Loading...
HomeMy WebLinkAbout1153 Bernal Avenue - Staff ReportItem No. 2 Regular Action PROJECT LOCATION 1153 Bernal Avenue City of Burlingame Design Review Address: 1153 Bernal Avenue Item No. 2 Regular Action Meeting Date: November 25, 2013 Request: Design Review for a first floor addition with a 9'-6" plate height to an existing single family dwelling with a detached garage. Architect: William Pashelinsky Applicant and Property Owner: Maya Eydelman General Plan: Low Density Residential APN: 026-183-010 Lot Area: 6,000 SF Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. Project Description: The existing two-story house with a detached two-car garage contains 3,754 SF (0.63 FAR) of floor area and has five (5) potential bedrooms. The applicant is proposing to add a 99 SF, first floor covered porch addition off the front of the house with a 9'-6" plate, where the existing first floor has an 8'-3" plate, and to replace a set of windows with doors along the right side building elevation. With the proposed covered porch addition at the front of the house, there is no increase to the existing non-conforming FAR (3,754 SF, 0.63 FAR, existing and proposed, where 3,170 SF, 0.53 FAR, is the maximum allowed) because the entire covered porch is exempt from the FAR calculation. The existing house exceeds the maximum allowable FAR by 584 SF. With the addition, there is no increase in the number of potential bedrooms on site (5 existing). Three parking spaces, two of which must be covered, are required on site. The existing detached two-car garage (19' x 19'-6", clear interior dimensions) meets the covered parking requirement for an existing garage. The existing, non- conforming, uncovered space in the driveway (9' x 17'-6") can remain as is because there is no change proposed to the number of bedrooms on-site. All other Zoning Code requirements have been met. The applicant is requesting the following application: ■ Design Review for a first floor addition with a 9'-6" plate height to an existing single family dwelling with a detached garage (CS 25.57.010, a, 4). 1153 Bernal Avenue Lot Area: 6,000 SF Plans date stam ed: November 12, 2013 EXISTING ` ORIGINAL � REVISED ALLOWED/REQ'D � PROPOSAL PROPOSAL SETBACKS Front (95t flr): 17'-8" (to landing) 17'-8" (to porch) 17'-8" (to porch) � 17'-6" (block average) �(2"d flr): 26'-4" no change no change �� 20'-0" -- _. .. .. . Side (left): 2'-6" (to bay)' 13'-6" (to porch) 13'-0" (to porch) 4'-0" (right 15t flr): 10'-10" no change no change 7'-6" (right 2"d flr): 8'-7" 2 no change � no change 12'-0" (average) Rear (1Sf f/r): 47'-0" E � 15'-0" (2"d flr): 45'-0" no change ( no change 20'-0" Lot Coverage: 2,349 SF 2,348 SF 2,353 SF 2,400 SF 39% 39% 39% f 40% FAR: 3,754 SF3 no change no change 3,170 SF4 0.63 FAR 0.53 FAR ,� . . .... _._._ ..... �.�_.. _..- -- — - — # of bedrooms: 5 no change no change --- Design Review 1153 Bernal Avenue EXISTING � ORIGINAL REVISED I ALLOWED/REQ'D PROPOSAL PROPOSAL I Parking: 2 covered � covered (19' x 19'-6") no change no change (18' x 18') 1 uncovered 1 uncovered (9' x 17'-6")5 ...._ _.. (9' x 20') Hei ht: 27'-8" from rade 15'-3" from rade 14'-9" from rade 30'-0" 9 � 9 ) i 9 ) i 9 ) DH Envelope: non-conforming �T�--�-- ' along left side of � n/a n/a CS 25.28.075 house ' Existing non-conforming side setback to bay window. Z Existing non-conforming second floor setback along the exterior side property line. 3 Existing non-conforming FAR (3,754 SF, 0.63 FAR, existing and proposed, where 3,170 SF, 0.53 FAR, is the maximum allowed) per CS 25.26.070 d. 4 (0.32 x 6,000 SF) + 900 SF + 350 SF = 3,170 SF (0.53 FAR) 5 Existing non-conforming uncovered parking space length. Staff Comments: See attached memos from the City Engineer, Chief Building Official, Parks Supervisor, Fire Marshal and Stormwater Coordinator. Design Review Study Meeting: At the Planning Commission Design Review Study meeting on October 28, 2013, the Commission had several questions and comments concerning either widening or lowering the proposed covered front porch. It voted to place the item on the Regular Action Calendar when the plans have been revised as directed (October 28, 2013, Planning Commission Minutes). The applicant submitted revised plans and a response letter on November 12, 2013, to address the Planning Commission's questions and comments. The revised plans include lowering of the proposed covered porch roof by 9", lowering the plate height from 10'-6" to 9'-6" and widening of the porch by 1'-1 ". Please refer to the copy of the July 22, 2013, Planning Commission minutes included in the staff report for the list of Planning Commission questions and comments. Design Review Criteria: The criteria for design review as established in Ordinance No. 1591 adopted by the Council on April 20, 1998 are outlined as follows: 1. Compatibility of the architectural style with that of the existing character of the neighborhood; 2. Respect for the parking and garage patterns in the neighborhood; 3. Architectural style and mass and bulk of structure; 4. Interface of the proposed structure with the structures on adjacent properties; and 5. Landscaping and its proportion to mass and bulk of structural components. Planning Commission Action: The Planning Commission should conduct a public hearing on the application, and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission's decision, and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 12, 2013, sheets A-1.01 through A-3.02 and sheet L1; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning -2- Design Review Commission review (FYI or amendment to be determined by Planning staf�; 1153 Bernal Avenue 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the City Engineer's June 25, 2013 memo, the Chief Building Official's June 21, 2013 memo, the Parks Supervisor's June 25, 2013 and September 24, 2013 memos, the Fire Marshal's June 20, 2013 memo, and the Stormwater Coordinator's June 19, 2013 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burtingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water runoff; 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and -3- Design Review 1153 Bernal Avenue 15. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Erica Strohmeier Associate Planner Cc. William Pashelinsky, 1937 Hayes Street, San Francisco, CA 94117, architect. Attachments: Applicant's response to Commission's comments, date stamped November 12, 2013 Photograph of proposed front doors, date stamped October 28, 2013 October 28, 2013 Planning Commission Design Review Study Minutes Application to the Planning Commission Letter of explanation from the architect, dated stamped June 17, 2013 Photographs of streetscape, date stamped June 20, 2013 Staff Comments Planning Commission Resolution (Proposed) Notice of Public Hearing — Mailed November 15, 2013 Aerial Photo -4- William Pashelinsky Architect 1937 Hayes Street San Francisco, California 94117 (415) 379 3676 Email :billpash@gmail.com" bill ap sh@gmail.com November 10th, 2013 Burlingame Planning Department 501 Primrose Road Burlingame, Ca. 94010 New Entry Porch 1153 Bernal Ave. Burlingame, Ca. 94101 Response to Burlingame Planning Commission Hearing October 28th, 2013 design review meeting The Commission requested that the proportions of the porch were too narrow. It was suggested that we review the height (reduce) and the width (increase). We have made the following modifications. The width of the porch has been changed from 7'-11" to 9'-0" The plate height of the roof has been leered from 10'-6" to 9'-6". �ECEIVED NOU � 2 2013 ;iTv o� �,��R� ���e<,�,,;, ?4 .'„� f �� . _ '� � �.� #' ' I � � �'i i ' . . . u'�, "� . . �'.r�" � ;, "" �.�' .�{� ; '� R. ' � �_ � �, ':C ����� ����� � r.�� �� ,� . '.'6 4S.n ��'�i,'�"hS `e '.�"Nt";'. i ¢- . ^ ¢ h ` � : �. .. ' ' �' "�� �sQ . . _ :. 4 � � ��� �,�� � : t� �,�� � :t , � . ` � .c ,_ - r��:. � _ " _ , t }' ,� . � �, '�'�' � T_ � ` � .. � �� . � ' .K ��� R�. �j . fY1 �� ..i- � ' . � �. e r . v . . . . . .��-�� '• I� �! E . .r_�i� �� _ , ,. �;��.� � � �� . _ � �� � � �.� ��� .. ,�������:. .�� : , . ���. , �,�;;� �; b ; _ �, , .. ,. : �., . .s��, ; �, , -: . . . . _ -. : -. . � . .. . . �*�� ;; : , . _, � : ._ � � � � ' _. .._. � �IX�IIIIl� �. - : ,. � , } _ � �lAl�� �z: ' �� ,�F.� � - ` � � �:= � ;� �. -_ _ � � � . .,,�.�_ _: -A _ , . n �.. � � ? � �;': _ � ; ` '` :� k"� ,..� � , — --z-,. _ r - � �-�' �` a�_ ,. �, ' � � ' " , � � ` _ � , < � ..:., y$ �' � _ a ' � -� .. �` . � x' '-� ' � a � A� - A _ ��� ��; � �.. _ . . S t.:. . :�: .:n. .:" ..�. _ � . .. .- .. . _. .: �, . .. . �..:.. N w . �� � � .f�... m — �:. •. � �c • + 4 . -. � � . v�{uw . � .. . , - , _ � � Y ... � � �� �� _ �� �X7:' e - � - . . �. �,. l �.�'.^ ,�.�.,,- . '� . � - ��p' f�. .. ' u: f°�i _ _x ��T��� � .. p�j � . » . � � , . . .. . . � : ..: _ � . � ....._. . .. � . . ..�, � ,... . r � .� .. � `� . � . ... . . . �k _ -i:� .. . ... . . .. . . � � � �.:.� ,. . ., + �' " a {� !f�" wi�l[ : , f � . . . Z . . � � - .. i � ,� - �7 . , . . . ' �� �f : � . ; , ,.. . . . ' �� .� �'�� . �'i:v ,.. _ . _ ..-..�..., . .... . �.... f . � . � � < .__._... ... .. , . _ . . . . . . . , , _ . . . . � � � ... t : f . - _-.. � � , � . . i � t" � � � . ' t y� . . �:�qyr.yY r a�.�: ...�,�:. � �i Y�. M 6.. � '+� , ` �� _ , ._ ',�+ ,.}'� _ f � - i - � ��, s� • �� - : ��� � � _ � . � �'�� ,�. 'a,3 . *� � €' � � ' �z _ � j : , � � � d' �.,, "c= � e � ... . , r . , , T� . � � ;. . .. _, ,, - '' � Y .' � `.' R nV`.. . , , f ._ : _' �,_. . S.�• �_. �c.� f , . .. �.' , f� . /Y^y . . � . F, �. - - � f"�� �' a.:�� -. i E . r `� y ., ��� j� . � , . � ". .: . r. �. .. . .. ^ — _ ' �. y£_. . ' �.� . r ' �." �n ... � . � . �.. .... + _ . . R Y - _ ;�' �Y,' �j ... . :1 F �:.,., '� I �' - • - - ' t .v. .- �Y ., . _ . . , . Y:� _ SC"`!' � f � � .:-.� � � Y �.,� I h�4�! Y' �� � _ � . . � _ 'F� �} �t��, �1 . . . _ � :R y �f, �A . � �1=': � � . " .. �'•�,' ,� �" ', t :.• . . . . �.. . q. e. , . . �;. ., . .. v . �; L '•��. `�1 . +! ... s � " .�...y. � .: . � a . .. : , . i ; ` ... . � ' . ' t.�%�=-,-�;.TF- ,.:. ' , :�-.. � _.. � . . , ' i ` ] �� - ... ' . .I • � . . . . . ��i.� � �'� i ;.� . � ;S .. • . . . .. . ' �, . . � , . ,>. .. � . ... - 11'illBli�itf�� • � .. . ... �. � �y�J � .. • . 1 i . .- .-� ! +# L+n#,�. -``'�_.. ' '�� � ',; , � � 11 � 1��,"i'4 +�,'.'*'. " � R ! �!�1 �r„! � r +�.�,..:�- .. � fi + � ana- �j � ,� �� � ��: � a _ �,��.� - � " , � '�- . . ,. - � ��' � \� � - � :i c � �' � , . .., ,.... . , � 3 r }. �.. Y„�. .r � ��:` ..,.'.1t�,►,��,�'.',e'.��'.. �'A,���,,1'►4i1���` ��`,� 1'1��1� '� �.,, ��, �� '° CITY OF BURLINGAME PLANN/NG COMMISSION — Unapproved Minufes Ocfober 28, 2013 5. 1153 BERNAL AVENUE, ZONED R-1 — APPLICATION FOR DESIGN REVIEW FOR A FIRST FLOOR ADDITION TO AN EXISTING SINGLE FAMILY DWELLING (WILLIAM PASHELINSKY, ARCHITECT; MAYA EYDELMAN. APPLICANT AND PROPERTY OWNER) (STAFF CONTACT: ERICA STROHMEIER All Commissioners had visited the property. There were no ex-parte communications. Reference staff report dated October 28, 2013, with attachments. Senior Planner Hurin briefly presented the project description. Questions of staff: Why is the alcove not considered to be a bedroom? (Hurin — wouldn't matter with respect to the parking.) Chair Sargent opened the public comment period. Alex and Maya Eydelman represented the applicant. Commission comments: ■ Commended the applicant for considering an improvement to the front porch. ■ Feels that the entry element is too tall, or too narrow. Did they consider widening or lowering the height? (M. Eydelman — are keeping the entry the same width, there is nowhere to go.) ■ Feels that the height should be reduced in height to eliminate some of the white space above. (A. Eydelman — to what height?) ■ Consider reducing the height so that the peak of the entry roof peak is at the same level as the back of the shed roof element. ■ Appreciates that fact that the front windows are being replaced with better scaled windows. ■ The railing looks very utilitarian; consider something more substantial. Public comments: None. There were no other comments from the floor and the public hearing was closed. Additional Commission comments: This house is a poster child for why design review came to be in Burlingame. Commissioner Terrones made a motion to p/ace the item on the Regu/arAction Ca/endar when complete. This motion was seconded by Commissioner Sargenf. Discussion of motion: None. Chair Sargent cal/ed for a vote on the motion to place this item on the Consent Ca/endar when p/ans have been revised as directed. The motion passed on a voice vote 5-0-1-1 (Commissioner Davis absent, Commissioner DeMartini recused). The P/anning Commission's action is advisory and not appealab/e. This item concluded at 9:01 p.m. 14 ���� 6VRLINGAME t-�� : COMMUNITY DEVELOPMENT DEPARTMENT • 501 PwMRose RoE►D • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org APPLICATION TO THE PLANNING COMMISSION Type of application: -� Design Review ❑ Variance ❑ Conditional Use Permit ❑ Special Permit PROJECT ADDRESS: APPLICANT project contact person ❑ OK to send electronic copies of documents ❑ Name: I" I� R- �� L�t= l�n'( �-v� Address: I' � 5 3�� r v� c.� � �'� ❑ Parcel #: � � � G ❑ Other: p24. . 10 � 01 t� PROPERTY OWNER project contact person ❑ OK to send electronic copies of documents ❑ Name: � A'`1 A' � N ZJ �� F�'� Address: f� � 3 ���,✓ ,2 �� �c/,2- City/State/Zip: �cJ� ti �-j r�c�.,.Q ,�'r-� 9`��lti City/State/Zip: �� � �� vt C�. w�.2 L� .� `«� � Phone: �3`��� Z5b �-2Z_0� Phone: � �i ( S� b �i � � � 6 � � Fax Fax: E-mail: ��C.-�-o� ��+2� vVltAc� ��IQ�aO•�twt E-mail: c�.oC-ti7 r( �i +��. l'b✓� �:� C�j c�.�u(�.C.; �.� C� ARCHITECT/DESIGNER Pro�ect contact person ❑ QK to send electronic copiss of documents ❑ Name: � Address: City/Statei 5 Phone: � � � ^ � � �I � � C ? � Fax: E-ma �r Burlingame Business License #: Z�S 7 2 0 PROJECT DESCRIPTION: �� � C ti� t,.h � r� � C/`G �. N e t... � � �C ti t � .• AFFADAVIT/SIGNATURE: I hereby certify under penalty of pery'ury that the information given herein is true and correct to the best of my knowledge and belief. __._.�--.� ,,..�-- p�.__ �.._ Applicant's signature: ..- -' Date: � ��`fi��3 I am aware of the�roposed applica�an reby authorize the above applicant to submit this application to the Planning Commission. � - �---��-� _�-- �'� Property owner's signaturg:�'''y�~ J Date: (P /��1 //� � - . ,.. -' ' Date submitted: yt Verification that the project architect/designer has a valid Burlingame business license will be required by the Finance Department at the time application fees are paid. S: �HANDOUTS�PCApplication.doc v � �. M _. � 1 v � � S �. � , S �' .� � � ol \ � N-• U— �-.' � v � � .1 : [�' � d � 6 � � � �C" y '� � � � 4 � , William Pashelinsky Architect 1937 Hayes Street San Francisco, California 94117 (415) 379 3676 Email billpash@gmail.com Project work: 1). Proposed 38 square foot covered porch to be with a gabled roof to give the entry a more pronounced feeling. The stairs will be on 3 sides. The design will be kept in the "mediterranean style of the house and surrounding vicinity. 2). Replace windows in existing dining room at north elevation with French doors and stairs leading to side yard. �'� � � ,� } :�_ :�. � � �.,., �..d JUN ]� 7 2013 CITY OF BU�iLINGAME CDD-PLANNING DIV. _. -,�- -��;r � � .�„s�r .�:< - AA45 BERNAL � � �;�� � � � j��z:� � � ��� .�,��� , -.------ � �:_ . �E F - �� ,. ._ , . , . .? _ : � � � �:: -. -�,�� -�.,� - �l ,,e��, � � � �:� , � .:` �^.^,� � .� ;� fi �Y , ` .. ,j ��i:.. .;� t_zS �i ��� ' �. : 4 �+�:: �,�� i '� t �- '{ t _ - _ . — '��„f . . _ : �.�- . —_.�c.�.. . _.,__ �-. _ ._- : a.- �,' "''�.. -'a-�` - _ 4.._ ' ."' �'�" ��.�...__------- � 1 � SUBJECT HOUSE BERNAL ^ ""� �.�'^-s. �' � 9 � r � � �., .. ,. .1 � �.. � � - w" ,�`iw�'��� �. ,��.y:� �� . �� ( � �� "�s _ 6'�1. ^iTii.l PHOTOS 1153 BERNAL AVE 1153 BERNAL (BROADWAY SIDE) ADJ RESIDENCE BROADWAY(CORNER) . '��� � �-� 1! 2 0 �� :3 - R� �r�� i!�+fYR;d/�� 1149 BERNAL Project Comments Date: June 18, 2013 To: X Engineering Division 0 Fire Division (650) 558-7230 (650) 558-7600 � Building Division � Stormwater Division (650) 558-7260 (650) 342-3727 � Parks Division 0 City Attorney (650) 558-7334 (650) 558-7204 From: Planning Staff Subject: Request for Design Review for a first floor addition with a 9'-3" plate height to an existing single family dwelling with a detective garage at 1153 Bernal Avenue, zoned R-1, APN: 026-013-010 Staff Review: June 24, 2013 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. Replace all displaced/damaged sidewalk, driveway, curb and gutter. Reviewed by: V V Date: 6/25/2013 Project Comments Date: To: From: June 18, 2013 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review for a first floor addition with a 9'-3" plate height to an existing single family dwelling with a detective garage at 1153 Bernal Avenue, zoned R-1, APN: 026-013-010 Staff Review: June 24, 2013 1) 2) 3) 4) 5) On the plans specify that this project will comply with the 2010 California Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California Building Codes. Specify on the plans that this project will comply with the 2008 California Energy Efficiency Standards. Go to http://www.energv.ca.qov/title24/2008standards/ for publications and details. Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. Anyone who is doing business in the City must have a current City of Burlingame business license. . 6) Provide fully dimensioned plans. 7) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 8) Provide existing and proposed elevations. 9) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 10)Show the distances from all exterior walls to property lines or to assumed property lines 11)Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 12)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 13)Provide handrails at all stairs where there are four or more risers. 14)Provide lighting at all exterior la i s. Reviewed , � Date: 6-21-2013 e Cyr, O 650-558- 270 Project Comments Date: To: June 18, 2013 � Engineering Division (650) 558-7230 � Building Division (sso) 5ss-�2so X Parks Division (650) 558-7334 From: P{anning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review for a first floor addition with a 9'-3� plate height to an existing single family dwelling with a detective garage at 1153 Bemal Avenue, zoned R-1, APN: 026-013-010 Staff Review: June 24, 2013 9. Provide site plan and landscape plan as per requirements; note all planting material and identify plants. � Reviewed by: B Disco �� 9���� Date: 6/25/13 Project Comments Date: To: From: June 18, 2013 � Engineering Division (65Q) 558-7230 � Building Division (sso) 5ss-�2so X Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-72Q4 Planning Staff Subject: Request for Design Review for a first floor addition with a 9'-3" plate height to an existing single family dwelling with a detective garage at 1153 Bemal Avenue, zoned R-1, APN: 026-013-010 Staff Review: June 24, 2013 1. Provide site plan and landscape plan as per requirements; note all planting material and identify plants. � Reviewed by: B Disco Date: 6/25/13 Project Comments Dat�: June 18, 2013 Yo� � Engineering l�ivisic�n (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 Fram: Planning Staff � f=�re Division � 650) 558-7600 � S+orm�at�r �ivisi;,�n (650) 342-3��;�7 f� City Attorney (650) 558-72D4 Su�ject: Request for Design Review for a first floor addition with a 9'-3" plate height to an existing single family dwelling with a detective garage at 1153 Bernal Avenue, zoned R-1, �PN: 026-013-010 Staff Review: June 24, 2013 NO COMMENTS. � Y � ',.. _� -.., � � ig� `,�N � � 2013 I T Reviewed by: -- ��,�a�t1_IN�AME Date: �/� ��/�,�, � Project Comments Date: To: From: June 18, 2013 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 X Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review for a first floor addition with a 9'-3" plate height to an existing single family dwelling with a detective garage at 1153 Bernal Avenue, zoned R-1, APN: 026-013-010 Staff Review: June 24, 2013 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://www.flowstobay.org/documents/business/construction/Countywide_Program_B MP_Plan_Sheet Jun2012.pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay.org/documents/municipalities/nd/Materials/2012%20Materials/ Architectural_copper_BM Ps_FI NAL.pdf For assistance please contact Stephen D. at 650-342-3727 _� �„� ,.�N 7F Reviewed by: SD :�U Date: 6/19/13 � �, �. SAN MATEO COUNTY4YIOE Water Pollution Prevention Program Clean Water. Heafthy Community. Construction Best Management Practices (BMPs ) Construction projects are required to implement the stormwater best management practices (BMP) on this page, as they apply to yow project, all year ]ong. �iaterials & 1'Vaste blanagement Noo-Razallous Materia4 ❑ Benn aM cover slockpiles of sand, dirt or other wnstnwuon ma[uial aith talq w hcn rmn is forttasl a if roi xtivdr Ming used within 14 dare. � Uu (bnl don't o�cnrse) recWimcd wala for dusl comrol. Hvardous Maicrials O lab,l all ha�ardous matcriats and Imardous oaacs (sich az pesucides, pnin�s, �hinners. sohxn�s, Poel. oil, und anlJreezc) in accordance with city. wunry, s1a1e and kdelal regWutions. ❑ S�ort Aazardous matcrieLs and w�asics in water ught contaircn, storc in appmpriale ucondap� conhinmen4 and co�nr Jum at the end of evcry work day or during p�et wwlhu or �vhcn rain is forecast. O Folba• manufx�urcr s application insuuctiofn for Iwardous K materiala and be cereful rot w uu mae �un necawy. Do not apply chemicals ouldoors wl¢n min is forecasc w�i�hin 23 hours. O Arrange for appmpriate disposal ofall ha�rdous nastes. Waste Management ❑ Covcr w�as[e disposal conlaincrs sccurelp ailh tarps u Ihc cnd of erep' woh dar and during �ve� W eatlier. O CAecl- x�aAe disposal con�ainut frcqucnth� fm IcaY.s md m ma4 sure �hry� are not orerfilled, Ne�rr 6ou do�m a dumps�er on the consvucuoo si[e. O Ckan ar replace ponablt loilels. aud inspect Oum Crequenely for Itaks and spilLa. ❑ Dispose of all wastes m�d debris pmperly. Recvcle marorials and wutes [hat can be rm�cled (sucA as ssphalt. coarele. eggregam base me�erials. wood. gyp boar4 Pipe, c¢J 0 Dispote oCliquid rcsidua from pnints, lhinnerx soh�ents, glues, and clwning fluids as Im�.vdoue waste. Constructia� Entronces anJ Perimner ❑ Fslablish and maimain clTcctivc perimc�crcontmis and stabilizs all construction entroncea md e.eits m sul5cirntly convol erosion aM sediment disclurga Gom site aod uacting off sirc. ❑ Sneep or �recuwo any shul Ilacking inunediatch� and secure udimenf source to preven[ CuN�er vacking. Never hox down streeu m cican up trxAing. Equipment A�Ianagement & Spill Control G�?�':, �k � r ". • .. '� . .� Mxintenance and Parking O Daignate an area, fitted with appropriate BMPe, for relucle and equipment perling w�d storage. ❑ Perfo`m major mainlenance, repairjobs, and rehick cnd equipmrnt w�ashing oft'site.. O If ref��elinQ or veNcle maintti��ce must be dont onsilc, wok in a bcn�d erca an�ay from stortn drainf and o�cr a drip pan big enough to wllcct Iluids. Raycle or dispose of 8uids as ha��dom �vaste. ❑ If vchiclt or equipment cleaning must be done onsire, clean H�ii6 wattt only in a bemied area that mll not alloa rinse n�ary ro Iun into gut�ers. streets, storm � drains, or s�face Waten. ❑ Do�rotcican.ehicicacquipmentonsireusingsoaps, sokrnls, depeisers, s[eam cicaning equipmenC etc. $pill Pm•cn[ion anA Connol O F:ccp spiLL cleanup mamrials (rags, absotbcnU, c[c.) evailabk et thc conshuction sitc at all timcs. ❑ Inspeet .chicica and cquipmrnt Rcqucndy for end �ep ir lenls prompUy. Uu drip pxna ro catch leaks until repnirs arc made. O Ckm up spilts w kaks immediamN und dispose of cteanup ma�erinb p(opcdy�. ❑ Do �ro� Iwtt down :urfaca �vAe�e fluids ha��e spillcd Uu dry eleanup mclhods (absarbcnl materials. cat littv a'd/orre6s} ❑ S��ecp up spillcd dry melcrinls immediatcly. Do �wt ay ro wnsA them away wiN wafer, a bury �hem. ❑ Clcun up spills m d"ut artaa b� digging up nnd pmperty disposu�g oCeomuninated toJ. ❑ Rcport signi5caot spills immediamk. You are reqiti�ed by law �o report nll signi6cant rekeses of hamrdous ma�crial; including oil. To �cpon a spill: 1) Dia1911 w your local emugcoc�� �esponse number. n Gll Ihe Go�emor's OtSce oC Emergenc�� Serv�ices Warning Ccnter. (B(� 832J330 (24 hwus), Earthwork & Contaminated Soils _—,:�i.�..,___----- f� ` . 6`i :,.1'� �—� ..es";e _.,;_ - �#�v Emsion Cootml O SchedWe grading and eccaration aark for dr�• wcatha only. ❑ Stebiliu ell denudeA areas, instoll m�d maintain Icmporan' erosian wnwlt (such az emsi� cootrol fabrie or bonded fibc mavis) unul vegeUtion ie eatnblished ❑ Seed a plant vege2uon for erosion wntrol on slopa or x�hcre conctructiou i: not imnudiatcly plamcd SeAiment Contml ❑ Pro[ect storm drein inkn, gmtva, dir..hes, end d+ainage cowxs with appmpriate BMPf, such u gravcl bag. fiber'olls, bem�s. etc. ❑ P�secnt sedimen[ fiom migatiug o6site by insmlling and mainuining scdimen[ coutrols, sucA as Gber rolls, si11 fences. w scdiment basina. O Kcep ercarated toil on Ihe si�e where it MI� IfOf COIIK� UlIO �IC SGtCL ❑ Traiukr c.ecavaicd matcriels a dump trucls on Ihe sile, no[ in Ihe sheel. O Contami�utW Soik O If any of Ihe folla��ing wndiri�s am observsd. test for cw�arninarion oM conmcl �he Regional Wa�u Qualin Conuol Board: � ■ Unusnal soil co�MiUons, discolom[ioq orodor. ■ Abandared mdc�ground tenks. ■ Abandoncd wells ■ Buried bartela, dc6ris, or ¢ash Paving/Asphalt VVork nr i � � - � a a�+. . . ii O Avoid paeing and swl coating in w�el wcathe4 ar wlcen nin is forecau beforc Gcah pa�xmcnt will ha��e limt W cure. O Corcr slorm drein inlcls end manholca whcn epplping scel coaL mck coa1, slum� seal, fog scal, ea. 0 Collect end recycle or oppropriatcly dispose ofcacess abrasi�•e gra�xl o� sand. Do NOT areep or wash it inm guttcrs. � Do not use waw to wash do��n kcsh asplult wncrete paH�ement Sse�cuttint & Atphal✓Cun[Me Rcmm�al ❑ Complemly co.�a or bartiwde sromi dnin inlcu when smr uitting Uu filtcr fabriq wwh basin inld Glkn. or gra�cl bags tu Lxp shmy out o( the stofm drain syst<m. O Shwel, abosorb. or vocuum sawtut sturty and dicpose of all w�sstc as soon u �ou are finishcd in onc localion or et �he end of wch work da�� (K�hiche��cr is soonu�>. O Itsaw�cw slum• enters e ca�ch buia clean if up'unmcdialcly�. Concrete, Grout & blortar Application ❑ S�we conacte, grou� and monu undu co�xr, on pnRcls and nw�ay from drainnge arcas. Theu marcrialf mutl never rcach a slwm diain. ❑ Wesh out ca�crcic cquipmcnUwcts oKsi¢ w in a con�aincd arw, so there is no discharge into lhe underlying soil or outo surtounding arcas. Lc� concrcte hardcn and disposc of as garbagc. O Colku �he nosh xa�tt fmm �rashing e�poud aggrcgate wncrete and remorc i� (or appropriak disposal oR'zite. Dewatering ��}. ;:.k:.,:' { �'';i�+t: ! � �..'�. �' a', ! , -,;:�_ j�'• �: h : ❑ Fliccli�rlr managc all runon, all runoRn•ithin Ihe sitc. and aIl runolf Ihat disctwrgcs fmm We silc. Dircn runbn �ratcr fmm oRzi�c away from oll disiurbcd areu w o�lrcmiu ensure compliarce. K ❑ NTen dew�atcring, notih and ob�ain apprw�al fran Ihe local municipaliry. bcfort diuharging watcr lo a slrcel guucr or stam drain. Filuation w di�xrsion �lwugh a buin, t�nk, w sediment trap ma�� 6e required. ❑ In arcaz of Icnowr cauamination, �esting is rtquired prior Io 2uu or diuha�e of ground�va�c, Consull wiih ��c Engincu io dctcrmine �vhelhu msting is requ'ved and hmr �o inlcrprel msula. Contami�atcd gmundwalcr mus� bc vca�cd or haukd oB-sitc Por propu disposel. Storm drain polluters may be liable for fines of up to $10,000 per day! Painting & Paint Removal � �'�-= .w N'4 P , ". .F'R.' t,,. ..a, _ t , � ; `�,.., .� � PaintinR clnnup ❑ Neru dwn bmshcs or nnsc paim wmniners into a sueet, guner, slorm dmin. or surfatc v�a�crx ❑ For �. eier-bascd peints, paim ou� b�ushes io 0¢ c Icn1 possiblc. Rinx to �hc sanilnry• scwcronce you hacc gaincd pcm�ission hom �iC local was�m.ala Irc�ImcM aullqritV. Nc.'Cr pOur painl dmrn a drnin. ❑ For oil-bescd paints, pnin� ail brushcs Io the exiem possible and clnn u�ith lhiimer or wlcenl in a proptt conraincc Filiu uid rc�¢e �hinncrs and solvcn�s. Disposc of ¢sidue aid um�sable Ihiimer/sohxms ns harardous wasic. Painl rtmur:�l ❑ Chcmical paint stripping msiduc and chips and dusi Gom merine painl5 ar paints wnuining Icod or �ribWylun musl bc disposcd of as harardnuz H�es�c. ❑ Paim chipq end dust f m nonJ�ar�rtlona dry stripping and s�nd blaring mar� bc s�vcp� up or wllw�ed in plasiic dmp <lodi: u�d disposcd of as vash. Landscape Nlaterials ( �t t -- /f'��Z.� O Conrain rtoekpiled landuaping ma�erielt br smring Ihcm undcr larps �.�hcn ihc�� uc na acli.�cly bcu�g uud. ❑ Stxk crodible tandscapc nm�crial on pallctt. Co�er w slorc U� �sc maicriats w�hen Ihcr arc not acuvelr hing uud m applicd. ❑ Discontinuc appliu[ion of any crodible �andswpc molcriel w�il6in 2 da��s bcfore a foreca5l rein n�cnt or during �cct �vcmhcr. � SAp pA7 q[QUNTYWID[ WaterPo��ution Prevention Program Clein W�ur. ��Khy [emmcnh�. Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during instaflation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. M unicipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) discharges to storm drains. ' Building with copper gutter and drainpipe. must be implemented to prevent prohibited During lnstal/ation � If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local� sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off-site for proper disposal. • Consider coating the copper materials with an impervious coating that prevents further. corrosion and runoff. This will also maintain the desired color for a longer time, requiring less maintenance. Storm drain inlet is blocked to prevent prohibited discharge. The water musf be pumped and disposed of properfy. During Maintenance Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If this is not an option, haul the wash water off-site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Photo credR: Don sancruary Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.orq (click on "Business", then "New Development", then "local permitting agency"). FINAL February 29, 2012 RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Desiqn Review for a first floor addition with a 9'-6" plate heiqht to an existinq sinqle familv dwellinq with a detached qaraqe at 1153 Bernal Avenue, zoned R-1, Mava Evdelman, 1153 Bernal Avenue. Burlinqame. CA 94010, propertv owner. APN: 026-183-010• WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 25, 2013, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. 2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman I, , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 25th dav of November. 2013 by the following vote: Secretary EXHIBIT "A" Conditions of approval for Categorical Exemption and Design Review. 1153 Bernal Avenue Effective December 5, 2013 that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 12, 2013, sheets A-1.01 through A-3.02 and sheet L1; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the City Engineer's June 25, 2013 memo, th Official's June 21, 2013 memo, the Parks Supervisor's June 25, 2013 24, 2013 memos, the Fire Marshal's June 20, 2013 memo, and Coordinator's June 19, 2013 memo shall be met; e Chief Building and September the Stormwater 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water runoff; EXHIBIT "A" Conditions of approval for Categorical Exemption and Design Review. 1153 Bernal Avenue Effective December 5, 2013 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 15. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. . CITY OF BURUNGAME w- . COMMUNITY DEVELOPMENT DEPARTMENT BURLINGAME 501 PRIMROSE ROAD •�-=s =•� s�� ; f�.,w �, BURLINGAME, CA 94010 � ' `'� � � �g � _ ' �L'� ,'.�'„ � PH: (650) 558-7250 o FAX: (650� 696-379Q � �: - - www.burlingame.org :�` � - '�' � � :r-. ; F .� . J 3e1 � '' �^ " �'+ • "9 f � � ! y� , t : ..�+�,_ .YrT. �.�'. -:�*,�'f Site: 1153 BERNAL AVENUE '�` � The City of Burlingame Planning Commission announces the following public hearing on MONDAY, NOVEMBER 25, 2013 at 7:00 P.M. in the City Hall Council Chambers, 501 Primrose Road, Burlingame, CA: Application for Design Review for a first floor addition to an existing single family dwelling at 1153 BERNAL AVENUE zoned R-l. APN 026-183-010 Mailed: November 15, 2013 (Please refer to ofher side) � ���.��� � i' i J.�'.; i;i t,,-._d Trcr:, 9=.0'0 � � {_ V J � 1-i�7 � PUBLIC HEARIIVG �VOTICE Citv of Burlinqarne A copy of the application and plans for this project may be reviewed prior to the meeting at the Community Development Department at 501 Primrose Road, Burlingame, California. If you challenge the subject application(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in the notice or in written correspondence delivered to the city at or prior to the public hearing. Property owners who receive this notice are responsible for informing their tenants about this notice. ' For additional information, please call (650) 558-7250. Thank you. William Meeker Community Development Director PUBLIC HEARING NOTICE (Please refer to other side)