HomeMy WebLinkAbout1115 Burlingame Avenue - Approval LetterDocuSign Envelope ID: 19DDDACE-5818-43F9-B3C7-3C84DA183648
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
April 23, 2021
Lijun He
1999 Beach Park Boulevard, Unit 19
Foster City, CA 94404
Re: 1115 Burlingame Avenue
Dear Mr. He,
�. CI7Y
t(`� i
��
��_,
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the April 12, 2021, Planning
Commission approval of your application for Commercial Design Review became effective April 22,
2021. This application was for changes to the front fa�ade of an existing commercial storefront at 1115
Burlingame Avenue, zoned BAC.
The April 12, 2021, minutes of the Planning Commission state your application was approved with the
following conditions:
2
3
4
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped March 31, 2021, sheets A0.0 through A6.0;
that any changes to the size or envelope of the building, which would include changing or adding
exterior walls or parapet walls, shall require an amendment to this permit;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYI or amendment to be determined by Planning staff);
that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
5. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
6. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
:� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::
DocuSign Envelope ID: 19DDDACE-5818-43F9-B3C7-3C84DA183648
April 23, 2021
1115 Burlingame Avenue
Page 2
7. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
8. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
in effect at the time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
9. that prior to scheduling the framing inspection, the project architect, engineer or other licensed
professional shall provide architectural certification that the architectural details such as window
locations and bays are built as shown on the approved plans; if there is no licensed professional
involved in the project, the property owner or contractor shall provide the certification under
penalty of perjury. Certifications shall be submitted to the Building Department; and
10. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An
extension of up to one year may be considered by the Planning Commission if application is made
before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
CDocuSigned by:
�� ���.�
28D6423C2EBB49F...
Kevin Gardiner, AICP
Community Development Director
c. Olive Grove Capital, LP, property owner
1115 Burlingame Avenue, Burlingame
Chief Deputy Valuation, Assessor's Office
(110 FT X 140 FT COR BLGME AVE & LORTON AVE BLOCK 11 TOWN OF BURLINGAME
MAP NO 1 RSM 2/87; APN: 029-211-260)
File
�. Register online to receive City of Burlingame e-mail updates at www.burlingame.org �: