1 Introduction
2
1.1 Project Description
3
2 Transportation Context
5
2.1 Transit Service
5
2.2 Bicycle Facilities
8
2.3 Pedestrian Facilities
11
3 Transportation Demand Management
12
4 Compliance with Guidelines and Trip Reduction Estimates
15
4.1 C/CAG Requirements
15
4.2 Trip Reduction Evaluation
17
4.3 Conclusion
19
Appendix A. TDM Diagrams Provided by DES Architects + Engineers
20
Appendix B. Project Trip Generation Estimates
23
Appendix C. Project Shuttle Routing
24
FEHR-j PEERS
1 Introduction
This report presents the Transportation Demand Management (TDM) program for the proposed Burlingame
Point Office campus development located at 300-333 Airport Boulevard in Burlingame, California. The office
will be occupied by single tenant, Facebook. This report identifies TDM measures designed to provide a
reduction in peak hour trips of at least 10 percent over comparable office campuses in San Mateo County.
This trip reduction is consistent with the site's reduced parking supply that is 10 percent below city code
requirements, from 2,547 required stalls to 2,292 stalls.
The TDM Program satisfies the City/County Association of Governments of San Mateo County (C/CAG)
requirement to mitigate all new peak -hour trips based on the C/CAG trip credit guidelines.' Peak period
includes 6:00 AM to 10:00 AM and 3:00 PM to 7:00 PM, and peak hour is defined as the hour in which the
heaviest daily traffic volume occurs, generally during morning and afternoon commute times. C/CAG
guidelines require developments projected to generate 100 or more net new peak hour trips to implement
TDM measures that have the capacity to mitigate all new peak hour trips based on C/CAG programmatic trip
credits. The project would generate an estimated 965 AM peak hour trips and 945 PM peak hour trips.' The
C/CAG guidelines provide a list of acceptable TDM measures and the equivalent number of trips that will be
credited for each measure. The TDM program, described in this report, follows and expands upon the
framework of these guidelines.
This TDM Program provides a set of strategies, measures, and incentives to encourage future employees of
Burlingame Point to walk, bicycle, ride public transportation, carpool, or use any other alternatives instead of
driving alone when traveling to and from work. In order to support that goal, this plan presents a range of
proven strategies and measures used across the Bay Area under a flexible implementation plan that can meet
the needs of the future tenants of Burlingame Point. This report represents an update of the TDM plan created
in 2011 for the project site and builds upon the conditions of approva► from August 28, 2018.
' City/County Association of Governments of San Mateo County, Guidelines for Implementing the Land Use Component of the Congestion Management
Program, 2004.
z See Appendix B for proposed project trip generation estimates.
FEHR ;PEERS
1.1 Project Description
The project site is located at 300-333 Airport Boulevard in the city of Burlingame, California, as shown in
Figure 1. The site is situated in the Anza area of Burlingame, which is in the northeast portion of the City north
of US-101. Existing land uses in the surrounding area are primarily offices, hotels, airport parking, and parks.
The project site is accessible via the following existing transportation facilities and services:
• Motor vehicle access through nearby interchanges of US-101 at Anza Avenue, Broadway, and
Peninsula Avenue.
• Transit access through nearby rail transit stations: the site is approximately two miles from the
Burlingame Caltrain Station, 1.8 miles from the Broadway Station (which currently lacks weekday
service), and 3.3 miles from the Millbrae Intermodal Transit Center (with both BART and Caltrain
stations). Shuttles are available to carry employees between the Millbrae Station and an existing
transit stop located about 0.2 miles west of the project site.
• Bicycle access through designated bicycle routes and lanes, including Airport Boulevard, Peninsula
Avenue, Broadway, and the San Francisco Bay Trail.
e proposed project
consists a total of 767,000 k =q v� _; v11_�r'1 {►
square feetcontaining two
5-story office buildings, 333 Airport Blvd 322 Airport Blvd
one 7-story office building,;
one 8-story office building
ps k. r
and one 2-story amenitiesUK
,:.
building. Parking will be "." "".' '"' B4
..
provided in a five -story I
311 Airport Blvd �,
parking structure, in a,
podium level parking areas
below the four office" <<
buildings, and in smaller
surface parking lots
scattered throughout the 307 Airport Blvd J U
site. Overall, the project will
'. An'po�ttBRc,
provide 2,293 parkingIll IA!
-•
spaces. The existing —----
Airport Boulevard
Figure 2. Illustrative Site Plan
alignment will be rerouted
through the center of the campus. No buildings will be constructed within the 100' shoreline band; these
areas, including the new Bay Trail segment, will lie restored and provide public access and a rehabilitated
shoreline protection structure. The Bay Trail, providing dedicated pedestrian and bicycle access, will run along
the east and west side of the project site. Airport Boulevard through the campus will be a bicycle route. An
illustrative site plan of the proposed project is shown in Figure 2. The project will be constructed in phases.
The project will also feature enhancements to the transportation services and infrastructure available on site.
These enhancements are detailed in this TDM Program.
FEHR A" PEERS
rancisco Bay
LEGEND
---- City Boundary Project Site Figure 1
�- Caltrain Station Project Site Location
2 Transportation Context
This chapter describes the existing non -automotive transportation system in the project vicinity, including the
transit services and facilities, bicycle facilities, and pedestrian facilities.
2.1 Transit Service
The existing transit facilities and services near the project site are shown in Figure 3 and described in detail
below.
Rail Service
Caltrain and BART provide rail passenger services to regional destinations such as San Francisco, Oakland,
and San Jose.
Caltrain currently runs up to five trains per hour in each direction during peak commute
Carr periods (approximately 6:00 to 9:00 AM and 4:00 to 7:00 PM). Beginning in 2022,
Caltrain will increase service to six trains per hour in each direction upon electrifying
service. During off-peak periods, service is less frequent as trains only run about once
an hour. The project site approximately two miles to the north of the Burlingame
Station, which is located at Howard Avenue and California Drive. Only some trains provide service at
Burlingame: during peak commute periods, two trains per hour stop at the station. Additionally, Broadway
Station is located approximately 1.8 miles to the west of the project site and the Millbrae Station (within the
Millbrae Intermodal Transit Center) is 3.3 miles to the northwest. Broadway Station only has service on the
weekend, whereas Millbrae Station is served by both limited stop and express trains during peak commute
hours. As Caltrain implements service improvements in 2022 and onwards, weekday service will be re-
instated at Broadway Station and all three stations are expected to see increased service.
Commuters at the Millbrae
Station may use the
Burlingame Bayside Area
Shuttle to access the Project
site (discussed further
below). This shuttle provides
service during weekday
commute hours between
Millbrae Station and a transit
stop located approximately
0.2 miles from the north side
of the project site. There are
no shuttles connecting
Burlingame Station to the
project site.
FEHRtPEERS
Caltrain will operate an electrified fleet beginning in 2022, enabling faster and
more frequent service.
B A R T Burlingame employees may also utilize Bay Area Rapid Transit (BART), a regional, rail
rapid transit service connecting the Peninsula with San Francisco and the East Bay. The
A nearest BART station is located at Millbrae. During the AM and PM commute periods
(6:00 to 9:00 AM, 4:00 to 7:00 PM) as well as during off-peak periods, BART operates
four trains per hour through Millbrae Station. As noted, the Burlingame Bayside Area
Shuttle is available to connect employees from Millbrae station and to the project site during commute hours.
Bus Service
San Mateo Transit District, or SamTrans, provides local and regional bus service
wmft throughout San Mateo County as well as portions of San Francisco and Palo Alto.
SamTrans does not provide direct service to the project site. The closest SamTrans
stop to the project site is located at Peninsula Avenue and Delaware Street, about a 1.5
mile walk from the project site across US-101. This stop is served by Route 292, which
connects the Hillsdale Shopping Center in San Mateo to the Transbay Terminal in
downtown San Francisco and runs along California Drive in Burlingame. Buses run approximately every 30
minutes.
Shuttle ,Service
The Burlingame Bayside Area Shuttle,
managed by the Peninsula Traffic
Congestion Relief Alliance (also known
as Commute.org), provides service
between the Millbrae Station and office
buildings in the Burlingame Bayside
area during morning and evening
commute hours. Shuttles operate
approximately once every 20 minutes
between 7:00 to 9:30 AM and 4:00 to
6:30 PM. The closest shuttle stop is
currently located at the intersection of
Airport Boulevard and Bay View Place,
approximately 0.2 miles from the
northern edge of the project site. This
shuttle service is free to riders.
The Burlingame Bayside Area Shuttle provides connections between Millbrae
Station and the Burlingame Bayside Area.
FEHR ''PEERS 6
LEGEND
-Z-= Caltrain Station SamTrans Bus Stop
locim BART Station o = Burlingame Bayside Area
Shuttle Stop
® Project Site
101
Figure 3
Existing Transit Network
2.2 Bicycle Facilities
The existing bicycle facilities are shown in Figure 4 below. As described below, bicycle routes are classified
as Class I, Class II, Class III, or Class IV.
Shared -Use Path (Class I Bikeway. — Bike paths provide a completely separate right of way that is
designated for the exclusive use of people riding bicycles and walking with minimal cross -flow traffic.
Such paths are often located along creeks, canals, and rail lines. Class I Bikeways can also offer
opportunities not provided by the road system by serving as both recreational areas and desirable
commuter routes.
SHARED -USE PATH (CLASS 1)
Completely separated right-of-way for exclusive use of bicycles and pedestrians
Not to scale I l" I 8'-12• 12•
Shoulder Paved Path Shoulder
Bike Lane (Class II Bikeway) — Using special lane markings, pavement legends, and signage, bike
lanes provide designated street space for bicyclists, typically adjacent to the outer vehicle travel
lanes.
BICYCLE LANE (CLASS II)
On -street striped lane for one-way bike travel
Bike Lane Sign
(Optional)
1
Not to scale I Sidewalk 1 7-8- 1 5'-6' 1 Travel Lane I Travel Lane 1 5'-6' 1 Sidewalk
Parking Bike Lane Bike Lane
FEHRtPEERS
• Bike Route (Class III Bikeway — Bike routes provide enhanced mixed -traffic conditions for bicyclists
through signage, sharrow striping, and/or traffic calming treatments, and provide continuity to a
bikeway network. Bike routes are typically designated along gaps between bike trails or bike lanes,
or along low -volume, low -speed streets.
BICYCLE ROUTE (CLASS III)
Shared on -street facility
Bicycle Route Signs
Not to scale I Sidewalk I Parking I Travel Lane I Travel Lane I Sidewalk I
• Protected Bikeway (Class IV Bikeway. — Cycle tracks or separated bikeways are set aside for the
exclusive use of bicycles and physically separated from vehicle traffic. Separated Bikeways were
adopted by Caltrans in 2015. Types of separation may include, but are not limited to, grade
separation, flexible posts, physical barriers, or on -street parking.
CYCLE TRACK/SEPARATED BIKEWAY (CLASS IV)
Physically separated bike lane
Not to scale I Sidewalk l 5'-7' I PaI MIg I I I WHI I Iavel I b' - t ' 1 Sidewalk l
Bike Lane & Lane Lane Bike Lane &
3-5' rnin. Buffer 2-3' rnin. [suffer
Bicycles may access the project site via Airport Boulevard, which alternates between a Class II lane and a
Class III bicycle routes. To the east of the project site, Airport Boulevard connects to a Class II bicycle lane
on Peninsula Avenue, which provides further connections to the bicycle network within the City of Burlingame
south of US-101. To the west, Airport Boulevard connects to Class II bicycle lanes on Broadway. Bicyclists
may also cross the US-101 via a bicycle bridge adjacent to Broadway. Additionally, the San Francisco Bay
Trail, a planned 400-mile system of trails encircling the San Francisco Bay, provides Class I bicycle facilities
to the north, east, and west of the project site.
FEH R A' PEERS
LEGEND
- Class I Bicycle Route Project Site
Class II Bicycle Route
Class III Bicycle Route
Figure 4
Existing Bicycle Facilities
2.3 Pedestrian Facilities
Pedestrian facilities include sidewalks, crosswalks, trails, and pedestrian signals and warning devices. Paved
sidewalks are located on both sides of Airport Boulevard to the west of the project site, whereas there are no
paved sidewalks on Airport Boulevard to the east. The intersections near the project site along Airport
Boulevard lack crosswalks. Pedestrian access between the Anza area to areas west of the US-101 is limited.
Pedestrians may cross the US-101 at freeway overpasses located on Broadway to the west and Peninsula
Avenue to the east.
Pedestrian facilities on Airport Boulevard near the project site.
FEHR ")'PEERS 11
3 Transportation Demand Management Program
The Burlingame Point TDM Program includes shuttle service to provide first/last mile connections to BART
and Caltrain, transit subsidies, on -site amenities such as food services, secure bicycle parking, and other
incentives and programs to promote alternatives to driving alone and to reduce the number of off -site trips in
single occupancy vehicles. Table 1 summarizes the TDM measures, which are described in detail below.
Measures 1 to 11 are TDM measures identified by C/CAG, whereas Measures 12 to 18 provide additional
support for travel by alternative modes. Appendix A presents a summary of the proposed general locations
for the site design features affiliated with the TDM program. Final locations for TDM measures will be
determined with City staff in coordination with the Developer and office tenant.
Table 1. Burlingame Point TDM Program Measures
1 Secure bicycle storage Each of the five project buildings will provide standard wall C/CAG
racks and bicycle lockers; additionally, the four office
buildings will provide racks for e-bikes. In total, the site will
provide 228 bicycle racks, including 34 a -bike capable
racks.
2 Showers and changing Each of the four office buildings will provide showers and C/CAG
rooms changing rooms available to all employees. In total, the site
will provide 21 showers.
3 Shuttle and commuter The tenant will participate in the Commute.org shuttle C/CAG
bus service' program and will provide supplemental shuttle service
between Millbrae Station and the project site. This shuttle
will serve as a first/last mile solution for Caltrain, BART, and
SamTrans riders. A shuttle stop will be provided onsite for
both services.
4
Subsidizing transit
The tenant will provide employees who commute by public
C/CAG
fares for employees
transit with a pre-tax subsidy of up to $260 per month.
5
Preferential parking for
The tenant will provide preferential parking stalls for
C/CAG
vanpoolers
vanpool.
6
Implementation of a
The tenant will organize a vanpool program that will cover
C/CAG
vanpool program
all travel expenses, including fuel and tolls.
7
Operation of a
The tenant will provide a staffed transportation help desk to
C/CAG
commute assistance
provide transit information and brochures as well as assist
center
employees with trip planning.
8
Survey employees to
Two surveys will be developed and administered every year
C/CAG
examine use and best
to examine TDM program participation and commute mode
practices
share. Alternative mode use changes will be tracked with the
employee survey and compared to prior years' results.
9
Installation of video
At least four video conferencing centers will be installed at
C/CAG
conferencing centers
each office building for use by the tenants of the facility.
FEH R t PEERS 12
10 Provision of onsite The tenant will provide amenities including banking, retail, a C/CAG
amenities coffee shop, dry cleaning, delivery pharmacy, and on -site
food service for employees. Additionally, the tenant will
include two bicycle repair stations and a full -service bicycle
repair shop.
11 Guaranteed Ride Home The tenant will participate in Commute.org's Guaranteed C/CAG
Program Ride Home Program. Commute.org provides up to 4
reimbursed rides per calendar year for people who walk,
bike, take transit, ride a shuttle, carpool, or vanpool to work
within San Mateo County.
12 TDM Coordinator
The tenant will designate a TDM Coordinator for the site.
Additional
The TDM Coordinator will promote the TDM Program,
activities, and features to all employees and develop the
transportation help desk and provide assistance on site (i.e.
Measure #7). Additionally, the TDM Coordinator will provide
information via new employee orientation packets, flyers,
posters, email, and/or educational programs, actively market
alternative mode use, and provide rideshare matching
assistance. The TDM Coordinator will conduct biannual
employee commute surveys to identify the need for mode
specific promotional material and educational programs (i.e.
Measure #8).
13 Direct route to transit
Well -lit paths will be provided using the most direct route to
Additional
the nearest shuttle stop from the different buildings. These
paths are shown on Appendix A.
14 Passenger loading
A convenient passenger loading zone for carpool and
Additional
zones
vanpool drop-off and pickup will be provided for all
buildings.
15 Pedestrian
On -site pedestrian facilities will be provided, including
Additional
connections
sidewalks and lighted paths between the buildings, parking
areas, and Airport Boulevard. Pedestrian safety
enhancements to facilitate Airport Boulevard crossings will
also be provided. These connections are shown on
Appendix A.
16 Information boards
Information kiosk/boards will be located in employee break
Additional
and kiosks
rooms or other common gathering areas (e.g. the building
lobby) to supplement the commute assistance center
(Measure #7). The kiosk will contain information on on -site
amenities, shuttles, SamTrans, Caltrain, BART, vanpool
organizations, bicycle routes, and other transportation
options information. The TDM Coordinator will be in charge
of updating information.
FEHR� PEERS 13
17 Promotional programs Promotional programs include new employee orientation
packets outlining alternative transportation options and an
orientation program, which will explain the importance and
benefits of using alternative transportation modes.
Packets will include (but not be limited to) information on
carpool/vanpool options, shuttle services, on -site amenities,
and bicycle options. Other annual or quarterly events could
include commute fairs where various transit organizations
set up marketing booths during lunch and events like "Bike
to Work Day."
Additional
18 Transportation Options Visitors to Burlingame Point will also be able to use the on- Additional
for Visitors (Maps and site transportation amenities. Maps and schedules will be
Schedules); On -site available online and at the commute assistance center.
Assistance
Note:
1. To reduce traffic in residential neighborhoods, shuttle buses from the project would be restricted from routing through the North
Shoreview neighborhood, including North Shoreview Boulevard (see Appendix C).
Existing Conditions - Bicyclist on Airport Boulevard (left); Commuters waiting for a shuttle on Airport Boulevard (right)
FEHR� PEERS 14
4 Compliance with Guidelines and Trip Reduction Evaluation
This section documents the proposed TDM Program's compliance and trip reduction evaluation with respect
to:
1. WAG requirement to mitigate all new peak -hour trips based on the C/CAG trip credit guidelines
2. Ten percent reduction in peak -hour trips required to justify the reduced parking ratio
4.1 C/CAG Requirements
C/CAG Guidelines require the Burlingame Point TDM Program to have the capacity to reduce the demand for
new peak hour trips. According to WAG Guidelines, the amount of "new" peak hour trips' is calculated based
on standard rates developed by the Institute of Transportation Engineers (ITE).4 Applying ITE rates, the
proposed project is estimated to generate 965 new AM peak hour trips and 945 new PM peak hour trips.5 The
AM peak hour would occur between 7 AM and 9 AM and the PM peak hour would occur between 4 PM and 6
PM.
Measures 1 through 11 are applicable for C/CAG trip credits. According to C/CAG trip credits, the Burlingame
Point TDM Program will have the capacity to reduce the demand for peak hour trips by 1,469 trips, as shown
in Table 2. This exceeds the maximum number of AM or PM peak hour trips calculated using ITE estimates
(965 and 945 trips, respectively). The Burlingame Point TDM Program therefore exceeds C/CAG requirements.
Table 2. C/CAG Credit Analysis for TDM Measures
1 Secure bicycle One peak -hour trip will be credited Assumes the site will provide 51
storage for every 3 new bike lockers/racks 228 bicycle racks, including
installed and maintained. 34 a -bike capable racks.
2 Showers and Ten peak -hour trips will be
changing rooms credited for each new combination
shower and changing room
installed. An additional 5 peak
hour trips will be credited when
installed in combination with at
least 5 bike lockers.
Assume 21 showers with 315
changing rooms across all
project buildings. Assume
installed in combination with
bike lockers.
s "New" is defined as in excess of existing land use trip generation.
^ Trip Generation Handbook, 9" Edition, Institute of Transportation Engineers, 2012.
e See Appendix B for project trip generation. There will be some trip reductions due to internalization and pass -by for the uses in the amenities building.
The internalization reductions are accounted for in the TDM reduction.
FEHR 'r PEERS
Operation of a
One peak -hour trip will be credited
Assume 40 seat employee 480
dedicated shuttle
for each peak -hour trip seat on the
shuttles, running every 10
service during the
shuttle. Increases to two trips if a
min (e.g. 6 stops for peak
peak period to a
Guaranteed Ride Home Program is
hour), totaling to 240 peak
rail station or an
also in place.
hour trip seats.
urban residential
area
Five additional trips will be
Assumes guaranteed ride
credited if the shuttle stops at a
home for transit riders.
childcare facility en route to/from
the worksite.
4
Subsidizing
One peak hour trip will be credited
Assume pre-tax transit
185
transit tickets for
for each transit pass that is
subsidy of $260. Assumes 8
employees
subsidized at least $20 per month
percent' of employees
for one year.
receive a subsidized transit
pass.
One additional trip will be credited
if the subsidy is increased to $75
for parents using transit to take a
child to childcare en route to work.
5
Preferential
Seven peak hour trips will be
Assume 2 spots at each
56
parking for
credited for each parking spot
office building, totaling to 8
vanpoolers
reserved.
spots.
6
Implementation
Seven peak hour trips will be
Assume 8 vanpools will be
80
of a vanpool
credited for each vanpool
arranged at the project site.
program
arranged by a specific program
Assumes guaranteed ride
operated at the site of the
home for vanpool users.
development. Increases to ten
trips if a Guaranteed Ride Home
Program is also in place.
7
Operation of a
One peak hour trip will be credited
Assume 7 features will be
19
commute
for each feature added to the
implemented. Assume the
assistance center
information center; and an
center is open 12 hours a
additional one peak hour trip will
month
be credited for each hour the
center is staffed with a live
person, up to 20 trips per each
200 tenants.
8
Survey employees
Three peak hour trips will be
Assume 2 surveys to be
3
to examine use
credited for a survey developed to
developed and administered
and best
be administered twice yearly.
every year.
practices
FEHR t PEERS 16
9 Installation of
Five peak hour trips will be
Assume four video
80
video
credited for a center installed at
conferencing centers per
conferencing
the facility.
office building
centers
10 Provision of
Five peak hour trips will be
Assume 9 distinct amenities:
45
onsite amenities
credited for each feature added to
Banking, retail, exercise
the job site.
facilities, coffee shop, on -site
dry cleaning, delivery
pharmacy, on -site food
service for employees, and
bicycle repair shops
11 Guaranteed Ride
Two peak hour trips will be
Assume purchasing 150
150
Home Program
credited for every 2 slots
slots (30% of the estimated
purchased in the program.
number of non-SOV drivers)
12 Combination of
Five peak hour trips will be
Assume implementation of
5
Ten TDM
credited.
more than 10 different
Strategies
strategies listed above.
C/CAG Trip Credits
1,469
Peak Hour Trips 965
Note:
1. Revised C/CAG Guidelines, September 21, 2004.
2. C/CAG trip credits in peak hour trips.
3. This mode share is 10 percent above the San Mateo County average of 7 percent.
Source: City/County Association of Governments San Mateo County 2004, and Fehr & Peers, 2019.
4.2 Trip Reduction Evaluation
The project's TDM target is a ten percent reduction in peak -hour trips. This target stems from the project's 10
percent reduction in the minimum parking requirement (from 2,547 required stalls to 2,292 stalls). Based on
the analysis described below, the project exceeds that goal, reaching a 31 percent reduction in peak -hour
trips.
Trip reduction effects were estimated using methods from the Quantifying Greenhouse Gas Mitigation
Measures,' a report released by the California Air Pollution Control Officers Association (CAPCOA). The
CAPCOA report provides methods for quantifying vehicle miles traveled (VMT) and vehicle trip (VT) reduction
for a list of mitigation measures. The CAPCOA measures were screened on the basis of the feasibility of
quantifying the reductions, the availability of robust and meaningful data upon which to base the
quantification, and whether the measures would result in appreciable reductions. The report represents the
e Quantifying Greenhouse Gas Mitigation Measures — A Resource for Local Government to Assess Emission Reductions from Greenhouse Gas
Mitigation Measures, California Air Pollution Control Officers Association. August, 2010.
FEHRtPEERS 17
state of practice in quantifying effectiveness of TDM strategies. It has been adopted into CaIEEMod, a
statewide land use emissions model developed in collaboration with the air districts of California, and is
recommended for use in California Environmental Quality Act (CEQA) documentation by the Bay Area Air
Quality Management District.
Table 3. Trip Reduction Estimates for TDM Measures
1 Secure bicycle storage Literature suggests end -of -trip facilities would have minimal
impacts when implemented alone and thus is not quantified.
2
Showers and changing
Literature suggests end -of -trip facilities would have minimal
rooms
impacts when implemented alone and thus is not quantified.
3
Operation of a
CAPCOA calculations for employee -sponsored shuttle (measure
dedicated shuttle
TRT-11). Assumed low implementation with large employer size.
service during the peak
% Reduction in commute VT =
period to a rail station or
7%
% shift in shuttle mode share of commute trips
an urban residential
% employees eligible *
area
adjustment from shuttle mode share to commute VT =
10% * 100% * 0.67
4
Subsidizing transit
CAPCOA calculations for subsidized or discounted transit
tickets for employees
program (TRT-4). Assumed suburban center as location type.
20%
% Reduction in commute VT =
20% * % employees eligible =
20% * 100%
5
Preferential parking for
Literature suggests preferential parking should be treated as
vanpoolers
complementary strategy and is likely to have negligible impacts
when implemented alone; trip reduction not quantifiable by
CAPCOA.
6
Implementation of a
CAPCOA calculations for employee -sponsored vanpool (TRT-11).
vanpool program
Assumed 2% of employees utilize.
1 %
% Reduction in commute VT =
% vanpool mode share * % employees eligible * 0.67 =
2% * 100% * 0.67
7
Operation of a commute
CAPCOA calculations for commute trip reduction marketing (TRT-
assistance center
7). Assumed estimated 50% of employees utilize.
2%
% Reduction in commute VT =
% reduction in commute vehicle trips * % employees eligible =
4% * 50%
8
Survey employees to
Research found no literature quantifying impacts of strategy.
examine use and best
practices
9
Installation of video
Research found no ►iterature quantifying impacts of strategy.
conferencing centers
FEHRtPEERS 18
10 Provision of onsite CAPCOA calculations for diversity of development (measure LUT-
amenities 3).
%Reduction in VT =
4°�° % increase in land use index
elasticity of VMT w.r.t. land use index =
43% * 0.09
11 Guaranteed Ride Home Per CAPCOA, effectiveness is already wrapped into other
Program commute strategies.
31 % Total Potential Trip Reduction2
10% Target
Note:
1. The CAPCOA Report uses a 1 to 1 conversion from VMT to vehicle trips. The report assumes that all vehicle trips will average
out to typical trip length. Thus, the report assumes that a percentage reduction in vehicle trips will equal the same percentage
reduction in vehicle miles traveled. This assumption was utilized in this table's calculations to report final % vehicle trip
reduction.
2. As described in the CAPCOA report (p.57), the effectiveness of each TDM strategy combined should be multiplied (not added)
to reduce the risk of double counting. Overall trip reduction =1 - (1 - 0.07) * (1 - 0.2) * (1 -0.01) * (1 - 0.02) * (1 - 0.04)
Source: Fehr & Peers, 2019.
4.3 Conclusion
The project's TDM Program is expected to meet requirements by C/CAG and the City of Burlingame. The
project receives 1,469 C/CAG trip credits, exceeding the required 965 credits. Additionally, the TDM measures
could reach a drive alone reduction of 31 percent, greater than the 10 percent target reduction required to
obtain a parking minimum reduction.
The project will engage in ongoing monitoring to ensure it meets its goal. As a part of the TDM program, two
surveys will be developed and administered every year to examine TDM program participation and commute
mode share. Alternative mode use changes will be tracked with the employee survey and compared to prior
years' results. If results of the survey reveal that the project is not meeting its drive alone target, TDM
strategies can be adjusted over time to ensure it meets this goal. Results from each survey will be provided
to the Community Development Department at the City of Burlingame for its records.
FEHRtPEERS 19
Appendix A TDM Diagrams Provided by DES Architects +
Engineers and Facebook
FEHRtPEERS 20
v LUCCT - bMUYVt:KJIU:KAPJUiINUi hHU ILI I IM
V I KHIVJI'UKIH I IUN YIUb
BIKE ROUTES, STORAGE AND SHOWER/CHANGING ROOMS
SHUTTLE AND COMMUTE ASSISTANCE (PODIUM LEVEL)
a6 :.
5ignage=
facebook Transportation
FEHRtPEERS 22
Appendix B Project Trip Generation Estimates
Table B-1. Project Trip Generation Estimates
Land Use Size
Office 711.9
Unit
ksf
ITE
710
AM
In
802
Peak Hour
Out
110
Trips
Total
920
PM
In
149
Peak Hour
Out
727
Trips
Total
876
Health 7.4
Club
ksf
492
5
5
10
15
11
26
Internal Reduction
-17
-15
-32
-15
-17
-32
Retail 6.6
ksf
820
4
2
6
12
13
25
Internal Reduction
-2
-1
-3
-6
-6
-12
Restaurant 35.6
Ksf
932
211
173
384
210
140
350
Internal Reduction
-106
-87
-192
-105
-70
-175
TDM Reduction
-105
-14
-120
-19
-94
-114
Total
792
173
965
241
704
945
Source: Hexagon Transportation Consultants, 2016
FEHR� PEERS 23
Appendix C Project Shuttle Routing
Example
# 0 4 Shuttle Route
Project
Site
♦
B URLINGA10 E
VILLAGE
R A Y PARK 8 U R L t G A W, E ♦4V
G A T
GARDENS
W
OAK GROVE 8 U R L I N G A M_E���l MANOR
EASTON T E R R AC E
A T E
D D I T ON
I/ iA PJ I W n A f-
H I L L S B () R 0 U G H
OAKSBRIDGE
L; P I- I N G A N! E
HILLS
I's
SKYFAR
RYAN TRACT
BURLINGAME
PARK,
COUNTRY
CLUB. MANOR i ZI
VM-A T E OL
PARK
'NORTH CENTRAL
North
Shoreview
Project shuttles and
buses would not be
routed through the
North Shoreview
neighborhood.
V I E W
EAST SAN
MATEO
7.W1
Ilk
FEHRtPEERS 25