Loading...
HomeMy WebLinkAbout1149 Bernal Avenue - Resolution� ,� RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: PLANNING DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD CA 94010 20Q5-061284 11:38am 04,'15/05 R1 Fee: NO FEE Count of pages 12 Reco�ded in Offiicial Records County of 5an Mateo V4'arren S�ocum Assessor-County Clerk-Recorder �'ll��!'�E�' II��� II'N I��� II'�' II'�I I��I�'l�! I il� �I'�' f�1��� �!I'J �!'il► * c 0 Q 5 0'] a 1 i 8 4 A� R* RESOLUTION NO. 032-2005 1149 BERNAL AVENUE; APN: 026-183-020 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. I ��� Date: 04/08/2005 �� Margar Mo oe, Cit lanner RESOLUTION 032-2005 RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for design review for a new, two-story sin�le familv dwelling and detached gara�e at 1149 Bernal Avenue, zoned R-1. Brian Cassidv, 2121 Easton Drive, Burlin�ame CA 94010 propertv owner APN: 026-183-020; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on March 28, 2005, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, 15303, Class 3—(a) construction of a limited number of new, small facilities or structures including (a) one single family residence or a second dwelling unit in a residential zone. In urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. 2. Said design review is approved, subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such design review are as set forth in the minutes and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. � � � Ch irman I, h1lPiWi?�'y ��^'�Qtb6 , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 28th day of March, 2005 by the following vote: AYES: COMMISSIONERS: Auran, Bojues, Brownrigg, Deal, Osterling, Vistica NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: Keighran ABSTAIN: COMMISSIONERS: NONE EXHIBIT "A" Conditions of approval for categorical exemption and design review. 1149 Bernal Avenue Effective Apri17, 2005 1. that the project shall be built as shown on the plans submitted to the Planning Departrnent date stamped February 17, 2005, sheets A-1 through A-4 and L1.0, and date stamped March 16, 2005, sheet A-5, and that any changes to building materials, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; 2. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; 3. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued for the new residence and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 4. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water runoff; 5. that prior to scheduling the foundation inspection a licensed surveyor shall locate the property corners and set the building footprint; 6. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation of the new structure(s) and the various surveys shall be accepted by the City Engineer; 7. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certification under penalty of perjury. Certifications shall be submitted to the Building Department; 8. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; 9. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans; EXHIBIT "A" Conditions of approval for categorical exemption and design review. 1149 Bernal Avenue Effective Apri17, 2005 Page 2 10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 11. that the conditions of the City Engineer's and Fire Marshal's February 11, 2005, memos, the Chief Building Official's February 10, 2005, memo, and the Recycling Specialist's and NPDES Coordinator's February 14, 2005, memos, shall be met; 12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; 13. that the project is subject to the state-mandated water conservation program, and a complete Irrigation Water Management Plan must be submitted with landscape and irrigation plans at time of pemut application; and 14. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance. Project Comments Date: To: From: 02/09/2005. ao( City Engineer ❑ Chief Building Official ❑ Recycling Specialist ❑ Fire Marshal ❑ City Arborist ❑ City Attorney Planning Staff ❑ NPDES Coordinator Subject: Request for design review for a new, two-story single family dwelling with a detached 2- car garage at 1149 Bernal Avenue, zoned R-1, APN: 026-183-020 Staff Review: 02/14/2005 1. See attached. 2. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. 3. Sheet A-5 of plans shows gutters to be constructed across property line which is not allowed. Plans shall also show foundation plans for the garage since garage is built on property line. No work shall be constructed across property lines. � � Reviewed by: V V �7��j< Date: 2/11/2005 � , � PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION PLANNING REVIEW COMMENTS .•�y,ro �� sy;�� . Project Namet •� � ,. .. ' - Project Address:_ ��� �t,�.�c,1�`iri: , ---_ The following requirements apply to the project 1 ,� A property. boundary survey shall be preformed by a licensed land surveyor. The survey shall show a11 property lines, property corners, easements, topographical features and utilities. (Required prior to the . building permit issuance.) _ 2 � The site and roof drainage sha11 be shown on plans and should be made to drain towards the Frontage Street. (Required prior to the building permit issuance.) � 3. The applicant sha11 submit project grading and drainage plans for . approval prior to the issuance of a Building permit. 4 The project site is in a flood zone, the project shall comply with the City's flood zone requirements. 5 � A sanitary sewer laterall� is required for the project in accordance with the City's standards. (Required prior to the building permit issuance.) 6. The project plans shail show the required Bayfront Bike/Pedestrian trail and necessary public access improvements as required by San Francisco Bay Conservation and Development Commission. 7. Sanitary sewer analysis is required for the project. The sewer analysis shall identify the projecYs impact to the City's sewer system and any sewer pump stations and identify mitigation measures. 8 Submit traffic trip generation analysis for the project. 9. � Submit a traf�ic impact study for the project. The traffic study should identify the project generated impacts and recommend mitigation � measures to be adopted by the project to be approved by the City . Engineer. 10. The project shall file a pazcel map with the Public Works Engineering Division. The parcel map shall show all existing property lines, easements, � monuments, and new properiy and lot lines proposed by the map. Page 1 of 3 U:�private development�PLANNING REVIEW COMI��NTS.doc :� , , � PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 11. A latest preliminary title report of the subject parcel of land shall be submitted to the Public Works Engineering Division with the pazcel map for reviews. 12, Map closure/lot closure calculations shall be submitted with the parcel map. 13 � The project shall submit a condominium map to the Engineeririg Divisions in accordance with the requirements of the Subdivision Map Ac� 14 � The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk and other necessary ; appurtenant work. 15 The project shall, at its own cost, design and construct frontage streetscape improvements including sidewalk, curb, gutters, pazking meters and poles, trees, and streetlights in accordance with streetscape master plan. 16 By the preliminary review of plans, it appeazs that the project may cause adverse impacts during construction to vehicular traffic, pedestrian traffic and public on street parking. The project shall identify these impacts and provide mitigation measure acceptable to the City. _ 17 The project shall submit hydrologic calculations from a registered civil . engineer for the proposed creek enclosure. The hydraulic calculations must show that the proposed creek enclosure doesn't cause any adverse impact to both upstream and downstream properties. The hydrologic calculations sha11 accompany a site map showing the area of the 100-year flood and existing improvements with proposed improvements. 18 Any work within the drainage area; creek, or creek banks requires a State Department of Fish and Game Permit and Army Corps of Engineers Permits. � 19 No construction debris shall be allowed into the creek. 20 �_ The project sha11 comply with the City's NPDES pernut requirement to prevent storm water pollution. 21 The project does not show the dimensions of existing driveways, re- submit plans with .driveway dimensions. Also clarify if the project is proposing to widen the driveway. Any widening of the driveway is subject to City Engineer's approval. 22 The. plans do not indicate the slope of the driveway, re-submit plans showing the driveway profile with elevations _ Page 2 of 3 U:lprivate development�PLANNING REVIEW COMMENTS.doc , ,�•• �' PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 23 The back of the driveway/sidewalk approach shall be at least 12" above the flow line of the frontage curb in the street to prevent overflow of storm water from the street into private property: 24. For the takeout service, a gazbage reeeptacle shall be placed iri front. The � sidewalk fronting the store sha11 be kept clean 20' from each side of the property. . 25. For commercial projects a designated gazbage bin space and cleaning azea shall be located inside the building. A drain connecting the garbage area to the Sanitary Sewer System is requueii. Page 3 of 3 U:�private development�PLAI�INING REVIEW COh�IENTS.doc Date: To: From: Subject: Staff Review: Project Comments 02/09/2005 ❑ City Engineer ❑ Recycling Specialist ❑ Chief Building Official [� Fire Marshal ❑ City Arborist ❑ NPDES Coordinator ❑ City Attorney Planning Staff �Request for design review for a new, finro-story single family dwelling with a detached 2- car garage at 1149 Bernal Avenue, zoned R-1, APN: 026-183-020 02/14/2005 ' ', Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. ', 2. Provide double backflow prevention. � Reviewed by: ��--/� ���.�� Date: 1� �`.Q.G--a.s— Project Comments Date: To: From: 02/09/2005 � ❑ City Engineer X Chief Building Official ❑ City Arborist ❑ City Attorney ❑ Recycling Specialist ❑ Fire Marshal ❑ NPDES Coordinator Planning Staff Subject: Request for design review for a new, two-story single family dwelling with a detached 2- car garage at 1149 Bernal Avenue, zoned R-1, APN: 026-183-020 . Staff Review: 02/14/2005 1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame Municipal and Zoning Codes, and all other State and Federal requirements. 2) Provide fully dimensioned plans. 3) Obtain a survey of the property lines for any structure within one foot of the property line. 4) Roof eaves must not project within two feet of the property line. 5) Exterior bearing walls less than three feet from the property line must be constructed of one-hour fire-rated construction. 6) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. 7) Provide guardrails at all landings. 8) Provide handrails at all stairs where there are more than two risers. 9) Provide lighting at all exterior landings. 10)The fireplace chimney must terminate at least two feet above any roof surFace within ten feet. Date: � / � /� ../ l . , ,+ . Project Comments Date: 02/09/2005 To: � City Engineer � Chief Building Official � City Arborist . � City Attorney From: Planning Staff X Recycling Specialist � Fire Marshal 0 NPDES Coordinator Subject: Request for design review for a new, finro-story single family dwelling with a detached 2- car garage at 1149 Bernal Avenue, zoned R-1, APN: 026-183-020 Staff Review: 02/14/2005 Applicant shall submit a Waste Reduction Plan and recycling deposit for this and all covered projects prior to demolition, construction or permitting. Reviewed by: Date: 2 �(//�� 1� w� ' � . Project Comments Date: 02/09/2005 To: � City Engineer � Chief Building Official � City Arborist � City Attorney From: Planning Staff � Recycling Specialist � Fire Marshal ✓ NPDES Coordinator Subject: Request for design review for a new, two-story single family dwelling with a detached 2- car garage at 1149 Bernal Avenue, zoned R-1, AP N: 026-183-020 Staff Review: 02/14/2005 Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution including but not limited to ensuring that all contractors implement construction Best Management Practices (BMPs) and erosion and sediment control measures during ALL phases of the construction project (including demolition). Additional stormwater requirements may be issued as conditions of approval for this project. Brochures and literatures on stormwater pollution prevention and BMPs are available for your review at the Planning and Building departments. Distribute to all project proponents. For additional assistance, contact Eva J. at 650/342-3727. Reviewed bv: t� e•���►.`� Date: O2 ��'� ��