November 30, 2012
Jack McCarthy
6257 Blaver Lane
San Jose, CA 95135
Re: 1225 Bernal Avenue
Dear Mr. McCarthy,
� CITY
�� ' � �
�
iG� ,
+.o..�,
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Councii, the November 13, 2012, Planning
Commission approval of your application for Design Review became effective November 26, 2012.
This application was for a new, two-story single family dwelling and detached garage at 1225 Bernal
Avenue, zoned R-1.
The November 13, 2012 minutes of the Planning Commission state your application was approved
with the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped October 26, 2012, sheets 1 through 6, L1.0, L2.0, GB1 and Boundary and
Topographic Survey;
2. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf�;
3. that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
4. that the conditions of the Chief Building Official's October 11, 2012 and August 16, 2012
memos, the City Engineer's August 29, 2012 memo, the Parks Supervisor's August 23, 2012
and September 19, 2012 memos, the Fire Marshal's August 20, 2012 memo, and the NPDES
Coordinator's August 22, 2012 memo shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
6. that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
:m Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
November 30, 2012
1225 Bernal Avenue
Page 2
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that during demolition of the existing residence, site preparation and construction of the new
residence, the applicant shall use all applicable "best management practices" as identi ied in
Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm
water runoff;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2010 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer,
14. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :C
November 30, 2012
1225 Bernal Avenue
Page 3
16. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building
Department. This approval is valid for one year and a building permit must be issued by December
23, 2013. A one year extension may be considered by the Planning Commission if application is
made before this expiration date.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must
do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or
federal law. �
Sincerely,
,
� -
,
William Meeker
Community Development Director
c. Chief Deputy Valuation, Assessor's Office
(LOT 11 BLOCK 36 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-173-050)
Suzanne and Chuck Lyman
2996 California Street
San Francisco, CA 94115
File
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �:
Project Comments
Date:
August 16, 2012
To: [�(( Engineering Division
(650) 558-7230
❑ Building Division
� (650) 558-7260
❑ Parks Division
(650) 558-7334
From: Planning Staff
❑ Fire Division
(650) 558-7600
❑ Stormwater Division
(650) 342-3�27
❑ City Attorney
(650) 558-7204
Subject: Request for Design Review for a new, two-story single family
dwelling and detached garage at 1225 Bernal Avenue, zoned R-1,
APN: 026-173-050
Staff' Review: August 20, 2012
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 8129/2012
6
: . PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REV�W COMII�NTS �'��� ��
Pro ectName:Sir[�t� t'-r��sttW ;i�f`izc�f;�,
J �TT��Y
- Project Address:_ �Z�--S ����- �'��
The following requirements apply to the project
1 � A property boundary survey shall be preformed by a licensed land .
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building permit issuance.) �wt�-f��( c�w� � ��� �..�lt�(.d � �1�'y �f�C.�IS;L�G
Lh't•� S c�(GJ�a2 ,
2 � The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building perm.it.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
� � �1�r G�:f tLr��j
5 A�'�sa�.m'tary sewer lateral is reqwred for the project in accordance with
the City's standards. )
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and IDevelopment Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
sha11 identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the Ciiy
Engineer.
10. The project shall file a parcel map with the Public VJorks Engineering
Division. The parcel map shall show a11 existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Page 1 of 3
U:\private development�PLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject pazcel of land shall be
submitted to the Public Works Engi.neering Division with the parcel map
for reviews.
12 Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project sha11 submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 ✓ The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct fronta.ge streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts duri.ng construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall subinit hydrologic calculations from a registered civil
engi.neer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed i.mprovements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engi.neers
Permits.
19 No construction debris shall be allowed into the creek.
20 � The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the d'unensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subj ect
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
� Page 2 of 3
U:\private development�PLANNII�TG REVJEW COMIVIENTS.doc
PUBLIC WORK_S DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach sha11 be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street i.nto private property.
24. For the takeout service, a garbage receptacle shall be placed i.n front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the buildi.ng. A drain connecting the garbage area to
the 5anitary Sewer System is required.
Page 3 of 3
U:\private development�PLANNING REVIEW COMIvIEN'TS.doc
z-"" - - - - - - -
i
� Project Comments
f
Date:
Revised Plans Submitted September 24, 2012
To: � City Engineer
(650) 558-7230
X Chief Building Official
(650j 558-7260
� Parks Supervisor
(650) 558-7334
From: Planning Staff
� Recycling Specialist
(650) 558-7271
0 Fire Marshal
(650) 558-7600
� NPDES Coordinator
(650) 342-3727
� City Attorney
Subject: Request for Desigr� Review for a new, two-story single family
dwelling and detached garage at 1225 Bernal Avenue, zoned R-1,
APN: 026-173-050
Staff Review: N/A
No further comments.
All conditions of approval as stated in the review dated 8-16-2012 will apply to this
project.
Reviewed by:
Date: 10-11-2012
G
F,.,._, -.._._ . ...�:�J.-�..T..^,. .r,-�,,.. _�_,.��.. �a_,_.�.._, .>.,-..�.,T_�
r ,
� Project Comments
Date:
To:
From:
August 16, 2012
� Engineering Division
(650) 558-7230
X Building Division
(650) 558-7260
� Parks Division
(650) 558-7334
Planning Staff
� Fire Division
(650) 558-7600
� Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Subject: Request for Design Review for a new, two-story single family
dwelling and detached garage at 1225 Bernal Avenue, zoned R-1,
APN: 026-173-050
Staff Review: August 20, 2012
� On the plans specify that this project will comply with the 2010 California Building
Code, 2010 California Residential Code (where applicable), 2010 California
Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing
Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the
Planning Commission has approved the project prior to 5:00 p.m. on December
31, 2010 then the building permit application for that project may use the
provisions found in the 2007 California Building Codes including all amendments
as adopted in Ordinance 1813.
�2 Specify on the plans that this project will comply with the 2008 California Energy
Efficiency Standards.
Go to http://www.enerqy.ca.qov/title24/2008standards/ for publications and
details.
;�3� Place the following information on the first page of the plans:
� "Construction Hours"
Weekdays: 7:00 a.m. — 7:00 p.m.
Saturdays: 9:00 a.m. — 6:00 p.m.
Sundays and Holidays: 10:00 a.m. — 6:00 p.m.
�(See City of Burlingame Municipal Code, Section 13.04.100 for details.)
47j On the first page of the plans specify the following: "Any hidden conditions that
�-r� require work to be performed beyond the scope of the building permit issued for
these plans may require further City approvals including review by the Planning
Commission." The building owner, project designer, and/or contractor must
submit a Revision to the City for any work not graphically illustrated on the Job
Copy of the plans prior to performing the work.
0
Project Comments
Date:
August 16, 2012
To: � Engineering Division
(650) 558-7230
� Building Division
(650) 558-7260
X Parks Division
(650) 558-7334
From: Planning Staff
� Fire Division
(650) 55&7600
� Stormwater Division
(650) 342-3727
� City At#orney
(650) 558-7204
Subject: Request for Design Review for a new, finro-story single family
dwelling and detached garage at 1225 Bernal Avenue, zoned �2-1,
APN: �26-'173-050
Staff Review: August 20, 2U12
�plete Water Conservation in landscape checksheet
a ��� � ��l ��
�
by: B Disco
Date: 8/23/12
i'
u
l
�
OUTDOOR 1�IATCR USE EFFICIENCY GHE��{LIST
1 certify if "{fie s b'�ect praje�t,� ti�e speciFed requirements of the Wat�r Conserva 'on in Landscaping Ordinance.
.�" / �� %,�. 4•'°�'�,,,'' '� �
Signature Date
�Single Family � MuIN-Family � Commerciaf 0 Insdtudona! Q lrrigatton anly ❑ industria( � Other:
ApplicanL Name (print}: � 1���,� f �� ��ontact Phone tt��� -'� �� ,
Project 5ite Address. � �'�,.. j ��� h�i�l'1 _ _ ���-` ; ,
Project Area {sq.#L or acrej: 1! of Units: tl of Metets:
Non-Surf
trrtgadbn 5ysteri� Effitiency
trr��atlonSystem Oesign
Total landscape Area (sq.�t.ji � �y � i;���;�(.''a��a .� �ta�;'�%=��.���-:�
� s� �L �`�?�' � � �Jk;• �,���
����!`(.��i''�[� `�f ' �I:.r�31�;�
7urf irrigated Ar�a {sq.ft.}: '�� t'� .
,-7-
Non 7uri Irrigated Area �sq.ft.j: ��j .�
5peciai l.apdscape Area {SLAj (sq.Ft.j: �.t�--
Water Feature Surface Area {sq.it.j: `""�
:Yi-i�f.. �I�jS•: ' .i::i� ' i' �•fC.'�rt.'j%-•�:! i � �-� �: � -"�'l`"
;=�.�s.:,;f��;�?�iii�is�.:y;.,:;:�;;::':�:�'t�.:';-�{►;?�;ii.�ti�.��s�i;a::ill�ti;;��;;� �;�:;.':�;.;
less ihan ?596 of the landscape are� is O Yes
tu�€ �o, See Water Dudget
All turf areas are> 8 feet tvide �Yes
All tuff is planted on sl�pes <25% Cf3,Yes
At least 80�6 of non-turF area is native ❑ Yes �
ar law water use plants No, 5ee Water Budget
Plants are grouped hy Hydrazones Yes
At least 2-inches of mulch on expvsed Yes
soil surfaces
70% ETo (l00;5 ETa for SLAsj es
No overspray or runoff es
System efficlency > 70°6 �es
;Automatit, salf-adjustin� irri�atlon C] No, not �equifed for Tiar 2
Moisture sensor/rain sensor shutaffs k�Yes
Na sprayheads in < 8•ft vride area �Yes
t�rtgatlon Tlme 5ys#em only operakes 6ek�veen S PNI �yes
and 10 AM
Meterin� Separate irrigation mete� �No, not raquired hecause < 5,000 sq.ft.
� Yes '
Switttm[t1g Poals / Spas Cover hi�hty recnmmended 1 0 Yes
�� [30, not required
Water Features RedreulaEing �' ❑ Yes
Less than 109'n of landscape are C] Yes
Dnc�mentailon Checklist f Yes
Landscape and Irrigatian Qesign Plan ❑ Preparecf by appllcant
.,�repared by professiana[
tNater 6udget {apttonai� Ci Prepared by a�piicant
tepa�ed by professional
0
a
.:�.,.,,_:,,:>•:��.: ;.:_ I
_ _.;�-, . .:.,.
;�,.• ::�
:";"� : ,�•�'� -� Q��: ¢,:
::�:::;:' -�0�
'�,�]j;.'.':"X�O�. ;�
:;;; •:;+:t = :i:
:,. _ �_ :.�;- ?;
`•'�•�=a��;`.-.Oz"-.
�,,�y.;;;;:t\f:t.�;;: �`
�".1: �..
::;;�;?• ;;0;.:;�
s�'. — .,�r::
::�`�:t:;�^ ;�0 r
!i.r.' .'-' Zi »'i • :.`1?
�p; — ;p;t:,::
__Y`` ,:`�_..
Post-instailatton audit compieted Completed by applicant �i '' ❑`•�
. ,;. , . ,.
orripleted by �rofesstonal �. _ � P
��� .� .. �l �-
r�"�,. [ •;"`;' t : _. . . .. . . - .. . _.
,r. � ! : - , . ._ � `;'�:
OUTDOOR WATER USE EFFICIENCY CH�CKLIST
e : - t s - • e � • - - - - �
Auditor: • se�r�=_trct, ?!i-� � �>t_ES_: � �� , i_i `t;r�i��, : - -
Materials Received and Reviewed: , �W�#er Conservation in Landscaping Ordinance
/,.
�U Outdoor Water Use Efficiency Checklist 0 Outdoor Water Use Efficiency Checklist
❑ Water Budget �Water Budget Calculation Worksheets
� ndscape Plan �7'P1ant List
❑ Post Installation Audit ❑ Other: �
Date Reviewed: =��v� r�4� � i,� .r7 �����i� >:� � � F:�y_ 1>,.C� .�._�;� -
❑ Follow up required (explain): L3'DXip irrigation ' �.
/
0 Self-adjusting irrigation Controller
Date Resubmitted: Plant pa(ate
Date Approved: . l�Three (3) inches of mulch
Dedicated Irrigation Meter Required: Id Soil amendment (e.g., compost)
Meter sizing: ❑ Grading
❑ Pool and/or spa cover •
❑ Dedicated irrigation meter
❑ Other: �
Comments: /y � < %� �f G� s
* �-�t ' �iFZ� �( !y?�-- L�4�(j'7 �'L.
!:,/ �i
Selected D�nitions:
Tier 1 New construction and rehabilitated landscapes with irrigated landscape areas between
• 1,000 and 2,500 square feet requiring a building or landscape permit, plan check or
design review, or new or expanded water service.
Tier 2 New construction and rehabilitated landscapeswith irrigated landscape areas greater than
2,500 square feet requiring a building or landscape permit, plan check or design review.
ETo Reference evapotranspiration means the quantity of water evaporated from a large field of
four-to seven-inch tall, cooi-season grass that is weil watered. Reference evapotranspiration
� is used as the basis of estimating water budgets so that regional differences in climate
can be accommodated. .
SLA Special Landscaped Area. Includes edible plants, areas irrigated with recycled water,
. surface water features using recycled water and areas dedicated to active play such as
parks, sports fields, golf courses, and where turF provides a playing surface.
Professional Professional is a"certified professional" or "authorized professional" that is a certified irrigatiora
designer, a certified landscape irrigation auditor, a licensed landscape architect, a licensed
landscape contractor, a licensed professional engineer, or any other person authorized by the
state to design a landscape, an irrigation system, or authorized to complete a water budget,
irrigation survey or irrigation audit.
Water Feature A design element where open water perForms an aeSthetic or recreational function. Water
features include ponds, lakes, waterfalls, fountains, artificial streams, spas, and swimming
pools (where water is artificially supplied).
WATER 6UDGET CALCS ��so�i 2
LYMAN RESIDENCE. I 225 BERNAL AVE.
MAXIMUM APPLIED WATER ALLOWANCE (MAWA)
CITY: BURLINGAME
REFERENCE EfO: 42.90 ETo (m. / yr.)
TOTAL LANDSCAPE AREA: 7,655 (sq.ft.)
SPECIAL LANDSCAPE AREA: O (sa.ft.)
MAWA: I 42,525 (ga1. / yr.)
�STIMATED TOTAL WATER USE (ETWU)
PF x HA / IE
ZONE H20 USE PF HA (sq.ft.) IE (sa.ft.)
(N) PLANTS VL 0.05 O / 0.7 I = O
(N) PLANTS L O. I 5 ` I,587 / 0.7 I = 335
(N) PlANTS M 0.50 5,268 / 0,7 I = 3,7 ! O
(N) PLANTS ti 0.85 O / 0.7 I = O
(N) LAWN Fi I.00 800 / 0.7 I = I, I 27
(E) LAWN ti I.00 " O / 0.7 I = O
(E) LANDSCAPING M 0.50 O / 0.71 = O
0.00 �` O / 0.71 = 0
WATER FEATU RES +
W.F. covered M 0.50 O = O
W.F. uncovered 11 I.00 O = O
SPECIAL IANDSCAPE AREA +
SLA 11 I.00 O = O.
ETWU complies with MAWA �U � � 3%, 562 (gal. / yr.)
����������
AUGI520�'
ci-�r c� �u���N�;��^c
CC}G-� L4Ntvit�dG D(\�
LANDSCAPE COEFFICIENTS
PLANT FACTOR PF
TYF'E LOW AVG tiIGH
TREES 0.2 0.5 0.9
SHRUBS 0.2 0.5 0.7
GROUNDCOVER 0.2 0.5 0.7
MIXED 0.2 0.5 0.9
LAWN 0.6 0.7 0.8
N OTES:
I. PF IS (0.6) FOR WARM-SEASON TURF GRASSES, (0.8) FOR COOL SEASON
2. •USE .8 FOR DWARF FESCUE
APPLICATION EFFICIENCY
APPLICATION DEVICE I% RANGE AVG. %
iMPACT, MULTIPLE, � SINGLE STREAM ROTORS 60 — 80% 70%
SPRAY t1EAD5 IN TURF 40 — 60% 50%
SPRAY 11EAD5 IN SHRUBS / GROUNDCOVER 60 — 80% 70%
MICROSPRAY — 6FT. OR L.E55 RADIUS 60 — 80% 70%
MICROSPRAY — 6Ff. OR MORE RADIUS 40 — 60% 50%
BUBBLERS (AJ 60 — 90% 80%
DRIP EMITTERS (B) 50 — JO% 80%
MULTI-PORT EMITTERS 50 — 90% 80%
NOTES:
A: BUBBLERS INSTALLED IN VJATER BASINS TO PREVENT RUNOFF
B: EFFICIENCY DROPS WITH AGE
ETo RATES
cin ero
ATIIERTON 42.9
BURLINGAME 42.9 'est.
HILLSBOROUGIi 44.25
MENLO PARK 42.9
PALO ALTO 43.0
REDWOOD CI 42.8
SAN MATEO 42.9 'est.
WOODSIDE 49.5
NOTES:
I. TYPICAL ETO FOR SAN MATEO COUNTY IS .20
ti
Project Comments
Date:
To:
From:
August 16, 2012
0 Engineering Division
(650) 558-7230
� Building Division
(650) 558-7260
� Parks Division
(650) 558-7334
Planning Staff
Subject: Request for Design
dwelling and detached
APN: 026-173-050
Staff Review: August 20, 2012
� Fire Division
(650) 558-7600
0 Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Review for a new, two-story single family
garage at 1225 Bernal Avenue, zoned R-1,
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch �cvater meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. All sprinkler drainage shall be placed into landscaping areas.
4. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by: �,�_ ����,,�� Date: � ��I �
C.�'
Project Comments
Date:
To:
From:
August 16, 2012
� Engineering Division
(650) 558-7230
0 Building Division
�s5o� 558-�2so
0 Parks Division
(650) 558-7334
� Fire Division
(650) 558-7600
X Stormwater Division
(650) 342-3727
� City Attorney
(650) 558-7204
Planning Staff
Subject: Request for Design Review for a new, finro-sto►�r single family
dwelling and detached garage at 1225 Bernal Avenue, zoned R-1,
APN: 026-173-050
Staff Review: August 20, 2012
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit to prevent stormwater pollution from construction activities. Project
proponent shall ensure all contractors implement Best Management Practices
(BMPs) during all phases of construction (including demolition).
When submitting plans for a building permit include a list of construction stormwater
pollution prevention BMPs as project notes and include them as a separate full size
plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached
Construction Best Management Practices (BMPs) plan sheet to comply with this
requirement. Electronic file is available for download at
http://www.flowstobay.org/bs_construction. php
(Scroll about half-way down the page and click on Construction BMP Plan
Sheet).
For assistance please contact Stephen D. at 650-342-3727
Reviewed bv: SD ��
Date: 8/22/2012
r
�
1
5) Anyone who is doing business in the City must have a current City of Burlingame
business license.
6� Provide fully dimensioned plans.
7) Provide a fully dimensioned site plan which shows the true property boundaries,
the location of all structures on the property, existing driveways, and on-site
parking.
8) When you submit your plans to the Building Division for plan review provide a
completed Supplemental Demolition Permit Application. NOTE: The Demolition
Permit will not be issued until a Building Permit is issued for the project.
9) Show the distances from all exterior walls to property lines or to assumed
property lines
10)Show the dimensions to adjacent structures.
y11 Obtain a survey of the property lines.
ndicate on the plans that exterior bearing walls less than five feet from the
property line will be built of one-hour fire-rated construction. (2010 CBC, Table
� 602)
�,3.)Rooms that can be used for sleeping purposes must have at least one window or
door that complies with the egress requirements. Specify the location and the
net clear opening height and width of all required egress windows on the
elevation drawinqs, Note: The area labeled "Retreat" is a room that can be
used for sleeping purposes and, as such, must comply with this requirement.
�"�Indicate on the plans that a Grading Permit, if required, will be obtained from the
Department of Public Works.
15)Provide guardrails at all landings. NOTE: All landings more than 30" in height at
any point are considered in calculating the allowable tot coverage. Consult the
Planning Department for details if your project entails landings more than 30" in
height.
16)Provide handrails at all stairs where there are four or more risers.
17)Provide lighting at all exterior landings.
NOTE: �4 written rEsponse to the items noted here and plans that specifically
address items 1, 2, 3, 4, 12, 13, and 14 must be re-submitted before this project
can move forward for Planning mmission action.
_�
Reviewed �� Date:8-16-2012