Dear Mr. and Mrs. Chabo,
F, c��°
� �,�� f �
�
_�
`y� _ +9Qe
a4nonwr�e
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the September 24, 2007, Planning
Commission approval of your application for Design Review and Variances for first and second story
front setbacks and lot coverage became effective October 4, 2007. This application was to allow for a
second story addition to an existing single family dwelling and detached garage at 1315 Edgehill Drive,
zoned R-1.
The September 24, 2007 minutes of the Planning Commission state your application was approved with
the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Department date
stamped September 10, 2007, sheets A.0 through A.5 and L.1, and that any changes to building
materials, exterior finishes, footprint or floor area of the building shall require an amendment to
this permit;
2. that larger scale plant materials, rather than larger container size shall be added to the landscape
plan; and a revised landscape plan shall be brought back to Commission as an FYI after changes
are made;
3
n
that the conditions of the Chief Building Official's March 23 and August 13, 2007 memos, the City
Engineer's March 23, 2007 memo, and the NPDES Coordinator's March 26 memo shall be met;
that if the structure is demolished or the envelope changed at a later date the lot coverage and
front setback variances, as well as any other exceptions to the code granted here, will become
void;
5. that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
6. that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), moving or changing windows and architectural
features or changing the roof height or pitch, shall be subject to Planning Commission review;
C� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �m
October 15, 2007
1315 Edgehill Drive
Page 2
7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
2001 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification that
the architectural details shown in the approved design which should be evident at framing, such
as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Department; and
12. that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. One extension of
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
�: _._i�i/�=i
William Meeker
Community Development Director
Chief Deputy Valuation, Assessor's Office
(S 30 FT OF LOT 17 AND NE 6 FT OF LOT X BLOCK 4 BURLINGAME TERRACE NO 2 RSM 7/38; APN: 029-
015-040 )