HomeMy WebLinkAbout111 Anza Boulevard - Agency Approval LetterMap ID
Direction
Distance
Elevation
M86
West
1/8-1/4
0.146 mi.
770 ft.
Site
MAP FINDINGS
HEALTHTELL LLC (Continued)
Facility ID: FA0047971
Prog Element Code: SML QUANTITY GENERATOR(1-1991bs/Mo) OFF-SITE
Record Id: PR0065582
Description: SQG OFF-SITE TREATMENT (1-199 LB/MO)
Facility Status: Inactive, non-billable
Program Category: MEDICAL WASTE
AGAVA PHARMACEUTICAL
849 MITTEN
BURLINGAME, CA 94010
Site 6 of 63 in cluster M
Relative: San Mateo Co. BI:
Higher Name:
Actual: Address:
8 ft. City,State,Zip:
Region:
Facility ID:
Prog Element Code
Record Id:
Description:
Facility Status:
Program Category:
M87
West
1/8-1/4
0.146 mi.
770 ft.
ADVANCED CHEMBLOCKS INC
849 MITTEN RD STE 101
BURLINGAME, CA 94010
Site 7 of 63 in cluster M
AGAVA PHARMACEUTICAL
849 MITTEN
BURLINGAME, CA 94010
SAN MATEO
FA0062793
GENERATES and RECYCLES WASTE OIL/SOLVENT
PR0085730
GENERATES & RECYCLES WASTE OILlSOLVENT
Inactive, non-billable
HAZARDOUS WASTE PROGRAM
EDR ID Number
Database(s) EPA ID Number
S123182829
San Mateo Co. BI 5121307691
N/A
RCRA NonGen/NLR 7024838703
CAL000385796
Relative: RCRA NonGen ! NLR:
Higher Date Form Received by Agency: 2013-05-29 00:00:00.0
Actual: Handler Name: ADVANCED CHEMBLOCKS INC
g ft. Handler Address: 849 MITTEN RD STE 101
Handler City,State,Zip: BURLINGAME, CA 94010
EPAID: CAL000385796
Contact Name: H�NGWANG DU
Contact Address: 849 MITTEN RD STE 101
Contact City,State,Zip: BURLINGAME, CA 94010
Contact Telephone: 650-692-2368
Contact Fax: 650-560-6477
Contact Email: INFO@ACHEMBLOCK.COM
Contact Title: Not reported
EPA Reagion: 09
Land T��pe: Not reported
Federal Waste Generator Description: Not a generator, verified
Non-Notifier: Not reported
Biennial Report Cycle: Not reported
Accessibility: Not reported
Active Site Indicator: Handler Activities
State Di:�trict Owner: Not reported
State Di:;trict: Not reported
Mailing A,ddress: 849 MITTEN RD STE 101
Mailing City,State,Zip: BURLINGAME, CA 94010
Owner Name: ADVANCED CHEMBLOCKS INC
TC6362151.2s Page199
. •
�(� , �e�$ e.�(kzza.. .
i+¢� ct.
STATE OF CAIIFORNIA EDMUND G. bROWN JR., Gov�rnor
SAN FRANCISCO BAY CONSERVATION AND DEVELOPMENT COMMISSION
30 VAN NE55 AVENUE �
SAN FRANCISCO, CALIFORNIA 94102
PHONE: 557-3686
y'� � � � � '1
�, u ;:.; ��,� .. � 9 l 9
PERMIT N0. 6-79 GITY OF. BURLINGrZM�
s"�LANNI.NG DEFT�
August 3, 1979
Anza Shareholders' Liquidating Trust
770 Airport Boulevard
Burlingame, California 94010
ATTENTION: David H. Keyston, Trustee
Gentlemen:
On July 19, 1979, the San Francisco Bay Conservation and Development
Commission, by a vote of 19 affirmative, 0 negative, approved the resolution
pursuant to which this permit is issued:
I. Authorization
A. Subject to the conditions stated below, the permittee is granted
permission to do the following within the 100-foot shoreline band on property
described as Parcel "W" and a portion of State Parcel 11 at 35 Bayview Place,
at the westerly end of a tidal lagoon on the Anza property in the City of
Burlingame, San Mateo County:
1. Parcel "W":
a. Construct and use a 7,250-square-foot portion of a
two-story parking deck;
b. Construct and use a 24-foot-wide by 40-foot-long aceess
ramp to the parking deck; and
c. Construct and use 32 parking spaces, 13 of which are for
public use.
cG ; ���vJ m� �� � �a1'�d -
� �.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 2
2. State Pareel 11:
a. Construct a landscaped public access corridor varying in
width from 3� to 100 feet wide along 260 lineal feet of the
lagoon shoreline that includes a path which has a minimum
width of 10 feet; and
b. Construct and use a 28-foot-wide by 110-foot-long portion
of a public street.
B. This authority is generally pursuant to and limited by the
application received on March 28, 1979, including its accompanying exhibits,
but subject to the modifications required by conditions hereto.
C. Work authorized herein must commence prior to December 1, 1979, or
this permit will lapse and become null and void. Such work must also be
diligently prosecuted to eompletion and must be completed by December 1, 1980,
unless an extension of time is granted by amendment of the permit.
D. This project will provide 20,400 square feet of new public access to
and along the shoreline. San Mateo Square Associates will provide and
maintain public access improvements on 16,695 square feet on State Parcel 11.
Anza Shareholders' Liquidating Trust, the permittee, will provide and maintain
improvements on 3,705 square feet on State Parcel 11.
II. Special Conditions
The auLhorization made herein shall be subject to the following special
conditions, in addition to the standard conditions in Part IV:
A. Specific Plans and Plan Review
1. Plan Review. No construction or use whatsoever shall be made of
any facility authorized herein until final precise site,
engineering, grading, architectural, and landscaping plans and
any other relevant criteria, specifications, and plan
information for that portion of the work have been submitted to,
and approved in writing by or on behalf of the Commission.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 3
a. Architectural Plans. Architectural plans submitted for
review shall consist of exterior elevations with building
details which indicate the location, dimensions, exterior
treatment, and color of all structures, outside signs and
other fixtures.
b. Landscaping Plans. Landscaping plans shall be prepared and
signed by a licensed landscape architect and may be
submitted as part of the architectural plans or submitted
separately. In either case, such plans shall consist of
grading, staking, planting, and irrigation sheets showing
the location, types and dimensions of all pathways, public
access areas, structures, parking spaces, benches, tables,
trash containers, lighting, and a list of the names and
quantity of all plant species to be used.
Architectural and landscaping plans submitted for review shall
be accompanied by a letter requesting plan approval, identifying
the type of plan submitted, the portion of the project involved,
and indicating whether the plan is final or preliminary.
Approval of disapproval shall be based upon (a) completeness of
the plan in showing the features required above, (b) consistency
of the plan, criteria and information with the specific terms
and conditions of this authorization, and (c) consistency of the
plan with the recommendations of the Design Review Board. In
each instance, plan review shall be completed, by or on behalf
of the Commission, within thirty (30) days after receipt of the
plan(s) to be reviewed, and shall consist of a letter
specifically referring to the submitted plan which indicates
whether the plan has been approved or disapproved.
2. Changes to Approved Plans. After final plans have been approved
pursuant to Condition II-A, no change shall be made to such
approved plans without first obtaining written approval of the
proposed ehange by or on behalf of the Commission. Approval or
disapproval shall be made within thirty (30) days after the
proposed ehange in plan has been submitted for approval and
shall be based on a finding that the change complies with this
authorization and would not detrimentally affect public access,
landseaping, open space, open water or other public benefits.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 4
3• Conformity with Approved Plans. All leases, contract
specifications, and all structures and improvements at the
project site shall conform to the final plans approved pursuant
to this condition. No structure shall be placed nor any
improvement undertaken that is not clearly shown and indicated
on the approved final plans. After construction, no noticeable
changes to the exterior of any structure shall be made, no
additional structures shall be built, nor shall park, open
space, open water, landscaped or public access areas be altered
without first obtaining written approval by or on behalf of the
Commission pursuant to Condition II-A-2.
B. Notice to Private Developers and State Lands Commission. Al1 plans
required to be submitted to BCDC pursuant to Condition II-A-1 of this
authorization, shall be submitted to San Mateo Square Associates, or its
successor in interest, to the City of Burlingame, and to the State Lands
Commission. In addition, a copy of this authorization and the approved plans
shall be provided to any person or entity leasing or otherwise obtaining a
right to use any area subject to this authorization or participating in the
construction of any building or other uses on the property. A copy of the
approved authorization with any amendments and the approved plans shall be
provided to sueh person or entity prior to the execution of the contraet or
other instrument or the commencement of construction, whichever is earlier,
and shall be accompanied by a written statement specifically calling attention
to the provisions of this authorization regarding public aecess, park, plan
review, and design controls.
C. Public Access
1. Area. Prior to the lease of any facility authorized herein, the
permittee shall, �y instrument or instrawents aceeptabie to
counsel for BCDC, dedicate to a public agency or otherwise
permanently guarantee rights for access for walking, sitting,
viewing, fishing, and other related purposes to the following
public aceess areas approximately as shown on Exhibit D of the
Staff Summary dated June 8, 1979:
a. An area which varies in width from 47 to 100 feet along 240
lineal feet of the lagoon shoreline; and
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 5
b. An area which varies in width from 31 to 69 feet along 20
feet of the lagoon shoreline immediately to the north.
2. Instruments. Instruments submitted to counsel for BCDC approval
pursuant to Condition II-C shall create permanent rights in
favor of the public for the purposes indicated and shall include
a map that shows the property lines and dimensions of sueh
areas, the 6.2 Mean Sea Level contour line (USGS, 1929 datum),
and contains a metes and bounds description of the areas. The
instruments shall be in a form suitable for recording in the
county where the property is located. Approval or disapproval
of the instruments shall occur within thirty (30) days after
submittal for approval and shall be based upon the sufficiency
of the instruments to create the rights and duties indicated in
the condition. Within sixty (60) days after approval, the
permittee shall record the instruments and shall provide
evidence of recording to the Commission.
3. Public Access Improvements. Prior to the use of any facility
authorized herein, the permittee or its assigns shall complete
the following public access improvements, all in accord with the
preliminary landscape plan entitled "Anza Baylands Master
Plan--Development Plan," Sheet 2 of 2, prepared by Peter
Callendar Associates, Landscape Arehiteets, dated May 11, 1979,
and with construction drawings approved pursuant to Condition
II-A:
a. Placement of berms, an irrigation system, and landscaping
in the areas referred to in Condition II-C-1, between the
two-story parking garage, Bayview Place and the lagoon;
b. Placement of a paved pathway not less than 10 feet in width
with a seating area and lighting and other improvements; and
c. Not less than two (2) public access signs of a size,
design, and with information approved by or on behalf of
the Commission placed at locations shown on the plans
approved pursuant to Condition II-C-3 above.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 6
4. Maintenance. All areas and improvements required by Condition
II-C, ineluding landscaping, signs, and public paths shall be
permanently maintained by, and at the expense of, the permittee,
any assignees, and sublessees. Maintenance shall include
repairs to all path surfaces, replacement of any plant material
that dies or becomes unkempt, periodic clean-up of litter and
other materials, and assuring that public access signs remain in
place and visible. Within thirty (30) days after notification
by staff, the permittee shall correct any maintenance deficiency
noted in a staff inspection of the site.
D. Permit Recording. The permittee shall record this authorization or
notice referring to this authorization with San Mateo County within thirty
i30) days after execution of this authorization and shall provide evidence of
recording to the Commission.
E. Assignment. The permittee may make a full or partial assignment of
the rights and/or duties under this authorization provided that the assignee
is acceptable to the Commission. The assignment shall be made in writing and
clearly indicate which portions are assigned and which portions remain
unassigned. Any assignee shall sign a written statement to the effect that he
or she has read and understands the conditions of this authorization, and
agrees to be bound by all terms and conditions hereof. Prior to undertaking
any work or uses on Parcel "W," the permittee shall assign that portion of
this authorization relating to such work and uses on State Pareel 11,
indicated in Condition II-C-la, to San Mateo Square Associates or its
suceessor in interest.
F. Waiver of Exemption for a Portion of State Parcel 11. Within ten
(10) days of the date of this authorization, the permittee shall submit a
letter that waives all rights whatsoever it has or may have to elain that any
work or uses pursuant to this authorization for State Pareel 11 are exempt
from the permit requirements of the Commission pursuant to any provision of
the McAteer-Petris Act or under common law. Such waiver shall be in a form
acceptable to counsel for the Commission.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 7
III. Findings and Declarations
This authorization is given on the basis of the Commission's findings
and declarations that the work authorized is consistent with the
McAteer-Petris Act, the San Francisco Bay Plan, and the California
Environmental Quality Act for the following reasons:
A. Use. The proposed commercial use and parking facilities is not in
any area designated on Bay Plan Map 9 for any priority use and is therefore
consistent with the Bay Plan.
B. Public Access. The proposed project, subject to Condition II-C
stated herein, would provide the maximum feasible public access to the Bay
shoreline, consistent with the project, and this access area would be improved
and permanently set aside for the use and enjoyment of the public. The
Commission specifically finds that without the public access areas required by
Condition II-C, it could not issue this authorization because it could not
find that maximum feasible public access consistent with the project would be
provided as required by Section 66632.4 of the Government Code.
C. Title. The State of California owns State Parcel 11 in fee and has
leased the area to the permittee. The State Lands Commission, administrator
of the state`s land, stated in a letter dated May 9, 1979, that no iiirther
review of the lease was required for road improvements and public aceess
improvements which would be provided on State Parcel 11, nor does the State
Lands Commission object to the agreement between the permittee and San Mateo
Square Associates to provide the public access improvements on Statt Parcel 11.
D. Environmental Impact Report. The City of Burlingame, the lead
agency, certified a Negative Declaration for the project on May 16, 1979•
H. Exemption. In submitting this application, the permittee had
reserved the right to claim an exemption pursuant to Section 66632•� of the
McAteer-Petris Act. The permittee has agreed by accepting the terms and
conditions of this authorization to waive the exemption claim as it relates to
that portion of State Parcel 11, which is the subject of this authorization.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 8
I. Conclusion. For all the above reasons, the public benefits from the
project clearly exceed any public detriment. The Commission further finds,
declares, and certifies that the activity or activities authorized herein are
consistent with the Commission`s Amended Management Program for San Francisco
Bay as approved by the Department of Commerce under the Federal Coastal Zone
Management Act of 1972, as amended.
IV. Standard Conditions
A. All required permissions from governmental bodies must be obtained
before the commencement of work; this includes, but is not limited to, the
U. S. Army Corps of Engineers, the State Lands Commission, the Regional Water
Quality Control Board, and the city and/or county in which the work is to be
performed, whenever any of these may be required. This permit does not
relieve the permittee of any obligations imposed by State or Federal law,
either statutory or otherwise.
B. The attached Notice of Completion shall be returned to the
Commission within thirty (30) days following completion of the work.
C. Work must be performed in the precise manner and at the precise
locations indicated in your application.
D. Work must be performed in a manner so as to minimize muddying of
waters, and if diking is involved, dikes shall be waterproof. If any seepage
returns to the Bay, the permittee will be subject to the regulations of the
Regional Water Quality Control Board in that region.
E. The rights derived from this permit are assignable, but such
assignment shall not be effective until the assignee shall have executed and
the Commission shall have received an acknowledgment that the assignee has
read and understood the application for this permit and the permit itself, and
agrees to be bound by the conditions hereof.
F. Exeept as otherwise noted, violation of any of the terms of this
permit shall be grounds for revocation. The Commission may revoke any permit
for sueh violation after a public hearing held on reasonable notice to the
permittee or to his assignee if the permit has been effectively assigned.
PERMIT N0. 6-79
Anza Shareholders' Liquidating Trust
Page 9
G. This permit shall not take effect unless the permittee executes the
original of this permit and returns it to the Commission within fifteen (15)
days after the date hereof.
Executed at San Francisco, California, on behalf of the San
Francisco Bay Conservation and Development Commission on the date first above
written.
�riginal sign,^d by
Michae! B. Wi�lmar
MICHAEL B. WILMAR
Executive Director
NIBW/mm
ce: U. S. Army Corps of Engineers, Attn: Regulatory Funetions Branch
S. F. Bay Regional Water Quality Control Board, Attn: Certification
Section
E ironmental Protection Agency, Attn: Eric Yunker, E-4-2
ity of Burlingame, Attn: John Yost, Assistant City Planner
San Mateo Square Associates, Attn: John Raiser
� * �t � � �t * � �t �t
Receipt acknowledged, contents understood and agreed to:
Executed at
On
By:
Applicant
Title
,. �
PERMIT N0. 6-79
ANZA SHAREHOLDERS' LIQUIDATING TRUST
NOTICE OF COMPLETION
San Francisco Bay Conservation
and Development Commission
30 Van Ness Avenue, Room 2011
San Francisco, California 94102
Gentlemen:
You are hereby informed that the work authorized by the above-
referenced permit was completed on
Executed at 4n_ � 19�
By:
Title