HomeMy WebLinkAbout1126 Bernal Avenue - Approval Letter�
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
ee
h ;,i�r,
' � � � 0 t
.
?Q,p � ��O
4rawRr�a
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
October 25, 2010
J Deal Associates
880 Mitten Road #102
Burlingame, CA 94010
Re: 1124 Bernal Avenue
Dear Mr. Deal,
Since there was no appeal to or suspension by the City Council, the October 12, 2010, Planning
Commission approvai of your application for Design Review and Special Permits for attached garage
and declining height envelope became effective October 22, 2010. This application was for a new,
two-story single family dwelling with an attached garage at 1124 Bernal Avenue, zoned R-1.
The October 12, 2010 minutes of the Planning Commission state your application was approved with
the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped September 29, 2010, sheets A-1 through A-5, SF-1, Landscape Plan and
Topographic Map and Boundary Survey;
2. that the bathroom window located above the entry on the front elevation shall be recessed
with a heavy shadow line; the design of the window shall be reviewed by the Planning
Commission as an FYI;
3. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff);
4. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
5. that the conditions of the Chief Building Official's August 31, 2010 and July 31, 2010
memos, the City Engineer's August 6, 2010 memo, the Fire Marshal's August 2, 2010
memo, the Park's Supervisor's September 1, 2010 and August 2, 2010 memos, and the
NPDES Coordinator's July 29, 2010 memo shall be met;
6. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director;
CC Register online to receive City of Burlingame e-mail updates at www.burlingame.org e9
October 25, 2010
1124 Bernal Avenue
Page 2
7. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing ali conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall not
be modified or changed without the approval of the Planning Commission, or City Council
on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
11. that during demolition of the existing residence, site preparation and construction of the new
residence, the applicant shall use all applicable "best management practices" as identified
in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of
storm water runoff;
12. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2007 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION
13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
14. that prior to scheduling the framing inspection the project architect or residential designer,
or another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the approved
plans; architectural certification documenting framing compliance with approved design
shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :9
October 25, 2010
1124 Bernal Avenue
Page 3
16. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans.
Reimbursement of the Design Review deposit will be processed and will be mailed to the property
owner under separate cover.
All site improvements and construction work will require separate application to the Building
Department. This approval is valid for three years during which time a building permit must be
issued. One extension of up to two years may be considered by the Planning Commission if
application is made before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must
do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or
federal law.
Sincerely,
.
�Gl!I
William Meeker
Community Development Director
c. Andrew Peng and Grace Wang, 1124 Bernal Avenue, Burlingame, CA 94010, property owners.
Chief Deputy Valuation, Assessor's Office
(LOT 21 BLOCK 34 EASTON ADD BURLINGAME NO 2 RSM A/72; APN: 026-182-170)
Chief Building Official, Community Development Dept./Building Div.
File
:o Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::