HomeMy WebLinkAbout305 Burlingame Avenue - Approval Letter., +I .
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burfingame, California 94010-3997
March 9, 2018
Danny Meredith
528 N. Claremont Street
San Mateo, CA 94401
Re: 305 Burlingame Avenue, Burlingame
Dear Mr. Meredith:
�, �a�rr
�:
�r , �j'
��
•� 4 ����.y
�_
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the February 26, 2018, Planning
Commission approval of your application for Design Review became effective March 8, 2018. This
application was for Design Review for a new, two-story single family dwelling with a detached garage at
305 Burlingame Avenue, Zoned R-1.
The February 26, 2018, minutes of the Planning Commission state your application was approved with
the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped February 13, 2018, sheets A-1.0 through A-4 and sheet L-1;
2. that prior to issuance of a building permit, an FYI application shall be submitted showing 1)
trim around the front entry door consistent with the Tudor style to match the rest of the
house, 2) Tudor trim detailing on the gable above the front entry similar to what is shown on
the detached garage gable, 3) planter beds along the edges of the landscape areas in the
front and rear yards, 4) landscaping in the strips between the house and driveway, and 5)
the detached garage moved 1-2 feet away from the side property line with consideration to
move it away from the rear property line;
3. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf�;
�
�
that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org :�
March 9, 2018
305 Burlingame Avenue
Page 2
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall not
be modified or changed without the approval of the Planning Commission, or City Council
on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2016 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by
the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
12. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the approved
plans; architectural certification documenting framing compliance with approved design
shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
14. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans.
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
March 9, 2018
305 Burlingame Avenue
Page 3
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An extension of
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
/
William Meeker
Community Development Director
c. Helen Cook, property owner
305 Burlingame Avenue
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOT 3 BLOCK 39 LYON & HOAG SUB TOWN OF BURLINGAME RSM B/20 CITY OF
BURLINGAME; APN: 029-262-030)
File
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
��'-r v O.�
�� � �
���1,���
1 �� V���
�� i `'.
Project Address:
Description:
From
Project Comments - Planning Application
305 Burlingame Avenue, zoned R-1, APN: 029-262-030
Request for Design Review for a new, two-story single family dwelling.
Martin Quan
Public Works Engineering
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
, .
2. No further comments. �
The following comments do not need to be addressed now, but you should be aware of them as they
will need to be addressed at time of building permit submittal.
3. Based on the scope of work, this is a"Type I" project that requires a Stormwater Construction Pollution Prevention
Permit. This permit is required prior to issuance of a Building Permit. An initial field inspection is required prior to the start
of any construction (on private property or in the public right-of-way).
4. Any work in the City right-of-way, such as placement of debris bin in street, work in sidewalk area, public easements,
and utility easements, is required to obtain an Encroachment Permit prior to starting work.
5. Construction hours in the City Public right-of-way are limited to weekdays and non-City Holidays between 8:00 a.m.
and 5:00 p.m. •
6. A remove/replace utilities encroachment permit is required to (1) replace all curb, gutter, driveway and sidewalk
fronting site, (2) plug all existing sanitary sewer lateral connections and install a new 4" lateral, (3) all water line connections
to city water mains for services or fire line are to be installed per city standard procedures and specification, (4) any other
underground utility works within city's right-of-way.
7. All water lines connections to city water mains for services or fire line protection are to be installed per city standard
procedures and material specifications. Contact the city Water department for connection fees. If required, all fire services
and services 2" and over will be installed by builder. All underground fire service connections shall be submitted as separate
Underground Fire Service permit for review and approval.
8. Sewer Backwater Protection Certification is required for the installation of any new sewer ffxture per Ordinance No.
1710. The Sewer Backwater Protection Certificate is required prior to the issuance of Building Permit.
9. A survey by a licensed surveyor or engineer is required. The survey shall show how the property lines were determined
and that the property corners were set with surveyors license numbers on durable monuments. This survey shall be
attached to the construction plans. All corners need to be maintained or reinstalled before the building final. All property
corners shall be maintained during construction or reestablished at the end of the project.
10. Please submit an erosion control plan. This plan shall include, but not limited to, delineation of area of work, show
primary and secondary erosion control measures, protection of creek or storm drain inlets, perimeter controls, protections
for construction access points, and sediment control measures.
11. Insert the'Best Management Practices', updated June 2014, construction sheet into the plans set. A copy can be found
at htta://www.flowstobay.or�/sites/default/files/Countvwide%20Pro�ram%20BMP�20PIan%20Sheet
June%202014%20Update.odf#overlav-context=brochures or http://www.flowstobay.or�/brochures then click
"construction bmn qlan sheet"
Reviewed By: Martin Quan Date: 8/24/17
� ciYv �
�� . :� �
� `i p��
,�i`�
� �� ..
Project Address:
Description:
From:
Project Comments - Planning Application
305 Burlingame Avenue, zoned R-1, APN: 029-262-030
Request for Design Review for a new, two-story single family dwelling.
Rick Caro III
Building Division
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal: No Comment
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
17) On the frst page of the plans specify the following: "Any hidden conditions that require work to
be performed beyond the scope of the building permit issued for these plans may require further
City approvals including review by the Planning Commission." The building owner, project
designer, and/or contractor must submit a Revision to the City for any work not graphically
illustrated on the Job Copy of the plans prior to performing the work.
18) Anyone who is doing business in the City must have a current City of Burlingame business
license.
Reviewed By: Rick Caro III Date: August 22, 2017
650 558-7270
� CITV
,��'�- - QT
�" i3 �1
— ��.;�`�
a
.� ��.=. ;
—,
Project Address
Description:
From
Project Comments - Planning Application
305 Burlingame Avenue, zoned R-1, APN: 029-262-030
Request for Design Review for a new, two-story single family dwelling.
Christine Reed
Fire Dept.
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
The following comments do not need to be addressed now, but you shouid be aware of them as
they will need to be addressed at time of building permit submittal:
Provide a residential fire sprinkler system throughout the residence:
a. Provide a 1-inch water meter or size to accommodate sprinkler system flow demand.
b. Provide a backflow prevention device/double check valve assembly — A schematic of water
lateral line after meter shall be shown on Building permit plans prior to approval indicating
location of the device after the split between domestic and fire protection lines.
c. Drawings submitted to Building Department for review and approval shall clearly indicate fire
sprinklers shall be installed under a separate deferred fire permit, approved by the Fire
Department prior to installation.
2. If an electronic gate crosses the driveway, provide a Knox key switch connected to the gate to
allow for fire department emergency access.
Reviewed By: Christine Reed Date: 7-6-17
650-558-7617
� cirv.n,
��` 3'�.
._�,,_
Project Address:
Description:
From
Project Comments -
305 Burlingame Avenue, zoned R-1, APN: 029-262-030
Request for Design Review for a new, two-story single family dwelling.
Bob Disco
Parks Division
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
1. Private Protected Tree Removal Permit required for removal of palm tree once project is
approved.
2. Water Conservation Checklist (attached) must be submitted for review.
The following comments do not need to be addressed now, but you should be aware of them as they
will need to be addressed at time of building permit submittal.
1. Irrigation plan shall include name of controller, valves, drip system etc. and be on separate
sheet. Due for Building Permit.
2. Existing City owned Eucalyptus trees may be removed pending ongoing independent arborist
evaluations. Park Division (558-7330) will notify homeowner via US Mail on any necessary
removals.
Reviewed By: BD Date: 8.30.17
650.558.7333
Bdisco@burlingame.org
.
BURLINC�',AME
Project Address:
Description:
From:
Project Comments - Planning Application
305 Burlingame Avenue, zoned R-1, APN: 029-262-030
Request for Design Review for a new, two-story single family dwelling.
Carolyn Critz
Stormwater
Please address the following comments at this time; provide a written response and revised
plans with your resubmittal:
Project does not create or replace 2,500 square feet of impervious surtace or use architectural
copper. Nothing further needed at this time.
The following comments do not need to be addressed now, but you should be aware of them as
they will need to be addressed at time of building permit submittal.
Any construction project in the City, regardless of size, shall comply with the city's stormwater
NPDES permit to prevent construction activity stormwater pollution. Project proponents shall
ensure that all contractors implement appropriate and effective Best Management Practices
(BMPs) during all phases of construction, including demolition. When submitting plans for a
building permit, please include a list of construction BMPs as project notes, preferably on a
separate full size (2'x 3' or larger) plan sheet. A downloadable electronic file is available at:
httq://www.flowstobay.ora/Construction under Construction BMP Brochures: Construction
BMP Plan Sheet.
For further assistance regarding stormwater, please contact Carolyn Critz, Environmental Compliance
Manager, at (650) 342 3727, ext. 118, or carolvn.critzCa�veolia.com
Reviewed By: Carolyn Critz Date: July 13, 2017
(650) 342 3727, ext. 118
MISSION ENC�INEERS, �NC.
Responsive Reliable Results Since 1953
November 14, 2018
City of Burlingame
Building Department
501 Primrose Rd.
Burlingame, CA 94010
Re: New Home Construction, 305 Burlingame Ave., Burlingame
APN: 029-262-03�
Dear Sir/Madam:
Planning
Land Surveying
Civil Engineering
Construction Staking
MEI# 17027
This letter is to certify that Mission Engineers, Inc. did field survey on November 14,
2018 the "As-Built" ridge elevation for the new house under construction at the above
address and found as follows:
House ridge elevation = 35.75 ft
Should you have any questions, please feel free to contact me.
Very Truly Yours,
09-30-19 I �k
Daniel Nunes, PLS s�, Ho, 9 Z�ti ��
LS 9212 Exp. 9/30/19 9rF oF �A`�Fo�
2355 De La Cruz Blvd., Santa Clara, California 95050
Ph. (408)727-8262 Fax (408)727-8285 missionengineersinc.com