HomeMy WebLinkAbout1141 Bernal Avenue - Resolution2005-192417
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
11:47am 11/02/05 R1 Fee: NO FEE
Count of pages 8
Recorded in Official Records
County of San Mateo
Warren Slocum
Assessor-County Clerk-Recorder
'� ! ' �� �� � � �� � R � � � '�' ��I�� !���� I����� ������ I ���
4 i 7 A R*
RESOLUTION NO. 094-2005
1141 BERNAL AVENUE; APN: 026-183-050
TITLE OF DOCUMENT
�-
I hereby certify this to be a full, true
and conect copy of the document it purports
to be, the original of which is on file in my office.
Date: 10/20/2005
Mar et onro City Planner
RESOLUTION 094-2005
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
design review for a first and second story addition at 1141 Bernal Avenue, zoned R-1, Remv
Sijbrant, propertv owner, APN: 026-183-050;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
September 12, 2005, at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19. Section: 15301 Class 1-
(e) additions to existing structures provided the addition will not result in an increase of
more than 50% of the floor area of the shuctures before the addition.
2. Said design review is approved, subject to the conditions set forth in E�chibit "A" attached
hereto. Findings for design review are as set forth in the minutes and recording of said
meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
CHAIRIVIAN
I, %tit�F,��{�-y ��,.Qt,,�flSl�,t� , Secretary of the Planning Commission of
the City of Burlingame, do hereby certify that the foregoing resolution was introduced and
adopted at a regular meeting the Planning Commission held on the 12th day of September, 2005,
by the following vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
Auran, Brownrigg, Deal, Osterling, Vistica
NONE
Cauchi, Keighran
NONE .n
I:�
EXHIBIT "A"
Conditions of approval for categorical exemption and design review
1141 Bernal Avenue
Effective September 22, 2005
that the project shall be built as shown on the plans submitted to the Planning Department date
stamped August l, 2005 sheets A0.1 through A5.1 and ME2.1, ME2.2, site plan, floor plans,
building elevations, landscape plan (on site plan) and mechanical and electrical plan;
2. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), moving or changing windows and
architectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
3. that the conditions of the Recycling Specialist, City Engineer, Chief Building Official, NPDES
Coordinator and Fire Marshal's memos dated June 23, 2005 shall be met;
4. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide to the Building Department certification of that height documenting
that it is the same or less than the maximum height shown on the plans;
5. that prior to scheduling the framing inspection, the project architect, engineer or other licensed
professional shall provide architectural certification that the architectural details such as
window locations and bays are built as shown on the approved plans; if there is no licensed
professional involved in the project, the property owner or contractor shall provide the
certification under penalty of perjury. Certifications shall be submitted to the Building
Department;
6. that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans;
7, that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued; and
9. that the project shall meet all the requirements of the California Building and Fire Codes, 2001
edition, as amended by the City of Burlingame.