Loading...
HomeMy WebLinkAbout1510 Cypress Avenue - Approval LetterCITY OF BURLINGAME City Hall - 501 Primrose Road Burlingame, California 94010-3997 April 6, 2012 Craig Suhl Cypress Avenue Investments LLC PO Box 117697 Burlingame, CA 94010 Re: 1510 Cypress Avenue Dear Mr. Suhl, �( � y 1 � � � �:�, - .tc '• � ���OAAT�D COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the March 26, 2012, Planning Commission approval of your application for Conditional Use Permit for re-emergence of two parcels previously merged by a use and Design Review became effective April 5, 2012. This application was for a new, two-story single family dwelling and detached garage at 1510 Cypress Avenue, zoned R-1. The March 26, 2012 minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped March 13, 2012, sheets A.1 through A.6, G.1, L.1 and Boundary and Topographic Survey; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the City Engineers February 2, 2012, memo, the Chief Building Official's February 22, 2012, and January 18, 2012, memos, the Parks Supervisor's February 15, 2012, and January 17, 2012 memos, the Fire Marshal's January 18, 2012 memo, and the NPDES Coordinator's January 17, 2012, memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; :G Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: April 6, 2012 1510 Cypress Avenue Page 2 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shail be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shail remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or cnanged without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 12. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �: April 6, 2012 1510 Cypress Avenue Page 3 14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 15. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate a�plication to the Building Department. This approval is valid for one year during which time a bu;lding permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, /��� � William Meeker Community Development Director c. James Chu, Chu Design Associates, Inc., designer 55 W. 43�d Avenue San Mateo, CA 94403 Chief Deputy Valuation, Assessor's Office (LOTS 6& 7 BURLINGAME HEIGHTS RSM C/45; APN: 028-294-070) Chief Building Official, Community Development Dept./Building Div. File n: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: 1 � Project Comments Date: January 13, 2012 To: d City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 From: Planning Staff ❑ Recyciing Specialist (650) 558-7271 ❑ Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-?727 ❑ City Attorney Subject: Request for Design Review for a new, two-story single family dwelling and detached garage at 1510 Cypress Avenue, zoned R-1, APN: D28-294-070 Staff Review: January 17, 2012 (Tues.) 1. See attached. 2. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. 3. Applicant needs to contact City Arborist regarding the relocation of sidewalk area around trees in the planter strip. Reviewed by: V V Date: 2/0212012