building
mountings are installed. Nevertheless we recommend that parking services.
system's garage be built separately from the dwelling.
— wall recess plans
— maintenance offer/contract
— declaration of conformity
— test sheet on airborne and slid -borne sound
See separate sheet regarding corrosion protection.
If there are traffic routes next to or behind the installations, railings
compliant to DIN EN ISO 13857 must be installed by the customer.
Railings must also be in place during construction.
Environmental conditions for the area of multiparking systems:
Temperature range —10 to +401 C. Relative humidity 50 % at a
maximum outside temperature of+401 C.
If lifting or lowering times are specified, they refer to an environmental
temperature of+10° C and with the system set up directly next to the
hydraulic unit. At lower temperatures or with longer hydraulic lines,
these times increase.
Table 4 in para. 4.1 contains the permissible sound level values
emitted from building services for personal living and working areas.
According to line 2 the maximum sound level in personal living and
working areas must not exceed 30 dB (A).
Noises created by users are not subject to the requirements
(see table 4, DIN 4109).
The following measures are to be taken to comply with this value:
— Sound protection package according to offer/order
(Klaus Multiparking GmbH)
— Minimum sound insulation of building R'w = 57 dB
(to be provided by customer)
Increased sound insulation (special agreement):
DIN 4109, Amendment 2, Information on planning and execution,
proposals for increased sound insulation.
Agreement: Maximum sound level in personal living and working
areas 25 dB (A). Noises created by users are not subject to the
requirements (see table 4, DIN 4109).
The following measures are to be taken to comply with this value:
— Sound protection package according to offer/order
(Klaus Multiparking GmbH)
— Minimum sound insulation of building R'w = 62 dB
(to be provided by customer)
Note: User noises are noises created by individual users in our
Multiparking systems. These can be noises from accessing the
platforms, slamming of vehicle doors, motor and brake noises.
SingleVario 20611 Code number 584.69.890.0021 Version 09.2009
Page 5 of 5
E
ns
Page 2
Width
M
Page 3
Approach
Load plan
Installation
Page 4
Electrical
installation
Technical
data
Page 5
, perfor-
for-
med
u_'
Safety fences Operating device
Any constraints that may be necessary according to DIN EN ISO 13857
in order to provide protection, for pathways directly in front, next to
or behind the unit. This is also valid during construction.
Numbering of parkingspaces
Consecutive numbering of parking spaces.
Lighting, ventilation, fire extinguishing and fire alarm systems.
According to DIN EN 14 010, a warning that identifies this danger
area must be placed in the entrance area that conforms to ISO 3864.
This must be done according to EN 92/58/EWG for systems without
a pit 10 cm from the edge of the platform.
Any necessary wall cuttings according to page 1.
Suitable electrical supply to the main switch and the control wire line
must be provided by the customer during installation. The functionality
can be monitored on site by our fitters together with the electrician.
If this cannot be done during installation for some reason forwhich the
customer is responsible, the customer must commission an electrician
at their own expense and risk.
In accordance with DIN EN 60204 (Safety of Machinery. Electrical
Equipment), grounding of the steel structure is necessary, provided
by the customer (distance between grounding max.10 m).
Cable conduits and recesses for operating device (fordouble wing
doors: please contact the local agency of Klaus Multiparking).
Operating device exposed Operating device concealed
110 above 120 above
carriageway carriageway
level n level
0 0
0
N
rn�
Conduit EN25 (M25) T—f f4
If the following are not included in the quotation, they will atso
have to be provided / paid for by the customer:
— Mounting of contactor and terminal box to the wall valve, complete
wiring of all elements in accordance with the circuit diagram
— Costs for final technical approval by an authorized body
— Main switch
— Control line from main switch to hydraulic unit
General description Platforms consisting of:
Multiparking system providing dependent parking spaces for 2 cars
one on top of the other each. The lower vehicle parks directly on the
floor plate. The vehicle parked on the bottom must be driven out
before lowering the platform.
The height of the platform can be adjusted flexibly (even subsequently).
Adjustment of maximum load of 2,500 kg can be made subsequently.
Dimensions are in accordance with the underlying dimensions of
parking pit, height and width
The parking bays are accessed horinzotally (installation deviation s 1 9/6).
Vehicles are positioned on the upper parking space using wheel stops on
the right side (adjust according to operating instructions).
Operation via operating device with hold -to -run -device using
master keys.
The operating elements are usually mounted either in front of the
column or on the outside of the door frame
Operating instructions are attached to each operator's stand.
For garages with doors at the front of the parking system the special
dimensional requirements have to be taken into account.
— 2 steel pillars with bases that are mounted on the floor (short or
long steel pillar bases can be selected optionally).
— 2 sliding platforms (mounted to the steel pillars with
sliding bearings)
— 1 platform
— 1 mechanic synchronization control system (to ensure synchronous
operation of the hydraulic cylinders while lowering and lifting the
platform)
— 1 hydraulic cylinder
— 1 automatic hydraulic safety valve (prevents accidental lowering of
the platform while accessing the platform)
— Dowels, screws, connecting elements, bolts, etc.
— The platforms and parking spaces are end -to -end accessible for
parking!
— Platform base sections
— Adjustable wheel stops
— Canted access plates
— Side members
— Cross members
— Screws, nuts, washers, distance tubes, etc.
— Hydraulic cylinder
— Solenoid valve
— Safety valve
— Hydraulic conduits
— Screwed joints
— High-pressure hoses
— Installation material
— Operating device (Emergency Stop, lock, 1 master key per
parking space)
— Terminal box at wall valve
— Electrical locking device
— Chain control
— Hydraulic power unit (low -noise, installed onto a console with a
rubber -bonded -to -metal mounting)
— Hydraulic oil reservoir
— Oil filling
— Internal geared wheel pump
— Pump holder
— Clutch
— 3-phase-AC-motor (3.0 kW, 230/400 V, 50 Hz)
— Contactor (with thermal overcurrent relay and control fuse)
— Test manometer
— Pressure reliefvalve
— Hydraulic hoses (which reduce noise transmission onto the
hydraulic pipe
" •�
!s�e�, cat!onw-„�>wtu�;:,E ,r The Klaus company reserves the right in the course of technical progress to use newer or other technologies, systems, processes, procedures
or standards in the fulfillment of their obligations other than those originally offered provided the customer derives no disadvantage from
their so doing.
COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010
p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org
CITY OF BURLINGAME
VARIANCE APPLICATION
Lc d s c a- ,•'
The Planning Commission is required by law to make findings as defined by the City's Ordinance
(Code Section 25.54.020 a-d). Your answers to the following questions can assist the Planning
Commission in making the decision as to whether the findings can be made for your request.
Please type or write neatly in ink. Refer to the back of this form for assistance with these questions.
a. Describe the exceptional or extraordinary circumstances or conditions applicable to
your property which do not apply to other properties in this area.
The project site's narrowness and required guest parking (located at rear yard) limits
available space for temporary loading/service vehicle space.
b. Explain why the variance request is necessary for the preservation and enjoyment of a
substantial property right and what unreasonable property loss or unnecessary
hardship might result from the denial of the application.
Locating loading/service vehicle space at other location on site would either reduce
residents' ability to maneuver vehicles due to narrowness of site or limit the landscape
area at rear yard.
C. Explain why the proposed use at the proposed location will not be detrimental or
injurious to property or improvements in the vicinity or to public health, safety,
general welfare or convenience.
Loading/service vehicle space would only be used temporarily during day. Language
restricting any other uses (guest parking, long-term parking, etc.) at stated hours may be
introduced into permit drawings to ensure space is ONLY used for deliveries, moving, etc.
d. How will the proposed project be compatible with the aesthetics, mass, bulk and
character of the existing and potential uses on adjoining properties in the general
vicinity?
Loading/service vehicle space built with porous/permeable pavers would allow
landscaping to be similar to adjoining properties by allowing plants to grow in temporary
space. Variance would also reduce "hardscaped" and non -porous areas to improve
stormwater treatment and aesthetics of project.
HandoutsWariance Application.2008
City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.or
PNO CITY G
4 4
BV1{u„fr. ME ENVIRONMENTAL INFORMATION FORM
(to be completed by applicant when Negative Declaration or Environmental Impact
Report is required)
Project Address: 1431 El Camino Real
Applicant Name: Levy Design Partners
Address: 90 South Park
City/State/Zip: San Francisco / CA / 94107
Phone: Brian Yang: 415-777-0561
Assessor's Parcel Number: 026-013-110
Property Owner Name: GGH Investment LLC
Address: 110 Robler Ave
City/State/Zip: Hillsborough / CA / 94010
Phone: Grace Li: 510-857-4567
Permit applications required for this project (special permit, variance, subdivision map, parcel map,
condominium permit, building permit, etc.): Two variances submitted (service vehicle in landscaped
front yard & vehicle lifts), boundary / topo survey, subdivision map, condo & buildinq permit.
Related permits, applications and approvals required for this project by City, Regional, State and Federal
Agencies: Caltrans Encroachment Permit, Bay Area Air Quality Management District Demolition
Permit
SITE INFORMATION
Site size: +/- 0.177 total Acres and +/- 7,722 total Square Feet Existing Zoning: R-3
Existing use(s) of property: Four Apartment Units
Total Number of Existing Parking Spaces1:10 (5 covered) Number of Compact Spaces': n/a
Number of Existing Structures and Total Square Footage of Each: 4,102 sf
Will any structures be demolished for this project? X Yes No
Size and use of structures to be demolished: 4 unit residential apartment building with detached
5-car garage.
Number and size of existing trees on site 2: None
Will any of the existing tress be removed? Yes X No
If Yes, list number, size and type of trees to be removed: n/a
Are there any natural or man-made water channels which nin through or adjacent to the site?
Yes X No If Yes, where? n/a
1 City of Burlingame minimum standard parking space size is 9'x20'. The minimum size for compact parking spaces is 8'xl7'.
Refer to City of Burlingame Zoning Ordinance C.S. 25.70 for parking requirements for particular uses.
2 Refer to the City of Burlingame's Urban Reforestation and Tree Protection Ordinance (C.S. 11.06) for tree removal permit
and tree planting requirements.
ICI.\i/7.Ail'JN�I
City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.or¢
Describe in general the existing surrounding land uses to the:
North Multi -family
residential
South Multi -family
residential
East Multi -family
residential
West Multi -family
residential
PROPOSED PROJECT
Project Description: New construction of (6) 3-story townhouse units. Each unit to be 2-
bedrooms over private 2-car garage.
Residential Projects:
Number of Dwelling Units: six
Size of Unit(s): 1,083 sf - 1,190 sf (average unit size of 1,114 sf)
Household size (number of persons per unit) expected: 2.2 persons / unit
Commercial/Industrial Projects:
Type and square footage of each use: n/a
Estimated number of employees per shift: n/a
Will the project involve the use, disposal or emission of potentially hazardous materials (including
petroleum products)? n/a Yes n/a No
If Yes, please describe: n/a
Institutional Projects (public facilities, hospitals, schools):
Major function of facility: n/a
Estimated number of employees per shift: n/a
Estimated Occupancy: n/a
For all Projects:
Flood Hazard: Is this site within a special flood hazard area? Yes X No
Land Use: If the project involves a conditional use permit, variance or rezoning application, please
explain why the applications are required3: Variance for vehicle lifts needed to provide 2 car spaces/unit.
Variance for service vehicle space in landscaped front yard needed to get all required services into
site's tight constraints (common open space, (2) guest parking spaces, trash enclosure, etc.).
3 Please fill out and submit the appropriate application form 9variance special permit, etc.)
City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.ore
Building gross square footage: Existing: 4,102 sf
Number of floors of construction: Existing: two
Proposed: 9,325 sf
Proposed: three
Traffic/Circulation: Standard and compact off-street parking spaces provided:
Existing
Standard 5
Compact
Total 5
Proposed: Standard 12
Compact
Total 12
Grading: Amount of dirt/fill material being moved (check one):
X 0-500 cubic yards 5,000-20,000 cubic yards
500-5,000 cubic yards Over 20,000 cubic yards(indicate amount)
Note: If fill is being placed over existing bay fill, provide engineering reports which show the effect of
the new fill on the underlying bay mud.
Storm water runoff: Indicate area of site to be covered with impervious surfaces (parking lot paving,
etc.): +/- 6,568 sf of impervious (building roof, driveway, pathways, trash enclosure)
Is the area with impervious surfaces less than 200 feet away from a wetland, stream, lagoon or bay?
Yes X No
Noise: Describe noise sources and timing of activity generated by your project during construction:
Vehicles,_ equipment, and general construction activity. All construction activity to be limited to
working hours of BMC 13.04.100.
Noise sources generated during operation of facility: General loading / unloading of vehicles,
movement of light construction equipment and vehicles.
Vibration: Will the proposal cause vibration that may affect adjacent properties? Describe any potential
sources of vibration: _Project should not create any more vibration than typical construction.
Exterior Lighting: Please describe any proposed exterior lighting of the facility4: Wall sconces at unit entries
and possibly some soft lighting at front yard landscaping, mail area, and rear yard trash enclosure.
Water: Expected amount of water usage:
Domestic 792 gal/day Peak use 52 gal/min
Commercial n/a gal/day Peak use n/a gal/min
Expected fire flow demand TBD by fire protection gal/min
consultant
As per the C.3 regulations set forth by the California Regional Water Quality Control Board, please
respond to the following questions:
1. Would the proposed project result in an increase in pollutant discharges to receiving waters?
4 Refer to City of Burlingame Exterior Illumination Ordinance (No. 1477) regarding requirements which limit exterior
illumination in both residential and commercial zones.
City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlinitame.org
2. Would the proposed project result in significant alteration of receiving water quality during or
following construction? Water usage should be similar to current levels or a small increase due to
additional 2 units over existing 4 units.
3. Would the proposed project result in increased impervious surfaces and associated increased
runoff? No - current building and paving covers more area with impervious surfaces than
Proposed project.
4. Would the proposed project create a significant adverse environmental impact to drainage patterns
due to changes in runoff flow rates volumes? No - Proposed project will provide more pervious
surfaces and landscaping to improve environmental impact compared to existing site.
5. Would the proposed project result in increased erosion in its watershed? No
6. Is the project tributary to an already impaired water body, as listed on the Clean Water Action
Section 303(d) list? If so will it result in an increase in any pollutant for which the water body is already
impaired? No
7. Would the proposed project have a potential significant environmental impact on surface water
quality, to marine, fresh, or wetland
waters? No
8. Would the proposed project have a potentially significant adverse impact on ground water quality?
No
9. Will the proposed project cause or contribute to an exceedance of applicable surface or
groundwater receiving water quality objectives or degradation of beneficial uses? No - Proposed project
will provide more pervious surfaces and landscaping to improve environmental impact compared
to existing site
10. Will the project impact aquatic, wetland, or riparian habitat?
No
Sewer: Expected daily sewer discharge 753 GPD
Source of wastewater discharge on site (i.e. restrooms, restaurants, laboratory, material processing, etc.)
City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.ore
General:
Are the following items applicable to the project or its effects? Provide attachment to explain nature of all
items checked `yes'. Yes No
Change in existing features of any bays, tidelands, beaches, or hills, or X
substantial alteration of ground contours.
Change in scenic views or vistas from existing residential areas or public lands
or roads. X
Change in pattern, scale or character of general area of project.
X
Significant amounts of solid waste or litter.
X
Change in dust, ash, smoke Rimes or odors in vicinity.
X
Change in bay, lagoon, stream, channel or groundwater quality or quantity, or
alteration of existing drainage patterns. X
Substantial change in existing noise or vibration levels in the vicinity (during
construction and/or during operation). X
Site on filled land or on slope of 10 % or more.
X
Use or disposal of potentially hazardous materials, such as toxic substances,
flammable materials or explosives. X
Substantial change in demand for municipal services (police, fine water, sewage)
Substantial increase in fossil fuel consumption (oil, natural gas, etc.).
Relationship to a larger project or series of projects.
CERTIFICATION
I hereby certify that the statements finnished above and in the attached exhibits
present the data acid information required for this initial evaluation to the best of
my ability, and that the facts, statements, and information presented are true and
correct to the best of my knowledge and belief. _.L_
Date 03/14/2017 Signature
X
X
X
Project Address
Description:
From:
Project Comments - Planning Application
1431 El Camino Real, zoned R-3, APN: 026-013-110
Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
Rick Caro III
Building Division
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
1) RESIDENTIAL: Rooms that could be used for sleeping purposes must have at least one window
or door that complies with the egress requirements. Rooms that could be used for sleeping
purposes must have at least one window or door that complies with the egress requirements. On
the elevation drawings specify the location and the net clear opening height and width of all
required egress windows. 2013 California Building Code (CBC) 1029.2 and 2013 California
Residential Code (CRC) §R310. The response did not include what the actual dimension of the
egress windows are in order to determine that the minimum 5.7 square feet would be met. Note:
That if you use the minimum dimension width of 20 inches for the egress window, than you
would need a minimum of a 42" net opening height.
17) Specify on the plan that all powder rooms shall comply with Section 1134A.2; Option 2, Items 8 through
12. The response to question # 17 stating that unit #7 will comply with the requirements for the accessible
route to the primary entry with one powder room on the primary level does not state how the powder
room will be designed to comply with 1134A.2; Option 2, Items 8 through 12.
18) Specify on the plans that all dwelling unit interior doors will comply with CBC 1132A5.2. The response
that Unit #7 will comply with the requirements for the accessible route to the primary unit entry, does not
address the strike edge maneuvering space at the door.
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
19) Anyone who is doing business in the City must have a current City of Burlingame business
license.
NOTE: A condition of this project approval is that the Demolition Permit will not be issued
and, and no work can begin (including the removal of any building components), until a
Building Permit has been issued for the project. The property owner is responsible for
assuring that no work is authorized or performed.
20) When you submit your plans to the Building Division for plan review provide a completed
Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be
issued until a Building Permit is issued for the project.
21) Include with your Building Division plan check submittal a complete underground fire sprinkler plan.
Contact the Burlingame Water Division at 650-558-7660 for details regarding the water system or Central
County Fire for sprinkler details.
22) Sewer connection fees must be paid prior to issuing the building permit.
23) A pre -construction meeting must be conducted prior to issuing the permit. After you are notified by the
Building Division that your plans have been approved call 650-558-7270 to schedule the pre -construction
meeting.
Reviewed By: Rick Caro 111 Date: February 27, 2017
(650) 558-7270
Project Address
Description:
From
Project Comments — Planning Application
1431 El Camino Real, zoned R-3, APN: 026-013-110
Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
Rick Caro III
Building Division
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
1) On the plans specify that this project will comply with the 2013 California Building Code, 2013
California Residential Code (where applicable), 2013 California Mechanical Code, 2013
California Electrical Code, and 2013 California Plumbing Code, including all amendments as
adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior
to 5:00 p.m. on December 31, 2016 then this project must comply with the 2016 California
Building Codes.
2) Specify on the plans that this project will comply with the 2013 California Energy Efficiency
Standards.
3) Place the following information on the first page of the plans:
"Construction Hours"
Weekdays: 8:00 a.m. — 7:00 p.m.
Saturdays: 9:00 a.m. — 6:00 p.m.
Sundays and Holidays: No work is allowed
(See City of Burlingame Municipal Code, Section 13.04.100 for details.)
Construction hours in the City Public right-of-way are limited to weekdays and non -City
Holidays between 8:00 a.m. and 5: 00 p.m.
Note: Construction hours for work in the public right of way must now be included on the
plans.
4) On the first page of the plans specify the following: "Any hidden conditions that require work to
be performed beyond the scope of the building permit issued for these plans may require further
City approvals including review by the Planning Commission." The building owner, project
designer, and/or contractor must submit a Revision to the City for any work not graphically
illustrated on the Job Copy of the plans prior to performing the work.
5) Due to the extensive nature of this construction project the Certificate of Occupancy will be
rescinded once construction begins. A new Certificate of Occupancy will be issued after the
project has been final. No occupancy of the building is to occur until a new Certificate of
Occupancy has been issued.
6) On the plans show that all openings in exterior walls, both protected and unprotected, will
comply with 2013 CBC, Table 705.8. Provide a table or chart that specifies 1) the openings
allowed and; 2) the size and percentage of the openings proposed.
7) RESIDENTIAL: Rooms that could be used for sleeping purposes must have at least one window
or door that complies with the egress requirements. Rooms that could be used for sleeping
purposes must have at least one window or door that complies with the egress requirements. On
the elevation drawings specify the location and the net clear opening height and width of all
required egress windows. 2013 California Building Code (CBC) 1029.2 and 2013 California
Residential Code (CRC) §R310.
8) Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of
Public Works.
9) Provide handrails at all stairs where there are four or more risers. 2013 CBC § 1009.
10) Provide lighting at all exterior landings.
11) Prior to applying for a Building Permit the applicant must either confirm that the address is
or obtain a change of address from the Engineering Department. Note: The correct
address must be referenced on all pages of the plans.
12) On the first page of the plans state the Access Regulations that you are using to gain full access
compliance. There are five access regulations that may apply to a multi -family residential project in
California:
a. The Architectural Barriers Act of 1969 (ABA)
b. Section 504 of the Rehabilitation Act of 1973
c. The Fair Housing Act (FHA)
d. The Americans with Disabilities Act (ADA)
e. The California Building Code (CBC), Chapters I IA and 1113.
13) On the first page of the plans clearly state whether ANY public money, of any kind, will or will not be
used to construct this project.
14) On the first page of the plans clearly state if an application for ANY tax credits have or will be submitted
for tax rebates. NOTE: See the 2015 California Code of Regulations, Title IV, § 10325 (f)7 (K). In part:
"All tax credit recipient projects shall adhere to the provisions of California Building Code I I (B)
regarding accessibility to privately owned housing made available for public use."
t 5) On the first page of the plans clearly state that all paths of travel and common use spaces will be
accessible and all living units will be adaptable.
16) Provide details which show that the water closet in each unit complies with CBC 1134A.7 41.
17) Specify on the plan that all powder rooms shall comply with Section 1134A.2; Option 2, Items 8 through
12.
18) Specify on the plans that all dwelling unit interior doors will comply with CBC 1132A5.2.
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
19) Anyone who is doing business in the City must have a current City of Burlingame business
license.
NOTE: A condition of this project approval is that the Demolition Permit will not be issued
and, and no work can begin (including the removal of any building components), until a
Building Permit has been issued for the project. The property owner is responsible for
assuring that no work is authorized or performed.
20) When you submit your plans to the Building Division for plan review provide a completed
Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be
issued until a Building Permit is issued for the project.
21) Include with your Building Division plan check submittal a complete underground fire sprinkler plan.
Contact the Burlingame Water Division at 650-558-7660 for details regarding the water system or Central
County Fire for sprinkler details.
22) Sewer connection fees must be paid prior to issuing the building permit.
23) A pre -construction meeting must be conducted prior to issuing the permit. After you are notified by the
Building Division that your plans have been approved call 650-558-7270 to schedule the pre -construction
meeting.
Reviewed By: Rick Caro III Date: October 3, 2016
(650) 558-7270
BURLINGAME
Project Address: 1431 El Camino Real, zoned R-3, APN: 026-013-110
Description: Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
From: Bob Disco
Parks Division
Please address the following comments at this time; provide a written response and revised
pl7sith your resubmittal:
.nclude existing Accolade elm trees in planter strip on landscape plans.
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
2. Irrigation plan required for Building Permit. Include irrigation to existing street trees.
Reviewed By: BD Date: 10/5/16
650.558.7333
Project Address
Description:
From:
Project Comments - Planning Application
1431 El Camino Real, zoned R-3, APN: 026-013-110
Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
Martin Quan
Public Works Engineering
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
Mawr. V-
•
2. No comments at this time.
The following comments do not need to be addressed now, but you should be aware of them as they
will need to be addressed at time of building permit submittal.
2. Insert the 'Best Management Practices', updated June 2014, construction sheet into the plans set. A copy
can be found at
httD://www.flowstobay.orR/sites/default/files/Countvwide%20Program%20BMP%20PIan%20Sheet-
June%202014%20Update.pdf#overlay-context=brochures or http://www.flowstobay.org/brochures then click
"construction bmp plan sheet"
3. Based on the scope of work, this is a "Type II" project that requires a Stormwater Construction Pollution
Prevention Permit. This permit is required prior to issuance of a Building Permit. An initial field inspection is required
prior to the start of any construction (on private property or in the public right-of-way).
Reviewed By: Martin Quan Date: 2/24/17
650-558-7245
Project Address
Description:
From
Project Comments - Planning Application
1431 El Camino Real, zoned R-3, APN: 026-013-110
Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
Martin Quan
Public Works Engineering
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
1. A remove/replace utilities encroachment permit is required to (1) replace all curb, gutter, driveway and
sidewalk fronting site, (2) plug all existing sanitary sewer lateral connections and install a new 4" lateral, (3) all
water line connections to city water mains for services or fire line are to be installed per city standard
procedures and specification, (4) any other underground utility works within city's right-of-way. Please show on
plans.
The following comments do not need to be addressed now, but you should be aware of them as they
will need to be addressed at time of building permit submittal.
2. Insert the 'Best Management Practices', updated June 2014, construction sheet into the plans set. A copy
can be found at
http://www.flowstobay.org/sites/default/files/Countywide%20Program%20BMP/o20PIan%20Sheet-
June%202014/o20Update.pdf#overlay-context=brochures or htttp://www.flowstobay.org/brochures then click
"construction bmp plan sheet"
3. Based on the scope of work, this is a "Type II" project that requires a Stormwater Construction Pollution
Prevention Permit. This permit is required prior to issuance of a Building Permit. An initial field inspection is required
prior to the start of any construction (on private property or in the public right-of-way).
Reviewed By: Martin Quan Date: 10/7/16
650-558-7245
CITY
i
Project Comments - Planning Application
Project Address: 1431 El Camino Real, zoned R-3, APN: 026-013-110
Description: Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
From: Christine Reed
Fire Dept.
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal:
1. The building shall be equipped with an approved NFPA 13R sprinkler system throughout.
Sprinkler drawings shall be submitted and approved by the Central County Fire Department prior to
installation. The system shall be electronically monitored by an approved central receiving station,
under a separate fire alarm permit.
2. The fire sprinkler system's fire department connection shall be located within 5 feet of the
sidewalk and not within city right-of-way.
3. The applicant shall ensure proper drainage in accordance with the City of Burlingame
Engineering Standards is available for the fire sprinkler main drain and inspector test on the building
plumbing drawings. These items may drain directly to landscape or in the sewer with an air gap.
4. The fire protection underground shall be submitted and approved by the Burlingame Building
Department prior to installation. The fire sprinkler system and fire standpipe system will not be
approved by the Central County Fire Department until the fire protection underground has been
submitted and approved by the Burlingame Building Department.
5. Electronic vehicular gate shall have a Knox key switch for emergency Fire Dept. access. The
front of the building shall have a Knox key box for emergency Fire Dept. access through pedestrian
gates and into other common areas of the building (if any).
Reviewed By: Christine Reed Date: 10-12-16
650-558-7617
Project Address
Description:
From:
Project Comments - Planning Application
1431 El Camino Real, zoned R-3, APN: 026-013-110
Request for Environmental Scoping (?), Condominium Permit, and Design
Review for 6 new townhome units.
Carolyn Critz
Stormwater
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
Project proponent completed, signed and submitted the Small Projects Checklist, which shows the
project is a Small Project.
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
1. Any construction project in the City, regardless of size, shall comply with the city's stormwater
NPDES permit to prevent construction activity stormwater pollution. Project proponents shall
ensure that all contractors implement appropriate and effective Best Management Practices
(BMPs) during all phases of construction, including demolition. When submitting plans for a
building permit, please include a list of construction BMPs as project notes, preferably, on a
separate full size (2'x 3' or larger), plan sheet. A downloadable electronic file is available at:
http://www.flowstobay.org/Construction
2. Label all pervious and impervious surfaces and site design measures for stormwater.
For further assistance regarding stormwater, please contact Carolyn Critz, Environmental Compliance
Manager, at (650) 342 3727, ext. 118, or carolyn.critz(a�.veolia.com
Reviewed By: Carolyn Critz Date: November 14, 2016
(650) 342 3727, ext. 118
ENVIRONMENTAL CHECKLIST FROM APPENDIX G OF THE CEQA GUIDELINES
AESTHETICS. Would the project:
❑ Have a substantial adverse effect on a scenic vista?
❑ Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
❑ Substantially degrade the existing visual character or quality of the site and its surroundings?
❑ Create a new source of substantial light or glare which would adversely affect day or nighttime views in the
area?
AGRICULTURAL RESOURCES. In determining whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site
Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use
in assessing impacts on agriculture and farmland. Would the project:
o Convert Prime Farmland, Unique Farmland or Farmland of Statewide Importance (Farmland), as shown on
the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources
Agency, to non-agricultural use?
❑ Conflict with existing zoning for agricultural use, or a Williamson Act contract?
❑ Involve other changes in the existing environment which, due to their location or nature, could result in
conversion of Farmland, to non-agricultural use?
AIR QUALITY. Where available, the significance criteria established by the applicable air quality management
or air pollution control district may be relied upon to make the following determinations. Would the project:
❑ Conflict with or obstruct implementation of the applicable air quality plan?
❑ Violate any air quality standard or contribute to an existing or projected air quality violation?
❑ Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is
non -attainment under an applicable federal or state ambient air quality standard (including releasing
emissions which exceed quantitative thresholds for ozone precursors)?
❑ Expose sensitive receptors to substantial pollutant concentrations?
❑ Create objectionable odors affecting a substantial number of people?
BIOLOGICAL RESOURCES. Would the project:
❑ Have a substantial adverse effect, either directly or through habitat modifications, on any species identified
as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by
the California Department of Fish and Game or U.S. Fish and Wildlife Service?
❑ Have a substantial or adverse effect on any riparian habitat or other sensitive natural community identified
in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish
and Wildlife Service?
❑ Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean
Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
❑ Interfere substantially with the movement of any native or resident or migratory fish or wildlife species or
with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery
sites?
❑ Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation
policy or ordinance?
❑ Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
CULTURAL RESOURCES. Would the project:
❑ Cause a substantial adverse change in the significance of an historical resource as defined in '15064.5?
❑ Cause a substantial adverse change in the significance of an archaeological resource pursuant to
' 15064.5?
❑ Directly or indirectly destroy a unique paleontological resource or site or unique geological feature?
o Disturb any human remains, including those interred outside of formal cemeteries?
Environmental Checklist from Appendix G of the CEQA Guidelines
GEOLOGY AND SOILS. Would the project:
❑ Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or
death involving:
a) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault
Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a
known fault? Refer to Division of Mines and Geology Special Publication 42.
b) Strong seismic ground shaking?
c) Seismic -related ground failure, including liquefaction?
d) Landslides?
❑ Result in substantial soil erosion or loss of topsoil?
❑ Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the
project, and potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or
collapse?
❑ Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (2001), creating
substantial risks to life or property?
❑ Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal
systems where sewers are not available for the disposal of waste water?
GREENHOUSE GAS EMISSIONS
❑ Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the
environment?
❑ Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
HAZARDS AND HAZARDOUS MATERIALS. Would the project:
❑ Create a significant hazard to the public or the environment through the routine transport, use, or disposal
of hazardous materials?
❑ Create a significant hazard to the public or the environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous materials into the environment?
❑ Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste
within one -quarter mile of an existing or proposed school?
❑ Be located on a site which is included on a list of hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the
environment?
❑ For a project located within an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport, would the project result in a safety hazard for people residing
or working in the project area?
❑ For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people
residing or working in the project area?
❑ Impair implementation of, or physically interfere with, an adopted emergency response plan or emergency
evacuation plan?
❑ Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including
where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands?
HYDROLOGY AND WATER QUALITY. Would the project:
❑ Violate any water quality standards or waste discharge requirements?
❑ Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that
there would be a net deficit in aquifer volume or a lowering of the local groundwater table (e.g., the
production rate of pre-existing nearby wells would drop to a level which would not support existing land uses
or planned uses for which permits have been granted)?
o Substantially alter the existing drainage pattern of the site or area, including through the alteration of the
course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off -site?
-2-
Environmental Checklist from Appendix G of the CEQA Guidelines
❑ Substantially alter the existing drainage pattern of the site or area, including through the alteration of the
course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which
would result in flooding on- or off -site?
❑ Create or contribute runoff water which would exceed the capacity of existing or planned stormwater
drainage systems or provide substantial additional sources of polluted runoff?
❑ Otherwise substantially degrade water quality?
❑ Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or
Flood Insurance Rate Map or other flood hazard delineation map?
❑ Place within a 100-year flood hazard area structures which would impede or redirect flood flows?
❑ Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding
as a result of the failure of a levee or dam?
❑ Inundation by seiche, tsunami, or mudflow?
LAND USE AND PLANNING. Would the project:
❑ Physically divide an established community?
❑ Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project
(including, but not limited to the general plan, specific plan, local coastal program or zoning ordinance)
adopted for the purpose of avoiding or mitigating an environmental effect?
❑ Conflict with any applicable habitat conservation plan or natural community conservation plan?
MINERAL RESOURCES. Would the project:
❑ Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
❑ 2b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a
local general plan, specific plan or other land use plan?
NOISE. Would the project result in:
❑ Exposure of persons to or generation of noise levels in excess of standards established in the local general
plan or noise ordinance, or applicable standards of other agencies?
❑ Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
❑ A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without
the project?
❑ A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels
existing without the project?
❑ For a project located within an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport, would the project expose people residing or working in the
project area to excessive noise levels?
o For a project within the vicinity of a private airstrip, would the project expose people residing or working in
the project area to excessive noise levels?
POPULATION AND HOUSING. Would the project:
❑ Induce substantial population growth in an area, either directly (for example, by proposing new homes and
businesses) or indirectly (for example, through extension of roads or other infrastructure)?
o Displace substantial numbers of existing housing, necessitating the construction of replacement housing
elsewhere?
❑ Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere?
-3-
Environmental Checklist from Appendix G of the CEQA Guidelines
PUBLIC SERVICES. Would the project:
❑ Result in substantial adverse physical impacts associated with the provision of new or physically altered
governmental facilities, need for new or physically altered government facilities, the construction of which
could cause significant environmental impacts, in order to maintain acceptable service ratios, response
times or other performance objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
RECREATION.
❑ Would the project increase the use of existing neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
❑ Does the project include recreational facilities or require the construction or expansion of recreational
facilities which might have an adverse physical effect on the environment?
TRANSPORTATION/TRAFFIC. Would the project:
❑ Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the
street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to
capacity ratio on roads, or congestion at intersections)?
❑ Exceed, either individually or cumulatively, a level of service standard established by the county congestion
management agency for designated roads or highways?
❑ Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location
that results in substantial safety risks?
❑ Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
❑ Result in inadequate emergency access?
❑ Result in inadequate parking capacity?
❑ Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts,
bicycle racks)?
UTILITIES AND SERVICE SYSTEMS. Would the project:
❑ Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board?
❑ Require or result in the construction of new water or wastewater treatment facilities or expansion of existing
facilities, the construction of which could cause significant environmental effects?
❑ Require or result in the construction of new storm water drainage facilities or expansion of existing facilities,
the construction of which could cause significant environmental effects?
❑ Have sufficient water supplies available to serve the project from existing entitlements and resources, or are
new or expanded entitlements needed?
❑ Result in a determination by the wastewater treatment provider which serves or may serve the project that it
has adequate capacity to serve the project's projected demand in addition to the provider's existing
commitments?
❑ Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal
needs?
❑ Comply with federal, state, and local statutes and regulations related to solid waste?
MANDATORY FINDINGS OF SIGNIFICANCE.
❑ Does the project have the potential to degrade the quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important examples of the major periods of California history or
prehistory?
-4-
Environmental Checklist from Appendix G of the CEQA Guidelines
❑ Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a project are considerable when viewed in connection
with the effects of past projects, the effects of other current projects, and the effects of probable future
projects)?
❑ Does the project have environmental effects which will cause substantial adverse effects on human beings,
either directly or indirectly?
-5-
CITY OF BURLINGAME
COMMUNITY DEVELOPMENT DEPARTMENT
BURLINGAME 501 PRIMROSE ROAD
BURLINGAME, CA 94010
PH: (650) 558-7250 • FAX: (650) 696-3790
www.burlingame.org
Site: 1431 EL CAMINO REAL PUBLIC HEARING
The City of Burlingame Planning Commission announces the NOTICE
following public hearing on MONDAY, MARCH 27, 2017 at
7:00 P.M. in the City Hall Council Chambers, 501 Primrose
Road, Burlingame, CA:`
Application for Environmental Review, Condominium Permit,
Design Review, Parking Variance for the use of mechanical
parking lifts, and Front Landscape Variance for a new 3-story, 6-
unit condominium building at 1431 EL CAMINO REAL zoned
R-3. APN 026-013-110
Mailed: March 17, 2017
(Please refer to other side)
Citv of Burlin_aame
A copy of the application` and plans for this project may be reviewed prior to
the meeting at the Community Development Department at 501 Primrose
Road, Burlingame, California.
If you challenge the subject application(s) in court, you may be limited to
raising only those issues you or someone else raised at the public hearing,
described in the notice or in written correspondence delivered to the city at or
prior to the public hearing.
Property owners who receive this notice are responsible for informing their
tenants about this notice.
For additional information, please call (650) 558-7250. Thank you.
William Meeker
Community Development Director
PUBLIC HEARING NOTICE
(Please refer to other side)
T)
Cb
9�0 G6 RO 79S tl T 700
T? T `u Ol ^ •P h�'L "'
► GP P 3 3 .
vo
7
05d„ O
T'r v 16,o rp
ov
h i`M1 w4b�
o� ti ^ �
,y
, h"I N to, or
03
7,1
40 A- �9A� ^ T� '�
^s .° °� e T T s
r
�tK
� h Sf a
lb,
Yroo
n �(l
^DL
¢E ��0 �! T
¢
z
ti
OFFICE OF
ASSESSOR -COUNTY CLERK -
RECORDER & ELECTIONS
COUNTY OF SAN MATEO
Date: May 21 2018
To: City of Burlingame
Community Development Dept - Planning Division
501 Primrose Road Burlingame, CA 94010
MARK CHURCH
ASSESSOR -COUNTY CLERK-
RF,CORDF,R & CHIEF SUCTIONS OFFICER
Final Posting Confirmation
for Environmental Impact Reports
Subject: Return of Environmental Documents Filed and Posted for 30 days.
Public Resources Code Section 21092.3
By:
The attached document(s), File Number 127089
was received, filed and a copy posted with the County Clerk on Feb 16 2018
and remained posted for thirty calendar days.
Besz De La Vega
Deputy Clerk on behalf of Mark Church
SS-12 Posting Confirmation Letter for Environmental Impact Reports
555 County Center, Redwood City, CA 94063
P 650.363.4500 F 650.599.7458 email countyclerk@smcacre.org web www.smcacre.org
State of California - Department of Fish and Wildlife
2018 ENVIRONMENTAL FILING FEE CASH RECEIPT
DFW 753.5a (Rev. 01/03/18) Previously DFG 753.5a
Print
SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY.
I Finalize&Email i
I
RECEIPT NUMBER:
02162018 —'
ATE CLEARINGHOUSE NUMBER (If applicable)
LEAD AGENCY LEADAGENCY EMAIL DATE
CITY OF BURLINGAME 02162018
COUNTY/STATE AGENCY OF FILING DOCUMENT NUMBER
CDFW 1 2--t'01?19
PROJECT TITLE
1431 EL CAMINO REAL - NEW THREE STORY, SIX UNIT CONDOMINIUM BUILDING
PROJECT APPLICANT NAME PROJECT APPLICANT EMAIL PHONE NUMBER
WILIAM MEEKER )
PROJECT APPLICANT ADDRESS CITY STATE ZIP CODE
PROJECT APPLICANT (Check appropriate box)
0 Local Public Agency School District Other Special District State Agency Private Entity
CHECK APPLICABLE FEES:
❑ Environmental Impact Report (EIR)
El Mitigated/Negative Declaration (MND)(ND)
❑ Certified Regulatory Program document (CRP)
❑ Exempt from fee
❑ Notice of Exemption (attach)
❑ CDFW No Effect Determination (attach)
❑ Fee previously paid (attach previously issued cash receipt copy)
$3,168.00 $ 0.00
$2,280.75 $ 2,280.75
$1,077.00 $ 0.00
ElWater Right Application or Petition Fee (State Water Resources Control Board only) $850.00 $ 0.00
0 County documentary handling fee $ 50.00
❑ Other $
PAYMENT METHOD:
❑ Cash ❑ Credit El Check ❑ Other TOTAL RECEIVED $ 2,330.75
SIGNATURE AGENCY OF FILING PRINTED NAME AND TITLE
X - DIANA SIRON/COUNTY CLERK
ORIGINAL - PROJECT APPLICANT COPY - CDFW/ASB COPY - LEAD AGENCY COPY - COUNTY CLERK DFW 753.5a (Rev. 20151215)
NOTICE OF DETERMINATION
TO: ® Office of Planning and Research FROM: City of Burlingame
P.O Box 3044 Community Development Dept.
Sacramento, California 95812-3044 Planning Division
501 Primrose.,Rgad-—,
Burlingame, A194 0 fir,
® County Clerk's Office a"` r� (";��' j °�
County of San Mateo SA j �j rVi��
555 County Center Road, First Floor FEB 16 Z018
Redwood City, California 94063-0977
F.
IUTARI( ; � '•
SUBJECT. Filing of Notice of Determination in compliance with Section 21152 of the A66ikekesources
Code.
1431 El Camino Real - New Three -Story, Six Unit Condominium Building
Project Title
2017122013 William Meeker (650) 558-7250
State Clearinghouse Number Contact Person Area Code/Telephone
(If submitted to Clearinghouse)
1431 El Camino Real, City of Burlingame, San Mateo County
Project Location (include County)
Project Description: The proposed 1431 El Camino Real project would include demolition of an existing two-story
apartment building with a detached five -car garage structure at the rear, and construction of a 3,858-square-foot,
six -unit, three-story (35 feet tall) residential building in its place. Each unit would be two bedrooms and 2.5
bathrooms, ranging in size from 1,004 square feet to 1,195 square feet. All entrances to the units would be located
on the north -facing (driveway) side of the project site. The application includes a request for a Condominium Permit,
Design Review, and Parking Variance for the use of mechanical parking lifts.
This is to advise that the City of Burlingame, the Lead Agency, has approved the above -described project on
February 12, 2018 and has made the following determinations regarding the above described project:
1. The project [❑will ® will not] have a significant effect on the environment.
2. ❑ An Environmental Impact Report was prepared for this project pursuant to the provisions of
CEQA.
® A Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
The EIR or Negative Declaration and record of project approval may be examined at: City of
Burlingame, Planning Division, 501 Primrose Road, Burlingame CA 94010.
3. Mitigation measures [®were [J were not] made a condition of approval of the project.
4. A statement of Overriding Considerations [❑was ®was not] adopted for this project.
5. Findings (® were ❑ were not) made pursuant to the provisions of CEQA.
This is to certify that the Negative Declaration with comments and responses and record of project approval is
available to the General Public at: City of Burlingame, Planning Division, 501 Primrose Road, Burlingame, CA
94010.
%Z�— February 15, 2018
William Meeker, Community Development Director Date
County of San Mateo
Assessor -County Clerk -Recorder
Mark Church
555 County Center
Redwood City, CA, 94063
Finalization 2018009097
2/16/18 2:34 pm
018 96
Item Title
1 Fish & Game: Mitigated Negative Declaration
Document ID Amount
DOC# 2018-000036 2330.75
Total 2330.75
Payment Type Amount
Check tendered 2280.75
# 272
Check tendered 50.00
# 273
Amount Due 0.00
THANK YOU
PLEASE RETAIN THIS RECEIPT
FOR YOUR RECORDS