HomeMy WebLinkAbout2748 Burlingview Drive - Staff ReportCity of Burlingame Item No. 8a Front Setback Variance and Hillside Area Construction Permit Regular Action Address: 2748 Burlingview Drive Meeting Date: November 24, 2014 Request: A Front Setback Variance and Hillside Area Construction Permit for single -story additions to an existing single-family residence. Applicant and Designer: Jesse Geurse, Geurse Conceptual Designs APN: 027-224-150 Property Owner: Henry Hsia Lot Area: 10,454 SF General Plan: Low Density Residential Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. Project Description: The subject site is a corner property located at the intersection of Burlingview Drive and Hillview Court. The municipal code defines the front of the property as the shortest lot line; in the case of this subject property, the front of the lot is defined as the lot line along Hillview Court. The existing single -story house has an entrance and an attached garage facing Burlingview Drive. There is an existing uncovered deck at the right side of the house, along the Hillview Court frontage. This deck is greater than 30 inches from grade and is included in both lot coverage calculations and setback measurements. With this application, the applicant proposes to remove the existing deck and to replace it with a 129 SF living area. The wall of the proposed living area has the same front setback as the existing house and deck, but is a new structure and must meet front setback requirements. The required average front setback is calculated by measuring the existing setbacks on the same block (in this case on Hillview Court), by discarding the smallest and the largest existing setbacks, and then by calculating the average of the remaining setbacks. For this block there were four properties used to calculate the average of the block. The applicant is requesting a Front Setback Variance for a proposed front setback of 18'-0" where 28'-4" is the average if the block and the minimum required front setback. The project includes demolishing an existing sunroom located at the rear, right side of the house and replacing it with living space with the same footprint. The proposed changes to the house are single story and the existing highest ridge of the residence will not be increased. With the proposed project, the number of bedrooms on site will be increased from 3 to 4. A four -bedroom house requires 2 parking spaces, one of which must be covered. The existing house has two covered parking spaces, one of which is non -conforming in length due to the location of a utility sink in the garage. The applicant proposes to remove the utility sink so that the attached garage provides two covered parking spaces that meet current requirements for existing covered parking space dimensions. The existing uncovered parking spaces in the driveway leading to the garage will remain. The applicant is requesting the following applications: ■ Front Setback Variance for a single family dwelling (C.S. 25.26.072(b)(1)); and ■ Hillside Area Construction Permit for work within the Hillside Area (C.S. 25.61.020). Variance and Hillside Area Construction Permit 2748 Burlingview Drive 2748 Burlingview Drive Lot Area: 10,464 SF Plans date stamped: November 12, 2014 EXISTING PROPOSED ALLOWED/REQ'D SETBACKS _ ............. ...................................................... _........................................................... ............. Front (1st fir): ................--_._.........................................................................................:............................ ................................................................... ................................................. .................................... 18'-0"' ..... ...........:...................... 18'-0" 2 28'-4" (is the block average) Side (left): 15'-7" No change 7'-6" (right): ...... -..._............................................................................_..---.._...._..................................................................----...._..............._._........................................................................._g............._......................._._......................... 20 -0 No change 7'-0" Rear (1st fir): .......................................................36'-5" No change 15'-0" Lot Coverage: 3300 SF ! 3201 SF 4445 SF 32% 31% 40% FAR: 2435SF 2564 SF 4245 SF s ................................... _...... _.............. 0.23 FAR 0.25 FAR 0.41 FAR ......................................... _ # of bedrooms: ................................................................................................................... ......................... 3 _........................................................................ . 4 --- .........................................................................................................................................................................................._......................................................................................_......................................................... Parking: 2 covered a 2 covered 2 covered (18' x 17') (18' x 18') (18' x 18') 1 uncovered 1 uncovered 1 uncovered (9' x 20') (9' x 20') (9 ' x 20') The existing front setback to the first floor is non -conforming (18'-0" existing where 28'-4" is the average of this court block). 2 The proposed front setback requires a variance (18'-0" proposed where 28'-4" is required) (C.S. 25.26.072(b)(1)). S (0.32 x 10,454 SF) + 900 SF= 2564 SF (0.25 FAR). 4 The existing attached garage provides on the left side one covered space that meets code required minimum dimensions. The covered space on the right does has an existing, non -conforming length of 17'-0" where 18'-0" is required because of the location of the utility sink in the garage. Staff Comments: See attached memos from the Chief Building Official, Fire Division, Engineering Division, Parks Division, and Stormwater Division. Study Meeting: At the Planning Commission study meeting on October 27, 2014, the Commission had concerns about the stated justifications for the front setback variance and the blank appearance of the proposed wall of the addition that faces Hillview Court. It voted to place this item on the regular action calendar when all information has been submitted and reviewed by the Planning Division (see the October 27, 2014 Planning Commission Minutes). The applicant submitted a response letter and revised plans, date stamped November 12, 2014, to address the Commission's concerns. Please refer to the response letter for details about the two revisions that were made to the plans. The applicant has supplied a new variance application form, date stamped November 20, 2014, and noted that he will be providing additional information regarding the variance in his presentation at the Planning Commission hearing. Required Findings for Variance: In order to grant a variance the Planning Commission must find that the following conditions exist on the property (Code Section 25.54.020 a-d): (a) there are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district; (b) the granting of the application is necessary for the preservation and enjoyment of a substantial property -2- Variance and Hillside Area Construction Permit 2748 Burlingview Drive right of the applicant, and to prevent unreasonable property loss or unnecessary hardship; (c) the granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience; and (d) that the use of the property will be compatible with the aesthetics, mass, bulk and character of existing and potential uses of properties in the general vicinity. Required Findings for Hillside Area Construction Permit: Review of a Hillside Area Construction Permit by the Planning Commission shall be based upon obstruction by construction of the existing distant views of nearby properties. Emphasis shall be given to the obstruction of distant views from habitable areas within a dwelling unit (Code Sec. 25.61.060). Planning Commission Action: The Planning Commission should conduct a public hearing on the application, and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission's decision, and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 12, 2014, sheets A.1 through A.6, T.0, SP.1 and DMA; 2. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 3. that if the structure is demolished or the envelope changed at a later date the Front Setback Variance, as well as any other exceptions to the code granted here, will become void; 4. that the conditions of the Engineering Divisions September 10, 2014 memo, the Building Division's September 15 and October 14, 2014 memos, the Parks Division's September 8, 2014 memo, the Fire Division's September 8, 2014 memo, and the Stormwater Divisions September 9, 2014 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which -3- Variance and Hillside Area Construction Permit 2748 Burlingview Drive requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame. Erika Lewit Senior Planner c. Jesse Geurse, applicant Attachments: Applicant's Response to Commission's comments, date stamped November 12, 2014 Minutes from Study Meeting of October 27, 2014 Application to the Planning Commission Variance Form (revised), date stamped November 20, 2014 Staff Comments Photo of existing front deck for 2748 Burlingview Drive (2 sheets) Planning Commission Resolution (Proposed) Notice of Public Hearing — Mailed November 14, 2014 Aerial Photo in Geurse Conceptual Designs, Inc. 405 Bayswater Avenue Burlingame, California 94010 November 11, 2014 City of Burlingame attn: Erika Lewit , Senior Planner 501 Primrose Road Burlingame, CA 94010 re: Response to Planning Commission's Comment's per meeting minutes on October 27, 2014 Planning Commission Meeting Dear Members of the City of Burlingame Planning Commission, We thank you for your concerns and suggestions made with regard to our application for setback variance review for the proposed addition located at 2748 Burlingview. We too, are architecturally sensitive and very eager to address your concerns. We had responded to your your comments either verbally or per plans. We hope that you find the revised project acceptable for approval. Please see below for response to changes. In response to your particular comments or recommendations during Study Item: 1. "Commisioner Sargent: Please show average setback on site plan" —GCD Response: Please see sheet SPA for location. As you can see the existing residence is well in the average setback. 2. "Commisioner Gum: blank wall" —GCD Response: Please see sheet A.1 and A.3 for revised windows and future idea for screening wall with additional vegetation and tree to soften wall. Thank you for this opportunity to further consider our proposed addition. Should you have additional questio}ngr concerns, please do not hesitate to contact us at 650-703-6197 Sincerely, Jesse Geur Principal DIVE NOV 12 ZO A Gi I Y OF BURLINGA►ME CDD-PLANNING DV HALL City of Burlingame BURLINGAME501PRIMROSE ROAD 501 PRIMROSE ROAD BURLINGAME BURLINGAME, CA 94010 Meeting Minutes Planning Commission Monday, October 27, 2014 7:00 PM Council Chambers a. 2748 Burlingview Drive, zoned R-1 - Application for Front Setback Variance and Hillside Area Construction Permit for first floor additions to an existing single-family dwelling (Jesse Geurse, designer and applicant; Henry Hsia, property owner) Staff Contact: Erika Lewit Attachments: 2748 Burlinqview Dr Staff Report 2748 Burlinqview Dr Attachments Commissioner Terrones was recused from this item. All Commissioners had visited the property. There were no ex-parte communications to report. Senior Planner Hurin presented the staff report. Commission comments/questions: > When plans come back would like them to show where average front setback line would be. > Responses in Variance application Items A and B don't justify variance. Item A — Stated that because it is a corner lot the front of the house is the side setback, but that is the case for every corner lot so is not exceptional or extraordinary. Item 8 — Hardship just talks about making a bedroom larger, and if it could not be extended the house value would decline, but does not adequately address the point of the variance. > Average setback is already 28.4 feet and existing property is already encroaching. Another 129 square feet will further encroach. > Will create more of a blank wall to the entry of Hillview Court, and is set up above street level. Anything to mitigate the blankness would be beneficial. As a study item, there is no action on this item. The application will return on the Regular Action Calendar when revised as directed. City of Burlingame Page 1 Printed on 1112012014 BUHIirvGnME COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org APPLICATION TO THE PLANNING COMMISSION Type of application: ❑ Design Review ❑ Variance ❑ Conditional Use Permit ❑ Special Permit ❑ Parcel #: ❑ Other: HILLSIDE CONSTRUCTION PERMIT PROJECT ADDRESS: 2748 BURLINGVIEW DRIVE B URLINGAME CA. 94010 Please indicate the contact person for this project APPLICANT project contact person OK to send electronic copies of documents Name: GEURSE CONCEPTUAL DESIGN, INC. Address: 405 BAYSWATER AVENUE City/State/Zip: BURLINGAME CA94010 Phone: 650.703.6197 Fax: 650558.9324 E-mail: JGEURSEOSBCGLOBALNET ARCHITECT/DESIGNER project contact person ❑ OK to send electronic copies of documents ❑ Name: GEURSE CONCEPTUAL DESIGN, INC. Address: 405 BAYSWATER AVENUE City/State/Zip: BURLINGAME,CA94010 Phone: 650.703.6197 Fax: 650558,9324 E-mail: JGEURSEOSBCGLOBALNET * Burlingame Business License #: 228811 EXP. 6-30-15 PROPERTY OWNER project contact person ❑ OK to send electronic copies of documents 0 Name: HENRY HSIA Address: 2748BURLINGVIEW DRIVE City/State/Zip: BURLINGAME CA94010 Phone: (650)387-4810 Fax: E-mail: HSIAHHOTMAILOMSN.COM PROJECT DESCRIPTION: CONVERT EXISTING COVERED PATIO INTO A FAMILYAND SINGLE STORYADDITION KITCHEN REMODEL, AND SPLITTING OF 1 ROOM INTO BEDROOM AND OFFICE, BATHROOM REMODEL AFFADAVIT/SIGNATURE: I hereby certify best of my knowledge and belief. Applicant's signature: I am aware of the proposed application nd Commission. I Property owner's of perjury that the information given herein is true and correct to the Date: 9-2-2014 the above applicant to submit this application to the Planning Date: 9-2-2014 Date submitted: * Verification that the project architect/designer has a valid Burlingame business license will be requiresl�y�fL{e Finance Department at the time application fees are paid. ❑ Please mark one box above with an X to indicate the contact person for this project. S:1Handouts\PC Application 2008-B.handout Ci fY OF BURLINGAME CDD-PLANNING DIV. Fro,\4 Se46Ac % Vcir,'a►n LL It- -Alre,a— (-o '-kS-1-n -cA )IDn a r1 � i �-�► rl. � � . U CITY OF BURLINGAME PLANNING DEPARTMENT 501 PRIMROSE ROAD P (650) 558-7250 F (650) 696-3790 CITY BURLINGAME F...;. GAME CITY O VARIANCE APPLICATION The Planning Commission is required by law to make findings as defined by the City's Ordinance (Code Section 25.54.020 a-d). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type or write neatly in ink. Refer to the back of this form for assistance with these questions. a. Describe the exceptional or extraordinary circumstances or conditions applicable to your property which do not apply to other properties in this area. PLANNMISCLASSU'YMOURCURRENTSMESETBAC KASAPRONTSETBACKDUETOOUR PROFER YBEMACORMML T.SHCI 1FRLErK,IMOPCORI!RPRO ERTIES AREC ASSEW ASPRC1I!1'I•WHICKCREA ESAHARDSKU?PORTHEREASONALLPRC> ffLNG PROPPRI7PS HAVE A A1R'llii'R PRONT YARD SEIBACR THEN OUR ACTUAL SIDE SETBACK AN AVERAGLISngNDEIERMiEDANDOURADDMONISNOTWMBNTHEPRONTSETBAC:R RE62ii RDCNMWEASRPORAVANANCEMCORMROPPE7QS1'IIdGV-MENMMMATCHALL ERTS M WALIS. b. Explain why the variance request is necessary for the preservation and enjoyment of a substantial property right and what unreasonable property loss or unnecessary hardship might result form the denial of the application. tw ir 1 1 • I • :/ «JJI :11+ I I" : J1.• • • I • :.' :1� J II JI I:I I' J '• IJ I I V A Z's, 4.16T.J64 • •.' 14 : Je' • •. • / • : " ' •.\'!I: 1, C. Explain why the proposed use at the proposed location will not be detrimental or injurious to property or improvements in the vicinity or to public health, safety, general welfare or convenience. THEPROPOSEDADDMONISASNGLL' SIIORYADDMONTHATWILLCOMMOPPANBOY AREAALRBADYOCCUPMBYALARGEWOODDECR. THELACATIONOPTHEAMMON JE WWWNOT O'PEGTANYNEIGHBORSVIEWINANYWAYSNCEASTRUCRMALREADYEKM ANDDOESNOT POISE ANYHEAL1HUK NOV 10,2014 CITY OF BURLINGAME CDD-PLANNINGDIV. d. How will the proposed project be compatible with the aesthetics, mass, bulk and character of the existing and potential uses on adjoining properties in the general vicinity? I• • •% J1 1 1 I ei , took1 1' :1111 of s I:1 «. \ II • I « J1+ I 11 • •. f :►1� I IJ N I: • ' I :►� J' • ' :l I' '�. NOV I � CITY OF B1JRL!".:- -•:.`E Project Comments Date: October 20, 2014 To: 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Variance and Hillside Area Construction Permit for single -story additions — 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: Single revised sheet- A.1 No further comments. All conditions of approval as stated in all previous reviews will apply to this project. Reviewed by: Date: 10-20-2014 Project Comments Date: October 14, 2014 To: U Engineering Division (650) 558-7230 X Building Division (650) 558-7260 U Parks Division (650) 558-7334 From: Planning Staff U Fire Division (650) 558-7600 U Stormwater Division (650) 342-3727 U City Attorney (650) 558-7204 Subject: Request for Variance and Hillside Area Construction Permit for single -story additions — 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: Revised plans date stamped October 7, 2014 Second comments: 15. ooms that could be used for sleeping purposes must have at least one window or that complies with the egress requirements. Specify the location and the net clear opening height and width of all required egress windows on the elevation drawings. 2013 California Residential Code (CRC) §R310. Note: The area labeled "Office" is a room that can be used for sleeping purposes and, as such, must comply with this requirement. The proposed egress window in the room labeled "Office" is specified on sheet A-1 as 1' 11-112". The minimum required egress window at grade level must have a minimum of 20" in width and 24" in height, net clear opening, with a total minimum of 5" 0". Revise sheet A.1 of the plans to show compliance with this requirement. Reviewed by:Date: 10-14-2014 Date: To: From: Subject: Staff Review: Project Comments September 8, 2014 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 September 8, 2014 1) On the plans specify that this project will comply with the 2013 California Building Code, 2013 California Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 California Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California uilding Codes. As of January 1, 2014, SB 407 (2009) requires non -compliant plumbing fixtures to be replaced by water -conserving plumbing fixtures when a property is undergoing alterations or improvements. This law applies to all residential and commercial property built prior to January 1., 1.994. Details can be found. at http:Ilwww.leginfo.ca.gov/pub/09-10/bill/sen/sb 0401- 0450/sb 407 bill 20091011 chaptered.html. Revise the plans to show compliance with this requirement. Under Building Dept. General Notes, Note #3 remove the reference to the 2008 California Energy Efficiency Standards. /Under Building Dept. General Notes, Note #2 remove the reference to the GreenPoints Checklist as that checklist is no longer required. Provide two completed copies of the attached Mandatory Measures with the submittal of your plans for Building Code compliance plan check. In addition, replicate this completed document on the plans. Note: On the Checklist you must provide a reference that indicates the page of the plans on which each Measure can be found. 5) Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) 6) On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 7) Anyone who is doing business in the City must have a current City of Burlingame business license. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on -site parking. 9) Provide existing and proposed elevations. 10)This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2013 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved plans. 11)Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12)Provide a complete demolition plan that includes a legend and indicates existing walls and features to remain, existing walls and features to be demolished, and new walls and features. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of any building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13)Show the distances from all exterior walls to property lines or to assumed property lines 14)Show the dimensions to adjacent structures. Project Comments Date: September 8, 2014 To: 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff X Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 No comments. Note: Fire sprinkler system required — sprinkler notes already on plans. !/3 kReviewed by: C. Reed Date: 9-8-14 Project Comments Date: September 8, 2014 To: X Engineering Division (650) 558-7230 U Building Division (650) 558-7260 U Parks Division (650) 558- 7334 From: Planning Staff U Fire Division (650) 558-7600 U Stormwater Division (650) 342-3727 U City Attorney (650) 558-7204 Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 9/10/2014 1400ms that could be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the location and the net clear opening height and width of all required egress windows on the elevation drawings. 2013 California Residential Code (CRC) §R310. Note: The area labeled "Office" is a room that can be used for sleeping purposes ",��`�`and, as such, must comply with this requirement. � indicate on the plans that a Grading Permit, if required, will be obtained from the vv Department of Public Works. 17)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 18)Provide handrails at all stairs where there are four or more risers. 2013 CBC § 1009. 19)Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 2, 3, 4, 15, and 16 must be re -submitted before this project can move forward for :Planning Commi ion action. Reviewed by: Date: 9-15-2014 Joe r -cab I A§Cr-5270 G'` Project Comments Date: September 8, 2014 To: U Engineering Division 0 Building Division ��(650) 558-7260 l�l Parks Division I Imo\ MDR IS i From: Planning Staff U Fire Division 0 Stormwater Division (650) 342-3727 U City Attorney i.,�..n »4 Subject: Request for Front Setback Variance and Hillside Area Construction n,. .:a t,.. _-4 -n'.-- .,,�.�:a:... a. ,.,: a:.,.. I., sue.,, i,_ i.,,,.ii:..g a i irriiiii. iisi a iiiSi. �wv� a�wiiiiii i.Ci dii cniSiiiiU iiiiiU iniiiiev uvVCniiiii �i 2748 Budingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 Reviewed by: /� Date: Project Comments Date: September 8, 2014 To: 0 Engineering Division 0 Fire Division (650) 558-7230 (650) 558-7600 0 Building Division X Stormwater Division (650) 558-7260 (650) 342-3727 0 Parks Division 0 City Attorney (650) 558-7334 (650) 558-7204 From: Planning Staff Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Electronic file is available for download at: http://flowstobay.org/construction . 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http-.1/flowstobay.org/newdevelopment. If applicable, include BMPs as project notes during building permit submittal. For assistance please contact Eva J. at 650-342-3727. Reviewed by: EJ Date: 9/9/2014 Water Pollution Prevention Program Clean Water. Construction Best Management Practices (BMPs) Construction projects are required to implement the stormwater best management practices (BMP) on this page, as Painting & Paint Removal they apply to your project, all year long. Materials & Waste Management Non -Hazardous Materials ❑ Berm and cover stockpiles of send, din or other construction material with tarps when rain is forecast or if not actively being used within 14 days. ❑ Use (but don't overuse) reclaimed water for dust control. Hazardous Materials ❑ Label all hazardous materials and hazardous wastes (such as pesticides, paints, thinners, solvents, fool, oil, and antifreeze) in accordance with city, county, state and federal regulations. ❑ Stem hazardous materials and wastes in water tight containers, store in appropriate secondary containment, and cover them at the end of every work day or during wet weather or when min is forecast. ❑ Follow manufacturer's application instructions for hazardous materials and be careful not to use more than necessary. Do not apply chemicals outdoors when rain is forecast within 24 hours. ❑ Arrange for appropriate disposal of all hazardous wastes. Waste Management ❑ Cover waste disposal containers securely with tarps at the end of every work day and during wet weather. ❑ Check waste disposal containers frequently for leaks and to make sure they are not overfilled. Never hose down a dumpster on the construction site. ❑ Clean or replace portable toilets, and inspect them frequently for leaks and spills. ❑ Dispose of all wastes and debris properly. Recycle materials and wastes that can be recycled (such as asphalt, concrete, aggregate base materials, wood, gyp board, pipe, etc.) ❑ Dispose of liquid residues from paints, thinners, solvents, glues, and cleaning fluids as hazardous waste. Construction Entrances and Perimeter ❑ Establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from site and tracking otrsite. ❑ Sweep or vacuum any street tracking immediately and seem sediment source to prevent further tracking. Never hose down streets to clean up tracking. Equipment Management & Spill Control st c Maintenance and Parking ❑ Designate an area, fitted with appropriate BMPs, for vehicle and equipment parking and storage. ❑ Perform major maintenance, repair jobs, and vehicle and equipment washing off site. Cl If refueling or vehicle maintenance must be done onsite, work hi a berated area away from storm drains and over a drip pan or drop cloths big enough to collect fluids. Recycle or dispose of fluids as hazardous waste. ❑ If vehicle or equipment cleaning must be done onsite, clean with water only in a berated area that will not allow rinse water to tun into gutters, streets, storm drains, or surface waters. ❑ Do not clean vehicle or equipment onsite using soups, solvents, degreasers, or steam cleaning equipment. Spill Prevention and Control ❑ Keep spill cleanup materials (e.g., rags, absorbents and cat litter) available at the construction site at all times. ❑ Inspect vehicles and equipment frequently for and repair looks promptly. Use drip pans to catch leaks until repairs are made. O Clean up spills or leaks immediately and dispose of cleanup materials properly. ❑ Do not hose down surfaces where fluids have spilled. Use dry cleanup methods (absorbent materials, cat litter, and/or rags). ❑ Sweep up spilled dry materials immediately. Do not try to wash them away with water, or bury them. O Clean up spills on dirt areas by digging up and properly disposing of contaminated soil. ❑ Report significant spills immediately. You are required by law to report all significant releases of bazardous materials, including oil. To report a spill: 1) Dial 911 or your local emergency response number. 2) Call the Governor's Office of Emergency Services Warning Center, (800) $52-7550 (24 hours). Eartbmoving � A ❑ Schedule grading and excavation work during dry weather. O Stabilize all denuded areas, install and maintain temporary erosion controls (such as erosion control fabric or bonded fiber matrix) will vegetation is established. ❑ Remove existing vegetation only when absolutely necessary, and seed or plant vegetation for erosion control on slopes or where construction is not immediately planned. ❑ Prevent sediment from migrating offsite and protect storm drain inlets, goners, ditches, and drainage courses by installing and maintaining appropriate BMPs, such rolls, silt fences sediment basins as fiber o s, sul , gravel bags, berms, etc. ❑ Keep excavated soil on site and transfer it to dump trucks on site, not in the streets. Contaminated Soils ❑ Vary ofthe following conditions am observed, test for contamination and contact the Regional Water Quality Control Board; - Unusual soil conditions, discoloration, or odor. - Abandoned underground tanks. Abandoned wells Buried barrels, debris, or trash. Paving/Asphalt Work A& ❑ Avoid paving and seal coating in wet weather or when rain is forecast, to prevent materials that have not cured from contacting stormwater runoff. ❑ Cover storm drain inlets and manholes when applying seal coal, tack coat, slurry seal, fog seal, etc. ❑ Collect and meycle or appropriately dispose of excess abrasive gravel or sand. Do NOT sweep or wash it into gutters. ❑ Do not use water in wash down fresh asphalt concrete pavement. Sawcutting & Asphalt/Concrete Removal ❑ Protect nearby storm drain inlets when saw cutting. Use filter fabric, catch basin inlet filters, or gravel bags to keep slurry out of the storm drain system. ❑ Shovel, abosorb, or vacuum saw -cut slurry and dispose of all waste as soon as you arc finished in one location or at the end of each work day (whichever is sooner!). ❑ If sawcut slurry enters a catch basin, clean it up immediately. Concrete, Grout & Mortar Application I ❑ store concrete, grout, and mortar away from storm drains or waterways, and on pallets under cover to protect them ftom min, runoff. and wind. ❑ Wash out concrete equipment/trucks oifstte or in a designated washout area, whom the water will flow into a temporary waste pit, and in a manner that will prevent leaching into the underlying soil or onto surrounding areas. Let concrete harden and dispose of as garbage. ❑ When washing exposed aggregate, prevent washwater from entering storm drains. Block any inlets and vacuum gutters, hose washwater onto dirt areas, or drain onto a berated surface to be pumped and disposed of properly. Landscaping ❑ Pmtem stockpiled landscaping materials from wind and rein by storing them under tarps all yearrvround. ❑ Stack bagged material on pallets and undercover. ❑ Discontinue application of any erodible landscape material within 2 days before a forecast min event or during wet weather. Storm drain polluters may be liable for fines olI up to 510,000 per day! Painting Cleanup and Removal ❑ Never clean brushes or rinse paint containers into a street, gutter, storm drain, or stream. ❑ For water -based paints, paint out brushes to the extent possible, and rinse into a drain that goes to the sanitary sewer. Never pour paint down a stone drain. ❑ For oil -based paints, paint out brushes to the extent possible and clean with thinner or solvent in a proper container. Filter and muse thinners and solvents. Dispose of excess liquids as hazardous waste. ❑ Paint chips and dust from non -hazardous dry stripping and sand blasting may be swept up or collected in plastic drop cloths and disposed of as trash. ❑ Chemical paint stripping residue and chips and dust from marine paints or paints containing lead, mercury; or tributyltin must be disposed of as hazardous waste. Lead bused paint removal requires a state - certified contractor. Dewatering 17 ❑ Discharges of groundwater or captured runoff from dewatering operations most be properly managed and disposed. When possible send dewatering discharge to landscaped area or sanitary sewer. If discharging to the sanitary sewer call your local wastewater treatment plant. ❑ Divert run-on water from offsite away from all disturbed areas. ❑ When dewatering, notify and obtain approval from the local municipality before discharging water to a street gutter or storm drain. Filtration or diversion through a basin, tank, or sediment trap may be required. ❑ In areas of known or suspected contamination, call your local agency to detemrine whether the ground water must be tested. Pumped groundwater may need to be collected and hauled off -site for treatment and proper disposal. F1AN MA t VRIIN -MME Water fwwon Prentonlram Requirements for Architectural Copper Chan Wxses, k�s;r�3 t".� :m�nc<a.. Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Building with copper flashing, gutter and drainpipe. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) must be implemented to prevent prohibited discharges to storm drains. During Installation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on -site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off -site for proper disposal. • Consider coating the copper materials with an impervious coating that prevents further corrosion and runoff. This will also maintain the desired color for a longer time, requiring less maintenance. Storm drain inlet is blocked to prevent prohibited discharge. The water must be pumped and disposed of properly. During Maintenance Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re -application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If this is not an option, haul the wash water off -site for proper disposal. x! a fir' Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing " i copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Photo credit: Don Edwards National Wildlife Sanctuary Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.orq (click on "Business", then "New Development", then "local permitting agency"). FINAL February 29, 2012 -SEP - 2 20': CITY OF BURUNGAME CDD-PLANNING DIV 40 m 2748 Burlingview Drive qm a RESOLUTION APPROVING CATEGORICAL EXEMPTION, HILLSIDE AREA CONSTRUCTION PERMIT AND FRONT SETBACK VARIANCE RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemption has been prepared and application has been made for Front Setback Variance and Hillside Area Construction Permit for first floor additions to an existing single- family dwelling at 2748 Burlingview Drive, Zoned R-1, Henry Hsia, property owner, APN: 027-224-150; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 24, 2014, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. 2. Said Hillside Area Construction Permit and Front Setback Variance are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Hillside Area Construction Permit and Front Setback Variance are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman I, , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 24th day of November, 2014, by the following vote: Secretary EXHIBIT "A" Conditions of Approval for Categorical Exemption, Front Setback Variance and Hillside Area Construction Permit 2748 Burlingview Drive Effective December 4, 2014 Page 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 12, 2014, sheets A.1 through A.6, T.0, SP.1 and DM. 1; 2. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 3. that if the structure is demolished or the envelope changed at a later date the Front Setback Variance, as well as any other exceptions to the code granted here, will become void; 4. that the conditions of the Engineering Divisions September 10, 2014 memo, the Building Division's September 15 and October 14, 2014 memos, the Parks Division's September 8, 2014 memo, the Fire Division's September 8, 2014 memo, and the Stormwater Divisions September 9, 2014 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame. CITY OF BURLINGAME COMMUNITY DEVELOPMENT DEPARTMENT BURLINGAME 501 PRIMROSE ROAD )� �' _ .• BURLINGAME, CA 94010 PH: (650) 558-7250 ® FAX: (650) 696-3790 www.burlingame.org Site: 2748 BURLINGVIEW DRIVE The City of Burlingame Planning Commission announces the following public hearing on MONDAY, NOVEMBER 24, 2014 at 7:00 P.M. in the City Hall Council Chambers, 501 Primrose Road, Burlingame, CA: Application for Front Setback Variance and Hillside Area Construction Permit for first floor additions to an existing single-family dwelling at 2748 BURLINGVIEW DRIVE zoned R-l. APN 027-224-150 Mailed: November 14, 2014 (Please refer to other side) City of Burlingame PUBLIC HEARING NOTICE A copy of the application and plans for this project may be reviewed prior to the meeting at the Community Development Department at 501 Primrose Road, Burlingame, California. If you challenge the subject application(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in the notice or in written correspondence delivered to the city at or prior to the public hearing. Property owners who receive this notice are responsible for informing their tenants about this notice. For additional information, please call (650) 558-7250. Thank you. William Meeker Community Development Director PUBLIC HEARING NOTICE (Please refer to other side) City of Burlingame Item No. 6a Front Setback Variance and Hillside Area Construction Permit Study Item Address: 2748 Burlingview Drive Meeting Date: October 27, 2014 Request: A Front Setback Variance and Hillside Area Construction Permit for single -story additions to an existing single-family residence. Applicant and Designer: Jesse Geurse, Geurse Conceptual Designs APN: 027-224-150 Property Owner: Henry Hsia Lot Area: 10,454 SF General Plan: Low Density Residential Zoning: R-1 Project Description: The subject site is a corner property located at the intersection of Burlingview Drive and Hillview Court. The municipal code defines the front of the property as the shortest lot line; with this property, the front is defined as the lot line along Hillview Court. The existing house has an entrance and an attached garage facing Burlingview Drive. There is an existing uncovered deck at the front, right side of the house (along the Hillview Court frontage). This deck is greater than 30 inches from grade and is included in both lot coverage calculations and setback measurements. With this application, the applicant proposes to remove the existing deck and replace it with a 129 SF living area. The wall of the addition has the same front setback as the existing house and deck, but is a new structure and is required to meet front setback requirements. The applicant is requesting a Front Setback Variance for a proposed front setback of 18'-0" where 28'-4" is the average setback for the houses on Hillview Court. The project also includes demolishing an existing 405 SF sunroom located at the rear, right side of the house and replacing it with living space with the same footprint. Taken together, the replacement of the deck and sunroom will increase the living space of the house by 129 SF, and the lot coverage will be reduced by 99 SF. The proposed changes to the house are single story and the existing highest ridge of the residence will not be increased. With the proposed project, the number of bedrooms on site will be increased from 3 to 4. A four -bedroom house requires two parking spaces, one of which must be covered. The existing house has two covered parking spaces, one of which is non -conforming in length due to the location of a utility sink in the garage. The applicant proposes to remove the utility sink so that the attached garage will have two covered parking spaces that meet current requirements for existing covered parking space dimensions. The existing uncovered parking spaces in the driveway leading to the garage will not be altered with the project. The applicant is requesting the following applications: ■ Front Setback Variance for a single family dwelling (C.S. 25.26.072(b)(1)); and ■ Hillside Area Construction Permit (C.S. 25.61.020). 2748 Burlingview Drive Lot Area: 10,454 SF Plans date stamped: October 7, 2014 EXISTING PROPOSED ALLOWED/REQ'D SETBACKS Front: ±_ 18'-0"' 18'-0" z i 28'-4" (is the block Side (left): 15'-7" No change 71-6" (right): _._._...._.......__...... ...... - -.._. 1_....__...._......._......_—___ 20'-0" _._.. .........................._.........._..-..._.._............... No change..................._............� _.........................._... . ................ 7'-0" Rear: ... 36'-5" — . — —No change._.._.....- -- --- --- 15'_0" Lot Coverage: i 3300 SF 3201 SF - i 4445 SF 32% 31% 40% e Variance and Hillside Area Construction Permit 2748 Burlingview Drive EXISTING PROPOSED ALLOWED/REQ'D FAR: j 2435 SF 2564 SF j 4245 SF s -- - ...._.__....--....._...__.... _-....... ........-------....... 0.23 FAR -----._.................. --... ....... -.... .... --......... _;_.._... --._ 0.25 FAR .......... _............ _ 0.41 FAR # of bedrooms: 3 ............... _.._........_......_... __ . _.....--:----._._._..._.....------...........----._......._.._.- 4 I ............. .................. ----.......................... --- Parking: i 2 covered a ....._.__..._._......__—__._..—.__.... 2 covered --... ----... _............... ._......... ...... _.._.._........ 1 covered (18' x 17') (18' x 18') (18' x 18') 2 uncovered 1 uncovered (9' x 20') No change (9' x 20') The existing front setback to the first floor is non -conforming (18'-0" existing where 28'-4" is the average of this court block). 2 The proposed front setback requires a variance (18'-0" proposed where 28'-4" is required) (C.S. 25.26.072(b)(1)). 3 (0.32 x 10,454 SF) + 900 SF= 2564 SF (0.25 FAR). 4 The existing attached garage has one covered space on the left side that meets code required minimum dimensions. The covered space on the right side of the garage has an existing, non -conforming length of 17'-0" where 18'-0" is required because the utility sink location. Staff Comments: See attached memos from the Chief Building Official, Fire Division, Engineering Division, Parks Division, and Stormwater Division. Required Findings for Variance: In order to grant a variance the Planning Commission must find that the following conditions exist on the property (Code Section 25.54.020 a-d): (a) there are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district; (b) the granting of the application is necessary for the preservation and enjoyment of a substantial property right of the applicant, and to prevent unreasonable property loss or unnecessary hardship; (c) the granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience; and (d) that the use of the property will be compatible with the aesthetics, mass, bulk and character of existing and potential uses of properties in the general vicinity. Required Findings for Hillside Area Construction Permit: Review of a Hillside Area Construction Permit by the Planning Commission shall be based upon obstruction by construction of the existing distant views of nearby properties. Emphasis shall be given to the obstruction of distant views from habitable areas within a dwelling unit (Code Sec. 25.61.060). Erika Lewit Senior Planner c. Jesse Geurse, applicant Attachments: Application to the Planning Commission Variance Form Staff Comments Photo of existing front deck for 2748 Burlingview Drive (2 sheets) Aerial Photo -2- COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org APPLICATION TO THE PLANNING COMMISSION Type of application: ❑ Design Review ❑ Variance ❑ Parcel #: ❑ Conditional Use Permit ❑ Special Permit ❑ Other: HILLSIDE CONSTRUCTION PERMIT PROJECT ADDRESS: 2748 BURLINGVIEW DRIVE B URLINGA.ME CA. 94010 O Please indicate the contact person for this project APPLICANT project contact person OK to send electronic copies of documents Name: GEURSE CONCEPTUAL DESIGN, INC. Address: 405 BAYSWATERAVENUE City/State/Zip: BURLINGAME CA94010 Phone: 650.703.6197 Fax: 650558.9324 E-mail: JGEURSEOSBCGLOBALNET ARCHITECT/DESIGNER project contact person ❑ OK to send electronic copies of documents ❑ Name: GEURSE CONCEPTUAL DESIGN, INC. Address: 405 BAYSWATER AVENUE City/State/Zip: BURLINGAMECA94010 Phone: 650.703.6197 Fax: 650 558 9324 E-mail: JGEURSEOSBCGLOBALNET * Burlingame Business License #: 228811 EXP. 6-30-15 PROPERTY OWNER project contact person ❑ OK to send electronic copies of documents Name: HENRY HSIA Address: 2748BURLINGVIEW DRIVE City/State/Zip: BURLINGAME, CA 94010 Phone: (650)387-4810 Fax: E-mail: HSIAHHOTMAIL@MSN.COM PROJECT DESCRIPTION: CONVERT EXISTING COVERED PATIO INTOAFAMILYANDSINGLE STORY ADDITION KITCHEN REMODEL, AND SPLITTING OF 1 AFFADAVIT/SIGNATURE: I hereby best of my knowledge and belief. Applicant's signature: I am aware of the proposed applicatil Commission. Property owner's Sig BEDROOM AND OFFICE, BATHROOM REMODEL of perjury that the information given herein is true and correct to the 7 Date: 9-2.-2014 apjk- rize the above applicant to submit this application to the Planning Date: 9-2--2014 Date submitted: k [ E * Verification that the project architect/designer has a valid Burlingame business license will be required�,3y`thg Finance Department at the time application fees are paid. ❑ Please mark one box above with an X to indicatp the contact person for this project. S:\Handouts\PC Application 2008-B.handout "i,v Y OF BURLINGAME COD -PLANNING ANNING UIV. CITY OF BURLINGAME PLANNING DEPARTMENT 501 PRIMROSE ROAD P (650) 558-7250 F (650) 696-3790 /- CIT7 BURUNGAME CITY OF BURLINGAME VARIANCE APPLICATION The Planning Commission is required by law to make findings as defined by the City's Ordinance (Code Section 25.54.020 a-d). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Please type or write neatly in ink. Refer to the back of this form for assistance with these questions. a. Describe the exceptional or extraordinary circumstances or conditions applicable to your property which do not apply to other properties in this area. PLANNING IS CLASSIFYING OUR CURRENT SIDE SETBACK AS A FRONT SETBACK DUE TO OUR PROPERTY BEING A CORNER LOT. SHORTER LENGTHS OF CORNER PROPERTIES ARE CLASSIFIED AS FRONT WHICH CREATES A HARDSHIP FOR THE REASON ALL FRONT NEIGHBORING PROPERTIES HAVE A FURTHER FRONT YARD SETBACK THEN OUR ACTUAL SIDE SETBACK AN AVERAGE IS THEN DETERMINED AND OUR ADDITION IS NOT WITHIN THE FRONT SETBACK REQUIREMENTS. WE ASK FORA VARIANCE TO CORNER OFF EXISTING RESIDENCE TO MATCH ALL EXISTING WALLS. b. Explain why the variance request is necessary for the preservation and enjoyment of a substantial property right and what unreasonable property loss or unnecessary hardship might result form the denial of the application. WE ASK THAT A VARIANCE BE APPROVED SO THAT A BEDROOM CAN BE MADE LARGER BY CORNING OFF EXISTING WALLS THAT ARE EXISTING. THE ENJOYMENT OF TIC ADDITION WOULD REFLECT AN ACTUAL MASTER BEDROOM WITH NEW BATH AND CLOSET. THE ADDITION WILL NOT EXCEED ANY EXISTING WALLS. IF BEDROOM CANNOT BE EXTENDED THEN A POTENTIAL OF THE HOUSE VALUE WOULD DECLINE FOR THE REASON IT CANNOT BE EXPANDED. C. Explain why the proposed use at the proposed location will not be detrimental or injurious to property or improvements in the vicinity or to public health, safety, general welfare or convenience. THE PROPOSED ADDITION IS A SINGLE STORY ADDITION THAT WILL CORNER OFF AN EMPTY AREA ALREADY OCCUPIED BY A LARGE WOOD DECK THE LOCATION OF THE ADDITION WOULD NOT EFFECT ANY NEIGHBORS VIEW IN ANYWAY SINCE A STRUCTURE ALREADYIIS, �"' 1 `� AND DOES NOT POISE ANY HEALTH RISK L SEP 16 2014 CITY OF BURLINGAME d How will the proposed project be compatible with the aesthetics, mass, bulk andP«NNIIVG D!V, character of the existing and potential uses on adjoining properties in the general vicinity? THE PROPOSED ADDITION IS A SINGLE STORY ADDITION THAT WOULD MATCH THE EXISTING AESTHETICS, MASS AND BULK SINCE THE ADDITION WILL MATCH EXISTING WALLS AND ROOF LINE WILL BE PUSHED OUT FROM IT'S ORIGINAL LOCATION. ADDITION TO MATCH EXISTING RESIDENCE WHICH MATCHES EXISTING NEIGHBORING EXTERIOR AESTHETICS. Project Comments Date: October 20, 2014 To: U Engineering Division (650) 558-7230 X Building Division (650) 558-7260 U Parks Division (650) 558-7334 From: Planning Staff U Fire Division (650) 558-7600 U Stormwater Division (650) 342-3727 U City Attorney (650) 558-7204 Subject: Request for Variance and Hillside Area Construction Permit for single -story additions — 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: Single revised sheet- A.1 No further comments. All conditions of approval as stated in all previous reviews will apply to this project. Reviewed by: Date: 10-20-2014 Project Comments Date: October 14, 2014 To: U Engineering Division (650) 558-7230 X Building Division (650) 558-7260 U Parks Division (650) 558-7334 From: Planning Staff U Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 U City Attorney (650) 558-7204 Subject: Request for Variance and Hillside Area Construction Permit for single -story additions — 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: Revised plans date stamped October 7, 2014 Second comments: 2hoat ms that could be used for sleeping purposes must have at least one window or complies with the egress requirements. Specify the location and the net clear opening height and width of all required egress windows on the elevation drawings. 2013 California Residential Code (CRC) §R310. Note: The area labeled "Office" is a room that can be used for sleeping purposes and, as such, must comply with this requirement. The proposed egress window in the room labeled "Office" is specified on sheet A-1 as 1' 11-112". The minimum required egress window at grade level must have a minimum of 20" in width and 24" in height, net clear opening, with a total minimum of 5" 0". Revise sheet A.1 of the plans to show compliance with this requirement. Reviewed by: Date: 10-14-2014 Date: To: From: Subject: Staff Review: Project Comments September 8, 2014 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 September 8, 2014 1) On the plans specify that this project will comply with the 2013 California Building Code, 2013 California Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 California Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California uilding Codes. ��As of January 1, 2014, SB 407 (2009) requires non -compliant plumbing fixtures to be replaced by water -conserving plumbing fixtures when a property is undergoing alterations or improvements. This law applies to all residential and commercial property built prior to January 1, 1994. Details can be found at http:///www.leginfo.ca.gov/pub/09-10/bill/sen/sb 0401- 0450/sb 407 bill 20091011 chaptered.html. Revise the plans to show compliance with this requirement. ;f Under Building Dept. General Notes, Note #3 remove the reference to the 2008 California Energy Efficiency Standards. 0Under Building Dept. General Notes, Note #2 remove the reference to the GreenPoints Checklist as that checklist is no longer required. Provide two completed copies of the attached Mandatory Measures with the submittal of your plans for Building Code compliance plan check. In addition, replicate this completed document on the plans. Note: On the Checklist you must provide a reference that indicates the page of the plans on which each Measure can be found. 5) Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) 6) On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 7) Anyone who is doing business in the City must have a current City of Burlingame business license. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on -site parking. 9) Provide existing and proposed elevations. 10)This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2013 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved plans. 11)Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12)Provide a complete demolition plan that includes a legend and indicates existing walls and features to remain, existing walls and features to be demolished, and new walls and features. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of any building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13)Show the distances from all exterior walls to property lines or to assumed property lines 14)Show the dimensions to adjacent structures. 1'5 ooms that could be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the location and the net clear opening height and width of all required egress windows on the elevation drawings. 2013 California Residential Code (CRC) §R310. Note: The area labeled "Office" is a room that can be used for sleeping purposes nd, as such, must comply with this requirement. ndicate on the plans that a Grading Permit, if required, will be obtained from the ,/ Department of Public Works. 17)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 18)Provide handrails at all stairs where there are four or more risers. 2013 CBC § 1009. 19)Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 2, 3, 4, 15, and 16 must be re -submitted before this project can move forward for Planning Commission action. Reviewed by: Joe 0 Date: 9-15-2014 Project Comments Date: September 8, 2014 To: 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff X Fire Division (650) 558-7600 U Stormwater Division (650) 342-3727 U City Attorney (650) 558-7204 Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 No comments. Note: Fire sprinkler system required — sprinkler notes already on plans. Reviewed by: C. Reed C Date: 9-8-14 Project Comments Date: September 8, 2014 To: X Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 9/10/2014 Project Comments Date: September 8, 2014 To: 0 Engineering Division U Building Division (650) 558-7260 Parks Division -^0 From: Planning Staff 0 Fire Division ipiznj F-g;p - cnn WWV 0 Stormwater Division (650) 342-3727 0 City Attorney Subject: Request for Front Setback Variance and Hillside Area Construction n,,...:a C— ..-- Fi^-- ...l.f:a: �.. �.— -- ,..,.a:.. ,.i. t,...,:i.. i.,, .ii . ,a i caliiii ivi u ii1ai iiisiii auiuiiivii iv ciii cniSiiiiu_ Sii-.Gla AV4 elIII! iul;-- ai 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 Reviewed by: Date: /�[—//K Project Comments Date: September 8, 2014 To: 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 X Stormwater Division (650) 342-3727 0 City Attorney (650) 558- 7204 Subject: Request for Front Setback Variance and Hillside Area Construction Permit for a first floor addition to an existing single family dwelling at 2748 Burlingview Drive, zoned R-1, APN: 027-224-150 Staff Review: September 8, 2014 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Electronic file is available for download at- http-liflowstobay.org/construction . 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://flowstobay.ora./newdevelopment . If applicable, include BMPs as project notes during building permit submittal. For assistance please contact Eva J. at 650-342-3727. Reviewed by: EJ Date: 9/9/2014 Water Pollution Prevention Program Clean Water. Construction Best Management Practices (BMPs) Construction projects are required to implement the stormwater best management practices (BMP) on this page, as they apply to your project, all year long. Materials & Waste Management Non -Hazardous Materials ❑ Benn and cover stockpiles of sand, dirl or other construction material with turps when rain is forecast or if not actively being used within 14 days. ❑ Use (but don't overuse) reclaimed water for dust control. Hazardous Materials ❑ Label all hazardous materials and hazardous wastes (such as pesticides, paints, thinners, solvents, fuel, oil, and antifreeze) in accordance with city, county, state and federal regulations. ❑ Store hazardous materials and wastes in water tight containers, store in appropriate secondary containment, and cover them at the and of every work day or during wet weather or when min is forecast. ❑ Follow manufacturer's application instructions for hazardous materials and be careful not to use more din necessary. Do not apply chemicals outdoors when min is forecast within 24 bouts. ❑ Arrange for appropriate disposal of all hazardous wastes. Wart. Management ❑ Cover waste disposal containers securely with tarps at the end of every work day and during wet weather. ❑ Check waste disposal containers frequently forleaks and to make sure they are not overfilled. Never hose down a dumpster on the construction site. ❑ Clean or replace portable toilets, and inspect them frequently for Lanka and spills. ❑ Dispose of all wastes and debris properly. Recycle materials and wastes that can be recycled (such as asphalt, concrete, aggregate base materials, wood, gyp board, pipe, etc.) ❑ Dispose of liquid residues from paints, thinners, solvents, glues, and cleaning fluids as hazardous waste. Construction Entrances and Perimeter ❑ Establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from site and tracking offsite. ❑ Sweep or vacuum any street tracking immediately and secure sediment source to prevent further tracking. Never hose down streets to clean up tracking. Equipment Management & Spill Control Maintenance and Parking ❑ Designate an area, fitted with appropriate BUPA, for vehicle and equipment parking and storage. ❑ Perform major maintenance, repair jobs, and vehicle and equipment washing off site. ❑ If refueling or vehicle maintenance must be done onsite, work in a bermed area away from storm drains and over a drip pan or drop cloths big enough to collect fluids. Recycle or dispose offluids as hazardous waste. ❑ If vehicle or equipment cleaning must be done onsite, clean with water only in a banned area that will not allow rinse water to run into gutters, streets, steno drains, or surface waters. ❑ Do not clean vehicle or equipment onsite using soaps, solvents, degreasers, or steam cleaning equipment. Spill Prevention and Control ❑ Keep spill cleanup materials (e.g., rags, absorbents and CAL litter) available at the construction site at all times. ❑ Inspect vehicles and equipment frequently for and repair leaks promptly. Use drip pane to catch leaks until repairs are made. ❑ Clean up spills or leaks immediately and dispose of cleanup materials properly. ❑ Do not hose down surfaces where fluids have spited. Use dry cleanup methods (absorbent materials, cat litter, and/or rugs). ❑ Sweep up spilled dry materials immediately. Do not try to wash them away with water, or bury them. ❑ Clean up spills ant dirt areas by digging up and properly disposing of contaminated soil. ❑ Report significant spills immediately. You are required by Inv to report all significant releases of hazardous materials, including oil. To repon a spill: 1) Dial 911 or your local emergency response number, 2) Call the Governor's Office of Emergency Services Warning Center, (800) 852-7550 (24 hours). Earthmoving Cl Schedule grading and excavation work during dry weather. ❑ Stabilize all denuded areas, install and maintain temporary erosion controls (such as erosion control fabric or bonded fiber matrix) until vegetation is established. ❑ Remove existing vegetation only when absolutely necessary, and seed or plant vegetation for erosion control on slopes or where construction is not immediately planned. ❑ Prevent sediment from migrating offsite and protect storm drain inlets, gutters, ditches, and drainage courses by installing and maintaining appropriate BMPs, such as fiber rolls, silt fences, sediment basins, gravel bags, berms, etc. ❑ Keep excavated soil an site and transfer it to dump trucks on site, not in the streets. Contaminated Sons ❑ If any of the following conditions are observed, test for contamination and contact the Regional Water Quality Control Board: - Unusual soil conditions, discoloration, or odor. - Abandoned underground tanks. - Abandoned wells Butied barrels, debris, or trash. Paving/Asphalt Work A& ❑ Avoid paving and seal coating in wet weather or when rain is forecast, to prevent materials that have not cured from Contacting stormwater runoff. ❑ Cover storm drain inlets and manholes when applying seal coat, tack coat, slurry seal, fog seal, etc. ❑ Collect and recycle or appropriately dispose of excess abrasive gravel or sand. Do NOT sweep or wash it into gutters. ❑ Do not use water to wash down fresh asphalt concrete pavement. SawcutdFtg At Asphalt/Concrete Removal ❑ Protect nearby storm drain inlets when saw cutting. Use filter fabric, catch basin inlet filters, or gravel bags to keep slurry out of the storm drain system. Cl Shovel, abosorb, or vacuum saw -cut slurry and dispose of at waste as soon as you are finished in one location or at the end of each work day (whichever is soonerl). ❑ If sawout slurry enters a catch basin, clean It up immediately. Concrete, Grout & Mortar Application a ❑ Store concrete, grout, and mortar away from storm dmins or waterways, and on pallets under cover to protect them from min, runoff, and wind. ❑ Wash out concrete equipment/trucks offsite or in a designated washout area, where die water will flow into a temporary waste pit, and in a manner that will prevent leaching into the underlying soil or onto surrounding areas. Let Concrete burden and dispose of as garbage. ❑ When washing exposed aggregate, prevent washwater from entering storm drains. Block any inlets and vacuum gutters, hose washwater onto dirt areas, or drain onto a banned surface to be pumped and disposed of property. Landscaping ❑ Protect stockpiled landscaping materials from wind and min by storing them under tarps all yca round. ❑ Stock bagged material on pallets and tinder Cover. ❑ Discontinue application of any erodible landscape material within 2 days before it forecast min event or during wet weather. Painting & Paint Removal Painting Cleanup and Removal ❑ Never clean brushes or rinse paint containers into a street, gutter, steno drain, or stream. ❑ For water -based paints, paint out brushes to the extent possible, and rinse into a drain that goes to the sanitary sewer. Never pour paint down a storm drain. ❑ For oil -based paints, paint out brushes to the extent possible and clean with thinner or solvent in a proper container Filter and reuse thinners and solvents. Dispose of excess liquids as hazardous waste. ❑ Paint chips and dust from non -hazardous dry stripping and sand blasting may be swept up or collected in plastic drop cloths and disposed of as trash. ❑ Chemical paint stripping residue and chips and dust from marine paints or paints Containing lead, mercury, or tributyltin must be disposed of as hazardous waste. Lead based paint removal requires a smte- certified contractor. Dewatering ❑ Discharges of groundwater or captured mnoff from dowatering operations roust be properly managed and disposed. When possible send dewatering discharge to landscaped urea or sanitary sewer. If discharging to The sanitary sewer call year local wastewater treatment plant. ❑ Divert run-on water from onsite away from all disturbed areas. ❑ When dewatering, notify and obtain approval from the local municipality before discharging water to a street gutter or storm drain. Filtration or diversion through a basin, tank, or sediment trap may be required. ❑ In areas of known or suspected Contamination, call your local agency to determine whether the ground water must be tested. Pumped groundwater may need to be collected and hauled off -site for treatment and proper disposal. a'tes lo!i`ion R ,mntirin Pragraam Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Building with copper flashing, gutter and drainpipe. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) must be implemented to prevent prohibited discharges to storm drains. During Installation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on -site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off -site for proper disposal. Consider coating the copper coating that prevents further also maintain the desired col less maintenance. materials with an impervious corrosion and runoff. This will or for a longer time, requiring Storm drain inlet is blocked to prevent prohibited discharge. The water must be pumped and disposed of properly. During Maintenance Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re -application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If this is not an option, haul the wash water off -site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.org (click on "Business", then "New Development", then "local permitting agency"). FINAL February 29, 2012 v 4� M r .';r�° ♦taWiu"rf"rIkl""A4 y,.1N 4 m�;�i'r. y a� ,sa'" f , dim• •�'-.� M„- s 9w nr �' Y v p�F►� r � Iwo � "�� �� � "f, ��y r '- 1 7 psi {, :�F " `g +� a. F _ y' I Y • — •, ti_ 06 µ 2748 Burlingview Drive Rk - # y �YR • � �� •� � . i� .tea 5� Y-JdsA�, _ �,,,;� m'i .. Vim. �U19i4 i, u"gga. 2748 Burlingview Drive ��A- 2! Z