Loading...
HomeMy WebLinkAbout567 Airport Boulevard - Staff Report (2)City of Burlingame Environmental Scoping and Design Review Study Address: 567 Airport Boulevard Item No. 11 d Environmental Scoping & Design Review Study Meeting Date: November 23, 2020 Request: Environmental Scoping and Design Review Study for an Application for Environmental Review, Commercial Design Review, and Conditional Use Permit for floor area ratio and building height for a new, eight-story office/research and development building and parking garage. Applicant and Property Owner: EW-PG Airport Owner, LLC APN: 026-363-590 and 026-363-470 Architect: DES Architects Zoning: AA (Anza Area) General Plan: Bayfront Commercial Lot Area: 558,962 SF (12.832 acres) Adjacent Development: Office buildings, Sanchez Channel and Burlingame Lagoon Current Use: Office Proposed Use: Office/Research & Development (retain existing office use) Allowable Use: Office, including research and development office with associated laboratories. Environmental Review: Environmental review is required for this project under the California Environmental Quality Act (CEQA). As a part of preparing the Initial Study for the environmental document for this project, staff is requesting that the Planning Commission comment on any potential environmental effects which it feels should be investigated. These potential environmental effects which will be considered in the CEQA document include: • Aesthetics • Agriculture • Air Quality • Biological Resources • Cultural Resources • Energy • Geology and Soils • Greenhouse Gas Emissions • Hazards and Hazardous Materials • Hydrology and Water Quality • Land Use and Planning • Mineral Resources • Noise • Population and Housing • Public Services • Recreation • Transportation • Tribal Cultural Resources • Utilities and Service Systems • Wildfire • Cumulative Impacts Any additional issues identified by the Commission will be incorporated into the environmental document for the project. At this time staff notes that based on preliminary analysis, it appears that the type of CEQA document required will be a Mitigated Negative Declaration. However, the type of CEQA document will be finalized during the environmental review process. The City has entered into a contract with ICF Jones & Stokes, Inc. to prepare the CEQA document for this project. During preliminary review, Planning staff identified that the following applications are required for this project: Commercial Design Review (Code Sections 25.47.060 and 25.57.010(c)); Conditional Use Permit for Floor Area Ratio greater than 0.6 FAR (0.9 FAR proposed) (Code Section 25.47.040 (a)); and Conditional Use Permit for Building Height (133'-0" proposed to the top of the office building and 65'-0" proposed to the top of the parking structure, where 65'-0" is the maximum allowed) (Code Section 25.47.025 (I)). Environmental Scoping and Design Review Study 567 Airport Boulevard Project Summary: The project site has an address of 555-577 Airport Boulevard; the proposed Office/Research and Development (Office/R&D) building would have an address of 567 Airport Boulevard. The project site is located on Airport Boulevard, however the majority of the site is located behind three existing office buildings (on separate parcels) fronting Airport Boulevard (411, 433 and 533 Airport Boulevard). The subject site is comprised of 555 and 577 Airport Boulevard, as well as a leased parcel (State Land Commission) bordering the site along the Sanchez Channel and Burlingame Lagoon; the total site area measures 12.83 acres. The project site is bordered by three existing adjacent office buildings at 411, 433 and 533 Airport Boulevard; Anza Parking (615 Airport Boulevard) is located to the west of the parcel; and the Sanchez Channel, Burlingame Lagoon, and the San Francisco Bay Conservation and Development Commission (BCDC) shoreline bands are located along the east and south sides of the site. Uses in the area include offices, office/life science uses, hotels and long-term airport parking uses. The project site currently contains two multi-tenant office buildings (120,579 SF office building at 555 Airport Boulevard and 139,154 SF office building at 577 Airport Boulevard), surface level parking and landscaping. The existing office buildings will be retained. The project plans show a parcelization which would create two parcels (Parcels 1 and 2) for ownership/management purposes. However, for review of development standards, the review is based on one parcel since it will continue to function as one parcel (e.g., parking, vehicular access, etc.). The proposed project consists of constructing a new eight-story, 241,679 SF Office/R&D building and a six- level parking garage. The garage will contain five levels of covered parking with the sixth level being open to the sky. The applicant notes that the proposed density and floor plate size is intended to allow tenant flexibility, particularly focused on life science and information technology. At this time a tenant has not been determined. The new parking garage and existing surface level parking spaces would provide parking for all three buildings on the site. The total building area on site (existing and new buildings) would increase to 501,412 SF. The proposed project also includes the following improvements: • New surtace parking area and access driveways. ■ New service / trash enclosures, and truck parking area. The existing trash enclosure next tothe bay trail will be demolished. • New landscaped promenades connecting all three buildings and parking garage. ■ New landscaped open space and paved plaza on the south and east side of the new building. ■ New stormwater treatment areas connecting to existing pump and outfallto Burlingame Lagoon. ■ New and re-located site utilities and equipment supporting the buildings. A total of 1,520 on-site parking spaces would be provided in surface level parking and in a proposed six-level parking garage, and would serve to provide parking for all three buildings on the site. The top (or sixth level) of the parking garage would be open. There would be 376 parking spaces provided in open surface parking areas throughout the site and 1,144 parking spaces in the proposed parking garage. All of the parking spaces provided would be independently accessible and are code compliant (see Off-Street Parking section for additional details). The Bay Trail, seating nodes, mature trees and vegetation currently exist along the shoreline. The project intends to maintain public access to the BCDC shoreline during and after construction, including the Bay Trail and 15 public Bay Trail access parking spaces. The Bay Trail, vegetation, and other amenities within the BCDC shoreline bands would not be altered. During construction, the parking areas along Burlingame Lagoon and Sanchez Channel will be fenced off. The 15 public access parking spaces will be relocated temporarily during construction (still close to the Bay Trail) and will be restored back to existing location afterwards. Page 2 of 11 Environmental Scoping and Design Review Study For a more detailed description of the proposed project, submitted by the applicant, dated November 12, 2020. The following table provides a summary of the project's standards. 567 Airport Boulevard Lot Area: 558,962 SF (12.832 acres) 567 Airport Boulevard please refer to the attached Project Description compliance with the AA District development Plans date stamped: November 12, 2020 Proposed Allowed/Required Use and Floor Area Ratio: Office/R&D Office/R&D 0.9 FAR ' 0.6 FAR 501,412 SF Total 335,377 SF (120,579 SF (e) office at 555 Airport) (139,154 SF (e) office at 577 Airport) (241,679 SF new office/R&D at 567 Airport Blvd) SETBACKS: Front: 277'-7" to building 30'-0" for 1St two stories/ Parking structure is not adjacent to 40'-0" for above two stories front property line Left Side: 410'-0" to building 10'-0" 235'-0" to parking structure Right Side: 340'-0" to building 10' 10'-0" to parking structure from interior property line Rear: 142'-0" to building 25'-0" 342'-0" to parking structure Shoreline Setback: Complies Average of 65' between structure & shoreline (Burlingame Lagoon): 142'-0" to building 342'-0" to parking structure (Sanchez Channel): 410'-0" to building 235'-0" to parking structure ' Conditional Use Permit for Floor Area Ratio greater than 0.6 FAR (0.9 FAR proposed) (Code Section 25.47.040 (a)). Page 3 of 11 6 6 �o � aBed �iil) SZO�Lti�9Z uoi}�ag apo�) (panno��e wnu�ixeua ay� si „p-,gg a�aynn 'am��n��s 6ui�{�ed au� �o do� ay� o} pasodad „p-,gg pue 6uip�inq a�i}}o ay� �o do� ay� o� pasodo�d „0-�E£�) 3y6iaH 6uip�in8 �o� �iw�ad as� �euoi�ipuo� auya�oys ay� �o ,pp � uiy�inn �ou pue `aui� �(}�ado�d �eaa wa� ,g� }sea� aw�a�oys ay; woa� ,00 � ;e ��eq�as aq �snua `(s)6uip�inq �o uey; a�oua ��eq�as si `s6uip�inq pn18 :ssa��d 6uipeo� �ea� �o sapis �e pa;e�o� aq �snw �od�iy LL5 pue �gg uaann�aq pa�e�o� ��ni�aanso/�u3 ysea 1 %0 6 %L � 6 � : seaad Bu��aed 0 0 :8u�de�spue� /009 /069 �I��q�aS �uo�� %56 %5£ :6u►de�spue7 a�!S l���l JN/d t/�SONb'7 (��eduao�) „0-�L6 X ,A-�8 (}�eduao�) „0-,L6 X ,A-�8 :suo�suaui�o iP�epue�s) ,A-�8 6 X„9-,8 (P�epue�s) „0-�8 6 X„9-�8 a�eds fiu►�aed :a�eds dn-��e9 �eal� ��0-�tiZ aa�ea�B �o ,�0-��Z /als�d anua (ol��� �S 0£E� 6 �o �S 000 �: � �ad s�e� £) u�ld Wdl �o uoi}e�uawa�duai �(q uoi��npa� uo paseq sa�eds OZ5' 6 sa�eds 1�303 OZ9`� o!��� �S 00£� 6 sa�e s ssa��e �i�qn 5 � uo paseq sa�eds Z�g' � + sBuip�inq a�i}�o �o� sa�eds g05 � :sa�eds 6u��aed �o aaqu�nN �JNDl21b'd 133ZI1S �,�0 Pa�l�olqun %OS pa�l�olqun °/o9S :aop�a�o� n�a�n �ivai� siy} 6uipaa�xa Z a�n;�n��s 6ui��ed �o do� o� „p-,gg s;yBiay �o� pa�inba� d�� ssa� si �anay�iunn -sai�o;s 5 �o ,gg Z;ade�ed 6uip�inq �o do� o� „0-�£E 6 ��4�!aH ��!pl!n9 �S 9£9`566 �S 668`6b� °/oSE %5Z :a6eaano� �07 �3d073/IN3 JN/071l18 paainbaa�panno���y pasodoad p�ena�no8 �od�ib L95 p�ena�no8 �od��y �gg �ipn�s Ma�na� uB�saQ pue Bu�do�s �eauawuo�inu3 Environmenta/ Scoping and Design Review Study 567 Airport Boulevard Informational Meeting: The applicant held an Informational Meeting via Zoom on November 10, 2020, where they provided an overview of and answered questions about the project. Information about the meeting was included in the Burlingame eNews digital newsletter and was also sent to persons on the project interest list. General Plan: In January 2019, the City adopted a new General Plan and certified the Environmental Impact Report (EIR). The General Plan designates this site as Bayfront Commercial. The Bayfront Commercial designation provides opportunities for both local and tourist commercial uses. Permitted uses include entertainment establishments, restaurants, hotels and motels, retail, and higher-intensity office uses. Because the project is an Office/R&D development, it is consistent with the land use designation. Design Review: Design Review is required for new commercial buildings pursuant to C.S. 25.57.010(c)(1). Design Review was instituted for commercial projects in 2001 with the adoption of the Commercial Design Guidebook. The criteria for design review in the Anza Area is detailed in Code Section 25.47.052 and requires the proposed project to be reviewed by the Planning Commission for the following considerations: 1. Support of the pattern of diverse architectural styles as defined in the design guidelines for the Anza subarea and the role of the shoreline in creating a network of interconnected open spaces; and 2. Respect and promotion of the streetscape by the placement of buildings to maximize the commercial use of the street frontage, off-street public spaces, and by locating parking so that it does not dominate street frontages, and for properties with any water frontage, that the design is sensitive to the surrounding bodies of water, physical and visual presence of the Bay Trail, and the orientation of the prevailing winds; and 3. On visually prominent sites and sites with shoreline as defined by the Bay Conservation and Development Commission, the design shall fit the site, support the Bay Trail and its park and recreational uses, provide for maximum user access and support recreational use by those who work in the area as well as those who visit; and the design fits the site and is compatible with the surrounding development and consistent with the design guidelines for the Anza subarea; and 4. Compatibility of the architecture and landscaping with the design guidelines for the Anza subarea including materials used in existing development, location and use of plant materials, and compatibility with transitions where changes in land use occur nearby; and 5. Architectural design consistency by using a single architectural style on the lot that is consistent among primary elements of the structure(s) and with the directives of the design guidelines for the Anza subarea; and 6. Provision of site features identified in the design guidelines such as orientation to minimize wind obstruction on San Francisco Bay, protection of the Bay environment, and landscaping and pedestrian circulation which enriches and enhances the existing recreation opportunities of the area, including extension of the Bay Trail as well as the commercial neighborhood. Materials proposed for the exterior of the Office/R&D building include pre-finish metal panels, fins, columns and rooftop screening, and metal sunshades and canopies. High-pertormance glazing is proposed for the exterior window system. The new Office/R&D building would be located between the finro existing office buildings at 555 and 557 Airport Boulevard and behind the proposed parking garage. A materials board will be available for review prior to the meeting. Page 5 of 11 Environmental Scoping and Design Review Study 567 Airport Boulevard Materials proposed for the exterior of the parking structure include painted concrete columns and spandrels, pre-finish metal panels, metal fins, metal wire mesh or perForated metal panels, cable railing, and Low-E green/blue tinted vision glazing. The new six-level parking garage would be located behind the adjacent buildings at 433 and 533 Airport Boulevard and associated parking deck on the northwest side. The garage will contain five levels of covered parking with the sixth level being open to the sky. The parking structure is approximately 73 feet from the proposed office/R&D building and the top parking level is setback another 60 feet. There are two access points from the main campus driveway into the parking garage. To better help visualize the proposed project, perspectives of the proposed project are provided in the Graphics Package submitted by the applicant. For additional information with respect to the proposed design approach, please refer to the Project Description submitted by the applicant (attached). Floor Area Ratio — Request for Conditional Use Permit: Planning staff would note that the maximum FAR allowed under the adopted new General Plan is 3.0, so the proposed 0.9 FAR proposed on the site with this project is in compliance with the General Plan. An application for a Conditional Use Permit is required for the proposed 0.9 FAR on the site (Conditional Use Permit required to exceed 0.6 FAR). Please refer to the attached Conditional Use Permit form completed by the applicant. Building Height — Request for Conditional Use Permit: The maximum building height allowed by right in the AA District is 65'-0" or 5 stories. Code Section 25.47.025 (I) allows for projects with a structure over 65'-0" or 5 stories in height to apply for a Conditional Use Permit. The applicant is requesting a Conditional Use Permit for the Office/R&D building (133'-0" proposed to the top of the building) and parking six-level parking structure (65'-0" proposed to the top of the parking structure). Staff would note that the existing office buildings surrounding the project are five to eight stories in height. Please refer to the attached Conditional Use Permit form completed by the applicant. In addition, the project must also comply with Federal Aviation Administration (FAA) standards. The applicant has submitted the project for FAA review and is in the process of obtaining a Letter of "No Hazard" for the project. View Corridor: To provide a view corridor, the width of any structure or combined structures on a lot shall not obstruct more than fifty (50) percent of the street frontages. This is an irregularly-shaped lot with three segments of street frontages along Airport Boulevard, two of which serve as driveway access points from Airport Boulevard to the buildings on the site. The applicant submitted a diagram on sheet A3.2 showing the proposed building and the view corridor calculation. Based on the project's street frontage on Airport Boulevard, the proposed project would comply with this requirement by preserving 56% of the view corridor. Off-Street Parking/Transportation Demand Management (TDM) Plan: With the proposed project, there would be a total of 501,412 SF of office and office/R&D uses on the site (120,579 SF existing office building at 555 Airport Boulevard; 139,154 SF existing office building at 577 Airport Boulevard; and the proposed 241,679 SF office/R&D building at 567 Airport Boulevard). Code Section 25.70.040 requires 1 space per 300 SF for office uses, which would result in a total of 1,672 off-street parking spaces for all three buildings. In addition, 15 spaces must be provided for for public Bay Trail Access parking. In total, 1,687 parking spaces would be required. However, the required off-street parking may be reduced through implementation of a Transportation Demand Management Plan. Krupka Consulting prepared a Transportation Demand Management Plan (TDM) for the proposed project (see attached TDM Plan, dated November 6, 2020). The purpose of the TDM Plan is to define specific TDM measures to be implemented by the Project to meet the City's TDM Program goal, which is: at least 20% of all employees regularly commute to work using modes other than single occupant vehicles (SOVs) or use an Page 6 of 11 Environmental Scoping and Design Review Study 567 Airport Boulevard alternative work hour schedule. This would help to reduce traffic congestion, reduce greenhouse gas emissions and other air pollution, and reduce the demand for parking. Equally important with regard to purpose is C/CAG's (City/County of Associated Government) stipulation that local jurisdictions must require the developer and all subsequent tenants to reduce demand for all new peak hour trips projected to be generated by developments. C/CAG established several choices for local jurisdictions, including implementing TDM Programs that have the capacity to fully reduce the demand for new peak hour trips. Therefore, the purpose of the TDM Plan was expanded to address the C/CAG requirement. With this application, the applicant is proposing a total of 1,505 parking spaces for the office buildings and 15 required public Bay Trail access spaces, for a total of 1,520 parking spaces. This equate to a ratio of 1 space per 330 SF (or 3 cars per 1,000 SF). This is accomplished through implementation of the TDM Plan, which would reduce the parking demand by 20%, which in this case would be 1,338 parking spaces plus 15 public Bay Trail access parking spaces. With the proposed project, 167 additional parking spaces are provided than would be allowed with the TDM Plan (1,505 — 1,338 = 167 spaces). Implementation of a TDM Plan is consistent with General Plan Policies M-7.5 (allowing creative parking approaches) and M-7.6 (reduction in parking demand through travel options programs such as parking cash-out and other TDM strategies), therefore a Variance for reduced parking is not required. There would be 376 parking spaces provided in open surface parking areas throughout the site and 1,144 parking spaces in the proposed six-level parking garage. The 1,520 parking spaces provided would consist of 1,188 standard, 300 compact and 32 disabled-accessible spaces. Of those spaces, there would be 14 clear air vanpool, 31 electric vehicle and 13 electric-vehicle ready spaces as required by code. Bicycle parking for 41 bicycles would also be provided on-site (4 short-term and 37 long-term). Proposed TDM measures are described in greater detail in the TDM Plan, but in summary they include the following: ■ Bicvcle Parkinq - The Project would include 41 bicycle parking spaces, with 37 Class I(secure) spaces in the bicycle enclosure on the first floor of the parking structure and 4 Class II spaces in 2 bike racks near building entries. ■ Shower Facilities - The new building would include shower rooms for men and women on the first floor, with a total of eight shower stalls, to support employees who bicycle and walk to work or exercise during the day, or both. ■ Dedicated qeak period shuttle service to BART/Caltrain that serves at least 60 round trip riders during the peak hour. This would be provided through direct contract or shared arrangement with a shuttle service sponsored by another development or entity. ■ Subsidized transit passes for at least 25% of employees with value of at least $20 per month per pass, or equivalent commuter benefit allowance or subsidy. This would be an employee benefit for the duration of employment and subject to change and customization to meet particular tenant conditions. ■ Parkinq Manaqement - The Project would include preferential parking of the following kinds: - Accessible ("ADA Stalls") - 32 total stalls (6 van, 26 standard), located in the parking structure and adjacent to existing buildings. - Clean Air Vehicle - 14 stalls, located in the parking structure. - Electric Vehicle Charging - 45 total (32 equipped, 13 ready), located in the parking structure and adjacent to the new building. Page 7 of 11 Environmental Scoping and Design Review Study 567 Airport Boulevard - Bay access stalls ("BCDC Stalls) - 15 stalls located adjacent to the Bay Trail - 45 EV parking (32 installed) Evaluating the performance and success of the TDM plans is essential to ensure TDM measures are implemented and effective. The TDM will require regular monitoring and reporting to ensure that tenants are in compliance. The TDM Plan includes a monitoring and reporting plan that consists of an annual survey of employees and preparation of an annual report. A Traffic Impact Analysis Report (TIA) was prepared by TJKM for the proposed project. The purpose of the report is to evaluate the project's traffic impacts to the surrounding transportation system pursuant to requirements under CEQA. To evaluate the impacts on the transportation infrastructure due to the addition of traffic from the proposed project, the study intersections were evaluated in accordance with the standards set forth by the level of service (LOS) policies of the City of Burlingame and the City/County Association of Governments of San Mateo County (C/CAG). Additionally, because three of the study intersections are located in the City of San Mateo, LOS policies from this jurisdiction were also considered for these intersections. TJKM also performed a Vehicle Miles Traveled (VMT) analysis for the project for informational purposes. The TIA will be peer reviewed as part of the CEQA document preparation. Landscaping: Proposed landscaping throughout the site is shown on the Landscape Plans (refer to sheets L1.1 through L5). In their Project Description, the applicant notes the following: "The landscape design incorporates the preservation of 148 existing trees on-site and adds 251 new trees. The outdoor program incorporates flex amenity spaces adjacent to each building and ties the landscape together with the use of similar plant material, hardscape geometry, and paving materials. The generous amount of open space at the southern exposure adjacent to the new building provides ample opportunity for outdoor amenities. It provides an overlook to capitalize on the lagoon and hill views as well as provides a variety of seating, dining opportunities, and lawn games. The plant palette is derived from a combination of drought tolerant native and adaptive plants which have a high success rate in this part of Burlingame. They are located on the site to maximize on microclimate factors such as sun exposure, shade, wind, etc. The plant palette is coordinated with C3 treatment measures such as bio-retention areas, such that the bio-retention areas fit seamlessly within the landscape design." The AA District standards required that 15% of the site be landscaped. The project proposes 35°/o site landscaping and therefore complies with the site landscaping requirements. Within the parking area, 10% of the area is required to contain landscaping (11.7% proposed). Lastly, 80% of the front setback is required to be landscaped. The existing front setback landscaping is nonconforming, with only 69% of the front setback containing landscaping; there are no changes proposed to the landscaping areas within the front setback. Based on the unique configuration of the lot, much of the front setback areas consists of driveways that provide access to the buildings on the site. Public Facilities Impact Fees: The purpose of public facilities impact fees is to provide funding for necessary maintenance and improvements created by development projects. Public facilities impact fees are based on the uses and the amount of square footage to be located on the property after completion of the development project. Based on the proposed Office/R8�D building, the required public facilities impact fees for this development project total $562,145.35 and is required to be paid in full, prior to issuance of the building permit. Page 8 of 11 Environmenta/ Scoping and Design Review Study 567 Airport Boulevard Commercial Linkage Fees: Commercial Linkage Fees are based on the land use and square footage for new commercial development projects. The intent of this fee is, in summary, to offset the demand for affordable housing that is created by new development and mitigate environmental and other impacts that accompany new commercial development. These fee calculations include gross square feet of floor area, excluding enclosed parking areas. In addition, the rates vary for prevailing wage and non-prevailing wage for labor used for the construction of the project. The fees for office uses are charged per square feet ($20.00 per SF if utilizing prevailing wages or $25.00 per SF if not utilizing prevailing wages). Based on the proposed Office/R&D building, the required Commercial Linkage Fee for this development project totals $4,833,580 (with prevailing wages) or $6,041,975 (without prevailing wages) and is required to be paid in full, prior to issuance of the building permit. Bayfront Development Fees: The purpose of Bayfront Development Fees is to provide funding for future construction, improvement and enlargement of major arterials and traffic control devices for the primary purpose of carrying through traffic and providing a network of roads within the Bayfront area on the east side of US 101 and to impose charges to support and defer the cost of the benefits rendered to owners and occupants of lands enjoying these improvements. The fees for office uses are charged per thousand square feet ($2,781 per thousand square feet), and based on the proposed Office/R&D building, the Bayfront Development fees for this development project total $672,109.30. Half of this fee is required to be paid prior to issuance of the building permit and the second half of the fee is required to be paid prior to scheduling the final inspection. Staff Comments: None. Planning Commission Action: Environmental Scoping: As the first discussion item, the Planning Commission should review and take public comment on the proposed project and the areas of potential environmental effects as listed in the staff report. The Commission should add any additional effects of the project that it believes should be addressed in the CEQA document. The areas of investigation for environmental evaluation as defined by CEQA are listed in the attached Initial Study Checklist for your reference. 2. Design Review Study: As the second discussion item, the Commission should comment on the design of the project as required by Chapter 25.57 and Chapter 25.47.052 of the Zoning Ordinance, Design Review, and to the following design criteria for commercial projects: a. Support of the pattern of diverse architectural styles that characterize the city's commercial, industrial and mixed use areas; and b. Respect and promotion of pedestrian activity by placement of buildings to maximize commercial use of the street frontage, off-street public spaces, and by locating parking so that it does not dominate street frontages; and On visually prominent and gateway sites, whether the design fits the site and is compatible with the surrounding development; and d. Compatibility of the architecture with the mass, bulk, scale, and existing materials of existing development and compatibility with transitions where changes in land use occur nearby; and Page 9 of 11 Environmental Scoping and Design Review Study 567 Airport Bou/evard e. Architectural design consistency by using a single architectural style on the site that is consistent among primary elements of the structure, restores or retains existing or significant original architectural features, and is compatible in mass and bulk with other structures in the immediate area; and Provision of site features such as fencing, landscaping, and pedestrian circulation that enriches the existing opportunities of the commercial neighborhood. In addition, the following design review criteria for commercial development in the Anza Area are outlined in the zoning code (C.S. 25.47.052): Support of the pattern of diverse architectural styles as defined in the design guidelines for the Anza subarea and the role of the shoreline in creating a network of interconnected open spaces; and 2. Respect and promotion of the streetscape by the placement of buildings to maximize the commercial use of the street frontage, off-street public spaces, and by locating parking so that it does not dominate street frontages, and for properties with any water frontage, that the design is sensitive to the surrounding bodies of water, physical and visual presence of the Bay Trail, and the orientation of the prevailing winds; and 3. On visually prominent sites and sites with shoreline as defined by the Bay Conservation and Development Commission, the design shall fit the site, support the Bay Trail and its park and recreational uses, provide for maximum user access and support recreational use by those who work in the area as well as those who visit; and the design fits the site and is compatible with the surrounding development and consistent with the design guidelines for the Anza subarea; and 4. Compatibility of the architecture and landscaping with the design guidelines for the Anza subarea including materials used in existing development, location and use of plant materials, and compatibility with transitions where changes in land use occur nearby; and Architectural design consistency by using a single architectural style on the lot that is consistent among primary elements of the structure(s) and with the directives of the design guidelines for the Anza subarea; and 6. Provision of site features identified in the design guidelines such as orientation to minimize wind obstruction on San Francisco Bay, protection of the Bay environment, and landscaping and pedestrian circulation which enriches and enhances the existing recreation opportunities of the area, including extension of the Bay Trail as well as the commercial neighborhood. Because a CEQA document is being prepared for this project, it is important that any changes to the building envelope be made early enough in the process so that any changes are reflected in the environmental review. Subsequent changes once the CEQA process has begun may result in the need for additional studies and analysis and will require additional time for the CEQA process to accommodate the review of such changes. Ruben Hurin Planning Manager Page 10 of 11 Environmenta/ Scoping and Design Review Study c. EW-PG Airport Owner, LLC, applicant and property owner DES Architects, architect Attachments: ■ Application to the Planning Commission ■ Project Description, submitted by the applicant, dated November 12, 2020 ■ Conditional Use Permit Applications ■ TDM Plan, prepared by Krupka Consulting, dated November 6, 2020 ■ Environmental Information Form ■ Notice of Public Hearing — Mailed November 13, 2020 ■ Area Map 567 Airport Boulevard Page 11 of 11 � PLANNING APPLICATION BURLINGAME COMMUNITY DEVELOPMENT DEPARTMENT—PLANNING DIVISION � 501 PRIMROSE ROAD, 2ND FLOOR, BURLINGAME, CA 94010-3997 TEL: 650.558.7250 � FAX: 650.696.3790 � E-MAIL: PLANNINGDEPT(c�BURLINGAME.ORG Z O H Q � � O � Z H t� W � O � a 555-577 Airport (proposed address for new building - 567 Airport) 026-363-590, 025-290-470 Anza Area PROJECT ADDRESS ASSESSOR'S PARCEL #(APNI ZONING PROJECT DESCRIPTION The project site is located at a developed parcel at the south end of the Airport Boulevard, east of US Freeway 101. It comprises of parcel APN 026-363-590 (555 and 577 Airport) and leased parcel APN 025-290-470 (State Land Commission). The total site area is 12.8 acres. The existing Bay Park plaza consists of one five-story and one eight-story multi-tenant o�ce buildings built in 1983 and 1998. Total building area is 259,733 sq. ft.. The project will add an 241,054 sq. ft. 8-story office / R&D building and a 5.5 level parking garage to the campus. The total building area on site is . increased to 500, 787 sq. ft.. Floor area ratio of the campus is 0.9. Parking for existing and new buildings will be provided at 3 cars per 1,000 sq. ft., with the new garage and surface parking lots. Other site improvements include new driveways, surfacing parking lots, landscape plaza, patios and walkways, service yards, as well as, utilities / equipment supporting the new project. EW - PG Air ort Owner, LLC 1099 18th Street, Suite 2900, Denver, CO 80202 �ID�� �� PROPERTY OWNER NAME X APPLICANT7 ADDRESS (303) 986-2222 Larry.Lance@EverWest.com 1� PHONE E-MAIL ' Z O f= Q � oC O � Z H z a U J d a a DES Architects and Engineers ARCHITECTIDESIGNER APPLICANT7 (650)364-6453 PHONE 33117 (Owner), 24614 (DES) BURLINGAME BUSINESS LICENSE # 399 Bradford Street, Redwood City ADDRESS khung@des-ae.com j E-MAIL j *FOR PROJECT REFUNDS* - Please provide an address to which to all refund checks will be mailed to: EW - PG Airport Owner, LLC I NAME a S � � w z � O t� O f— > Q � � � Q 1099 18th Street, Suite 2900, Denver, CO 80202 ADDRESS I HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE INFORMATION GIVEN HEREIN IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. APPLICANT'S SIGNATURE (IF DIFFERENT FROM PROPERTY OWNERI DATE I AM AWARE OF THE PROPOSED APPLICATION AND HEREBY AUTHORIZE THE ABOVE APPLICANT TO SUBMIT THIS APPLICATION TO THE PLANNI.R� COMMISSIO�IJIVISION. EVII - PG Airpork Ow1'�r, LLC ��''" � r� �'t" `-E' -_ Larry Lance, EVP, Asset Services May 8, 2020 PROPERTY OWNER'S SIGNATURE DATE 6 AUTHORIZATION TO REPRODUCE PLANS I HEREBY GRANT THE CITY OF BURLINGAME THE AUTHORITY TO REPRODUCE UPON REQUEST ANDIOR POST PLANS SUBMITTED WITH THIS APPLICATION ON THE CIN'S WEBSITE AS PART OF THE PLANNING APPROVAL PROCESS AND WAIVE ANY CLAIMS AGAINST THE CITY ARISING OUT OF OR RELATED TO SUCH ACTION KH (INITIALS OF ARCHITECTIDESIGNERI � J z O w � � � � Q � N APPLICATION TYPE ❑ ACCESSORY DWELLING UNIT (ADU) IBI CONDITIONAL USE PERMIT (CUP) � DESIGN REVIEW (DSR) ❑ HILLSIDE AREA CONSTRUCTION PERMIT ❑ MINOR MODIFICATION ❑ SPECIAL PERMIT (SP) ❑ VARIANCE (VAR) ❑ WIRELESS ❑ FENCE EXCEPTION ❑ OTHER: DATE RECENED: '����I�i%�` `�:�AY 1 2 20; � `r rJF BURLWC:, ��D-PLANNING Di`�, N � D � � c � m O Z r � BURLIIVGAME BAY � PROJECT DESCRIPTION November 12, 2020 Owner's Project Objectives The goals of the project sponsor are: DES . To develop an approximately 241, 679 square foot Office / R&D building and a 5.5 Level ,�«,,,��t,� �,,,, ,�, 4 G a� parking structure on an existing 2-building corporate campus utilizing an existing surface parking lot, suitable for a single major office tenant. • To develop a Class A Office / R&D building in a high visibility location proximate to major transportation corridors. • To develop a Class A Office / R&D building that is LEED-certified and demonstrates sustainable design principles and technology. • To develop a Class A Office / R&D building with adequate density and floor plate size to allow flexibility in user-make-up, particularly focused on life science and information technology. • To develop a Class A Office / R&D building within an existing corporate campus with adequate building height and density to provide usable open space between buildings that connects to the waterfront edges and San Francisco Bay Trail running through the site. • To develop a Class A Office / R&D building that has design elements that allow it to integrate into the existing campus without overwhelming the design of the existing buildings. • To develop a Class A Office / R&D building with a new parking structure that provides sufficient automobile parking to meet the demand of the entire campus and allows for opportunities for the use of alternative transportation methods. Project site The project is located at a developed site at the south end of the Bayfront Specific Plan Area, east of US Freeway 101. It is comprised of parcel APN 026-363-590 (555 and 577 Airport) and leased parcel APN 025-290-470 (State Land Commission). The total site area is 12.83 acres. Its northwestern property line follows Airport Boulevard and three adjacent office developments — 411 Airport Blvd, 433 Airport Blvd, and 533 Airport Blvd. The Anza Parking lot (615 Airport Blvd) is to the west of the parcel. The Sanchez Channel, Burlingame Lagoon, and the BCDC shoreline bands are on the east and south sides of the site, and are the projecYs "public" frontage as seen from the freeway. The San Francisco Bay is further to the north. Vehicular traffic on site is primarily coming from and going to US Freeway 101 - via Broadway Avenue, Anza Boulevard, and Peninsula Avenue exits - through Airport Boulevard. Commute.org runs a shuttle service from Millbrae Intermodal Station (Bart / Caltrain / SamTrans) to the Bayfront 399 Brndfirrd Street IZedtuood Cih�, G�lifc�rnin 94063 Tel 650-36�-�4.53 Fax �50-364-2618 zuznw.des-ee.co�n � Burlingarryie Bay � 10192.002 Project Description NovemHer 12, 2020 Page 2 of 9 area, and has a stop right across the street from the project site, at Airport Boulevard and Bay View Place. Airport Boulevard has bike lanes and sidewalks on both sides, along its entire length. The existing Bay Park plaza consists of one five-story and one eight-story multi-tenant office buildings built in 1983 and 1998. Total building area is 259, 733 sq. ft. The rest of the site is used as surface parking lots. The south and east sides of the site are within 100 feet of the BCDC shoreline bands. There are existing bay trails, seating nodes, mature trees and vegetation along the shoreline. Project Scope The project will add a 241,679 sq. ft., 8-story Office / R&D building and a 5.5 level parking garage to the existing campus. Total building area will be increased to 501, 412 sq. ft. Floor Area Ratio is up from 0.46 to 0.9. (2019 City of Burlingame General Plan allows for a 3.0 max FAR for this site). The new garage and surface parking lots will provide 1,520 stalls for new and existing buildings, at 3/ 1,000 ratio. The project will also revamp the entire campus with these improvements: • New surface parking area and access driveways. • New service / trash enclosures, and truck parking area. The existing trash enclosure next to the bay trail will be demolished. • New landscaped promenades connecting all three buildings and parking garage. • New landscaped open space and paved plaza on the south and east side of the new building. • New stormwater treatment areas connecting to existing pump and outfall to Burlingame Lagoon. • New and re-located site utilities and equipment supporting the buildings. The project intends to maintain public access to the BCDC shoreline during and after construction, including the bay trail and 15 parking spaces. The bay trail, vegetation, and other amenities within the BCDC shoreline bands will not be altered. During construction, the parking areas along Burlingame Lagoon and Sanchez Channel will be fenced off. The 15 public parking spaces will be relocated temporarily during construction (still close to the bay trail) and will be restored back to existing location afterwards. The project is proposing a comprehensive Transportation Demand Management (TDM) Plan. The intent is to reduce single-vehicle trips to / from the site and encourage employees taking public transportation. Examples of the TDM plan measures include: 2 on-site shuttle bus stations/ parking, multiple bike storage locations, and changing room / shower facilities. DES Architects + Engineers, Inc. G`2020 � Burlingame Bay � 10192.002 Projeci Descnption November 12, 2020 Page 3 of 9 Site and Building Design The proposed office building will be sited on the parking lot between the two existing buildings, with roughly 70 feet separation from each of the existing buildings. The shape of the new building is slightly curved at the ends for a smoother visual transition to the other buildings. It will be 133 feet tall (measured to the top of the parapet) and is set back 142 feet from the Burlingame Lagoon shoreline. This setback allows for a generous open space on the south side of the building, with views to the Burlingame Lagoon. The building's primary entrance is on the north side, facing the main campus driveway and Airport Blvd. This campus driveway not only connects all three buildings and the parking garage, but also branches into a loop road to the service areas between 577 Airport and the new building. The trash enclosure and truck parking space will be screened with new landscaping and existing trees along the shoreline. Another smaller trash enclosure will be built on the east side of 555 Airport. The new surface + 4.5 level parking garage will be tucked behind the adjacent buildings and parking deck on the north-west side. It is approximately 73 feet from the new office building and the top parking level is setback another 60 feet. There are two access points from the main campus driveway. Accessible parking stalls and electrical vehicle chargers will be provided in this garage. 555 Airport Blvd and 577 Airport Blvd buildings are 68 feet and 90 feet (top of parapet) in height. Both structures are highly visible from the US 101 freeway and the Burlingame Lagoon. 577 Airport is wrapped in dark tinted glazing and pre-cast concrete bands throughout. 555 Airport has a curved, bluish-green reflective glass fa�ade on the north side that then transitions to punched window openings encased in pre-cast concrete pilasters and spandrels. The two ends of the building are stepped down one floor. The buildings have a general off-white color tone. The new office building's design respects the architectural and waterfront context of the campus. Its north-south orientation helps with day-lighting and varying fa�ade treatment. The north side is primarily clad in slightly tinted glazing, with vertical fins and narrow metal bands. The curved glass wall continues into projected horizontal ribbon windows that wrap around the east end of the building. To emphasize the view corridor to the Airport Boulevard, the first two floors at the north- west corner are recessed and clad with highly transparent structural glass. The facade then changes to tinted glass wall framed in metal panel pilasters. There is a view balcony at the seventh floor of the north-west corner. The south fa�ade is highlighted by the inter-play of various design elements. The arcades on the first and second floors recall the architecture of 555 Airport and then transition gradually into punched windows on upper floors, matching the taller massing of 577 Airport. The "encased" glazing is a slightly darker bluish-green color for better energy performance and compliments the blue-tinted glass elsewhere. At the east end, the ribbon windows continue one third of the south fa�ade and then change back to the full-height glass walls with metal sunshades and off-set accent DES Architects + Engineers, Inc. �02U20 � Burlingame Bay � 10192.002 Project Description November 12, 2020 Page 4 of 9 metal fins. This glass wall is very "dynamic" as it is reflecting the water of the Burlingame Lagoon in high and low tides. The top two floors at the building's east end are setback 25 feet to create a size-able rooftop patio that is shaded with metal trellis and canopy. This design feature not only provides an amenity space for the tenants but also a nice transition to the shorter 555 Airport building. The new surface + 4.5 Level parking garage is naturally ventilated. Its design emphasizes the concrete structural columns and spandrels with painted finishes and varied openings. The garage's entries and street frontages (between the adjacent office buildings) are framed in off-white painted "portals" with perforated metal panels. The two elevator / stair towers have an open glass fa�ade and metal canopy that shares the design aesthetics of the new office building. The new building and garage will use high-performance glazing, low-carbon concrete, metal sunshades and fins, and other structural materials and finishes that are friendly to the environment. Mechanical and electrical systems and lighting controls will be highly efficient and appropriate for tech and life science uses, such as LED lighting fixtures, occupancy sensors, electrical generators... etc. Electrical vehicle chargers and clean-air vehicle parking will also be provided on site. The project will comply with the latest CalGreen and City's reach code (if applicable to the project). It will also target LEED certification — an industry benchmark for energy efficient building design. Landscape and Open Space The landscape design incorporates the preservation of 148 existing trees on-site and adds 251 new trees. The outdoor program incorporates flex amenity spaces adjacent to each building and ties the landscape together with the use of similar plant material, hardscape geometry, and paving materials. The generous amount of open space at the southern exposure adjacent to the new building provides ampie opportunity for outdoor amenities. It provides an overlook to capitalize on the lagoon and hill views as well as provides a variety of seating, dining opportunities, and lawn games such as cornhole. The plant palette is derived from a combination of drought tolerant native and adaptive plants which have a high success rate in this part of Burlingame. They are located on the site to maximize on microclimate factors such as sun exposure, shade, wind, etc. The plant palette is coordinated with C3 treatment measures such as bioretention areas, such that the bioretention areas fit seamlessly within the landscape design. Site lighting takes its cue from the geometry in the landscape design and the materials and rhythm used in the architectural design of the new building. The site lighting concept is used to bring these elements together and tie the site to the building. DF.S Architects + £ngirieers, Inc. ��2020 � Burlingame Buy � 10192.002 Project Description November 12, 2020 Page 5 of 9 Existing Topography The existing site is relatively flat, with grades varying between elevations 4 and 12 (relative to NAVD 88 datum). The site grades gently to a low-lying portion of the property at the midpoint of the property line shared with low lying properties along Airport Boulevard to the northwest of the site. The site conforms up to elevations at the shoreline protection located to east of the site at Sanchez Channel, and south of the site at Burlingame Lagoon. Site Grading: The proposed project will maintain existing grading for much of the site. The proposed parking structure (565 Airport Boulevard) will have a finished floor elevation of 6.0. The proposed building (567 Airport Boulevard) will have a finished floor of elevation 12.0. The site is located largely in the FEMA Flood Hazard Area AE, with a base flood elevation of 10.0. 567 Airport Boulevard is proposed to be elevated above the base flood, and the parking structure will be dry flood-proofed to 1 foot above the base flood elevation. The proposed grading will conform to grading at the shoreline and will not add fill at the existing shoreline. Stormwater Treatment: As a redevelopment project that replaces or alters more than 50% of the existing impervious surface at the site, the project will provide treatment for all impervious surfaces at the project site. The proposed site will be treated by on-grade flow-through planters. The parking structure will be treated by a treatment planter located behind the parking structure, and the remainder of the site will be treated through several treatment planters. A new pump station will direct required runoff from the remainder of the site to treatment flows distributed through the remainder of the site. Planters will be sized based on local requirements and will be preliminarily sized at 4% of the impervious surface for the site plan. Final sizing will be documented in the Stormwater Management Plan to be submitted with the Construction Documents for the project. Utilities Existing site utilities will be removed as required for new utilities to serve the development. New water services will be connected to the existing 12-inch municipal water main located south of the site, running the shoreline along Burlingame Lagoon. Existing water will be rerouted as required. Existing sewers will also be rerouted as required, with new sewer services extended to the new buildings at 565 and 567 Airport Boulevard and will utilize existing sewer connections to the 10-inch municipal sewer in Airport Boulevard. The proposed redevelopment will not increase runoff from the site and will utilize the existing storm drain pump station connecting to Burlingame Lagoon. In addition, a treatment pump station will be added to direct required runoff to treatment planters distributed throughout the site. DES Architects + Engineers, Inc. ��2020 � Burlingame Bay � 10192.002 Project Description Noventber 12, 2020 Page 6 of 9 Parcelization The existing site is a single parcel. The project will subdivide the site, to create two parcels. Parcel A will include existing 555 Airport Boulevard building, as well as the new Office / R&D building (567 Airport Boulevard) and the parking structure (565 Airport Boulevard), and a portion of the remaining site including landscape improvements and surface parking. Parcel B will encompass existing 577 Airport Boulevard and portions of the remaining site and surface parking. Parcel A will reserve the right to create two commercial condominiums for 555 and 567 Airport Boulevard buildings to be in their own respective condominiums. Sea-level rise The proposed commercial building is proposed to have a finished floor of 12.0. This is 2 feet above the FEMA base flood elevation of 10.0, allowing 2 feet of freeboard for potential sea level rise. The proposed parking structure is proposed to have a finished floor of 6.0 and will include mitigations to dry floodproof the building to elevation 11.0. Zoning Compliance The project is zoned as Anza Area (AA), under the City of Burlingame Bayfront Specific Plan. Zoning regulations that would apply to this project: Chapter 25.47 Anza Area Chapter 25.70 Off-street Parking Requirement Proposed Footnote Use Offices - including research and Office / R&D Ch 25.47.020 (c) development offices with associated laboratory uses, as well as instructional activities associated with an office on the site. Buildings and structures that None Ch 25.47.020 (h) exceed forty (40) feet in height when located within one hundred (100) feet of the San Francisco Bay shoreline as defined by the Bay Conservation and Development Commission (BCDC). FAR 0.6 Allowed 0.9, include 555, Ch 25.47.025 (a) DES Architects + Engineers, Inc. v2020 � Burlinganie Bay � 10192.002 Project Description Novemher 72, 2020 Page 7 of 9 > 0.6 CUP 577 Airport and new 8-story building. Total gross floor area is 501,412 sq. ft. (excl. rooftop penthouses) CUP SETBACK Front: 30 ft typical. Complies, Refer to Ch 25.47.040 (a) 1- Side: 10 — 30 ft Sheet 3.1 of the 3 Rear: 25 ft planning set. Setback from SF Bay and its Complies, average Ch 25.47.040 (a) 4b Estuaries setback: � 115 ft Average 65 feet between any structure and shoreline as defined by BCDC. For structures taller than forty (40) Complies. Ch 25.47.040 (a) 4c feet, the minimum setback from the BCDC bayside jurisdiction line shall Height: 133 ft be equal to the height of the Setback: 142 ft structure. Parking No parking spaces in front setback. Grandfathered Ch 25.47.040 (a) 5 Location No parking spaces within twenty conditions, permitted (20) feet from the inner edge of the per 20-82 BCDC Bay Trail. permit. View The width of any structure or Complies, refer to Ch 25.47.040 (a) 6 Corridor combined structures on a lot shall Sheet A3.2. not obstruct more than fifty (50) percent of the street frontages. Confirmed with Planning on 9.8.2010. Height 65 ft max Building height: 133 Ch 25.47.040 (a) 7 ft (A) CUP No building or structure shall None Ch 25.47.040 (a) 7 exceed forty (40) feet when located (B) within one hundred (100) feet of the DES Ardtitects + Engineers, Lr�c. 002020 � Burlingnrne Bay � 10192.002 Project Description Novemher 12, 2020 Page 8 of 9 San Francisco Bay shoreline as defined by the BCDC Lot 35% Max 25% (555, 577 Ch 25.47.040 (a) 8 Coverage Airport, New office building, Parking garage and accessory structures), Complies. Refer to Sheet A3.2. Lot Frontage 100 feet / 40,000 sq. ft min Complies, refer to Ch 25.47.045 (a) / Minimum Sheet A3.1. Lot size Landscaping Min 15% of the site Complies. Ch 25.70.050 (a — c) Min 80% of front setback 35% of the site, Min 10% of parking area including State Land Commission land, and 11 % of parking area. Refer to Sheet L5. No changes to the street frontage and existing vegetation to remain. Trash / Fully enclosed, attached or Complies. Fully Ch 25.70.050 (d — e) loading doc detached structure for refuse and enclosed trash garbage containers enclosure and 75 feet from rear property line screened service 100 feet from BCDC shoreline yards as shown on site plan. Loading and delivery area are setback 75 feet from rear property line and outside 100 feet BCDC shoreline band. Parking 1 car / 300 sq. ft. or 3.3 cars / 1,000 3 car / 1,000 sq. ft. Ch 25.70.040 sq. ft. (gross floor area) With TDM plan. DES Architects + Engineers, Inc. CJ2020 � Burlingnme Bay � 10192.002 Project Description November 12, 2020 Page 9 of 9 Provided a traffic No CUP is required, study and TDM plan per Planning's email to justify lowered dated 9.8.2010. parking ratio. DF.S Arcliitccts + Engr�iecrs, Inc. n2020 City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlin ame.org �� ciT. o � � BURLINGAME 4� `y,.±. •oi °b„ CUP for 0.9 FAR y 4 � ��t ��: �.�' �_�' .'� Q 2�zli ,''� �',U�LING�MF . ,;,, The Planning Commission is required by law to make findings as defined by the City's Ordinance (Code Section 25.52.020). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type or write neatly in ink. Refer to the back of this form for assistance with these questions. 1. 2. 3. Explain why the proposed use at the proposed location wil! not be detrimental or injurious to property nr i�nprovements in the vicinity nr to publie health, safety, general welfare o�� convenience. The project will develop a 241,679 square foot Office / R8D building and a 5.5 Level parking structure at the existing Bay Park Plaza office campus. The neighboring properties are office buildings and a rental parking lot for the San Francisco International Airport. Hence, the proposed use is compatible with the existing uses on site and neighboring properlies. The project can be accessed from Airport Boulevard and US 101 Freeway. There will be sufficient on-site parking to meet the demand of the entire campus. It will also have a TDM to support the use of aiternative transportation and minimize traffic impacts. The site is also connected to the existing sidewalks on Airport Boulevard and the San Francisco Bay Trails along Burlingame Lagoon and Sanchez Channel. Existing public access parking will be preserved. The project will be designed to the latest building and fire code standards and will comply with City of Buriingame's municipal codes. New or relocated sewers, utilities, power, stormwater treatment and trash facilities will be provided for the new and existing buildings. The new Office / R8D Building will have energy-efficient mechanical equipment and sustainable design features. It is intended to achieve LEED certification. How will the proposed use be located and conducted in accordance with the Burlingame General Plan and Zoning Ordinanee? The site is zoned as Anza Area (AA) within the Bayfront Specific Area. The Buriingame General Plan (2019) states that "The Bayfront will be a regional recreational and business destination." Goal CC-6.3 Infill Development - encourages increased intensity via high-quality infill development on surtace parking lots, and support the conversion of surface parking lois into active commercial and hospitality uses. The City of Burlingame's Zoning Ordinance, 5ection 25.47.025 Conditional Permitted Uses (a) - Offices with a maximum floor area ratio greater than 0.6, including research and development offices with associated laboratory uses, as well as, instructional activities with an office on the the site, requires a Conditional Use Permit. The proposed project meets the above requirement. It is an infill development and increases the intensity of an existing office use. A new Class A Office / R&D building (and associated parking garage) will be built at the surface parking lot of an existing office campus. Total FAR i: increased from 0.46 to 0.9. The project also complies with other Anza Area's development standards, including building setback, minimum lot size, street frontage, view corridor and landscaping design. Hnw will the proposed project be compatible witl: tlie aestheties, mass, bulk and eharaeter of the existing and potential uses on adjoining properties in the general vicinity? The existing and adjoining properties, including the Burlingame Bay project east of Sanchez Channei, are all office buildings. The proposed Office ! R8D building, therefore, is consistent with these uses. The proposed 8-story Office / R&D building is carefully sited between the existing 5 and 8-story structures, to maintain views from these buildings. There's ample of landscaped open space and separation between the new and existing buildings. The variety of building heights on this campus is compatible with the massing and character of the immediate neighborhood, including the adjacent Burlingame Bay campus. The new Office / RSD building also has a substantial setback (142 feet) from the Burlingame Lagoon and bay trails, while preserving public access to the shoreline. The new building's design compliments the architectural styles of the existing structures on site. The use of modern and quality building finishes, such as highly-transparent curtain walls, metal panels and other articulations on the facade, enhances the aesthetics and "business destination" character of the Bayfront neighborhood. CITY OF BURLINGAME CONDITIONAL USE PERMIT APPLICATION The parking garage is located on the interior side of the site. Its street presence is limited, including the two ends of the garage and a small portion on the north side (between the two oftice buildings at adjacent parcels). These areas are treated as the main architectural features - metal panel-clad portal elements, with perforated metal screen and alternating vertical fins. City of Burlingame Planning Department �r� C�TY ���.t� 6URLINGAME ; ..E o °w,' CITY OF BURLINGAME CONDITIONAL USE PERMIT APPLICATION 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.org CUP for Building Height, 09.10.2020 _� � 9� �.,. � �_ E� S � 2��� , . _:i�1GAUlE The Planning Gornmission is required by law to make findings as clefined by the City's Ordinance (Code Section 25.52.020). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type or write neatly in ink. Refer to the back of this form for assistance with these questions. � 2. Explain why the proposed use at the proposed location wil! not be detrimental or injurious to property or iinprovements in the vicinity or to public health, safety, generul welfare or eonvenience. The project will develop a 241,679 square foot Office / R&D building and a 5.5 Level parking structure at the existing Bay Park Plaza office campus. The neighboring properties are office buildings and a rental parking lot for the San Francisco International Airport. Hence, the proposed use is compatible with the existing uses on site and neighboring properties. The project can be accessed from Airport Boulevard and US 101 Freeway. There will be sufficient on-site parking to meet the demand of the entire campus. It will also have a TDM to support the use of alternative transportation and minimize traffic impacts. The site is also connected to the existing sidewalks on Airport Boulevard and the San Francisco Bay Trails along Burlingame Lagoon and Sanchez Channel. Existing public access parking will be preserved. The project will be designed to the latest building and fire code standards and comply with City of Burlingame's municipal codes. New or relvcated sewers, utilities, power, stormwater treatment, and trash facilities will be provided for the new and existing buildings. The new Office / R8D Building will have energy-e�cient mechanical equipment and sustainable design features. It is intended to achieve LEED certification. How will the proposed use be located and conducted in accordance with the Burlingame General Plan and Zoning Ordinance? The siting of the new building and parking garage preserves more than 50% of the street frontages / view corridors from Airport Blvd to Burlingame Lagoon and Sanchez Channel. No new structures are proposed within the 100 teet BCDC shoreline band. In essence, the project is compliant with (1) Zoning Ordinance Sec 25.47.040 - 6 View Corridor, and (2) Burlingame General Plan Goal CC-6.1 View Corridor - ensures that new developments preserve public view to the waterfront. The new 8 story Offico / R&D building, at 133 feet tall (to top of the parapet), is above the 65 feet height limit for any properties with frontages along Burlingame Lagoon (sec 25.47.040 - 7A). However, it is setback further frorn the Burlingame Lagoon than the other two existing buildings. Its south side is setback 142 feet from the bayside jurisdiction line of the BCDC shoreline. This is more than the 1:1 height to setback requirement (sec 25.47.040 - 4C). The new 5.5 level parking garage is located on the north side of the site. It generally complies with the 65 feet height limit, except at the two elevator / stair towers (69 feet). The front portion of this garage is only 47 feet tall. The top parking level is set back further and 57.5 feet tall. The project complies with other Anza Area's development standards, including building setback, minimum lot size, street frontage, and landscaping design. 3. How will the proposed project be compatible with the aesthetics, mass, bulk and character of the existing and potential uses on adjoining properties in tl:e genera[ vicinity? The existing and adjoining properties, including the Burlingame Bay project east of Sanchez Channel, are all office buildings. The proposed Office / R&D building, therefore, is consistent with these uses. The proposed 8-story Office ( R8D building is carefully sited between the existing 5 and 8-story structures, to maintain views from these buildings. There's ample of landscaped open space and separation between the new and existing buildings. The variety of building heights on this campus is compatible with the massing and character of the immediate neighborhood, including the adjacent Burlingame Bay campus. The new Office / R&D building also has a substantial setback (142 feet) from the Burlingame Lagoon and bay trails, while preserving public access to the shoreline. The new building's design compliments the architectural styles of the existing structures on site. The use of modern and quality building finishes, such as highly-transparent curtain walls, metal panels and other articulations on the facade, enhances the aesthetics and "business destination" character of the Bayfront neighborhood. The parking garage is located on the interior side of the site. Its street presence is limited, including the two ends of the garage and a small portion on the north side (between the two office buildings at adjacent parcels). These areas are treated as the main architectural features - metal panel-ciad portal elements, with perforated metal screen and alternating vertical fins. krupka. DRAFT FINAL TDM PLAN BURLINGAME BAY Prepared for EW-PG Airport Owner, LLC Prepared by KRUPKA CONSULTING November 6, 2020 krupka. [this page intentionally left blank] a 3p O O PROJECT SITE �� : AIRPORT BlYO ' . •. [ _ � -�. . N•Jr� � .:, '� ___'-, _r�� ,». ur� !� � • \ ,' , fi ' + � � , �, . , . j7. � .. ` i"�`' '�y , . `�� �; . ��i • . P 0 . .. S.tGn� � , 1 MI � p a _��,_' P 41RPORT BLVD ��� ��-�• 101 � .� � � ' ; � {i�i»�� -1' 1 . .;� ' � �� ..y� � � 'Y��/ ^ �� � '� . .. � . . ` �f _� ._ ��`�7 �+'1..�`�'tv-!�.'�. 1�.�� �..1 . tfr4�_ �,~� '.. . ..; � . �• q�RP j��.�� � � . � ,.� �} 0` L#1•t'�IG �� '�'� i . `�i tfR.� . �.� � ' (�r �A'r �' 'i =�<� ��' E * i ,,y��// {' .�., �.,•.,�f :�w ,. ,yj' '.�C ,��'•' ' ,` ���i��,� ��`j� �� �rvu �,-.8 •�;���1� 'r,�+� �1'*'�+�+R�Y��.��a« ��>� � i . w �+� � ` ` �- '� � -,t , �. t • +� ' �S � � � ���i � � ��`+��. �. Y.' �^ 1M � y� � .� '„�t \ 'l �f1. '1� �fra a�� ! �. .� ��*:M���I.���a� �.' �,�J��1 MF� � • r•�y � },�;� ,�4''�'y -: � . � �,•~,� .��'' �.. ♦ � • ry �}` C�~i`�j��J�IY� �+�,.,.`' '`�`•�i� '�-�. �'���a��� ��' � � „T"►�`� y�`�l"�k�*�j�,_���{,���;�,, �nl�^ ,� --��' � � �f� �•K�is.�y, � � .�'•' T r ��, r �� 4��'. �` ff ; �"�r`r� ?'�$' yi�?�* ry� 's.� ` ` ; , ' �� ���,�� �4►� Y�.Tj� it'� ` � �a ��'. �, �� ; ..��J( � �•� `Lt+'•'C Y �• s_ '.�",,� 'r )�'.R.S�.+•i'* .� � �r �t` �`�'.�..;"��K .' � . .. '•\ �. �`,.; ,� �,� � �, tw i . �� f r+�Si}�� �,...� ,b� �' � . Y`• . � y ,7c �,_ �}y /.` �.�,,� � �l �-� � i •:� �y1'� ,� � w Y�`. ..'(V• 1}"� '-�dl� � .. 'r. ,� �`�,�;;�. ��;; '� �4 r� � . -_�,�'% ; 3-. M�`t ��FX•�,` �•`��`,��. `� ,� •',.� •"�- �'+,?` � �!��.¢�.%•��±- �;► �' «'�'�, ,�►�`'f��'��,. .•,,�F{f�,, P F, .,� �� ,`�1 ,�r , ..�t�T��l.�[��� � �� � l ��y � �� r } .I: � , t L x��.^ 'i JyP ` aC . N . - �i .1sY', !� �. ��. � T' T-, i�.\\� ���•• �`�I _ _x►~• � �` '�< �` ^.Y ��. r�, ♦ • . , s � ��a . QF,� A �„ �;�'� . �- . ? .����. ���,.,�,,,�t��s. r�,,,���e,s ��.� Exhibit A � Project Site Burlingame Bay TDM Plan Project Vicinity � — J i 9R�' ! �� �r' � .. � -- �r.Y�r.�� - � � vJ0 � ,�t0 ,;a" . o�� .'�\ . � � �, � _, �J�� � - , �, , � ��� � � � �.. �_�--��'l-:= : �` ;j�� -- � �_� ' � �, j��.. ' � � . *,°�-� ,;,.: :#�j L �c U ' �n9 6 � /10' � +, llGr .1 � °> ae + �.5 Level,! :- �� � 4. � �. `� �M�f t: m ' � .� � �' A' �' � �� � - °�• i �Itj� ` ` � .�� ese -.nf �,�, �'� � �� d � �. � :*' �'" e.! L` I�'"'�'�- —�, i' '"� E�/�'� �� 1►+' %9 � y�s � .� a•. xf � ��a x ,'' ., . � � �� . -f - � ` r��' •[� � . � �:,�■� � 577Airport •� �+�(E) Office Bwlding � 567 Airport Blvd. ` �•' �&story/ 139K � New Office Building � �E� � �� � �' _ j B-story, 241K p!".II 5 M f, .� � - � 'F � ���f,'''t �,� .�-'yif�,�a^.� ��'1� .�''. � 'wh' �..,,� r�.'' ,�"��� -=4i' t_ ;�� � eTt r: � �� ��� __`: ` � i � 'r���°. .. � -- _.. T...�._ � � ;� Burlingame Lagoon , -• ---• . , � � � �� �� _ _ _ �► �_ ���� �; suunce: urs nron�re�r.s + F���;�r,a�_.�, 2ozn Exhibit B Burlingame Bay TDM Plan Site Plan krupka. access and circulation, substantial landscaping with promenades, view areas and patios with seating and casual dining features are proposed to complement the waterside setting. Supportive TDM Infrastructure and Project TDM Measures The Project as envisioned would be a pedestrian and bicycle friendly campus within the Bayfront commercial area, served by active transportation such as the Burlingame Trolley, Burlingame Bayside Shuttle and mature sidewalks, trails and bikeways. Exhibit C highlights active transportation serving the Project. Project TDM measures were defined to complement the existing TDM setting. The following paragraphs highlight these features, which are summarized on Exhibit D. Community ConnectivitX - The Project and respective site improvements would connect to and complement Bayfront area facilities, including sidewalks and bike lanes on Airport Boulevard and the Bay Trail adjacent to the Project site, which serves the Coyote Point Recreation Area in San Mateo. This indicates positive community connectivity. Public Transportation Access - The Project would include a commute bus center with two bus bays. The facility would be located adjacent to the parking structure in the center of the site, with suitable turning movement dimensions to allow easy bus entries and exits and connections to Airport Boulevard. The Burlingame Trolley traverses the Bayfront area and includes a stop near 577 Airport Boulevard, and connects the Project site with the Broadway and Burlingame Caltrain Stations as well as Broadway and Burlingame Avenue business districts. Commute.org operates the Burlingame Bayside Shuttle, which provides direct commute period service between the Project site and the Millbrae BART/Caltrain Station. Two buses serve the area and carry approximately 2,800 total AM and PM peak period riders per month (Source: Commute.org data summaries for October 2019 and January 2020). Pedestrian Amenities - The Project walkway system would minimize vehicular conflicts, allow direct access to the Bay Trail, buildings and the parking structure. Landscaping features, patios and seating areas would complement the walkway system and soften the Project environment. Bicycle Parkinq - The Project would include 41 bicycle parking spaces, with 37 Class I(secure) spaces in the bicycle enclosure on the first floor of the parking structure and 4 Class II spaces in 2 bike racks near building entries. Shower Facilities - The new building would include shower rooms for men and women on the first floor, with a total of eight shower stalls, to support employees who bicycle and walk to work or exercise during the day, or both. Parking Management - The Project would include preferential parking of the following kinds. • Accessible ("ADA Stalls") - 32 total stalls (6 van, 26 standard), located in the parking structure and adjacent to existing buildings. • Clean Air Vehicle - 14 stalls, located in the parking structure. Draft Final TDM Plan for Burlingame Bay November 6, 2020 Page 2 Exhibit C Samtrans Routes Trail (existing) Bike Path (Class I) Burlingame Bay TDM Plan Burlingame Trolley � � � Trail (planned) - - • - - Bike Path (Class II) Active Transportation -r-�-� Burlingame Shuttle �-- Bike Path (Class III/Sharrows) SOUHCE: DESAicNfects+Fngineers.7(J70�n�18�iiliii��arneGener�lPlan. Cityo/Ruilin�idii��.'07� Burlingame Bay TDM Plan TDM Elements SOUpCE: DESArchltects+Eng/neers, 2020 Exhibit D krupka. Electric Vehicle Charging - 45 total (32 equipped, 13 ready), located in the parking structure and adjacent to the new building. Bay access stalls ("BCDC Stalls) - 15 stalls located adjacent to the Bay Trail - 45 EV parking (32 installed) Vehicular Access - The Project would be served by two existing driveways on Airport Boulevard. Internal drive aisles would connect the driveways and provide direct access to the parking structure and surface parking. Freight and trash loading zones would serve all buildings directly with suitable turning and parking dimensions. Programmatic TDM Measures Given the Project may be occupied by one or more tenants, and most candidate tenants are familiar with and routinely incorporate TDM in practice, Client intends to require tenants by lease agreement to actively incorporate and participate in TDM measures most suitable to them to achieve the TDM Plan purpose. TDM Requirements - Client shall oversee the TDM program and require tenants to implement and consistently carry out and monitor the following TDM measures. TDM Coordinator - A Project TDM Coordinator shall be responsible for implementing, maintaining and monitoring the TDM Plan. The TDM Coordinator shall participate in TDM training sponsored by Commute.org in during the first year of occupancy. Employee SurveX - A confidential survey of transportation characteristics of employees shall be conducted with findings submitted to the City upon full occupancy of the Project and periodically thereafter. The survey shall include residence location, mode of travel to work, duration of commute, usual work schedule and interest in commute alternatives. Attachment A, appended hereto, lists the proposed survey questions and gives a good understanding of the expected data to be generated. Commute Alternative Information - A summary pamphlet shall be prepared that describes commute alternatives (to driving alone) and summarizes the TDM Plan. This pamphlet shall be made available to all employees and updated at least annually. Commute Alternative Plan - The Project shall implement TDM measures to meet the City's TDM policy and goal, which is: at least 20% of all employees regularly commute to work using modes other than single occupant vehicles or use an alternative work hour schedule. The TDM Plan shall comply with the C/CAG Land Use Guidelines that stipulate the TDM Plan have the capacity to fully reduce the estimated demand for new peak hour trips generated by the Project. Draft Final TDM Plan for Burlingame Bay November 6, 2020 Page 3 krupka. The Project shall be required to provide the following TDM measures. Dedicated peak period shuttle service to BART/Caltrain that serves at least 60 round trip riders during the peak hour. This would be provided through direct contract or shared arrangement with a shuttle service sponsored by another development or entity. Subsidized transit passes for at least 25% of employees with value of at least $20 per month per pass, or equivalent commuter benefit allowance or subsidy. This would be an employee benefit for the duration of employment and subject to change and customization to meet particular tenant conditions. Other candidate TDM measures tenants may incorporate include, but not be limited to, the following. Alternative work schedules or telecommuting Guaranteed emergency ride home, which gives eligible employees free rides home in case of personal emergencies or unexpected late work days that cause them to miss a customary transit ride or carpool seat Coordination and incentives to enhance alternative mode usage, including the following functions • Introduce employees to the TDM Plan • Help use 511 Rideshare and 511 Transit Trip Planning • Help match "bike buddies" and "walk buddies" • Coordinate and manage bicycle parking and preferential parking spaces • Help assess and establish alternative work schedules and telecommuting • Catalog and update available transportation services, bicycle routes, bike share facilities, transit schedules and shuttle services; provide alerts regarding . changes and new opportunities Calculation of Trip Credits Per C/CAG Guidelines The implementation of a TDM program that has the capacity to fully reduce the estimated demand for new peak hour trips generated by a new development project is one of five options local jurisdictions may use to help offset or mitigate the traffic impacts of development projects according to the C/CAG Land Use Guidelines. Table 1 summarizes the estimated trip credits for Project TDM measures, including site design elements and required TDM measures, based on application of the C/CAG trip credit unit values. This evaluation addressed the trip generation for the new building only. The total trip credits exceeds the estimated net new peak hour trip values and therefore meets the intent of the C/CAG requirements. Draft Final TDM Plan for Burlingame Bay November 6, 2020 Page 4 krupka. Table 1 ESTIMATED TRIP CREDITS PER C/CAG LAND USE GUIDELINES TDM Measure Number of Units Notes C/CAG Unit Trip Resulting Trip per TDM Plan Credit (Rate per Credits for TDM Unit) Plan Bicycle lockers 41 3 123 and racks Showers and 8 trip credits 10 85 changing rooms calculation (combination) includes 5 bonus credits for bicycle storage Dedicated peak 60 peak hour round 1 60 period shuttle to trip seat; estimate BART/Caltrain reflects 5% of employees during the peak hour Subsidized transit 300 25% of estimated 1 300 passes for employee count employees (at at 5 employees least $20 per per 1,000 sf month per ticket/ pass) Preferential 14 spaces are 2 28 parking for designated for carpoolers and Clean Air vanpoolers Vehicles, not separately for carpoolers and vanpoolers; lower trip credit rate — for carpoolers — used TOTAL TRIP 596 CREDITS PROJECT NET 276 NEW PEAK HOUR TRIPS (TJKM, Traffic Impact Analysis Report, May 8, 2020) PROJECT TRIPS YES MITIGATED? Draft Final TDM Plan for Burlingame Bay November 6, 2020 Page 5 krupka. Monitoring and Reporting The following monitoring and reporting plan shall be implemented to help Client and the City assess the effectiveness of the TDM Plan against its stated goal. EmRloyee Survek - Each year the Project is occupied and prior to February 15, tenants shall survey existing employees to estimate the proportion of employees commuting in single- occupant vehicles and assess employees' work and travel characteristics, overall perceptions of travel alternatives, and concerns about the TDM Plan. The proposed questions to be included in the survey are summarized in Attachment A. Annual Pr�ect TDM Program Re� - Annual reporting shall commence the calendar year after the Project reaches 90% occupancy. Each year prior to March 30, Client shall prepare and submit a report summarizing the results of the tenants' Employee Surveys and TDM Plan activities. The report shall also include descriptions of any new or modified programs to be introduced in the next year, or any programs that would be changed as a result of user comments. Client shall meet with City staff to review comments on the report and discuss reasonable changes or other actions required to address the comments. Such changes or actions, and their implementation status, would be reported in the subsequent report. Client reserves the right to revise its TDM Plan as necessary to achieve TDM Plan goal in the most cost-effective manner, and understands that such revisions are subject to review and approval of the City Community Development Director. Client also understands the City Community Development Director reserves the right to request modifications to the TDM Plan. Enforcement - The City reserves the right to assess an annual penalty for non-compliance. Conclusions This TDM Plan describes strong TDM infrastructure and Project TDM Measures, which give the Project a solid employee serving, pedestrian/bicycle friendly foundation and, combined, indicate strong potential to achieve the TDM Plan goal. A reasonable monitoring and reporting requirement provides a credible means for Client and City to manage the performance of the TDM program. Draft Fina/ TDM P/an for Burlingame Bay November 6, 2020 Page 6 krupka, ATTACHMENT A PROPOSED EMPLOYEE SURVEY QUESTIONS 1. What time do you typically arrive for work in the morning? 1. Shift Work or Varies 2. Before 5:00 AM 3. 5:00 AM to 10:00 AM - By 30 Minute Increment (increments are listed in the survey) 4. After 10:00 AM 2. What time do you typically leave work? 1. Shift Work or Varies 2. Before 4:00 PM 3. 4:00 PM to 8:00 PM - By 30 Minute Increment (increments are listed in the survey) 4. After 8:00 PM 3. During a normal week, how variable are your work hours? 1. Start and finish at approximately the same time every day 2. Work hours vary occasionaily 3. Work hours vary often 4. On a typical day, how long does it take to get to work (primary commute)? 1. Fuil time teleworker, so commute time is negligible 2. 1 to 120 minutes in increments of 15 and 30 minutes (increments are listed in the survey) 3. Greater than 120 minutes 5. Approximately how far is it from your home to your work site (one-way)? 1. Full time teleworker, so commute distance is negligible 2. 1 to 100 miles in stepwise increments of 5, 10, 15, 20 and 40 miles (increments are listed in the survey) 3. Greater than 100 miles 6. Which of the following best describes your regular work schedule? 1. Five day work week (full-time) 2. Four day work week, 10-hour days (full time) 3. Nine days, 80 hours worked in two week period (full time) 4. Part time 7. What is your primary mode of travel to work for each of these specific dates (seven listed)? (sub modes are listed in survey) 1. Drive (alone, carpool, vanpool, motorcycle/moped) 2. Passenger (taxi/Uber/Lyft, carpool, vanpool) 3. Transit (SamTrans (Express Bus, Regular Bus), Caltrain, Dumbarton Express) 4. Commute shuttle provided by employer 5. Bicycle 6. Walking, jogging, in-line skating, similar 7. Work from home, off-site, similar 8. Variable or compressed work schedule - day off 9. Away from office(sick, vacation, non-work day, business travel) 8. Please offer your perspectives on alternative travel options at your work site. 9. Please offer and comments or concerns you have about the TDM Plan. Draft Fina/ TDM Plan for Burlingame Bay November 6, 2020 Page A-1 City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlingame.ore �� CITY � � � BURLINGAME ENVIRONMENTAL INFORMATION FORM '°� to be com leted b a licant when Ne ative Declaration or Environmental Im act ..� ��, 'b,.,�.�,�e'°�� � P Y PP g P Report is required) ;'�Hr � w 2020 GENERAL INFORMATION ;TY OF BL'RL{NGAME 555-577 Airport PTO�eCi AC�C�I'eSS: (Proposed address for new buiiding - 567 Airport)ASSeSSOI''S P1rCe1 NUTT1beI': 026-363-590, 025-290-470 Applicant Name: �a�ry �a��e Address: 1099 18th Street, Suite 2900 Clty/St3te/Zlp: Denver, co sozoz Phone: (sos> sss-2222 PTOpeI'ly OWT10T Nallle: EW - PG AirpoR Owner, LLC AC�CII'eSS: 1099 18th Street, Suite 2900 City/State/Zip Phone: Denver, CO 80202 303)986-2222 Permit applications required for this project (special permit, variance, subdivision map, parcel map, condominium permit, building permit, eiC.�: Commercial Design Review, Conditional Use Permit and Environmental Review. Related permits, applications and approvals required for this project by City, Regional, State and Federal Agencies: FAa, BCDC Permit Amendment, State Land Commission land lease renewal SITE INFORMATION Slte S1Ze: �2•8 acres Acres and 55s,962 sq. ft. SC�Uare Feei Existing Zoning: � Existing use(s) of properiy: o�e�e Total Number of Existing Parking Spacesl: a�s Number of Compact Spacesl: No�e Number of Existing Structures and Total Square Footage of Each: 2 EX�St��9 st���c��es: 555 a,��Port ��zo,681 Sq. Ft.) 577 Airport (137,537 Sq. Ft.) Will any structures be demolished for this project? X Yes No S1ze and use of structuTes to be demollshed: Existing trash enclosure Number and size of existing trees on site`: 3os cocai ex�sc��q t�ees, refer to L1 for locations and Arborist report for complete list Will any of the existing tress be removed? x Yes No lf Yes, list number, size and type of trees to be removed: � ss totai c�ees to be �emo�ed, of these 17 are considered 'Protected' per City of Burlingame. Refer to L1 for complete list of Protected Trees to be removed, refer to Arborist Report for complete list of Existing Trees Are there any natural or man-made water channels which run through or adjacent to the site? x Yes NO If Yes, where? South - Burlingame Lagoon; East - Sanchez Channel � City of Burlingame minimum standard parking space size is 9'x20'. The minimum size for compact parking spaces is 8'x17'. Refer to City of Burlingame Zoning Ordinance C.S. 25.70 for parking requirements for particular uses. z Refer to the City of Bwlingame's Urban Reforestation and Tree Protection Ordinance (C.S. 11.06) for tree removal permit and tree planting requirements. ENVREV.FRM City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlin�ame.org Describe in general the existing surrounding land uses to the: NOTih Office Buildings SOUih Burlingame Lagoon East Sanchez Channel WeSt Surface parkinq lot PROPOSED PROJECT Project Description: The project site is located at a developed parcel at the south end of the Airport Boulevard, east of US Freeway 101. It comprises of parcel APN 026-363-590 (555 and 577 Airport) and leased parcel APN 025-290-470 (State Land Commission). The total site area is 12.8 acres. The existing Bay Park plaza consists of one five-story and one eight-story multi-tenant office buildings built in 1983 and 1998. Total building area is 259, 733 sq. ft.. The project will add an 241,054 sq. ft. 8-story office / R&D building and a 5.5 level parking garage to the campus. The total building area on site is increased to 500, 787 sq. ft.. floor area ratio of the campus is 0.9. Parking for existing and new buildings will be provided at 3 cars per 1,000 sq. ft., with the new garage and surface parking lots. Other site improvements include new driveways, surfacing parking lots, landscape plaza, patios and walkways, service yards, as well as, utilities / equipment supporting the new project. Residential Projects: Number of Dwelling Units: Noc a,pprcabie S1Z0 Of UI]1t�S�: Not Applicable Household size (number of persons per unit) expected: Not APPr�abie CommerciaUIndustrial Projects: Type and square footage of each use: NeW off��e i R&o s��id��9 at za�,054 sq. ft. Estimated number of employees per shift: eoo Will the project involve the use, disposal or emission of potentially hazardous materials (including petroleum products)? Yes X No If Yes, please describe: Institutional Projects (public facilities, hospitals, schools): Major function of facility: Estimated number of employees per shift Not Apolicable Not Applicable Estimated Occupancy: Not appu�abie For all Projects: Flood Hazard: Is this site within a special flood hazard area? X Yes No Land Use: If the project involves a conditional use permit, variance or rezoning application, please explain why the applications are required3: 3 Please fill out and submit the appropriate application form 9variance special permit, etc.) ENVREV.FRM City of Burlingame Planning Department 501 Pnmrose Road P(650) 558-7250 F(650) 696-3790 www.burlin�ame.ore 555 Airport (120,681 Sq. Ft.) Building gross square footage: Existing: 5�� A��Po�c �is�,537 Sq. Ft.) PiOpOSeCI: New Office / R8D Building at 241,054 sq. ft. Number of floors of construction: Existing: �s Proposed: s Traffic/Circulation: Standard and compact off-street parking spaces provided: Existing: Standard 879 (incl 15 BCDC parking stalls) Proposed: Standard 1,267 Compact Compact 2s2 Total 879 Total � ,519 Grading: Amount of dirt/fill material being moved (check one): 0-500 cubic yards x 5,000-20,000 cubic yards 500-5,000 cubic yards Over 20,000 cubic yards(indicate amount) Note: If fill is being placed over existing bay fill, provide engineering reports which show the effect of the new fill on the underlying bay mud. Storm water runoff: Indicate area of site to be covered with impervious surfaces (parking lot paving, etC.�: Total site includes approx. 380K SF imp. surface (both new and existing to remain) Is the area with impervious surfaces less than 200 feet away from a wetland, stream, lagoon or bay? X Yes No Noise: Describe noise sources and timing of activity generated by your project during construction: _ General construction noise, construction schedule TBD Noise sources generated during operation of facility: Vibration: Will the proposal cause vibration that may affect adjacent properties? Describe any potential sources of vibration: No Exterior Lighting: Please describe any proposed exterior lighting of the facility4: Parking lot area lighting, pedestrian pole lights, bollards. Refer to LT-1 Water: Expected amount of water usage: Domestic gal/day Peak use gaUmin Commercial za,�sz gai. gaUday Peak use ��s gaUmin Expected fire flow demand O�ce building 1,000 gpm (assumes high-rise / automatic standpipes, three exit stairs) / parking structure 750 gpm (assumes no car stackers) As per the C.3 regulations set forth by the California Regional Water Quality Control Board, please respond to the following questions: 1. Would the proposed project result in an increase in pollutant discharges to receiving waters? No, site is developed, inclusion of new C.3 treatment will reduce pollutant discharqe. 4 Refer to City of Burlingame Exterior Illumination Ordinance (No. 1477) regarding requirements which limit exterior illumination in both residential and commercial zones. ENVREV.FRM City of Burlingame Planning Department 501 Pnmrose Road P(650) 558-7250 F(650) 696-3790 www.burlin a� me.org 2. Would the proposed project result in significant alteration of receiving water quality during or following construction? No 3. Would the proposed project result in increased impervious surfaces and associated increased runoff? rvo 4. Would the proposed project create a significant adverse environmental impact to drainage patterns due to changes in runoff flow rates volumes? No 5. Would the proposed project result in increased erosion in its watershed? No 6. Is the project tributary to an already impaired water body, as listed on the Clean Water Action Section 303(d) list? If so will it result in an increase in any pollutant for which the water body is already impaired? No 7. Would the proposed project have a potential significant environmental impact on surface water quality, to marine, fresh, or wetland waters? rvo 8. Would the proposed project have a potentially significant adverse impact on ground water quality? No 9. Will the proposed project cause or contribute to an exceedance of applicable surface or groundwater recciving water quality objectives or degradation of beneficial uses? No 10. Will the project impact aquatic, wetland, or riparian habitat? No Sewer: Expected daily sewer discharge 668 Units (524 from WC/UR/LAV/SH/SK-mop, 128 from SK-kitch, 16 from dishwasher) Source of wastewater discharge on site (i.e. restrooms, restaurants, laboratory, material processing, etc.) EIv'VREV.FRM City of Burlingame Planning Department 501 Primrose Road P(650) 558-7250 F(650) 696-3790 www.burlin ag me.org General: Are the following items applicable to the project or its effects? Provide attachment to explain nature of all items checked `yes'. Change in existing features of any bays, tidelands, beaches, or hills, or substantial alteration of ground contours. N� Change in scenic views or vistas from existing residential areas or public lands Yes or roads. Change in pattern, scale or character of general area of project. Signifcant amounts of solid waste or litter. Change in dust, ash, smoke fumes or odors in vicinity. No �r.� Change in bay, lagoon, stream, channel or groundwater quality or quantity, or "° alteration of existing drainage patterns. Substantial change in existing noise or vibration levels in the vicinity (during N° construction and/or during operation). Site on filled land or on slope of 10 % or more. No Use or disposal of potentially hazardous materials, such as toxic substances, NO flammable materials or explosives. Substantial change in demand for municipal services (police, fire water, sewage) Yes Substantial increase in fossil fuel consumption (oil, natural gas, etC.�. Yes Relationship to a larger project or series of projects. CERTIFICATION I hereby certify that the statements furnished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date os.�i.zo2o Signature � Kenny W H DES. Architects and Engin��s � Yes Yes ENVREV.FRM �CITY OF BURLINGAME � COMMUNITY DEVELOPMENT DEPARTMENT BURLINGAME 501 PRIMROSE ROAD C� BURLINGAME, CA 94010 ,�� _ PH: (650) 558-7250 www.burlingame.org Project Site: 567 Airport Boulevard, zoned AA The City af Burlingame Planning (ommission announces fhe following virtual public hearing via Zoom on Monday, November 23, 2020 at 7:00 P.M. You may access the meeting online at www.zoom.us/join or by phone at (669) 900-6833: Meeting ID: 882 8668 2408 Passcode: 106924 Description: Application for Environmenial Scoping, Commercial Design Review und Conditional Use Permits for floor area ratio and building height for o new eight-story office�research and development building and parking garage. Members of the pu6lic may provide wriiten comments by email to: pu6liccommentna burlingame.org. Mailed: Novem6er 13, 2020 (Please refer to other sideJ PUBLIC HEARING NOTICE City of Burlingame - Public Hearina Notice If you have any questions about this application or would like to schedule an appointment to view a hard copy of the application and plans, please send an email to planninsdeptCu�burlinsame,orQ or call (650) 558-7250. Individuals who require special assistance or a disability-related modification or accommodation to participate in this meeting, or who have a disability and wish to request an alternative format for the agenda, meeting notice, agenda packet or other writings that may be distributed, should contact the Planning Division at planningdeptC�burlinrzame.org or (650) 558-7250 by 10 am on the day of the meeting. If you challenge the subject application(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in the notice or in written correspondence delivered to the city at or prior to the public hearing. Property owners who receive this notice are responsible for informing their tenants about this notice. Kevin Gardiner, AICP Community Development Director (Please refer to ocherside) 567 Airport Boulevard 500' noticing APN #: 026-363-590 � � ', i � � �`�� . ° `� �, . . , .