Loading...
HomeMy WebLinkAbout1315 Edgehill Drive - Approval Letterw CITY OF BURLINGAME City Hali — 501 Primrose Road Burlingame, California 94010-3997 October 15, 2007 Rafi and Aida Chabo 1315 Edgehill Drive Burlingame, CA 94010 Re: 1315 Edgehill Drive Dear Mr. and Mrs. Chabo, F, c��° � �,�� f � � _� `y� _ +9Qe a4nonwr�e COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the September 24, 2007, Planning Commission approval of your application for Design Review and Variances for first and second story front setbacks and lot coverage became effective October 4, 2007. This application was to allow for a second story addition to an existing single family dwelling and detached garage at 1315 Edgehill Drive, zoned R-1. The September 24, 2007 minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Department date stamped September 10, 2007, sheets A.0 through A.5 and L.1, and that any changes to building materials, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; 2. that larger scale plant materials, rather than larger container size shall be added to the landscape plan; and a revised landscape plan shall be brought back to Commission as an FYI after changes are made; 3 n that the conditions of the Chief Building Official's March 23 and August 13, 2007 memos, the City Engineer's March 23, 2007 memo, and the NPDES Coordinator's March 26 memo shall be met; that if the structure is demolished or the envelope changed at a later date the lot coverage and front setback variances, as well as any other exceptions to the code granted here, will become void; 5. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; C� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �m October 15, 2007 1315 Edgehill Drive Page 2 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; and 12. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. One extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, �: _._i�i/�=i William Meeker Community Development Director Chief Deputy Valuation, Assessor's Office (S 30 FT OF LOT 17 AND NE 6 FT OF LOT X BLOCK 4 BURLINGAME TERRACE NO 2 RSM 7/38; APN: 029- 015-040 ) File �: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��