Loading...
HomeMy WebLinkAbout111 Anza Boulevard - Agency Approval LetterMap ID Direction Distance Elevation M86 West 1/8-1/4 0.146 mi. 770 ft. Site MAP FINDINGS HEALTHTELL LLC (Continued) Facility ID: FA0047971 Prog Element Code: SML QUANTITY GENERATOR(1-1991bs/Mo) OFF-SITE Record Id: PR0065582 Description: SQG OFF-SITE TREATMENT (1-199 LB/MO) Facility Status: Inactive, non-billable Program Category: MEDICAL WASTE AGAVA PHARMACEUTICAL 849 MITTEN BURLINGAME, CA 94010 Site 6 of 63 in cluster M Relative: San Mateo Co. BI: Higher Name: Actual: Address: 8 ft. City,State,Zip: Region: Facility ID: Prog Element Code Record Id: Description: Facility Status: Program Category: M87 West 1/8-1/4 0.146 mi. 770 ft. ADVANCED CHEMBLOCKS INC 849 MITTEN RD STE 101 BURLINGAME, CA 94010 Site 7 of 63 in cluster M AGAVA PHARMACEUTICAL 849 MITTEN BURLINGAME, CA 94010 SAN MATEO FA0062793 GENERATES and RECYCLES WASTE OIL/SOLVENT PR0085730 GENERATES & RECYCLES WASTE OILlSOLVENT Inactive, non-billable HAZARDOUS WASTE PROGRAM EDR ID Number Database(s) EPA ID Number S123182829 San Mateo Co. BI 5121307691 N/A RCRA NonGen/NLR 7024838703 CAL000385796 Relative: RCRA NonGen ! NLR: Higher Date Form Received by Agency: 2013-05-29 00:00:00.0 Actual: Handler Name: ADVANCED CHEMBLOCKS INC g ft. Handler Address: 849 MITTEN RD STE 101 Handler City,State,Zip: BURLINGAME, CA 94010 EPAID: CAL000385796 Contact Name: H�NGWANG DU Contact Address: 849 MITTEN RD STE 101 Contact City,State,Zip: BURLINGAME, CA 94010 Contact Telephone: 650-692-2368 Contact Fax: 650-560-6477 Contact Email: INFO@ACHEMBLOCK.COM Contact Title: Not reported EPA Reagion: 09 Land T��pe: Not reported Federal Waste Generator Description: Not a generator, verified Non-Notifier: Not reported Biennial Report Cycle: Not reported Accessibility: Not reported Active Site Indicator: Handler Activities State Di:�trict Owner: Not reported State Di:;trict: Not reported Mailing A,ddress: 849 MITTEN RD STE 101 Mailing City,State,Zip: BURLINGAME, CA 94010 Owner Name: ADVANCED CHEMBLOCKS INC TC6362151.2s Page199 . • �(� , �e�$ e.�(kzza.. . i+¢� ct. STATE OF CAIIFORNIA EDMUND G. bROWN JR., Gov�rnor SAN FRANCISCO BAY CONSERVATION AND DEVELOPMENT COMMISSION 30 VAN NE55 AVENUE � SAN FRANCISCO, CALIFORNIA 94102 PHONE: 557-3686 y'� � � � � '1 �, u ;:.; ��,� .. � 9 l 9 PERMIT N0. 6-79 GITY OF. BURLINGrZM� s"�LANNI.NG DEFT� August 3, 1979 Anza Shareholders' Liquidating Trust 770 Airport Boulevard Burlingame, California 94010 ATTENTION: David H. Keyston, Trustee Gentlemen: On July 19, 1979, the San Francisco Bay Conservation and Development Commission, by a vote of 19 affirmative, 0 negative, approved the resolution pursuant to which this permit is issued: I. Authorization A. Subject to the conditions stated below, the permittee is granted permission to do the following within the 100-foot shoreline band on property described as Parcel "W" and a portion of State Parcel 11 at 35 Bayview Place, at the westerly end of a tidal lagoon on the Anza property in the City of Burlingame, San Mateo County: 1. Parcel "W": a. Construct and use a 7,250-square-foot portion of a two-story parking deck; b. Construct and use a 24-foot-wide by 40-foot-long aceess ramp to the parking deck; and c. Construct and use 32 parking spaces, 13 of which are for public use. cG ; ���vJ m� �� � �a1'�d - � �. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 2 2. State Pareel 11: a. Construct a landscaped public access corridor varying in width from 3� to 100 feet wide along 260 lineal feet of the lagoon shoreline that includes a path which has a minimum width of 10 feet; and b. Construct and use a 28-foot-wide by 110-foot-long portion of a public street. B. This authority is generally pursuant to and limited by the application received on March 28, 1979, including its accompanying exhibits, but subject to the modifications required by conditions hereto. C. Work authorized herein must commence prior to December 1, 1979, or this permit will lapse and become null and void. Such work must also be diligently prosecuted to eompletion and must be completed by December 1, 1980, unless an extension of time is granted by amendment of the permit. D. This project will provide 20,400 square feet of new public access to and along the shoreline. San Mateo Square Associates will provide and maintain public access improvements on 16,695 square feet on State Parcel 11. Anza Shareholders' Liquidating Trust, the permittee, will provide and maintain improvements on 3,705 square feet on State Parcel 11. II. Special Conditions The auLhorization made herein shall be subject to the following special conditions, in addition to the standard conditions in Part IV: A. Specific Plans and Plan Review 1. Plan Review. No construction or use whatsoever shall be made of any facility authorized herein until final precise site, engineering, grading, architectural, and landscaping plans and any other relevant criteria, specifications, and plan information for that portion of the work have been submitted to, and approved in writing by or on behalf of the Commission. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 3 a. Architectural Plans. Architectural plans submitted for review shall consist of exterior elevations with building details which indicate the location, dimensions, exterior treatment, and color of all structures, outside signs and other fixtures. b. Landscaping Plans. Landscaping plans shall be prepared and signed by a licensed landscape architect and may be submitted as part of the architectural plans or submitted separately. In either case, such plans shall consist of grading, staking, planting, and irrigation sheets showing the location, types and dimensions of all pathways, public access areas, structures, parking spaces, benches, tables, trash containers, lighting, and a list of the names and quantity of all plant species to be used. Architectural and landscaping plans submitted for review shall be accompanied by a letter requesting plan approval, identifying the type of plan submitted, the portion of the project involved, and indicating whether the plan is final or preliminary. Approval of disapproval shall be based upon (a) completeness of the plan in showing the features required above, (b) consistency of the plan, criteria and information with the specific terms and conditions of this authorization, and (c) consistency of the plan with the recommendations of the Design Review Board. In each instance, plan review shall be completed, by or on behalf of the Commission, within thirty (30) days after receipt of the plan(s) to be reviewed, and shall consist of a letter specifically referring to the submitted plan which indicates whether the plan has been approved or disapproved. 2. Changes to Approved Plans. After final plans have been approved pursuant to Condition II-A, no change shall be made to such approved plans without first obtaining written approval of the proposed ehange by or on behalf of the Commission. Approval or disapproval shall be made within thirty (30) days after the proposed ehange in plan has been submitted for approval and shall be based on a finding that the change complies with this authorization and would not detrimentally affect public access, landseaping, open space, open water or other public benefits. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 4 3• Conformity with Approved Plans. All leases, contract specifications, and all structures and improvements at the project site shall conform to the final plans approved pursuant to this condition. No structure shall be placed nor any improvement undertaken that is not clearly shown and indicated on the approved final plans. After construction, no noticeable changes to the exterior of any structure shall be made, no additional structures shall be built, nor shall park, open space, open water, landscaped or public access areas be altered without first obtaining written approval by or on behalf of the Commission pursuant to Condition II-A-2. B. Notice to Private Developers and State Lands Commission. Al1 plans required to be submitted to BCDC pursuant to Condition II-A-1 of this authorization, shall be submitted to San Mateo Square Associates, or its successor in interest, to the City of Burlingame, and to the State Lands Commission. In addition, a copy of this authorization and the approved plans shall be provided to any person or entity leasing or otherwise obtaining a right to use any area subject to this authorization or participating in the construction of any building or other uses on the property. A copy of the approved authorization with any amendments and the approved plans shall be provided to sueh person or entity prior to the execution of the contraet or other instrument or the commencement of construction, whichever is earlier, and shall be accompanied by a written statement specifically calling attention to the provisions of this authorization regarding public aecess, park, plan review, and design controls. C. Public Access 1. Area. Prior to the lease of any facility authorized herein, the permittee shall, �y instrument or instrawents aceeptabie to counsel for BCDC, dedicate to a public agency or otherwise permanently guarantee rights for access for walking, sitting, viewing, fishing, and other related purposes to the following public aceess areas approximately as shown on Exhibit D of the Staff Summary dated June 8, 1979: a. An area which varies in width from 47 to 100 feet along 240 lineal feet of the lagoon shoreline; and PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 5 b. An area which varies in width from 31 to 69 feet along 20 feet of the lagoon shoreline immediately to the north. 2. Instruments. Instruments submitted to counsel for BCDC approval pursuant to Condition II-C shall create permanent rights in favor of the public for the purposes indicated and shall include a map that shows the property lines and dimensions of sueh areas, the 6.2 Mean Sea Level contour line (USGS, 1929 datum), and contains a metes and bounds description of the areas. The instruments shall be in a form suitable for recording in the county where the property is located. Approval or disapproval of the instruments shall occur within thirty (30) days after submittal for approval and shall be based upon the sufficiency of the instruments to create the rights and duties indicated in the condition. Within sixty (60) days after approval, the permittee shall record the instruments and shall provide evidence of recording to the Commission. 3. Public Access Improvements. Prior to the use of any facility authorized herein, the permittee or its assigns shall complete the following public access improvements, all in accord with the preliminary landscape plan entitled "Anza Baylands Master Plan--Development Plan," Sheet 2 of 2, prepared by Peter Callendar Associates, Landscape Arehiteets, dated May 11, 1979, and with construction drawings approved pursuant to Condition II-A: a. Placement of berms, an irrigation system, and landscaping in the areas referred to in Condition II-C-1, between the two-story parking garage, Bayview Place and the lagoon; b. Placement of a paved pathway not less than 10 feet in width with a seating area and lighting and other improvements; and c. Not less than two (2) public access signs of a size, design, and with information approved by or on behalf of the Commission placed at locations shown on the plans approved pursuant to Condition II-C-3 above. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 6 4. Maintenance. All areas and improvements required by Condition II-C, ineluding landscaping, signs, and public paths shall be permanently maintained by, and at the expense of, the permittee, any assignees, and sublessees. Maintenance shall include repairs to all path surfaces, replacement of any plant material that dies or becomes unkempt, periodic clean-up of litter and other materials, and assuring that public access signs remain in place and visible. Within thirty (30) days after notification by staff, the permittee shall correct any maintenance deficiency noted in a staff inspection of the site. D. Permit Recording. The permittee shall record this authorization or notice referring to this authorization with San Mateo County within thirty i30) days after execution of this authorization and shall provide evidence of recording to the Commission. E. Assignment. The permittee may make a full or partial assignment of the rights and/or duties under this authorization provided that the assignee is acceptable to the Commission. The assignment shall be made in writing and clearly indicate which portions are assigned and which portions remain unassigned. Any assignee shall sign a written statement to the effect that he or she has read and understands the conditions of this authorization, and agrees to be bound by all terms and conditions hereof. Prior to undertaking any work or uses on Parcel "W," the permittee shall assign that portion of this authorization relating to such work and uses on State Pareel 11, indicated in Condition II-C-la, to San Mateo Square Associates or its suceessor in interest. F. Waiver of Exemption for a Portion of State Parcel 11. Within ten (10) days of the date of this authorization, the permittee shall submit a letter that waives all rights whatsoever it has or may have to elain that any work or uses pursuant to this authorization for State Pareel 11 are exempt from the permit requirements of the Commission pursuant to any provision of the McAteer-Petris Act or under common law. Such waiver shall be in a form acceptable to counsel for the Commission. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 7 III. Findings and Declarations This authorization is given on the basis of the Commission's findings and declarations that the work authorized is consistent with the McAteer-Petris Act, the San Francisco Bay Plan, and the California Environmental Quality Act for the following reasons: A. Use. The proposed commercial use and parking facilities is not in any area designated on Bay Plan Map 9 for any priority use and is therefore consistent with the Bay Plan. B. Public Access. The proposed project, subject to Condition II-C stated herein, would provide the maximum feasible public access to the Bay shoreline, consistent with the project, and this access area would be improved and permanently set aside for the use and enjoyment of the public. The Commission specifically finds that without the public access areas required by Condition II-C, it could not issue this authorization because it could not find that maximum feasible public access consistent with the project would be provided as required by Section 66632.4 of the Government Code. C. Title. The State of California owns State Parcel 11 in fee and has leased the area to the permittee. The State Lands Commission, administrator of the state`s land, stated in a letter dated May 9, 1979, that no iiirther review of the lease was required for road improvements and public aceess improvements which would be provided on State Parcel 11, nor does the State Lands Commission object to the agreement between the permittee and San Mateo Square Associates to provide the public access improvements on Statt Parcel 11. D. Environmental Impact Report. The City of Burlingame, the lead agency, certified a Negative Declaration for the project on May 16, 1979• H. Exemption. In submitting this application, the permittee had reserved the right to claim an exemption pursuant to Section 66632•� of the McAteer-Petris Act. The permittee has agreed by accepting the terms and conditions of this authorization to waive the exemption claim as it relates to that portion of State Parcel 11, which is the subject of this authorization. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 8 I. Conclusion. For all the above reasons, the public benefits from the project clearly exceed any public detriment. The Commission further finds, declares, and certifies that the activity or activities authorized herein are consistent with the Commission`s Amended Management Program for San Francisco Bay as approved by the Department of Commerce under the Federal Coastal Zone Management Act of 1972, as amended. IV. Standard Conditions A. All required permissions from governmental bodies must be obtained before the commencement of work; this includes, but is not limited to, the U. S. Army Corps of Engineers, the State Lands Commission, the Regional Water Quality Control Board, and the city and/or county in which the work is to be performed, whenever any of these may be required. This permit does not relieve the permittee of any obligations imposed by State or Federal law, either statutory or otherwise. B. The attached Notice of Completion shall be returned to the Commission within thirty (30) days following completion of the work. C. Work must be performed in the precise manner and at the precise locations indicated in your application. D. Work must be performed in a manner so as to minimize muddying of waters, and if diking is involved, dikes shall be waterproof. If any seepage returns to the Bay, the permittee will be subject to the regulations of the Regional Water Quality Control Board in that region. E. The rights derived from this permit are assignable, but such assignment shall not be effective until the assignee shall have executed and the Commission shall have received an acknowledgment that the assignee has read and understood the application for this permit and the permit itself, and agrees to be bound by the conditions hereof. F. Exeept as otherwise noted, violation of any of the terms of this permit shall be grounds for revocation. The Commission may revoke any permit for sueh violation after a public hearing held on reasonable notice to the permittee or to his assignee if the permit has been effectively assigned. PERMIT N0. 6-79 Anza Shareholders' Liquidating Trust Page 9 G. This permit shall not take effect unless the permittee executes the original of this permit and returns it to the Commission within fifteen (15) days after the date hereof. Executed at San Francisco, California, on behalf of the San Francisco Bay Conservation and Development Commission on the date first above written. �riginal sign,^d by Michae! B. Wi�lmar MICHAEL B. WILMAR Executive Director NIBW/mm ce: U. S. Army Corps of Engineers, Attn: Regulatory Funetions Branch S. F. Bay Regional Water Quality Control Board, Attn: Certification Section E ironmental Protection Agency, Attn: Eric Yunker, E-4-2 ity of Burlingame, Attn: John Yost, Assistant City Planner San Mateo Square Associates, Attn: John Raiser � * �t � � �t * � �t �t Receipt acknowledged, contents understood and agreed to: Executed at On By: Applicant Title ,. � PERMIT N0. 6-79 ANZA SHAREHOLDERS' LIQUIDATING TRUST NOTICE OF COMPLETION San Francisco Bay Conservation and Development Commission 30 Van Ness Avenue, Room 2011 San Francisco, California 94102 Gentlemen: You are hereby informed that the work authorized by the above- referenced permit was completed on Executed at 4n_ � 19� By: Title