Loading...
HomeMy WebLinkAbout1208 Bernal Avenue - Staff ReportItem No. Consent Calendar PROJECT LOCATION 1208 Bernal Avenue City of Buriingame Design Review, Floor Area Ratio Variance and Special Permits Address: 1208 Bernal Avenue Item No. Consent Calendar Meeting Date: July 13, 2009 Request: Application for Design Review, Floor Area Ratio Variance and Special Permits for Declining Height Envelope and Basement for a first and second story addition to a single family dwelling and new basement. Applicant and Architect: TRG Architects APN: 026-172-190 Property Owners: Brad and Roxann Loose Lot Area: 6000 SF General Plan: Low Density Residential Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. Project Description: The existing two-story house with an attached garage is nonconforming in floor area ratio, containing 3,520 SF (0.58 FAR) of floor area (3020 SF, 0.50 FAR maximum allowed) and has four bedrooms (the existing sunroom qualifies as a bedroom for parking purposes). With the proposed additions and renovations on the first and second floors, there will be slight decrease in the existing nonconforming floor area from 3,520 SF (0.58 FAR) to 3,506 SF (0.58 FAR) where 3,020 SF (0.50 FAR) is the maximum allowed. However, a FloorArea Ratio Variance is required because the project involves substantial construction and with the proposed alterations still exceeds the maximum allowed FAR by 486 SF. The side setbacks along both the right and left property line have a nonconforming setback of 3'-0" where 4'-0" is the minimum required. Portions of the existing second floor along the right and left side property lines extend beyond the declining height envelope and therefore are an existing nonconforming condition. With the proposed addition, there are two additional minor encroachments into the declining height envelope. Along the right side property line, the wall along the closet and bathroom in Bedroom #4 extends beyond the declining height envelope by 4.6 SF (0'-4" x 14'-0" area); and along the left side property line, the proposed covered balcony off Bedroom #3 at the front of the house extends beyond the declining height envelope by 3.75 SF (1'-6" x 2'-6" area). W ith this project, the applicant is proposing to add a new basement. Since the finished floor above the proposed basement is less than 2'-0" above existing grade, the 694 SF basement is exempt from floor area ratio (up to 700 SF inay be exempt). However, Special Permits are required for the basement ceiling height (8'-0" proposed where 6'-6" is allowed without a Special Permit) and for a direct exit from the basement to the exterior of the structure other than a light or window well (exterior stairway proposed along the left side of the house). The existing house has four rooms which qualify as bedrooms. There will be no increase in the number of bedrooms with the proposed addition/renovation. One covered parking space (10' x 20') and one uncovered parking space (9' x 20') are required on site. The existing attached oversized one-car garage provides one covered parking space (10' x 20') and one uncovered parking space (9' x 20') is provided in the driveway. All other Zoning Code requirements have also been met. The applicant is requesting the following: ■ Design Review for a first and second story addition (CS 25.57.010, a, 1); ■ Floor Area Ratio Variance for a first and second story addition (3520 SF, 0.58 FAR existing; 3506 SF, 0.58 FAR proposed; where 3020 SF, 0.50 FAR is the maximum allowed) (CS 25.28.070, a); ■ Special Permit for construction exceeding the limits of the declining height envelope along the right and left side property lines (4.6 SF, 0'-4" x 14'-0" along the right side property line and 3.75 SF, 1'-6" x 2'-6" along the left side property line) (CS 25.28.035, c); ■ Special Permit for a new basement with an interior ceiling height greater than 6'-6" (8'-0" proposed) (CS 25.28.035, �; and Design Review, FloorArea Ratio Variance and Special Permifs 1208 Bernal Avenue ■ Special Permit for a direct exit from a basement to the exterior of the structure that is anything other than a light or window well (exterior stairway proposed) (CS 25.28.035, g). 1208 Bernal Avenue Lot Area: 6000 SF Plans date stam ed: Jul 1, 2009 EXISTING ' PROPOSED ( ALLOWED/REQUIRED SETBACKS � Fronf (1st f/r): 18'-11" no change 15'-0" or block average (2nd f/r): 18'-11" 20'-3" to covered balcony 20'-0" Side (left): 3'-0"' 8'-10" 4'-0" (ri�hf)_ 3'-0"' 5'-6" _ 4'-0" Rear (9sf f/r): 46'-2" 49'-8" 15'-0" (2nd flr): 57'-9" 49'-8" 20'-0" Lot Coverage: 2009 SF 1848 SF 2400 SF 33.4% 30.8% 40% _,._._.. ..._._.�. _._____�..�._�.�.._._.___._ �._ .�_. �. .�_.. FAR. 3520 SF 2 � 3506 SF 3 � 3020 SF 4 0.58 FAR f' 0.58' FAR � 0.50 FAR # of bedrooms: 4 4 --- Parking: 1 covered no change 1 covered (10' x 20') (10' x 20') 1 uncovered 1 uncovered (9' x 20') (9' x 20') Heighf: 23'-0" 21'-3" 30'-0" Basement: none new basement with 8'-0" I CS'25.28:035, f and`g � ceiling height and direct f exit to exterior 5 , ( ........_ ......... .��._._� .......:_ __�_ ...::_._.,,.�__ __�.�...�.-----1----=- :.._—�.T_--- :_.__... ____.:.: ....._... ...... _�...._.. ......... DH Envelope: portions of house along � 4.6 SF (0'-4" x 14'-0") � CS 25.28.075 ` right and left side � along the right side j ' property extend beyond i property line and 3.75 SF � DHE 6 i(1'-6" x 2'-6") along the, l left side property line : ' � extend beyond DHE' t ' Existing nonconforming left and right side setbacks (3'-0" existing where 4'-0" is the minimum required). 2 Existing nonconforming floor area ratio (3520 SF, 0.58 FAR existing where 3020 SF, 0.50 FAR is the maximum allowed). ' Floor Area Ratio Variance for a first and second story addition (3520 SF, 0.58 FAR existing; 3506 SF, 0.58 FAR 4 proposed; where 3020 SF, 0.50 FAR is the maximum allowed). (0.32 x 6000 SF) + 1100 SF = 3020 SF (0.50 FAR) 5 Special Permits for a new basement with an interior ceiling height greater than 6'-6" (8'-0" proposed) and for a direct exit from a basement to the exterior of the structure that is anything other than a light or window well (exterior stairway proposed). 6 Portions of the existing second floor along the right and left side property lines extend beyond the declining height envelope. ' Special Permit for construction exceeding the limits of the declining height envelope along the right and left side property lines (4.6 SF, 0'-4" x 14'-0" along the right side property line and 3.75 SF, 1'-6" x 2'-6" along the left side property line). -2- Design Review, FloorArea Rafio Variance and Special Permits 1208 Bernal Avenue Staff Comments: See attached memos from the Chief Building Official, Fire Marshal, City Engineer and NPDES Coordinator. There were no comments from the City Arborist. Design Review Study Meeting: At the Planning Commission design review study meeting on June 22, 2009, the Commission had several comments and suggestions regarding this project (June 22, 2009 Planning Commission Minutes). The designer submitted a response letter dated June 25, 2009, and revised plans, dated stamped July 1, 2009. Listed below are the Commissions' comments and responses by the applicant. 1. Like the rear elevation; buf there is something about the front elevafion thaf doesn't work; fhe cornice e/emenf doesn't appear fo work. � There were no changes made to the front elevation. 2. The front entry e/ement cal/s for something special in fhe window above, perhaps a mission-style window or a stone surrounded window. • The window above the entry was revised to include additional horizontal muntin bars, a column in befinreen the windows and a stucco base (see revised Front Elevation, sheet A.31, date stamped July 10, 2009). 3. With respecf to garage doors; correct references for hinges (noted as "grates" on plans.) • The notes for the garage door hinges have been corrected (see revised Front Elevation, sheet A.31, date stamped July 10, 2009). 4. With respecf the rear balcony; clarify the material used. • Notes were added to the Rear Elevation noting that the balcony will contain a wrought iron railing. 5. Generally be cerfain to call out all finishing maferials, including sizes of corbe/s. • Additional notes were added to the revised plans date stamped July 1, 2009 6. Show the missing sfoop on right elevation. • The stoop was added on the Right Elevation (see revised Right Elevation, sheet A3.4, date stamped July 1, 2009). 7. The windows in the garage door seem small. • The size of the windows in the garage door were not changed. Design Review Criteria: The criteria for design review as established in Ordinance No. 1591 adopted by the Council on April 20, 1998 are outlined as follows: Compatibility of the architectural style with that of the existing character of the neighborhood; 2. Respect for the parking and garage patterns in the neighborhood; 3. Architectural style and mass and bulk of structure; 4. Interface of the proposed structure with the structures on adjacent properties; and 5. Landscaping and its proportion to mass and bulk of structural components. -3- Design Review, FloorArea Ratio Variance and Special Permifs 1208 Bernal Avenue Findings for Design Review: Based on the findings stated by the Planning Commission in the attached minutes of their June 22, 2009 meeting, that the proposed addition is a good design and well integrated into the existing house, the project is found to be compatible with the requirements of the City's five design review guidelines. Findings for a Special Permit: In order to grant a Special Permit, the Planning Commission must find that the following conditions exist on the property (Code Section 25.51.020 a-d): (a) The blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure's design and with the existing street and neighborhood; (b) the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood; (c) the proposed project is consistent with the residential design guidelines adopted by the city; and (d) removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the city's reforestation requirements, and the mitigation forthe removal that is proposed is appropriate. Special Permit Findings for Declining Height Envelope: Based on the findings stated in the attached minutes of the Planning Commission June 22, 2009, design review study meeting, that the finro encroachments into the declining height envelope are minor and are located along the right side property line (4.6 SF, 0'-4" x 14'- 0" area) and along the left side property line (3.75 SF, 1'-6" x 2'-6" area), and that the proposed encroachments into the declining height envelope add interest to and enhance the design of the second story, the project is found to be compatible with the special permit criteria listed above. Special Permit Findings for a basement with a ceiling height greater than 6'-6": Based on the findings stated in the attached minutes of the Planning Commission's June 22, 2009, design review study meeting, that the basement provides additional living area below grade that does not add to the mass and bulk of the structure and is consistent with city development regulations, the project is found to be compatible with the special permit criteria listed above. Special Permit Findings for a direct exit from a basement to the exterior of the structure: Based on the findings stated in the attached minutes of the Planning Commission's June 22, 2009, design review study meeting, that the direct exit from the basement will not be seen from the street and will not add to the mass and bulk to the structure and therefore is consistent with the existing street and neighborhood, the project is found to be compatible with the special permit criteria listed above. Required Findings for Variance: In order to grant a variance the Ptanning Commission must find that the following conditions exist on the property (Code Section 25.54.020 a-d): (a) there are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district; (b) the granting of the application is necessary for the preservation and enjoyment of a substantial property right of the applicant, and to prevent unreasonable property loss or unnecessary hardship; (c) the granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience; and (d) that the use of the property will be compatible with the aesthetics, mass, bulk and character of existing an potential uses of properties in the general vicinity. -4- Design Review, FloorArea Ratio Variance and Special Permits 1208 Bernal Avenue Variance Findings for FloorArea Ratio: Based on the findings stated in the attached minutes of the Planning Commission's June 22, 2009, design review study meeting, that the existing structures already exceed floor area and the proposed project will decrease overall floor area on the property, that the proposed design changes improve conditions on the property and that overall building height will be reduced by almost two feet, articulation is being added that will help with mass and bulk and the code changed since the home was built, the proposed project is found to be compatible with the Variance criteria listed above. Planning Commission Action: The Planning Commission should conduct a public hearing on the application, and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission's decision, and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped July 1, 2009, sheets A1.1 through A3.4 and L1.0; 2. that if the structure is demolished or the envelope changed at a later date the Floor Area Ratio Variance, as well as any other exceptions to the code granted here, will become void; 3. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 4. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 5. that the conditions of the Chief Building Officiai's April 29, June 29 and June 9, 2009 memos, the City Engineers May 12, 2009 memo, the Fire Marshal's May 4, 2009 memo and the NPDES Coordinator's May 5, 2009 memo shall be met; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plan , before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; � 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2007 Edition, as amended by the City of Burlingame; -5- Design Review, FloorArea Ratio Variance and Special Permifs 1208 Bernal Avenue THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 13. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Staff Comments: See attached memos from the Chief Building Official, Fire Marshal, City Engineer, City Arborist and NPDES Coordinator. Ruben Hurin Senior Planner c. TRG Architects, applicant and architect Attachments: Application to the Planning Commission Variance Form Special Permit Form Staff Comments Planning Commission Resolution (Proposed) Notice of Public Hearing — Mailed July 3, 2009 Aerial Photo � Plan Check Comments Reply Date: June 25, 2009 `� ��i � 1 �' �::. � Applicant: TRG Architects 205 Park Road Ste. 203 Burlingame, CA 94010 Address: Owner: Re: 1208 Bernal Avenue Burlingame, CA 94010 Brad & Roxann Loose Plan Check Comments i U L 0 1 2009 :�ITY OF BURLINGP.ME ?I_ANNI�:G DEPT. Planning Comments: 1. The plans have been amended to clarify the finish materials with additional notes. 2. The plans have been amended to show a zinc roof with integrated PV solar panels. 3. The plans were not revised to reflect an increased garage side setback due to client needs. However, the plans have been amended to reflect a more cohesive design at the side garage setback. 4. The plans have been amended to revise the front elevation's windows & design. 5. The front elevation has been amended to show a feature window above the front door. 6. The plans have been amended to reference "hinges" instead of grates on the garage door. 7. The plans have been amended to show the size of the corbels in the rear elevation. 8. The plans have been amended to show the landing on the side garage door. 9. Please see the attached cut sheets for examples the windows in the garage doors. � CITY � ��;���� � '��ii`,` i,ui��iiw�. ti �'� o co �� q '>rowwreo � CITY OF BURLINGAME PLANNING COMMISSION UNAPPROVED MINUTES Monday, June 22, 2009 — 7:00 p.m. City Council Chambers — 501 Primrose Road Burlingame, California IX. DESIGN REVIEW STUDY ITEMS 5. 1208 BERNAL AVENUE, ZONED R-1 — APPLICATION FOR DESIGN REVIEW, FLOOR AREA RATIO VARIANCE AND SPECIAL PERMITS FOR DECLINING HEIGHT ENVELOPE AND BASEMENT FOR A FIRST AND SECOND STORY ADDITION TO A SINGLE FAMILY DWELLING AND NEW BASEMENT QUALIFYING AS SUBSTANTIAL CONSTRUCTION (TRG ARCHITECTS, APPLICANT AND ARCHITECT; BRAD AND ROXANN LOOSE. PROPERTY OWNERS) STAFF CONTACT: RUBEN HURIN Reference staff report dated June 22, 2009, with attachments. Planning Manager Brooks briefly presented the project description. There were no questions of staff. Chair Terrones opened the public comment period. Randy Grange, 205 Park Road; and Roxanne Loose, 1208 Bernal Avenue; represented the applicant. Commission comments: ■ Clarified finishing materials. ■ Roof plan appears to show tile. Are their samples; bring them when the project comes back? (Grange — will actually use a metal roof; standing seam that will accommodate the solar panels.) ■ Why can't the garage side setback be increased? Would improve the design. (Grange/Loose — basically cutting the rearof the house off, behind the garage; the frontwalls will remain. The owners don't want to have it considered to be a new home for tax purposes. Have multiple bicycles; wider garage provides storage area.) ■ Likes the rear elevation; but there is something about the front elevation that doesn't work; the comice element doesn't appear to work. (Grange — can take another look at it.) ■ Landscaping will assist with the front elevation. • The front entry element calls for something special in the window above, perhaps a mission-style window or a stone surrounded window. ■ With respect to garage doors; correct references for hinges (noted as "grates" on plans.) ■ With respect the rear balcony; clarify the material used. ■ Generally be certain to call out all finishing materials, including sizes of corbels. ■ Show the missing stoop on rear elevation. ■ Landscaping is nice; there is a lot of paving, but don't know where more softscape would be placed. (Grange — pavers will have increased space between them to improve permeability.) ■ Regarding the FAR Variance; are improving the situation, the height will come down by two feet and articulation is being added that will help with mass and bulk, plus the code changed since the home was built. ■ No problem with the Special Permit for the basement; the landscaping will work well with the stairs that exit the area. ■ Sympathetic to bicycle storage needs. ■ The windows in the garage door seem small. ■ Like doors opening onto the front patio. ■ Have a built-in table in the dining room; but could conceivably build a pantry under the stairs if they were relocated. (Grange — since the stairs also lead to the basement, could not accommodate this change.) _ CITY OF BURLINGAME PLANNING COMMISSION — Unapproved Minutes June 22, 2009 Public comments: None. There were no other comments from the floor and the public hearing was closed. More Commission comments: Agreed with other comments regarding Variance and Special Permit, design changes improve conditions on the property. Commissioner Brownrigg made a motion to place the item on the Consent Calendar when complete. This motion was seconded by Commissioner Cauchi. Discussion of motion: None. Chair Terrones called fora vote on the motion to place this item on the Consent Calendar when plans have been revised as directed. The motion passed on a voice vote 5-0-1-1 (Commissioner Visfica absent, Commissioner Yie recused). The P/anning Commission's action is advisory and not appealable. This item concluded at 10:23 p.m. Commissioner Yie returned to the dais. 2 �+ •',C�T `` S dl ; >;�� COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 � www.burlingame.org APPLICe4ilON TO i'HE PLA11lNINC COMIVIISSIO(V Type of appiication: I� Design Review [3� Variance ❑ Parcel #: �2� "�`12 " l 9� ❑ Conditional Use Permit C� Special Permit O Oiher: PROJECT ADDRESS: I20 ��er na1 R-vex�ve � Please indicate the contact person for this project APPLICANT project contact person� PROPERTY OWNER project contact person ❑ OK to send electronic copies of documents j� OK to send electronic copies of documents ❑ Name: TR6 R�cY1i�-tc� -�1At1da Chaxl Name: �rdtd► �' �-oXA�tl'�1 '1..0oSe Address: `Zo 05 �11t'k �t�o�t� S�'• c�1�3 City/State/Zip: �Y`�'n�a''me, C.�i q'�0�1� Phone: C�50� 5�1q- 5`j(pa2 Fax: C�5o� 57q' p115 Address: 12�08 'ge�Rq� Pcvec�v{: City/State/Zip: ��'�����'rne � � °���10 Phone: C0�1�'A.G� A�Ii�C.� Fax: E-maii: dmanda @ �rgarch•com E-mail: ARCHITECT/DESIGNER proiect contact person ❑ OK to send electronic copies of documents ❑ Name: �R6 �cc1K1i�C'c,`�'S � Rand� 6ta.n9e Address: Sume as ab�v� City/State/Zip: Phone: Fax: E-mail: � Gi.if�ii��a�wi�v C�.iviriv.ci.ci � iC.vrivp .�� �'��•��� _ ,� ' � � 2009 ;� :�;�,A,�. PROJEC'� DESCRIPTION: R���� d� a" s'1U��j �i0me , AFFAbAVIT/SIGNATURE: I h by certify un r enalty of perjury that the information given herein is true and correct to the best of my knowledge and b e. Applicant's signature: Date: �� I 15 ��q I am aware of the proposed application and hereby aut ize the above applicant to submit this application to the Planning Commission. Property owner's signature: Date: 1 D 0 Date submitted: �t • 2`� •0� Co�1ac1- ardii�c� CDn�'Ad" CA'�dhi�G� ,k Verification that the project architect/designer has a valid Burlingame business license will be required by the Fi�ance Department at the time application fees are paid. ❑ Please mark one box above with an X to indicate the contact person for ihis project. S:�Handouts\PC Application 2008-B.handout '� � T� � ��•` ,...-. � _, f�. . ��� �., . S .:�-= t G �, �' S � r �� � � l` ,� z�, �� .,r, �„�_ ��� �' r, � R P"`t^-+: � � c�rr �� ��� � _ �'��f J� '�� CITY OF BURLINGAME ' VARIANCE APPLICATION The Planning Commission is required by law to make findings as defined by the City's Ordinance (Code Section 25.54.020 a-d). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type orwrite neatly in ink. Referto the back of this form for assistance with these questions. a. Describe the exceptional or extraordinary circumstances or conditions applicable to your property which do not apply to other properties in fhis area. See atfached responses. b. Explain why fhe variance requesf is necessary for the preservation and enjoyment of a substantial property right and what unreasonable properfy /oss or unnecessary hardship might result from the denial of fhe application. c. Explain why the proposed use at the proposed location will not be defrimental or injurious to property or improvements in the vicinity or to public healfh, safety, general welfare or convenience. d. How will the proposed projecf be compatible with the aesthetics, mass, bulk and character of the existing and potential uses on adjoining properfies in the general vicinity? COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org Handouts\Variance Application.2008 , a� �� Attachment A �, : !� 2009 VARIANCE APPLICATION FOR FLOOR AREA `: �F �''�uNGp'ME 1208 Bernal Avenue a. This variance request is not to expand the FAR, but to retain the FAR tha# already exists in this house. Prior to the 1990's, Burlingame had no FAR; only lot coverage restrictions. This house, at 32.6% lot coverage, was well within the limits. When the rules changed to 32% of the lot plus 1500 SF for FAR, this house became 77 SF too big. Then when the rules changed again to 32% of the lot plus 1100 SF, this house became 477 SF too big. The house never changed, just the rules. Most of this overage is in the 2 car attached garage, but it's impossible to detach and move the garage of this house. We are proposing to reduce the lot coverage to 29.5%. We are proposing to reduce the living space by 74 SF (it is used in exterior second floor decks). b. The variance request is necessary for the preservation and enjoyment of substantial property rights. The FAR and garage rules were implemented after this house was built, and the garage cannot be moved. There are also inherent inefficiencies created by the garage; the proposed plan has just four bedrooms and no living room (only a family room), yet the house is still over on FAR. Denial of the variance request would create an unreasonable hardship; forcing the home owner to reduce their house by 477 SF with no viable way to accomplish it. Furthermore, this block is full of newer homes built before the zoning changes; these houses are even larger, with 1209 Bernal across the street, for example, at 3770SF. c. The proposed use at the proposed location will not be detrimental or injurious to property or improvements in the vicinity or to public health, safety, general welfare, or convenience. There is no change in the proposed use at the proposed location, nor will there be any additional impact caused to neighboring properties by this floor area variance because it is an existing condition. d. The proposed project will be compatible with the aesthetics, mass, bulk, and character of the existing and potential uses on adjoining properties in the general vicinity. The proposed floor area is an existing condition, and the proposed remodel helps to redistribute the space in a less-bulky manner. The floor area will help to accentuate the aesthetics and character of the property. City of Burlingame • Community Development Department • 501 Primrose Road • P(650) 558-7250 • F(650) 696-3790 • www.burlinpame.orp � c�ry �i:�i � �`�;,� CITY OF BURLINGAME ` SPECIAL PERMIT APPLICATION The Planning Commission is required by law to make findings as defined by the City's Ordinance (Code Section 25.50). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type or write neatly in ink. Refer to the back of this form for assistance with these questions. 1. Explain why the blend ofmass, sca/e and dominant structural characteristics of the new construcfion or addition are consistent with the existing structure's design and with the existing streef and neighborhood, See attached responses. 2. Explain how the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood. 3. How will fhe proposed project be consisfent with the residential design guidelines adopted by fhe city (C.S. 25.57)? 4. Explain how the removal of any trees /ocated within the footprint of any new structure or addition is necessary and is consistenf with the city's reforestafion requirements. What mitigafion is proposed for the removal of any frees? Explain why this mitigation is appropriafe. Rev. 07.2008 � See over for explanation of above questions. SPECIAL.PERMIT.APP.FORM ��������� ' 1 � 0 5 2009 Attachment A ;� �� .P� �r�c�.nn� SPECIAL PERMIT FOR DECLINING HEIGHT ENVELOPE 1208 Bernal Avenue The mass, scale, and dominant structural characteristics of the new construction are consistent with the existing street and neighborhood. There are a wide variety of houses on the street (in terms of style, mass, scale etc...) and the proposed Mediterranean style fits in nicely. The roof lines are being revised to include more hip roofs (rather than gable roofs) to lessen the impact of the front elevation. The area in which the exterior exceeds the DHE is an existing condition, not a new one. In fact, the amount of the DHE encroachment is being reduced with the proposed design because a portion of the existing 2"d Floor above the garage is being removed. 2. The rooflines, fa�ade, materials, and elevations of the proposal are similar to that of other houses in the neighborhood. Stucco, wood, attached garages, etc.... The roofline is varied and the fa�ade includes many architectural details to enrich its character. The area in which the exterior exceeds the Declining Height Envelope is a� existing condition. There will be no additional increase in the building mass to worsen the DHE. 3. 1. The architectural style is compatible with the character of the neighborhood. 2. The attached garage is being is maintained to be the same as existing patterns and consistent with the neighborhood. 3. See items 1 and 2 above for comments about style, mass and bulk. 4. A full landscaping plan is being provided, which will be a significant improvement for the site. 4. There will be no trees removed for this project. One large tree in the front property area will be maintained, and a new full landscape plan will be introduced to enhance the landscape design: Please see the landscaping plan for details. .,. . . - - � r-• - ; ���. ;, ;i;�r;� Attachment A `���nr SPECIAL PERMIT FOR BASEMENT WITH CEILING HEIGHT GREATER THAN 6'-6", AND EXTERIOR STAIRS 1208 Bernal Avenue The mass, scale, and dominant structural characteristics of the new construction are consistent with the existing street and neighborhood. There are a wide variety of houses on the street (in terms of style, mass, scale etc...) and the proposed Mediterranean style fits in nicely. The proposed basement and associated stair has no impact on the mass or scale of the,structure. 2. The rooflines, fa�ade, materials, and elevations of the proposal are similar to that of other houses in the neighborhood. Stucco, wood, attached garages, etc.... The roofline is varied and the fa�ade includes many architectural details to enrich its character. The basement and associated stair are not visible from the street, and do not contribute to the rooflines, materials etc... 3. 1. The architectural style is compatible with �the character of the neighborhood. 2. The attached garage is being is maintained to be the same as existing patterns and consistent with the neighborhood. 3. See items 1 and 2 above for comments about style, mass and bulk. 4. A full landscaping plan is being provided, which will be a significant improvement for the site. 4. There will be no trees removed for this project. One large tree in the front property area will be maintained, and a new full landscape plan will be introduced to enhance the landscape design. Please see the landscaping plan for details. Project Comments Date: June 29, 2009 To: ❑ City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 From: Planning Staff ❑ Recycling Specialist (650) 558-7271 ❑ Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Subject: Request for Design Review, Floor Area Ratio Variance and Special Permits for a first and second story addition and new basement at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190. Staff Review: Project Comments Date: To: From: June 5, 2009 ❑ City Engineer (650) 558-7230 X Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 ❑ Recycling Specialist (650) 558-7271 ❑ Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Planning Staff Subject: Request for Design Review, Special Permits and Variance for a firsl and second story addition at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190. Staff Review: 2) Per the City of Burlingame's adopted Resolution, applications received after January 1, 2009 must complete a"GreenPoint Rated Checklist". The GreenPoint Rated Checklist, and other information regarding the City's Green Building requirements, can be found on the City website at the following URL: httq://www.burlingame.orq/Index.aspx?qage=1219 or Contact Joe McCluskey at 650-558-7273. No response. 14) Specify the use (e.g. bedroom, family room, etc.) for the basement area. This room must be labeled for its intended use. With a second stairway and adjacent powder room it will clearly not be used for storage. Please label appropriately. NOTE: A written response to the items noted here and plans that specifically address items 2 and 14 must be re-submitted before this project can move forward for Planning Commission action. Revie y: _ Date:—����Ol Project Comments Date: To: From: April 29, 2009 ❑ City Engineer (650) 558-7230 X Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 � Recycling Specialist (650) 558-7273 ❑ Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Planning Staff Subject: Request for Design Review, Special Permit, and Variance for a first and second story addition at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190 Staff Review: May 4, 2009 � On the plans specify that this project will comply with the 2007 California Building �Codes (CBC). Per the City of Burlingame's adopted Resolution, applications received after January 1, 2009 must complete a"GreenPoint Rated Checklist". The GreenPoint Rated Checklist, and other information regarding the City's Green Building requirements, can be found on the City website at the following URL: http://www.burlingame.orq/Index.aspx?paqe=1219 or Contact Joe McCluskey at 650-558-7273. 3) Anyone who is doing business in the City must have a current City of Burlingame business license. 4) Provide fully dimensioned plans. 5) Provide existing and proposed elevations. 6) This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2007 California Building Code for new structures. 7) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certifi�ate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 8) Show the distances from all exterior walls to property lines or to assumed property lines 9) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 10)Comply with the 2005 California Energy Efficiency Standards for low-rise residential / non-residential buildings. Go to http://www.energ .c�a.,qov/title24 for �ublications and details. n the plans specify that the roof eaves will not project within two feet of the �operty line. � 2) oms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the size and location of �II required egress windows on the elevation drawings. rovide section details that show the finished headroom height for each area of the basement. NOTE: Areas with a headroom height greater than 5'11" are onsidered to be floor area by the Planning Division. �4�' pecify the use (e.g. bedroom, family room, etc.) for the basement area. 15)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 16)Provide handrails at all stairs where there are four or more risers. 17)Provide lighting at all exterior landings. 18)The fireplace chimney must terminatP at least two feet higher than any portion of the building within ten feet. Sec. 2113.9 NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 11, 12, 13, and 14 must be re-submitted before this project can move forward for Planning Commission action. Reviewed by: Date: � Project Comments Date: To: From: April 29, 2009 d City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 O Recycling Specialist (650) 558-7273 d Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Planning Staff Subject: Request for Design Review, Special Permit, and Variance for a first and second story addition at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190 Staff Review: May 4, 2009 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. Applicant is advised to call City Arborist regarding potential relocation of sidewalk area around trees in the planter strip. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 5/12/2009 Project Comments Date: To: From: April 29, 2009 � City Engineer (650) 558-7230 0 Chief Building Official (650) 558-7260 � City Arborist (650) 558-7254 � Recycling Specialist (650) 558-7273 �Fire Marshal (650) 558-7600 � NPDES Coordinator (650) 342-3727 0 City Attorney Planning Staff Subject: Request for Design Review, Special Permit, and Variance for a first and second story addition at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190 Staff Review: May 4, 2009 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Reviewed by: ;�� Date: � g Project Comments Date: To: From: April 29, 2009 � City Engineer (650) 558-7230 � Chief Building Official (650) 558-7260 � City Arborist (650) 558-7254 � Recycling Specialist (650) 558-7273 � Fire Marshal (650) 558-7600 X NPDES Coordinator (650) 342-3727 � City Attorney Planning Staff Subject: Request for Design Review, Special Permit, and Variance for a first and second story addition at 1208 Bernal Avenue, zoned R-1, APN: 026-172-190 Staff Review: May 4, 2009 Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement Best Management Practices during construction. Include a list of BMPs and an erosion and sediment control measures plan, as project notes, when submitting plans for a building permit. Please see attached brochures for guidance. The attached brochure may also be downloaded directly from flowstobay.org. For additional assistance, contact Kiley Kinnon, Stormwater Coordinator, at (650) 342-3727. 9�����i���:.- MAl' � �; ��i-�� ��Tv or- e��R,tiN������e _ ,;:N��,��c� o�:, Reviewed by: �� ,� Date: �% �/� j" � r % � Srnmw.ra � PoDurimPmvmtlwP�agw �' p' °a ,',` �� . �` , � '�..� � � Gtneisl �+..~ Cons�action & Site Supervision m�Wp�dR stlwtl� b dq ws.e.de+�T �.r..m�av�.ssp �.r �v� a s�. am. aae. o.mor c.a,n .reqi.� Itoeee se e�^� ry d+�rY m..1dd0'atw vb wim Lar a f Iln A�at M w�0r Abd� ICaml w� �:.(�.rtdW4 Se+�1Y (qwv�'dv��ou•.riW b�to rrn> q> pavr trVrp CIrL t aren wv Eo� .oi.a0ere� llm�am�rrnooa..wd6nb as� e�ldstUra Wr M �� ILw 1a�4^�� d rYs�lou. �l�b 0m biabw w�Obk b wayr �to �ad� s b m�pcYa P� 4Ls,uE�m �E w� !� w ss�rrwpdmsmG Ykn�psibMNils Qm�Lsi�J�r+ms lOsp� � e�Nep aaYltl w Dr � odn.....ta..m.Jear.. -r.�y.r r�o� h dipi.0 w�.tl b.� sq !s �as� ��s M �ele� e! ��d N�r �F14bsjrnpeMdt I[�p alab w[ ef fi� �u-►^r �vsC eWleba V Oe �s� 6.vapm�OYa N N r�ela vvLh �iYyl W k Owl�y a �aq �oah I[N omrr� aQaper! uM1ea /l�a��� �a.e.r.as�..mara. r IAf �N M+� sie� rie b�Y b sas �.i. amyuds4 Vp�ms6�hqY�eew�y, us �IXo� vab:trlWPe A edimr d aPoroeLLMlt IGm 4 �b.4+M raer i� �bo `lmmlmbm�� W u poMwYraMw w�8emqdp? aVw4�dmymebeb whme�s P�`. Itla m1 v� ��, �r pr sw�bYwVM3RAv�s /Cms OLv�WYAmp�'nmrkBa@meY6k k�1a ebu ev��bnmEs mo8 af rm �Ie mp� aP��W rmMoadb�muW �b 6q�Or. A V W Yc tier Y wcammled b ymnl bbDd6l�li��a d�a ea �YprsJ YWyhb��sdmWmlo�Yw. ♦w� 0. w� we...a.ru w wr +^�V a.ds bldiuosmev�'sE �.w m AYpo,M a(/�eP�y. Orl tiYr e�qsd) tr 1�6tl�bIMY1� l�Ay lMsiY ss iYiWa - �'vWs ���Y �Ys �s�Y�QJrmbY�olFa/ III� is�s1�4Y �aYY �1snr p�01a An�P fiOmMaf�YYv�iY,eo� ram�Y. +�.k po rl ��rt 4o�+a a1...d.t. W ua.04a A4 �G �i�Y �Y�[� �i�Y adro'eCa�ocbu. Weh�dWal IDlys d�Y �w r ds W� rYY I eMb� uq w�.ca r�.r d.... a e. �a�a.4 h� N.sl4 wre�b�s! pbu, wYrlv EmA4 Mum �b�h mJ ��r, waoL m! eYe-0 veFs tlea NrYY M 4b� ms �ot b isY<le6 e W 4s I�i¢� b� p�epYY I�dOLL a Ebs�C �( � YmNw � MOR ba� wW rwdd�> I�w Ws Y 6� ase sr' � m�! s b�oML Stormwater Pollution Preven�ion Program Pollution Preventio�. — It's Part of the Plan It is your responsibility to do the job right! Runoff &om sh�eets and otherpaved areas is a major source ofpollution in local creeks, San Francisco Bay and the Pacific Ocean Conshvction activities caa directly affect the health of our waters unless conuactois and crews plan aheadto keep dirt, debris, and other construction waste away &om starm drains and creeks. Following these guidelines will ensure your compliance with local srormwater ordinance requirements. Remember, ongoing monitoriag and tnaintenance of installed conirols is cniccial to pcoper implementatian_ Heavy Equipment Operatioa 'O Earth-Moving Activities .N4 � Ipmwd+rt�se�u�ab'�M.e.onrbv.s �• SIrpl�i�a1l�Rwlil�eb�sr I9daW�Yspvvl�6aaammis �nma..�ym..:.a.�rm.w..�. ,ev...r.mr�e.:.a:�a:�+rv�.s ' w.wd��06a�osmdWseW rr.+oae�a��+v�H.�w.rcm. Jhe.aa.n4.��s�s.+r�aem w8itl[m6ayqr�vtlY� d��M1q4�4�1dYTIs.A Illtiri�YwYrlrrdbnl4��`9eE� �hosmAW�W�mla y�'b W �4ikJa IWd Yd�adloY�bdi�ale�Q�nmCaanr ��dNdod�a I Mf�s�rjareua.i4�l�alwNid aMym��uY.{eQO� IM�wodPieC�iiwAs�nCmPR 1�� . i u� v. ae:..a �.a..a � �. semma.awK�.�Mro��swaae.r Imwb.war�:ru.aasa..sr LbiP�d4bOeOs+�Ys��.�mnY rmwla rymw�vt��s)dewhnwape 1yw d'yadhNr�vdwr�a l7npYb^Oa�imue(�aYaml�rte�aY lDe�oluw6sdm7bWh'vY¢a1�R�T�v FO�bdMomw�lamhetlpv v� ! Lori'bme! whide EaaM�. Q� � Nl6 assY�hb �L O�Lif� ! 7l�R Yo� dnn"dn1� W�e� a opms66 vSar �bw miN Lns 9mei [l� 67 s4mq sei aa I.tous vea.o. er Yea obtr nn) ��+ ya01c Y/v�1��NRvl��abb9 trbtdwa �S�vwiwudM���b� tk.aw ee�aeMOos�j'�1lwr'.s d1M1�a W s419�vb�j�L it 6t0uaL I CI� i 9� P d�l �s 41 � T a! Pqvb' kqo�yo[aW�MAI. i�.omr sa r r sw=nr aa+�• .r.�u rma V.,F ]Y w�pY.a b r e.pe A�I�ra�etYvm�v�4Y� alTa^O��YANl�fauo+ii{7s+s �)GY 911 Q�oslml emqee»�bt � h0 4e Owmf1 Oma ef Pm�s>l��ia 4Lvk{ o....romaa.nsowr,..� Os��l �r Isafle� I9 l�M1y mmum d i+dg.� tr 61•smr. JPd �sy�meY�Onw'd6ws11�l�dY. JR'hs�[awhm�Iddq�mMm�u�mneeml hdoeem�n4v�w'iPoe�mmpl�ep'bmdas�w J 6mmhm IDnslOsdl� 1o�b�btlrmatlusaqi¢osarr IIM! b d�1 pd�lO�rrlf 4Yv mi��d. IIm�alba.oadba�wawww4kMf omYm.mo� sErsssi���alW Q.�f:�alle�! • II�slcYaa8la�.�auir • Abmdme/sdvposGlelu . �ra�r.a. • aL�Lotl�6YR�4i Roadwork & Paving IM�eNVWhO���a�fa4ef a1�li�db Ad�+f� !lJeiYe mnda M O�Y•ad b b• W¢ I Oni �Y qu�er {rlsb W�4�� M�t�t K� �� ! Ps6m u1{� �4 R�. 06 w W'ml � Rt ���npia W �tlt ♦wa�z.a�'awkdrr�.ma bYa� W4h�lt��laql�IJa�h�C_wq fimmm'sedaw4 J po.olaeAblaibY4lob>�aqoWm�ls � �s�j�Y �C a� b.u.u� m.w.6mk� �y W �. a whrRpaumla J7Li��1o�Y��Ma�PdP� Q�l � I Awilp"4 W �lmm[iti�aM1Sa�9m� i 6rwO Mfia� Ee4 p�es N 1n. tiv c ma I mRSE W otl6�dmmbW �M qp1�Y{ ree.�.�r4..t� I W Wiear. Gtr1�. v4� b B.�imQ�aal �rl� lli.�Ma.�mtl�W 5aaqusLryy.p�es m6 a YmO� �sY�Y Yo ��hae smv 4� Cd- W �dKfdLay��bJn�a JGw�LddYraee Umvu�IWwN s�mom�. e�.�.sea.�r uma�...�e.m.a I�aaf iaa6Q01�11o'bW uEEo� lOr86�PlmPRVY @9Pr:�b,ab�mvihl (dolR � V. wc) V�'b md� �[Y� wbn o01 i m� ICImNW R�dlshab{�M�ID�eh(�4! �toer �.�.vl a d[ �v ma �w� camL alydol J Co0eo1 �tl �cycY a�pP W mdY ��wus �h�iwp�wlr�ml Ibtl!^nr+�riaFf�s LbdtmmeL .yr�sa.u+rm..i JNaNm�aqam� maNel�t�[��amr IMrbs1�[i etlP��Kbrb�vw�G ar.ro�.e...ra I?4b ws 6cb� N��� de� m m� Y mwd �A d�hGa'm6 I �relp�mbiles�yaw�LSbA ,m�ey,vree.e�r ItY�YSAews�w e.Ls W MM EYcILtr� �wVmbo� Fnesh Concrete & Mortar Application . j OSN/�b�lbdb� lBad��IW �d1Y �mstlmrtY��� !m A� r! wa1 sr W Y mEr m�4 pmemiG !a �mdm¢MCCpmrt�t6m�L Painting & Application of Solvents � Adhesives , ![w� �C W^W /WI P� d wr�r wq Ea Y{eet �4 �! �o Ae4 flpd�iJ�s fia Dy4�4d��Xt�a W rhde{6il�w lmew ..r r ar b� C�sl ot r• b�e� �.maeoe.aaamb'(a.i.a�. bd sm.rr Oa/�i . ! Sm� bP im�[ � Op. m e0d b oe b 4y we6Ll t��W�dvAlGmPeR�Y� �toi1 ed..,vemd�a�a .i�+...aor.e.»..ris��.r. dK c+�R w� em. � ae / W�iasameaYmirmmlyi�Matev Y�or�a{��o��rrwd0o.�aas�s IPr�Y�lO�t0�Wlvis�hma pmiaawKlrm�sY�d�rdiys�d� P��[msnO�sYqrwm�sLwN� pb�FY/Lm�s9�a+�Yd��bl0� PmV��Ylealwwow�rYssrslap�. b�iYa�i�ebn�Nw�fyas��rh�e nRi�MrGew�dla `Y�+. Moa �obp fu�+I �sA�4 r r�r � I�Ysyosks�mwa�m�M1�A�W Y�Ap. I Bw q a! ap�Ye mY m s Yip a lsry yli'tle Ef^V Wah / WbeelmN{ W dl¢Mwpatltlaw�Qw�stioa � .u66s�amditl��y�aCo�sOstrlvw9:le1D hMta��m@�Y I Ps�w1YOW�wukEmAtlRwryyobtm0cbe Eam as�'i Ibam iniea Hue � wi �e dbt md4J� WoGiM1 JPYxYg WrwoOs��m�aYdwwEne upn �meQemYMtmlrs[mNMSxt�edM dm�. I WMh��yMKMa�epiky�04'ps� d dVs i�F l�sY��4bW efYaram�Ya�IW66 J Mipa d�II mmY daiv b�4 Pti r.e...:a.r lNn�wle5Es���_ . .• Storm drain pollubers may be liable for fines of up to $25,000 per day! I Fa w4i��1 PL+4 P� M F`is e!� aer ps .wra�w mrr>w..a..nae mm:: ➢orsa � 4W� dal�vw GYw+dmo Iqu6�d�d�rY�sdea��. hY �sN ! IYW elbs W bM Gas►YWvde� Lf �PPei rrw.uv�r`..�yammaep..e. 6op bIYUCYVdbafrvr► J 6sh1 D� �PD�i i•� W� d dP d 6� Om �e i� 4 P�� �! Ied s tl1�yl W u+Mdiyewdo(�hONou��rY� ! wmwppo{arLmyh.l!'s��a.m.i66qi P��+�Gblorklsm �a Yl A��lxaem�dw w..a �o.e. m, m a eea�.w e� �..r..� asmmi sm W 0' �0 6d a[ i[7^� m av0e ¢ UA Q �we�.adr:s.rwa.v�em.mn.� s�W w��.�r. or e�+eamd e s ae �uwr �sOr�Y's Wfi'{sYdo 'eia. lydM�IMe�TiM1����Y I�..)�.sa�.im—.-• . �ar• bvehotl dla� ww m0a4a blN'. a s¢ �bM�wAbb.aono��� l�i�4 �. sGlW dii a9l� WOaet a[� R e�r.r.sra� I tr 41b.�a0L�d�rt U��dm� ym4 i.ma�e�+ay.. r rmw. w.n. . ! SaY Wdb{r��iwYfY�3�ilYrBsYre C.ar)�.moeW 9.mDFianrf4rtq�ti� r�mdoswbAiyaL . JVnpedm�afPdm9b WbeMnw.C�3v q'r. W z mrk.i6 a..mdv..pdq o Ta�- �'V^�^Y� ��� �S. and Pool Maintenance J fOYd Mod{�s �d ro0k �Y A� �md �1 .mb �.�aa��.lrewaawMN+�+�w. I SIa�P� Wvmslal��bilom r i�YCamPrb�' t � srs.au. a� rm..dva� as�..s= I ll� �m�l�rk Gv r tltl� e Y.s �sCwy im�sfdYa I Immmi�Y W �1lMf V4Mis.Are� aa6id�leCfa�aa IL1AN Y r sr6�14� et�Wa e� tr 4+r =�f+Vad� /441�M JII� 4 Y�m W 600� W A�tla� Riras amn4 adr v'w�tr�im�1A94�d�d mrWoYYYuI I Oirya d vwd ynY�iO� r bdo� �r I CdM'Is�alNdasiWmv.PA��W dA �P dp ��l.W tmp6 I oe.ap�r.awsu Wa �emwsies.tm os4tlh�rl�nle�sy�loy, d�ctlqpivyolp�� w�ebPdW wiPo�bOamYaUiYb e�1oJfiGYm�oblNaiw . ia.rer..�.rw...r.`..rrr. hsLTss�9p M�b�rw - INswbWY�'tldf� ¢P��Ise�laas ,lavd I MY�nqryit� pdrA YdNrlr�6S b ��ns=�mM��or.Nrr. �Ad w.ad�l� MYUW �r�r�m � / Ol�d.�es � 4 r d's3.Od b!. �f .e.vp.oe.aebr rd w�ns�ssd.s."al y �Iv{��se� N9' � aw�pP tl��l� I210 wl �aOPa�� VPdda fued Y�r � t W i� � rr L�rY�s b moPa;tl Pd de W a6CqpiY�IbqsW Ilir�lY �.wb rw, b � �Y aa�m�a� N.c RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, SIDE SETBACK VARIANCE AND LOT COVERAGE VARIANCE RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Desiqn Review, Floor Area Ratio Variance and Special Permits for Declining Heiqht Envelope and Basement for a first and second story addition to a sinqle familv dwellinq and new basement at 1208 Bernal Avenue, zoned R-1, Brad and Roxann Loose, qroqertv owners, APN: 026-172-190; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Julv 13, 2009, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section: 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. 2. Said Design Review, Floor Area Variance and Special Permits are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review, Floor Area Ratio Variance and Special Permits are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman I, , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 13`h dav of Julv, 2009 by the following vote: Secretary EXHIBIT "A" Conditions of approval and Special Permits. 1208 Bernal Avenue Effective July 23, 2009 for Categorical Exemption, Design Review, Floor Area Ratio Variance that the project shall be built as shown on the plans submitted to the Planning Division date stamped July 1, 2009, sheets A1.1 through A3.4 and L1.0; 2. that if the structure is demolished or the envelope changed at a later date the Floor Area Ratio Variance, as well as any other exceptions to the code granted here, will become void; 3. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 4. that any changes to the size garage, which would includ amendment to this permit; or envelope of the basement, first or second floors, or e adding or enlarging a dormer(s), shall require an 5. that the conditions of the Chief Building Official's April 29, June 29 and June 9, 2009 memos, the City Engineer's May 12, 2009 memo, the Fire Marshal's May 4, 2009 memo and the NPDES Coordinator's May 5, 2009 memo shall be met; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2007 Edition, as amended by the City of Burlingame; EXHIBIT "A" Conditions of approval and Special Permits. 1208 Bernal Avenue Effective July 23, 2009 for Categorical Exemption, Design Review, Floor Area Ratio Variance THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 13. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. . CITY OF BURLINGAME - COMMUNITY DEVELOPMENT DEPARTMENT BURLINGAME 501 PRIMROSE ROAD �•�-�_,.�.:�- BURLINGAME, CA 94010 "- �s,�.=��_� � 9�" PH: (650) 558-7250 • FAX: (650) 6=��' T�'�� -- �.r � ��: •=� �,r� :.� v: www.burlingame.org c�..� r��•�T� =`' �� �-� � �-�: =e .n:. ��,f '1•� ��!' '�'�' �' • � r.r :�' s r+�_� s � Site: 1208 BERNAL AVENUE The City of Burlingame following public hearing 7:00 P.M. in the City Road, Burlingame, CA: Planning Commission announces the on MONDAY, JULY 13, 2009 at Hall founcil Cham6ers, 501 Primrose Application for Design Review, floor Area Ratio Variance and Special Permits for Declining Height Envelape and Basement for a first and second story addition to a single family dwelling and new hasement qualifying as substantial construction at 1208 BERNAL AVENUE zaned R-1. APN 026-172-190 Mniled: July 3, 2009 (Please refer to ofher side) � �� .�� Q ro��€�ed rrc.�, `�. ���; ;41 Z tc s�,�c�p,r� PU�LIC HEARII+IG t�OT10E . � , :. . . A copy of the application and plans'for this project may be reviewed prior to the meeting at the Community Development Department at 501 Primrose Road, Burlingame, California.' If you challenge �the sub�ect application(s) in court, �you may be limited to raising only those issues you or s�mpone else raised at the public hearing, described in the `notice or,in :writfen cor�espondence` delivered to the city at or prior to the public hearing. ' �' ; . , -- � Property owners who recei�e;`this��notice are:responsible far;informing their tenants about this notice For additional information, please�call �650) �558 7250 Thank�you. William Meeker ' � � Community Development Direc�or=_' , PIJ�LIC �H�AR1�9G �O'�'ICE (Please refer fo ofher side) .'t�;i� 's � :+�er. _ ��r � i ,�.,: t +�''.s a�''c , _ . ,�. � �,�� . M; • , � °� � � . � ; -�� � :,� ��.: , y 8,� -"� _ . :� � # �,� `La� s,� ' '� � �„+`�' 4," � , ' r ' +,�,�' � . � �*�� �w- i�.' '"a� �� ' �' � Y�. �r �J�, . . [i �.i+� �. �,i, a���� r �.:i � �fi,.�m .Fye� ' / f �, � , r � ��� �� �� `�, ��,�� c � .� � �` �,�, �� � � �,� � � �� . ,� 'Ji �f s����r *, <� `�^�,, � • � �. � '- �g*%� '�"�zz,''t�.�.�'""'�''°�� `':�"L` �}'��" �`� �� — .. , ' ' �� ,� \ `� � `' �� > � ��� �' .��e�:'^"{'{ � �` ,"'� � � �'�"C"✓�,`� ��t { *Y 6'�"" A'� s'�aY� ��.� tf,Y r9�r �`LEy M \x�± � � � �R �g.a `. ... F i � '�,. ����� r � . ��➢s � �` "�jy '� `� �r w � p d "•'"' t �� I` �, . ' it ¢ Ss ��. �a�.' . ��"a � .. � � `•• �?�'-K�'_ , , > ,/1 �e . : ' ,, , % & t i �' i 5 � �� z � � ,�� �.'.S� � � �� �""'`'> ��� ` � �' i� � ��� ��. .. ��'IY ��� q , �4 . ,.,.� �� �, �i �g� � y � B'i�A' �' � •` }�•! � J`,� , . ��. � 4-- `� 6 A � :-•� ' t �,"�' ^ � � ` �� p � � �.. ♦ Y � � ce ` , • Wp "s , �� y /�,�a - ,�g " � '�'� . V A • � ,� • +��\ i." " � ' ' f ��kW �~.':� �' j ^�� �� �� � � j, � � * 1 � f � � ,. z� S q . } N �. � k ,'����3 �v1�� � t : . Y � Yi� F �`3�••�i . �p. . . . ' • s ` » ,• . ,� � F # � Y Xy .� � "= . � A .. ,� �,.,.. }� 't �� ., � �,�,g. � � i � ;"' Y� � B'� � . � -� .',X "s ; � � ., T:: � � � � � � �� �� ... �� �t � ., � . � L"7P"y: �� +.. r �'�"{ �E / • i t�� . , � , .�� . � � . '. .,� '.�s j'" '' .'6,�. � � : � , . . � , � s � "�C . �• 1��• � � ' �� � �', al m � ,� �: � � F� , �. ,� � ;� � „�' � . � � �. . � `.�� �� � � . ,. �- f � � �� r a �-,� � � � $,� z .. �.�� � J,,�, .� ' •'�' ,� `��� �"4� ������' � i. `,* %� ♦. ' 4 �. `"��2: "'' � / r ; �r�. �$� �k�, • ~��,����t . � r • � I.I,, , .f� +� " ��, r r?(� � l�` �, a . � , � � �,, � � � � ' ���,,� �, ;i*�\ . '� � � �'`r � � � �,�,�' ,� ' F'' .� ���+ 1 ; :d. � �� � '..t� �.. c�� � � � Y �:acV, �� s .. �. �{� ,� ,. �� ��� � � .. 1 '� � " t� � � • �' S. i� ��.. �,�✓ 6�'J, Y . 't� � �,` a � - �. `r�.y/ '�' �'"��.:� `N: t , �: ��: �� y. �.. ' � ,� � � ..� 7� `''. �y "� '�iY `� } ��ga1V � X � � ,,� ��.. � Y ,P •� N �' i� �' ,�y, _ .+.� +� ��.m � , ) Y �r �' f,�sr � t' �I' � � ; "+�'Q'� �v. � ,� . � l�' II %� .. . l ���j - � � " J� � � ��''�e. 4 . �' .,� s � �� � ��''rt �%, x � � �.... 1 p ` ,� �� � ` { f�� � , !� . � � * �� :xe • • i� 1 a'�h.. .+'r �. y * �"{ +�� � Q- S-. i ' I ,.M1 . M � �� '�% �'3 _ i � , �'� � ° � �yR � , �� x . t' ��/�' z '. � �� "�� � :s�' �m` � ' I , e •. - _ � - `�'�� ,�.. w� ��� �s� �,�,wJ�j�,� ��rr * , �'Eh,,� � �,wy `� .. ,�"�.. x,• <,: �;, �',t'�'��F.;�a rr .7 ;�` ' \ : � `�� # �=t,. > � ,�, `�. 't�- ��,.v" , J �, p�..' ''°�`"'y�`�l. �.�; t�r•� •'o•� �'Z,<�`� .Ai ?{� �� � �� � � �'<. � �, �:�� � �-�' ..:� ` s _ � � � b �' ` " - , . �t . �. a� , � < . ` {� f ��/ s.� y�.` M?` ��j����;, s a., � � � �..+%•�.'�. �'r� �* / i��*1 .!. �i.�- ��� I. 1 � � � , / � .�II � �..._ r� .�;,� � .,, � � . � .� �,r �. .� �, � z � �9� � ; " , t�� � l; . 1 ,� `�'• :� .e � F ,�''� . ��r �q� zJ ., ��'a� ~ �� ,'.. ti + .J'', ,�, `�' "'� y ��J ' ' �� � + _ ,�� �'" „ . : . , t � � �' ,�� �, �`f��f . ���� "� - �a .. �,� ` � .� �.,� � .t � : { �, ,�� n� �� ,�� �, ,�e ,+ ,, , �'' � �.� ,�� .a+ r� `a� * � •. T,� �`�'�� t '� ' ' +�`� . � [ ,4 � yy.� � ,sa. w . '� � , " ,�.]Q',"n> �y�. � `�'S;r � v � �a-� ''� �' ''f ,i L V ♦ k� �o�y$' 'L^Y ` ; / k ♦ � � � . �` ° ` �'� ` � �`"P � � .� t � , r»�. .`". , - '4 �� i _ � . '� � ' � ,�4 �%�I °�� ' �,/T '� � r. � � �� :�' � �1 t"�'' � i � 'v 'Yr.�� �'�mJ/y� t''��. �' a,w� : �t'r �,r `Y��/ ' � ..7 +� '"� d • . . , ,, , • � Y� •.-��� � � ',� �� �+ *"Tr � w'�,�g�s� 1p��.�t � ��`'�„ ,,. "�'�-. � 4 � � _ "' � .,�,.� `�.�. ; � f �� '�%.�'i.�% h�s, �' -:l � �,la rc' � � t �, • '` �, ,"*.�' � � f, « .'.'.� ,,,�4 �i. s �! _. �q, , ' � A r ,-. �►� ' � ' i` ° '� �' �� ' �� , - "�1 `e\ . , >> � ... �, x r'n � � � i . �� ' >`�. a" '� r ', t i , ,.�' ' � ��, � . �t�.fp ��_, @-'�."�. r h' »"�r � t�- �+r.;, '���i, `, < i�,� ` "�� �., � y� �� "�y� /�� �' ,; y ��� �. � i. ,� ,i� , � ' � iC � �,.,� � �� r1 • '��`. � ' ,.A, � _4 � r� � � :� .x '� ' � � � . 5h � . �„�, � � � � � ��„�, ��,' ,�'' i , � , �� .� ., . �°:`^^� + �r� . �`�., s' � �; ' � �• - ,� � ��, � ; �,,� 4 � �s* `" , w ,� � ,�. "4,'�'f,� .. , ,��; :�� '°� - � :��� ;� t : �� . .. �°�., �;��;�, �. �+"�.�� ,;,. �V`' '� ,�, . w. ,,. .„ , < > �Y , �'' ,,� � . � . � , � a�tq� . � � � '�" .r ,� ,� �� �""" ..� , �{�� a � � .� � �'k �� ` �'� -. � � . . , �. � �� , " , �. : ,,� , � � �i-' � �O . �"�..,��,� %"� '., �x: �_ f "�C � �'' , �° � � '� ,y fi �' .'v� *"�ii e�� � ,p• �� �x+,, ^�,� �'��. t'��: ` y �f. � x?� � . ., :'�_ �� , � � � � �,i . rS". .�'a� � • .,../1 �. '✓ „�a;r' ''t� � 'fi � � '� '�r . � �` F`fCl� � '�' � ' � �; �+"� '�°�e*�i�� rY+ `� � ��:a:�.^� ,.�"^� ..�. �:r /£�� /r�� .�:�`�s. �.� �`�*j�'*, �' r�` `11 +�"�StJ - � �'Mt,,, �y..� � `�a� ,+� � � � �+ 1 � � ;� +��, fio- `i ' � � � � � � �"� t ./� : �: ,._ . }�: �' r , �, � f `' _ y � � t ... ^. � . .s ^ . � , `� � � �. . t � � � � .. . � ' �` «�.. :A � ��n . � �-rx ;.'A*4�w'�.,...',- r...-y . . _ . ' e ��`M �... c • _�'i�� 0 as = g `• � .r' . . t w � * �. � t i - q.�,. �►. �` � „w C •• '�� � � �� �► ���, y �„ � � � �. ��'g� .t� 'A