July 24, 2009
Randy Grange
TRG Architects
205 Park Road, Suite 203
Burlingame, CA 94010
Re: 1208 Bernal Avenue
Dear Mr. Grange,
�.� �' �
:� —
�`
4Q _ 'pQe
�hcwwr• e
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the July 13, 2009, Planning
Commission approval of your application for Design Review, Floor Area Ratio Variance and Special
Permits for Declining Height Envelope and Basement became effective July 23, 2009. This
application was for a first and second story addition to a single family dwelling and new basement at
1208 Bernal Avenue, zoned R-1.
The July 13, 2009 minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shali be built as shown on the plans submitted to the Pianning Division date
stamped July 1, 2009, sheets A1.1 through A3.4 and L1.0;
F
3
that if the applicant chooses to propose a clay tile roof instead of the metal roof with solar
panels as proposed, the item shall be brought back to the Commission as an FYI item;
that if the structure is demolished or the envelope changed at a later date the Floor Area Ratio
Variance, as well as any other exceptions to the code granted here, will become void;
4. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYI or amendment to be determined by Planning staff);
5. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
6. that the conditions of the Chief Building Official's April 29, June 29 and June 9, 2009 memos,
the City Engineer's May 12, 2009 memo, the Fire Marshal's May 4, 2009 memo and the
NPDES Coordinator's May 5, 2009 memo shall be met;
m� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
July 24, 2009
1208 Bernal Avenue
Page 2
7. that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of
approval is required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2007 Edition, as amended by the City of Burlingame;
12. THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
13. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectura� certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org eg
i
July 24, 2009
1208 Bernal Avenue
Page 3
16. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
17. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
18. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
Reimbursement of the Design Review deposit will be processed and will be mailed to the property
owner under separate cover.
All site improvements and construction work will require separate application to the Building
Department. This approval is valid for one year during which time a building permit must be issued.
One extension of up to one year may be considered by the Planning Commission if application is
made before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must
do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or
federal law.
Sincerely,
i�
/_,/;, :� j��%/
�..
�
William Meeker
Community Development Director
c. Brad and Roxann Loose, property owners
Chief Building Official, Community Development Dept./Building Div.
Chief Deputy Valuation, Assessor's Office
(LOT 22 BLOCK 35 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-172-190)
File
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �a
�
�
Project Comments
Date:
June 29, 2009
To: ❑ City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From: Planning Staff
❑ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Subject: Request for Design Review, Floor Area Ratio Variance and Special
Permits for a first and second story addition and new basement at
1208 Bernal Avenue, zoned R-1, APN: 026-172-190.
Staff Review:
Project Comments
Date:
To:
From:
June 5, 2009
❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
❑ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Planning Staff
Subject: Request for Design Review, Special Permits and Variance for a first
and second story addition at 1208 Bernal Avenue, zoned R-1, APN:
026-172-190.
Staff Review:
2) Per the City of Burlingame's adopted Resolution, applications received after
January 1, 2009 must complete a"GreenPoint Rated Checklist". The
GreenPoint Rated Checklist, and other information regarding the City's Green
Building requirements, can be found on the City website at the following URL:
http�//www burlinc�ame orq/lndex aspx?qaqe=1219 or Contact Joe McCluskey
at 650-558-7273.
No response.
14) Specify the use (e.g. bedroom, family room, etc.) for the basement area.
This room must be labeled for its intended use. With a second stairway and
adjacent powder room it will clearly not be used for storage. Please label
appropriately.
NOTE: A written response to the items noted here and plans that
specifically address items 2 and 14 must be re-submitted before this project
can move forward for Planning Commission action.
Date:—����0�
Project Comments
Date:
To:
From:
April 29, 2009
❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
❑ Recycling Specialist
(650) 558-7273
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Planning Staff
Subject: Request for Design Review, Special Permit, and Variance for a firsi
and second story addition at 1208 Bernal Avenue, zoned R-1, APN:
026-172-190
Staff Review: May 4, 2009
� On the plans specify that this project will comply with the 2007 California Building
�Codes (CBC).
Per the City of Burlingame's adopted Resolution, applications received after
January 1, 2009 must complete a"GreenPoint Rated Checklist". The GreenPoint
Rated Checklist, and other information regarding the City's Green Building
requirements, can be found on the City website at the following URL:
http://www.burlinqame.orq/Index.aspx?paqe=1219 or Contact Joe McCluskey at
650-558-7273.
3) Anyone who is doing business in the City must have a current City of Burlingame
business license.
4) Provide fully dimensioned plans.
5) Provide existing and proposed elevations.
6) This project will be considered a New Building because, according to the City of
Burlingame Municipal code, "when additions, alterations or repairs within any
twelve-month period exceed fifty percent of the current replacement value of an
existing building or structure, as determined by the building official, such building
or structure shall be made in its entirety to conform with the requirements for new
buildings or structures." This building must comply with the 2007 California
Building Code for new structures.
7) Due to the extensive nature of this construction project the Certificate of
Occupancy will be rescinded once construction begins. A new Certifi�ate
of Occupancy will be issued after the project has been finaled. No
occupancy of the building is to occur until a new Certificate of Occupancy
has been issued.
8) Show the distances from all exterior walls to property lines or to assumed
property lines
9) Provide a complete demolition plan that indicates the existing walls, walls to be
demolished, new walls, and a legend. NOTE: The Demolition Permit will not
be issued until a Building Permit is issued for the project.
10)Comply with the 2005 California Energy Efficiency Standards for low-rise
residential / non-residential buildings. Go to http://www.enerqy.ca.gov/title24 for
�ublications and details.
n the plans specify that the roof eaves will not project within two feet of the
operty line.
��2) oms that can be used for sleeping purposes must have at least one window or
door that complies with the egress requirements. Specify the size and location of
C��II required egress windows on the elevation drawings.
rovide section details that show the finished headroom height for each area of
the basement. NOTE: Areas with a headroom height greater than 5'11" are
6�-�onsidered to be floor area by the Planning Division.
��pecify the use (e.g. bedroom, family room, etc.) for the basement area.
15)Provide guardrails at all landings. NOTE: All landings more than 30" in height at
any point are considered in calculating the allowable lot coverage. Consult the
Planning Department for details if your project entails landings more than 30" in
height.
16)Provide handrails at all stairs where there are four or more risers.
17)Provide lighting at all exterior landings.
18)The fireplace chimney must terminate at least two feet higher than any portion of
the building within ten feet. Sec. 2113.9
NOTE: A written response to the items noted here and plans that specifically
address items
1, 2, 11, 12, 13, and 14 must be re-submitted before this project can move
forward for Planning Commission action.
Reviewed by: Date: �
l/ "
Project Comments
Date:
To:
From:
April 29, 2009
�( City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
❑ Recycling Specialist
(650) 558-7273
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Planning Staff
Subject: Request for Design Review, Speciaf Permit, and Variance for a first
and second story addition at 1208 Bernal Avenue, zoned R-1, APN:
026-172-190
Staff Review: May 4, 2009
1. Storm drainage shalf be designed to drain towards the street frontage or to the
City storm drain system.
2. The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk, driveway and other necessary
appurtenant work. Applicant is advised to call City Arborist regarding
potential relocation of sidewalk area around trees in the planter strip.
3. Sevrer bac�vrater protection certification is required. Contact Public lN.orks —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 5/12/2009
Project Comments
Date:
To:
From:
April 29, 2009
� City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
� City Arborist
(650) 558-7254
� Recycling Specialist
(650) 558-7273
�Fire Marshal
(650) 558-7600
� NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Subject: Request for Design Review, Special Permit, and Variance for a first
and second story addition at 1208 Bernal Avenue, zoned R-1, APN:
026-172-190
Staff Review: May 4, 2009
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by: ;�� ��� Date: �;��i,,��g
_ T
Project Comments
Date:
To:
From:
April 29, 2009
� City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
� City Arborist
(650) 558-7254
0 Recyciing Specialist
(650) 558-7273
� Fire Marshal
(650) 558-7600
X NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Subject: Request for Design Review, Special Permit, and Variance for a first
and second story addition at 1208 Bernal Avenue, zoned R-1, APN:
026-172-190
Staff Review: May 4, 2009
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution from construction
activities. Project proponent shall ensure all contractors implement Best
Management Practices during construction.
Include a list of BMPs and an erosion and sediment control measures plan, as
project notes, when submitting plans for a building permit. Please see attached
brochures for guidance. The attached brochure may also be downloaded directly
from flowstobay.org.
For additional assistance, contact Kiley Kinnon, Stormwater Coordinator, at (650)
342-3727.
��������
��aY - � 2oos
rITY OT 6U�UNGAiJ�E
FU;^!Nt'JG DE�T.
Reviewed by: � ,� Date: v S/� j" �
'� �
�
,
.-� „
���
��� 1 �' ����.�°
.IIR-'��%�;�!. � ,
= i� ���,,;, "
' :�%;.
'��k�=i
� ���
�
Construction
& Site Supervision
mnYe� rtmdint dr�tl.� b A�
..s�v.d+n �.r..d.a.ea vx. �,.
Y��r1a��W �M1t�vi� �eY 6�4�
J4M r P� �s bd�Y 6� Nilrya[M1�
wwrs.e.�eir.s.+s•a...rPts .
lCasl b �r �f�Rw�.l� �wr H
fwwW m..�)b W ��.�.o.�
mI a V��� �'O N�Ir w!M ��v h�
� ..rrwrdre.n.w.tr�ree.r.au.y
�s��m.sesaes...ww
�
�T�.i 1� qle�� d «�csaslwa N.b
r. rw.....n.u.....�m..+s.eau � r
�eYadti 4ls�.b�.eas W.eu �.ww
.w.r�w++�+rrk..�..roua
U�Y � �yi�ll ��r w b e
ne+y...ad...n.u.r. r...e�.�.yr
n.+r�r.sa.+er..o..o
a.e�. �.rs mr rM r�e.a e..�
�waW.ey.`..vra
IZw� �I�dY wl �i 4 ��Y-�.�I �vQ
..�+.rr...a a...y...�ym.r
,oiiars4srYb �IONule 6n4 �
� I^���� �4�M �ea 1�N vrY s�
r..�ay nqae�...�e r a. w sir.i.
lec
�D�' �w� �w�i �:�s1Y�1 i�Y � �Y� 6.��,
aa�k1 aa6�M� Vn�� ��Ywesr�.
�uo�>air�¢erq�mestd
.m.r.u.r
ia.0 � Fw+.b. r.w.,po, eo.m.eb..
Y�6s�asuls�.e0r pamd.rswl��
�wMr�aR VrtJla`iommod'
.�r.�omu. ��rmn���..1..
�pYbqbAe,ldewa
If WrYrYbq�saO.vklpnW�b
t�m.es�.+vvr.me.A.�. �....tema
sl��/wadmW ba�iA�lr
Mp�.ACWeErYvao�bib �.et
wso ar umw 7+... da .w .+y.. b
Nu� Y b�� s 6� asw�la �le�
INW w� M� wur w Ws6r� h ps�
whW wds 6� O� bbl �YeY� �1 wv1o�
uo=..aafpep.y. o.t weYl.qrr ar
W
�fiY1W�wM1rAi�
/TsW� wrs nisM - �Alsis n.n� whs
W
�� mWY�QCrmyMe��sx�
iu� �e►.r�.�..ee..e s.ai. w�w
� P�-M af KT�Y r4YY we� � m�e�w.
�9Lk AT ML b��4 �0��. �d T
••m. vw. �+. r..e:r..i.e.�. �rr
�o�rbMaY.stl� WYh\MIb�L
IWiw N.Y ww r b�W� wW� yq�l}
xr� ..w�ue. �a. d.r m e. �..N.4
�'i �:"W.•�d 4�r nbH. emt
F� �{�MII W ae�1 �val W Jmtl �es1t
is IM�YY W 46rY 6usrtMwqaW srl
a w. r. erq.rr �am: aye..a r�
hsWrewtsr���.t�a.wWW.
Stormwater Polluti.on Prevention Program
Pollutio� Prevention — It's Part of the Plan
It is your responsibility to do the j ob right!
Runoff from streets aad otherpaved areas is a maj ot source ofpollutioa in local creeks, San Francisco Bay and tho Pacific Ocean.
Consuuction activities can directly affect the health of our waters unless conhactors and crews plan aheadto keep dirk debris, and other
construction waste away from storm drains and creeks. Following these guidelines cvill ensure your compliance with local stormwater
ordinanca requirements. Remember, ongoing monitoring and maintenance of installed conhnls is crucial to proper implementation
Heavy
Equipment
Operation
G
Earth-Moving
Activities
AIY dpqlr
I�swddy+�ntlam6� �FeLwl�vss
�
sr►r+srr�++..,.w...ad.w iar.wsc�rn�e..e+vo.av
♦a.�.wrb4.ww.�.rir�.� .p....r.�arr..��w�a�rayo�i
d�yweO�.AMr���wm mal� WA
M.+.rd��d�a M.4Y.��e.d.�
,.ra.r.�yrrw.�.
! MiWbY�.IfeM�rb^>�lb��tiR��
�a���
I7.R ��k.�rst�y.Ylebaal.+bYir
�ly�l`��Rd
! `�e.r/ul. W �.yle��w�sYvseel��.
.or air s Mr, r 6y y� w sq aar r
ue1 rb M yula Oenen �Y i� �. ra� Y
erW asrYv�y s/ �s�e4wlanaye�By w
�Lps.[O1srYoiw.w
I0.�wi��i rNbb�vd.�qYy��
I� •
l�s�aYMwYVMMsIa
a.. � ���.�. Mrro�.
� �+... a a...'a:n' n..r.. aro..s�
ess..e.. e.wmwqmdu.y.rmqss
ae�l.t.aesr.W dll.ecoVsno)+�e
pmr. vy..r�.�K w}ra.sp r Ywy
IbOo�IMra
�s.wsysmr h srm. se..a..�x ry..w
dp.ti.sr...i ��o+.sw baa
vw.m..a..r�N m.r...u�
I cr� � Mu. w un.� y m W w�� v�b
Y7r1YKw�i�e/wa
� RW��MMbr Mu b YTo� 9mnia�
4� �h Th� a� tqtl�d E] Iw e ryMl
�0 tl�i6dnle�� N�vM v��Y. Yo Vtl�
.anup�.aa.erram.ya�� qar
1�Irp�leaY av�se��pa��abu, 3)GO
0� Os�o'� Omw Kbw�s� ]�.le� �Mo`�
c�..lwal.ti,�ww.m.f
�n..e m.�+or. �.s.m.� w.s.. r m
e.s..�a b �a.. �� r+w �..�.. �
Yer.tisMosb�YYle�en
Jllw Ysk A� w�Yol� b A�IvqQwm! mw
us.r..er.�
Roadwork & Paving
.``
: Dn^�^V rL 61�� w�ia�sd'o�t w.l �Is' b
�r�r.
J es.u� o..� r v��.ea br b..us
J Oui JI qu�� (vinb u� iqtl� MYY[ �V'ips�
f1^�1•
i e.ss.�..+r.� �v.`,. r �wa.r.v,�r
r�+pemrm..s..de�x�
! rvr..n.rsr..a�ew�e+bs�����r
ew...ir. wa+.m4wa�.rrr.�..q
!.� �rs de6 � v.iL
� a.a.. u.r.a r w.wr> ae wab� a
ik .r.41�.���w�4.a
n�s�rp�Y.
♦'�br mpkr.s Y �+.a ss w.��r �:
Dk4l dl�atlo�
l6�nwyi�lwo.WwGwMw�vd�vPw �YfaaMbLLwB�i Yw.��.Y�.rwLeb
i���L . I6�r��Isr�4.mdrbl�wN qql�►�
♦nw�b.e.�c.r�..ra..iar..ar `�'°'�'v'�+�tb�.t..
�� IUr el4 r{ m�Ls. aMls edM�lli�eC�asl
�a.
�7nMrRo.nwmer.w�e.r..m..am.nw. ♦�••ae...r.mee.�..r.ro��wee..
�Ysl,s.�wv�vlp. bMwrrb��sas:�osi.WCn4
�r r..�N.r as..a an.a
J 6.� �shpY� d ods mrneUa rslb wlY
vu�.tl�.bslaebr W�mFT�►a0asiv6Ydw���rrt�
!le1�dJ�r�Yi��dPv4�vktrtiw4 �flaaiR��wMyeYWMa
� driry. sa.w�wfs W v�. sreasmda
l��ii�4�PM�Pb�06wMJ�dea (dW�P.wc)O�velrrdsw4�s�Yw
�,e .a:��r�i�.w�.oz>w .�.��..�
ia�e.�..es.�.�w��.+.�:o.v� mm
b�lwwW4wad�i6Y�am0�bbo��wm� JCohd�d�a�SYaeRPOP�I�a[ats
6euswtr�b� .b.iw�mdsr�l
Jlbs�w�daGSMOdurwdmepJ�emwM� IAwtlnw�4vOmiaYlwnr�wJo�mrJrmssaL
wd��M. rP^�yO�+e/Vf fMas JA�� d�6nYW{WEJtsmr
ua.ra..o�uxo...a«...arwr o,.s�m. �"`
daamw,w{SIw�IWsQu�tlry6wNori JAl1�b�He[AWP��tbw�b�vw�7
.ar.rqswnrra
• 11e�IMmotltla�amis+leSsNn ��s6GaomS �'pr,rmm�YaawywH
. neea.rme.wwa.b ♦neea.my...strrir.ws.M.+.+�w.er.a
• BsfdYvd4d��4fWY � �4Yn�lyWr�swl�eW
�2�....r.. bn...w � a.e.� �.a.a rcu. y
few� �e�L
Fresh Concrete
& Mortar Application
i
��I /etl�� Ifn1l
rees r��.a r r�w.d� � a..�. �,.
E� Sf W tie�Y�lrs.�0�wa�M Ea
�+.�u r�¢ ner H vwd.y a w`.t
lDe� I�O�fo�M bp.u� Wdb�wbMy
wi6aa�...er w.ac..n m aa..s w.
�.�RM�s6
!� Yd9w�0aYmw�v�mlM1�A�W
d�G�
i e..� r ao�r ��.. s.r. r..r rre.
4e� d^4�
JFl�d�4��0 LLIrM�w�l�tlAw�Rm�uvWa
- .r�mraYr4n��r,aOe�oG�hh�9�W
s..w+w.�emr.s.
I frt���eOePr�rW Om ddwwn/ydoawRzlb
p�ro�s e�.i.. tm.� .�r..r ..e a:�
�b s
d y�4 ble tirt
J tl.a Y� `r. w emeawb m.wYb.ubp. r
rys� �woCm/W �aer rmlebn Yiein
�n�6��
IwM6Ni�sr�W.�....eyvym rvh.
d � e�v�h•
��f� VPdW KbiNw�auN ��Ird6R
IUW«�xm.tl �r.(me 4�+.w0.
WwuMYrat
I Nw�4n eW w�obr�iv:�Yl
Storm drain polluters may be liable for fines of up to $25,000 per day!
�,�• .. :.�� :��- :�� �•
� � �� �. • �i� :. � � , •
A �v/:�. : �� ��� : 1 :11:1
� ♦" l
.:/
'„Q �1� 1 � :� ' i ��
�f � i��"' ,
J `' YYJ';' ;.� �
�.�1�� `�"� Ir�
s. rort+.t r.r mi.. uar tiae a.
Ws+�.aa�+.d�r•Y..e,�mrw Jnadw.�i.r�pn...�.�e...ter
�...w..tr�.W.�r.tr.rtm�. �r.b.a4m��.e.re.a.m.rs��c
...� e.a�eer awb (m.wn r� �ed �.�.+r
vAo�l . Ia�a.w�al.A�.r.ord�wi.ir�r
Y �stl r+oP sY�t
I�ao� rre...i.ea�...�,r• ♦�rwi.�Wrm..anysay..rc
���4 DAq �es �R r rtua
Nr�/�� W�mIwA�YDYpv��Lsa
fyii �l�sil� Y YO�Ie� � W.
h4e �.N
IMl WV� W/e�1 C�w�d� 4/ �eiW�Y
W�W Wrly �q V �M T � eWerd i��luae
drap Wi d �qew! �fr �r\
/6�IWri�� ip�3qniVJdipdir
bo vl�DWd w/m� �Y led r 4My1
x...� r ey...a.c..va...a.
I WMwbOetsLL��b�l9ti�iwM64idr
Pm�++c ble k M bit �J�dwur sm �S�t
�,.a. �r „u. a .a.a.in e. m�..�..�
smvlqr blai[)wrmWa44x
�YYYdI�iel��f�rr�lY�w�Y YsWr�
� �.ra...�r�e��re.+.me
��sr�Nsb'Y�lif WlrLa
1w�a1M�� I.b��/�ib wlswrl�6Y
�M1�rMMM�fO�wYJUV �Wt�t�
Yr�Y�viww�wsYstlr WYb.�rp
w'e.s b �. �`:A' M...vo'vy m. �
AeY. sa s� �av tlW �9� WwN K� p'
�4Y�eWliW�
I l�+w Id4+ �0.i�d �.l4 n4� 1 s� yYq
6rJdbl �. r Ym�ds� w.�
� s..u.�r> e�.+.. �ra m.a.a r. r w..
Cuaq 6haY1 HaM DM�'r sP^��i R1�4
mdeow6ElpL .
J Umpr� a� efPW �OM JY u Misa.G� M
w.�. o.s. w r...a...paa w ro.�.
� 1^�/.
JUw� M I.Wie. 3.Nealu��o
� a r.. a....... �. ma t+� w.. r�. a
srYwYYni
! W jw a(is�1 pisid� w Os/w� w�a
� r.n.. r. r o.+. ��wwa �..+c.e e..
♦iiPQ�PI[m�F W mmp�
IbriP�/�v�rhCom bemndusnl0
m W dv 1d �+,Y'sTb V. I�w dippy� d P�[
w�we b Wb4 Y 9P^'H `P wmis:s� R rb
Isd�l�Innepe�Y/�dww .
! 0. r� ww r �W Isq> Ir s� r�r,
I�eVl�awb]H Al�bwrry
l NsR 6 W R ml�urd.tvl i Ra �o.. m w
�Iws6�a
J ��ro��pa�y�a;r.Y ��'r
�s+�a..d. a r.r`.r... r. �
m�
J Oled..r/ wr r� Y. b y.;.�e� b Y�Is�
a.a(Y�Ysw1�Ib Y�I�w�nO�resi WwA)h'
�ry �Irw�wuqit�w��p.aus��M�
Jd wl r wypelaA Jp�iAa Cc.�d J� NO
Jle�f r� rr.l��i�s b mOPei��d Owl d�4
sl. Cbp� i 1ah1 r q��Y Yp r�� Y
�h �v.., h� r rw..r.r Mr.
�rrW�.a.r.r.�.o.�'.�m�oe.r� �ra..e�.a..rwwr4rr�r..r�w �e ..�'sm ad�ao.eu..�.�a..q
�a.>r.�w�...rra�.rc.�...r� w�.u�.ra�r.�s...m.n.r..�sr
Mw��v�MRf�..rebP�o:a vo�es.a.l�..r..a�.r.wwaeo,;qR �noe.u.oawm...isNW..b..4m...o
FdYY�+nbwwT�n�Y�wa[��dw+Yr NwisW�Aw��ti� reOrW�e4Ua�w
s...«t ro �d... r,�..n u.wa w m.�.
�.�.d�....�w....r...d,s. i....�..+..�..�..a..r.w�...am.
A.iybna�.eb� �M.�e1�wY�r�eh�aYaPW�arYa q�w