May 21, 2021
1110 Bernal Avenue, LLC
1731 Adrian Road #13
Burlingame CA 94010
Re: 1110 and 1112 Bernal Avenue
Dear Property Owner,
Since there was no appeal to or suspension by the City Council, the May 10, 2021, Planning
Commission approval of your application for Design Review, Conditional Use Permit for re-emerging
lots, and Lot Combination to create two new parcels became effective May 20, 2021. This application
was for two new, two-story single family dwellings with detached garages on two new lots at 1110 and
1112 Bernal Avenue, zoned R-1.
The May 10, 2021, minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division and date
stamped April 20, 2021, sheets A1.0 through A9.0, L1.0 through L2.5, and Boundary and
Topographic Survey dated October 29, 2020 for Lot 16, 1110 Bernal Avenue; and date stamped
April 20, 2021, sheets A1.0 through A9.0, L1.0 through L2.5, and Boundary and Topographic
Survey dated October 29, 2020 for Lot 17, 1112 Bernal Avenue;
2. that prior to issuance of a building permit, the applicant shall submit an FYI to include an updated
landscape plan and matching site plan for the project which shows landscaping along the right
side property line for 1110 Bemal Avenue that is agreed upon by the owner/applicant and by the
owner of 1980 Carmelita Avenue;
3. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYI or amendment to be determined by Planning staf�;
4. that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
5. that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
6. that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::
DocuSign Envelope ID: 555112C8-D782-4546-B448-05C2D73736D0
May 21, 2021
1110 and 1112 Bernal Avenue
Page 2
7. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for the
property;
12. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property
corners, set the building footprint and certify the first floor elevation of the new structure(s) based
on the elevation at the top of the form boards per the approved plans; this survey shall be
accepted by the City Engineer;
13. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification that
the architectural details shown in the approved design which should be evident at framing, such
as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
°:. Register online to receive City of Burlingame e-mail updates at www.burlingame.org :�
DocuSign Envelope ID: 555112C8-D782-4546-6448-05C2D73736D0
May 21, 2021
1110 and 1112 Bemal Avenue
Page 3
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An
extension of up to one year may be considered by the Planning Commission if application is made
before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
CDocuSi9�ed by:
��. ���.�
28D6423C2E8B49F...
Kevin Gardiner, AICP
Community Development Director
Tim Raduenz, applicant and designer
Chief Deputy Valuation, Assessor's Office
(LOTS 16 17 & SELY 25 FT OF LOT 18 BLK 34 EASTON ADDITION NO 2 RSM 3/93; APN:
026-182-250)
File
:� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::