HomeMy WebLinkAbout1145 Bernal Avenue - Resolution� � r
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
zo7 �-0�3792
3•�� ��rr; 03125-17 R9 Fee: NO FEE
Craurrl n! Pages 13
f�ecurued i:z ��fii�:i:�l Records
C�un!y e� San Mateo
Mar;c Church
,';.,sessor �;.o{int ar
CI k-Recorder
''' q"'I �� I �I � ���
�l�i� � ������� ��i ����� ��'!' �l��� ���!I i��l �;��� ��!�I Il�li i►lil!!B► � I �!I ��II
+� r? 0 i; p�' � s E 9 1 4$*
Resolution No. 7 - 2017
1145 BERNAL AVENUE
APN 026-183-030
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
dOCUf11Pn} i4 ni irnnrfc fn he 4he nrininal nf �e�hirh ie nn fila in mv
OfFC@.
Date:
�
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desian
Review for a first and second story addition to an existinq sinqle familv dwellinq at 1145 Bernal Avenue,
Zoned R-1, Miro and Marica Braienovic propertv owners APN� 026-183-030;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
February 13. 2017, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (e)(2), which states that additions to existing structures
are exempt from environmental review, provided the addition will not result in an increase of
more than 10,000 SF in areas where all public services and facilities are available and the area
in which the project is located is not environmentally sensitive, is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
3. It is further directed that a certified copy of this resolution be ec rded in the official records of
the County of San Mateo.
C airman
I, �t���t��c.�fSecretary of the Planning Commission of the
hereby certify that the foregoing resolution was introduced and adopted at a
Planning Commission held on the 13t" dav of Februarv, 2017, b
1145 BERNAL AVENUE - RESO 7-2017
aves: BANDRAPALLI, GAUL,
GUM, LOFTIS, SARGENT
NOEs: NONE
AeseNT: TERRONES
Recuseo: DEMARTINI
City of Burlingame, do
regular meeting of the
y the following vote:
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
1145 Bernal Avenue
Effective February 23, 2017
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped January 17, 2017, sheets A0.1 through A2.3, A9.1, and date stamped January 30,
2017 sheets A2.4 through A3.3;
2. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf�;
3. that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
4. that the conditions of the Building Division's December 21, 2016 and January 13, 2017
memos, the Engineering Division's November 22, 2016 memo, the Fire Division's November
28, 2016 memo, the Parks Division's November 28, 2016 and January 19, 2017 memos, and
the Stormwater Division's December 5, 2016 memo shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
6. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be inctuded and approved in the construction plans before a Building
permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2013 Edition, as amended by the City of Burlingame;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
1145 Bernal Avenue
Effective February 23, 2017
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
12. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
14. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.