Loading...
HomeMy WebLinkAbout85 California Drive - Staff Report (2)� Item No. 9c Environmental Scoping PROJECT LOCATION 85 California Drive City of Burlingame Item No. 9c Environmenfal Scoping, Rezoning, General Plan Amendment, Lot Merger Environmental Scoping and Lot Line Adjustment and Commercial Design Review Address: 85 California Drive Meeting Date: February 22, 2016 Request: Application for Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and Lot Line Adjustment and Commercial Design Review for a new automobile service facility at an existing automobile dealership. Applicant: Kent Putnam APN: 029-242-020,-030,-040,-050 & portion of -230 Designer: Alan Cross, Proto Inc. Lot Area: 24,820 SF (0.57 acres) combined Property Owner: Kent Putnam General Plan: Commercial Uses: Service & Special Sales Zoning: CAR and R-4 Burlingame Downtown Specific Plan: California Drive Mixed Use District & R-4 Incentive District Adjacent Development: Automobile sales and service and multifamily residential. Environmental Scoping: Environmental review is required for this project because it includes a Rezoning and General Plan Amendment of a portion of a parcel, and therefore does not qualify for an exemption. As a part of preparing the initial study for the environmental document for this project, staff is requesting that the Planning Commission comment on any potential environmental effects which it feels should be investigated. Since the proposed new automobile service facility is less than 10,000 SF in area it qualifies for a CEQA exemption, therefore the comments and discussion on the environmental review should be limited to the proposed Rezoning and General Plan Amendment. The issues identified by the Commission will be incorporated into the initial study for the project. The standard list of items investigated in an initial study is attached for reference. At this time, staff notes that based on preliminary analysis, it appears that the type of CEQA document required will be a Negative Declaration. However, the type of CEQA document will be finalized during the environmental review process. History: On May 11, 2009 the Planning Commission approved an application for Commercial Design Review for fa�ade changes to the existing Subaru showroom (see attached May 11, 2009 Planning Commission Minutes). The project was completed in December, 2010. Project Summary: The project site is located at the southwest corner of California Drive and Bayswater Avenue. The project site consists of five separate parcels; four parcels and a portion of a fifth parcel would be combined into one lot for the proposed project (see attached diagram). The remaining parcel at the corner of Bayswater Avenue and Highland Avenue would continue to be used for storing new vehicle inventory. The proposed Iot combination requires applications for Rezoning a portion of a parcel from R-4 (high density multifamily residential) to CAR (California Drive Auto Row) and a General Plan Amendment (from R-4 Incentive District to California Drive Mixed Use District). The site is surrounded by automobile sales and service facilities; there is an existing two-story multifamily residential building to the south. The project site currently contains a one-story Subaru showroom building, a one-story Subaru automobile service facility, a Hertz automobile rental office located in the service facility building and automobile storage for Subaru and Hertz on a paved parking area. The proposal includes demolishing a small office at the rear of the existing showroom building, the existing service facility and Hertz rental office and building a new, 9,634 SF automobile service facility for Subaru. The new service facility would consist of 16 service bays, parts and tool rooms, a service writer office and customer Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and 85 California Drive Commercial Design Review lounge. The front of the lot would contain an outdoor vehicle display area and customer/employee parking. During preliminary review Planning staff identified the following applications required for this project: • Environmental Scoping for Rezoning and General Plan Amendment of a portion of a site; • Rezoning of a portion of a site from R-4 (high density multifamily residential) to CAR (California Drive Auto Row); ■ General Plan Amendment of a portion of a site from R-4 Incentive District to California Drive Mixed Use District; ■ Lot Merger to combine four existing parcels into one parcel (portions of Lots 5 and 6, Block 13) and Lot Line Adjustment; and • Commercial Design Review for a new automobile service facility at an existing automobile dealership. Building Design: The existing Subaru showroom building to be retained contains stucco walls, a slate tile clad pilaster, an aluminum anodized storefront system, aluminum composite paneling and painted steel and aluminum trim across the upper portion of the building. The proposed new automobile service facility requires an application for Commercial Design Review and is subject to Section 5.0 - Design & Character of the Downtown Specific Plan (see attached). The proposed service facility building contains prefinished horizontal metal and aluminum composite panel siding, painted steel and aluminum trim and an aluminum anodized storefront system. Please refer to the proposed building elevations (sheet A.301) provided by the designer. As measured from the average top of curb level along California Drive, the proposed building measures 24'-2" in height and therefore is in compliance with building height regulations (55'-0" maximum allowed; Conditional Use Permit required for any building exceeding 35'-0"). The proposed ground floor ceiling height is 18'-10" where 15'-0" is the minimum required. Off-Street Parking: Off-street parking is required for the existing automobile sales showroom and the proposed automobile service facility. Based on the existing automobile showroom (1,539 SF @ 1:600 SF parking ratio) and proposed automobile service facility (8,725 SF @ 1:800 SF parking ratio), a total of 14 off-street parking spaces are required. The proposal complies with the off-street parking requirement by providing a total of 14 parking spaces at the front of the site. The front of the site would also contain a vehicle display area. Customers will enter the facility off Bayswater Avenue and drive into one of two service drive lanes until greeted by a service writer. The vehicles would then be driven to the service facility for servicing. Two new curb cuts will be installed along Bayswater Avenue for the new service facility. The existing curb cut along BayswaterAvenue near the corner will be reduced in width. Street Trees: There are no street trees currently existing along California Drive in front of the project property. As required by the Parks Division, two new 24-inch box street trees (Red Spire) will be planted along California Drive. There are seven existing street trees along Bayswater Avenue in front of the project property. Three of the seven street trees will be removed. The remaining four street trees will be replaced with four Gingko biloba street trees. F Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and Commercial Design Review Table 1- Compliance with CAR Regulations 85 California Drive Lot Area: 24.820 SF Plans date stam ed• Februa 16 2016 Use: _ __ _ __ ____ Setbacks and Build-to-line: Front (California Drive): g0'-0" no minimum required (18% of the of existing building ;(at least 60% of building must be is located at front property line) ' located at front property line) _ _ _ _........ _ _... _ _ . _... _.... _ __ , _ _ ._...._ _ _. . Inferior Side Setback: 0'-0" no minimum required _........ _ _... ..._ __ _._........ _ _ _.._ _ _ _ _ _ _ _ _ ... Exterior Side Setback 0'-0" no minimum required (BayswaterAve): __ ... _ _ ......._ __ _ _ __....... _ __ _ __ :_ __ ...... _.... _ _ _ _.........._ .. Rear Setback: 20'-0" no minimum required _ _ .. __ _ _........ _ _ _;. __ _... _ . ._.... _..... _ .. _... __._.. Building Height: 24'-2" 55'-0" maximum _. _. ._.. .....__ _ _ .._ >35'-0" with CUP _._ , _ _ _ ..._ _ Ground Floor Ceiling Height: 18'-10" 15'-0" minimum _. _ __....... _ _.__ _......... __ _._ Otf-Street Parking: 14 spaces 14 spaces ' The proposed project is not required to comply with the build-to-line requirement since the project consists of an addition and not a new development. Staff Comments: See attached comments from the Building, Parks, Engineering, Fire and Stormwater Divisions. This space intentionally left b/ank. P • rY Proposed Allowed/Required automobile service facility automobile service facility allowed as a permitted use in the CAR District : _._. __ _ _ _ _ . 3 Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and 85 California Drive Commercial Design Review Public Facilities Impact Fees: The purpose of public facilities impact fees is to provide funding for necessary maintenance and improvements created by development projects. Public facilities impact fees are based on the uses, the number of dwelling units, and the amount of square footage to be located on the property after completion of the development project. New development that, through demolition or conversion, will eliminate existing development is entitled to a fee credit offset if the existing development is a lawful use under this title, including a nonconforming use. Based on proposed service facility (9,634 SF) and providing a credit for the existing service facility to be demolished (2,620 SF), the required Public Facilities Impact Fee for this development project is: $16,130.01 (see table below). The Public Impact Fees payment will be required at time of building permit issuance. Service Area Auto Service Facility 9,634 SF (industrial) (fee based on per 1,000 SF) General Facilities & Equipment _ _ __ . _. Libraries Police Parks and Recreation __._............_.__.__ .................._ ._..._......_. Streets and Traffic Fire Storm Drainage _ . _ _ _ Subtotal __ Total $305 x 9.63 = $2,937.15 _ _ _ _ _ .......... not applicable _ _ _ _.. _....... _ $48 x 9.63 = $462.24 _ _ _ _ $56 x 9.63 = $539.28 _ _... _._ ...._ _....... _....._ $1,146 x 9.63 = $11,035.98 __. $118x9.63=$1,136.34 $628 x 9.63 = $6,047.64 _...._ _......_ __._ _ .._...... __ _ $22,158.63 _..._ _ ___ _ ._......_ $22,158.63 - $6,028.62 (credit for existing service buildinq) $16,130.01 Existing Auto Senrice 2,620 SF (industrial) (fee based on per 1,000 SF) $305 x 2.62 = $799.10 not applicable ___. ......... __._..... _ ......... _ ; $48 x 2.62 = $125.76 $56 x 2.62 = $146.72 _ _..._............ __._ ............ . ........ _......._ __. ....._ _..... $1,146 x 2.62 = 3,002.52 $118x2.62=$309.16 ___ _ ........._ . $628 x 2.62 = $1,645.36 _..._ _ . . __ _ ; $6,028.62 Planning Commission Action: The Planning Commission should review the proposed project and the areas of potentially significant environmental effects identified by staff. The Commission should identify any additional effects of the project which it anticipates may be potentially significant to the environment with regards to the proposed Rezoning and General Plan Amendment. Any issues identified by the Planning Commission will be added to the draft initial study for the analysis to be prepared by Planning staff. The areas of investigation for environmental evaluation as defined by CEQA are listed on the attached sheets immediately following the staff report. Ruben Hurin Senior Planner c. Alan Cross, Proto, Inc., applicant and designer Kent Putnam, property owner 4 Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and 85 California Drive Commercial Design Review Attachments: Application to the Planning Commission Parcel Map and Zoning Diagram Downtown Specific Plan Diagram Design & Character of the Downtown Specific Plan — Section 5.0 Environmental Checklist from Appendix G of the CEQA Guidelines Staff Comments Notice of Public Hearing — Mailed February 12, 2016 Aerial Photo 5 eur+uNcaMe '�.._t!� �. COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org APPLICATION TO THE PLANNING COMMISSION Type of application: X❑ Design Review ❑ Conditional Use Permit ❑ Variance ❑ Special Permit PROJECT ADDRESS: 85 California Drive APPLICANT project contact person 6a OK to send electronic copies of documents fj� Name: Alan Cross Address: 566 Folsom Street City/State/Zip: San Francisco, CA 94105 Phone: (415)992-6899 Fax E-mail: alan@proto-inc.com ARCHITECT/DESIGNER pro�ect contact person � OK to send electronic copies of documents � Name: Alan Cross Address: 566 Folsom Street City/State/Zip: San Francisco, CA 94105 Phone: (415)992-6899 Fax: � Parcel #: 029-242-050 ❑ Other: PROPERTY OWNER project contact person ❑ OK to send electronic copies of documents ❑ Name: Kent Putnam Address: 85 California Drive City/State/Zip: Burlingame, CA 94010 Phone: (650)558-5628 Fax: E-mail: E-mail: alan@proto-inc.com * Burlingame Business License #: ' �..-. b h i"„ .. ��� .. ,�u Y x � � � .,ea�..,.,,� " 9 ZOi7 - :-'J(i! iNG,-1nn,� �,�! r.;n ,- PROJECT DESCRIPTION: Demolition of (e) 2620 GSF Automobile Service Facility and construction of new 8110 GSF service facility with additional 55841 GSF covered service drive and associated site improvements. Signage is excluded and under a separate permit. AFFADAVIT/SIGNATURE: I hereby certify under penalty of perjury that the information given herein is true and correct to the best of my knowledge and belief. _ ApplicanYs signature: Date: `�" % ��� I am aware of the proposed application and hereby authorize the above applicant to submit this application to the Planning Commission. Property owner's signature:_ Date: /- I— a�' �� Date submitted: 4• � • �5 * Verification that the project architecUdesigner has a valid Burlingame business license will be required by the Finance Department at the time application fees are paid. S: �HANDO UTS �PC Application. do c � 1 \ Vl ` � _ �001 _ �z �OS �_OS �N vl b � Q � �� p 53.5 0 a 2�a C� . P R R. s S• i � ►� r --� -- ---- z Pro�;�s�� ,�� ,� � combination and lo+ - line adjustrn� inciudes the.. parcels; inclL: 53.5 portion of parcel a: corner of g Bayswater Ave ard � High��n.�-A--��- --- 5 .�, /�,\ �w��') \�X`i ��i •• . � � C � c � �. � 332 a" a �� 3 8� Z � B� E' Ef. la 5 PARC � ONb' 7y� /y .� o j � � � Z Q � � J O C� Z O � � � W > BURLINGAME DOVG�NTQWN SPECIFIC Pi.AN � ►�i �_..� �a :���. � ENVIRONMENTAL CHECKLIST FROM APPENDIX G OF THE CEQA GUIDELINES AESTHETICS. Would the project: ❑ Have a substantial adverse effect on a scenic vista? ❑ Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? ❑ Substantially degrade the existing visual character or quality of the site and its surroundings? ❑ Create a new source of substantial light or glare which would adversely afFect day or nighttime views in the area? AGRICULTURAL RESOURCES. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: ❑ Convert Prime Farmland, Unique Farmland or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? ❑ Conflict with existing zoning for agricultural use, or a Williamson Act contract? ❑ Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? AIR QUALITY. Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: ❑ Conflict with or obstruct implementation of the applicable air quality plan? ❑ Violate any air quality standard or contribute to an existing or projected air quality violation? ❑ Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? ❑ Expose sensitive receptors to substantial pollutant concentrations? ❑ Create objectionable odors affecting a substantial number of people? BIOLOGICAL RESOURCES. Would the project: ❑ Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? ❑ Have a substantial or adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? ❑ Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? ❑ Interfere substantially with the movement of any native or resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? ❑ Conflict with any Iocal policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? ❑ Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? CULTURAL RESOURCES. Would the project: ❑ Cause a substantial adverse change in the significance of an historical resource as defined in'15064.5? ❑ Cause a substantial adverse change in the significance of an archaeological resource pursuant to '15064.5? ❑ Directly or indirectly destroy a unique paleontological resource or site or unique geological feature? ❑ Disturb any human remains, including those interred outside of formal cemeteries? Environmental Checklist from Appendix G of the CEQA Guidelines GEOLOGY AND SOILS. Would the project: ❑ Expose people or structures to potential substantial adverse efFects, including the risk of loss, injury, or death involving: a) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. b) Strong seismic ground shaking? c) Seismic-related ground failure, including liquefaction? d) Landslides? ❑ Result in substantial soil erosion or loss of topsoil? ❑ Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? ❑ Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (2001), creating substantial risks to life or property? ❑ Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? GREENHOUSE GAS EMISSIONS ❑ Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? ❑ Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? HAZARDS AND HAZARDOUS MATERIALS. Would the project: ❑ Create a significant hazard to the public or the environment through the rou#ine transport, use, or disposal of hazardous materials? o Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? ❑ Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? ❑ Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? ❑ For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? ❑ For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? ❑ Impair implementation of, or physically interFere with, an adopted emergency response plan or emergency evacuation plan? ❑ Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? HYDROLOGY AND WATER QUALITY. Would the project: ❑ Violate any water quality standards or waste discharge requirements? ❑ Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? ❑ Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? -2- Environmental Checklist from Appendix G of the CEQA Guidelines ❑ Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? ❑ Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? ❑ Otherwise substantially degrade water quality? ❑ Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? ❑ Place within a 100-year flood hazard area structures which would impede or redirect flood flows? o Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? ❑ Inundation by seiche, tsunami, or mudflow? LAND USE AND PLANNING. Would the project: ❑ Physically divide an established community? ❑ Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? ❑ Conflict with any applicable habitat conservation plan or natural community conservation plan? MINERAL RESOURCES. Would the project: ❑ Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? ❑ 2b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? NOISE. Would the project result in: ❑ Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? ❑ Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? ❑ A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? ❑ A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? ❑ For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? ❑ For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? POPULATION AND HOUSING. Would the project: ❑ Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? ❑ Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? ❑ Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? -3- Environmental Checklist from Appendix G of the CEQA Guidelines PUBLIC SERVICES. Would the project: ❑ Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other perFormance objectives for any of the public services: a) Fire protection? b) Police protection? c) Schools? d) Parks? e) Other public facilities? RECREATION. ❑ Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? ❑ Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? TRANSPORTATION/TRAFFIC. Would the project: ❑ Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? ❑ Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? ❑ Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? ❑ Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? ❑ Result in inadequate emergency access? ❑ Result in inadequate parking capacity? ❑ Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? UTILITIES AND SERVICE SYSTEMS. Would the project: ❑ Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? ❑ Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? ❑ Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? ❑ Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? ❑ Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? ❑ Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? o Comply with federal, state, and local statutes and regulations related to solid waste? MANDATORY FINDINGS OF SIGNIFICANCE. ❑ Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? -4- Environmental Checklist from Appendix G of the CEQA Guidelines ❑ Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? ❑ Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? -5- S.0 Design & Character l �ii.r �/�ca�ler coirtuirr.r de.ri�n �rridelrne., crn�l rlevelo�ment �tand�rrcJ.r tbut a��i!! �urde �r�rd de/�irte tbe e•bcrruiter oj nery �lerelorment in tbe Doiwrtore�n .Sj�ec7fic• Pluu �n•ea. TGe r/e��igr. ,�srideli�re.r are intead�r/ to implzitrerrt t1�e e�i.riorr �rnd �o�rl� oj tl�e Sj�ecrfic Pl�r�r, �u�re�e`ated i�r lbc� otber �/�npter.c The de��r�it �rrirleli�re� nre no! rlireitive, �ut are inteiarlyd to e�tablr.rb t{�e�rri�leir��rinciple�_fi�r err.rrrrin�,�ootl t/e.�i�n tfiat effec7ir�ell� im�learent the,�ocr/.r und poluze.r, a�• well ae� Icrn�l rree deci.rronr, o( tl�e l�oivrafoivrt .S�eci%�ii Plnrr. "1'he Desigu C�uidelines are crafted to: • Provide propexty o�vners ;�nd de�-elo�exs �vith a cleax �•ision ot the type and qualit�� of developmen[ the city desires ;�nd espects in Do�vntown. • tier�-e as a set of �,niidin�; desi�n principles Eor public ofFicials, de��elopers, desi�;ners and the comnuinitt� ro use, whidi are sensitive tc� the conditions of each subarea of the plannin� area. • Gi�-e the City� of 13urtiugame tools to evaluatc and guide project design. • Supplement the Cotnmercial Design Guideb<�ok with �uidelines and standards specific to Do�vntown. "1'he �;uiclelines and standards that have been cleveloped for the llowntown Si�ecitic Plan area are based on tlle land iises an�i diaractcr of each Do�vnto�vn subarea. 'fl�e Subareas arc described in tlie Land Use Cliapter ((:hapter 3) of tllis Plan. ��'ithin die Specific Plan area, any actions proposing substantial ph5�sical chan�es to an5� parcel of land or existin� stnicture, or the proPos�d construction of new structtires, shall be subject to Design IZeview as out- litied in Section 25.57 of the I3urlin�ac77e Mutucipal Code. t\pplieadons sllall be revie�ved for consistenc}� with all applicable Downtown Specit7c Plan and General Plan pro�isions, and applicable Ciry ordinances and standards. llesign guidelines and staridards i�i botli tlie Downlou��t SpeiiJic Plui! and tlie Com��rarczal De�•i�ir Guide�oo,C-- appl�� to all do�vnto�vn projects and proeide the basis for ciesign re�view. 5.1 DOWNTOWN ARCHITECTURAL SETTING Uowntown Iiurlingatne �e1s tl�e Eocal point of the Cin� cluring i[s carl�� devcloE�ment, and over the years it has coutinued to be tlie symbolic center of the communit�•. It contiilues to be a deEined, identifiable �lace �vith distinct bc>undaries and a unique urban scale. �1 range of architectural sty�les anci periods are represented �vidiin 1>ownto�vn and sen�e to create a distinctive character for the area, one that is higlil�� valued by the City�'s residents and that leaves a]asring, positive impression upon �-isirors. Ne�v biiilclings and reliabilitatio�i projects sliould dra�v frotn and build uron this character. �.0 Design Sc Character � �, ; ,�.1 F.�,�i�i..�.:i��.. Cornmercfal Design Guldebook FIGURE 5-2: Commercial and mixed use development projects in the Downtown Specific Plan area are subject to the City of Burlingame's Commercial Design GuideGook. 5.2 It1 the commercial areas, there is a consistenc}� ancl cohesion of arclii- tectural styles. 1�1an�- builciings utilize dassical proportions, and are enriclied �vitll detailing such as pillsters, �vood detailing, and ernbossed relief. There are also soine fine modern buildings, which overall are compatible in scale and detail �vith more historical examples. The "core" area centered around I3urlinglme and I Ioward rlvenues func- tions as a defined retail center. In the residential neighborhoods, �tvles are more variecl. Cohesion is achieved by compatibilin- in l�uilding scale and massing, along with consistentl}� lush landscaping. All buildiiigs �vithiii eadi area of Do�vntown should contribute to tlie area's identitv as a part of llo�vnto�vn I3urlingame. "I'he core commer- cial areas centered on I3urlingame and Ho�vard Avcnues sliould have a lively mis of buildings at different heights and st}�les. Grotmd floor retail should relate to llowntown's traditioiial storefrotits by� usuig large displly �vindo�vs, kickplates, and clerestor�- and trinsom windows. In the California Drive commercial areas, development ma�� be lower in intensit�� but should contintte to build on the Downto�vn core's classic, restrained stvling. In the residential areas, ne�v projects should rein- force tlie Fine-graitied scale and quiet ainenity tliat esists. The variety of architectural styles is an asset to Downtown, and both historically� inspired and modern sty�les should be accommodated. Regardless of architectural style atid approach, new build'uigs should e�liibit fine-grained, pedestrian-friendly scale and details. D�SIGN STANDARDS FOR COMMERCIAL AND MIXED USE AREAS The commercial areas of Do�vntown Burlingame have historicall}• been the most active, public places in the community�. New commercial and mised use buildings should contribute to the existing "Main Street" cliaracter. They sltould enhance tlie pedestrian nature of Do�vntown, definin� the street as a public place, with active storefronts, windo�vs, FIGliRG i-1: The core commercial areas centered on Burlingame and Howard Avenues features a range of architectural styles and periods. :ind doors at �rouiid le��eL <1rcl�itectute sliould include the t�-pe of �vell-crafted architectural details that are common to I3urlingame, �nd con��e�- diat architecttiral heritage in terms of material, color, propor- tion, �vindow t}�j�c, and overall composition. Commercial and mi�ed use development projects iii tlle Downto�vn �pecific Plan area are subject to the Cit�� of 13urlingame's Comnrer�zal I)e�i�vr Guicle%ao,�. In addition, tlie follo�vin� recommendations apply� specihcallv to Downto�vn development: 5.2.1 PEDESTRIAN USE AND CHARACTER 5.2.1.1 Enirances Commercial entrances sl�oulcl be recessed frotn tlie E1�1C�(', creating a small alco��e. 1'his establishes a more definitive sense of entr�� and affc>rcls an alternative view of inerchanciise in the displat� windows. I:sisting recessed entries should be retained. '1'he doors oi a cominercial storeFront t��picall�� contain latge glass panels with vertical proportions that present n visual connection to dle streetscape. Storefronts shoiild conunue to ezhibit this pattern, whether a new project or the re-use of an e�isting space. 5.2.1.2 Ground-Level Corner Uses [ Iigh activity�-generating uses are especially encouraged at Cl�e I3urlingame Avenue and I Ioward �lvenue intersections with side streets. Storc: fa�ades along side streets should be desi�,�ied to lielp entic� pedestrians onro the side streets. To achieve this, the fa�ades should include windo�as and continuauon of the architectural details from tlir main storefront e�tendin� across the sidestseet fa�ade. l:titries Yo elevator lobbies sl�ould not be located at tliese intexsections �vhcre thev �vould seree to diminisli pedestrian activity at tliese higl�ly �-isible locations. FIGURE 5-3: Commercial entrances should be recessed from the facade, creating a small alcove. FIGURE 5-4: Cortter parcels are encouraged to incorporate special fe.iaues such as rounded or cut corners, special corner entrances, display windows, corner roof features, etc. but should avoid monumentally-scaled elements such as towers. 5.0 Design 8c Characrer 5.2.1.3 Ground Level Treatment FIGURE 5-5: Purticiilar atte�ition sliould be given to craftsmansliip and detailing within the pedestrian's range of touch and view. The unique community character created by tl�e mi�ture of building ages and architecniral st}'les should be maintained. :1ll street-frontage establishmcnts should provide priman� access directl�� to the street. Particular attention should be given to craftsmanslup and detailing �vit}iin the pedestrian's range of touch and ��ie�v t�or instance, t}ie use of special storefroiit detailing and fa�ade ornamentation such as plant- ers, flo�cer boses, 1riCi s�ecial materials can reinforce the pedestrian 111ilIYP. Of T�iC SCTefI. "i'o ensure else in caring for latidscaping, major reinodels and ne�v projects sliould provide outdoor water spigots and electric sockets. ��G'l�en l�usinesses }iaee access to water, tliey caii inore easily care for their plants and trees, and keep the streets cleaned as well. 5.2.1.4 Site Access CurU cuts are prohibited on I3urlingame ,�venue and should be avoided ro the estent feasible on F-Ioward A�•enue and California Drive. Anv on-site parkin� garage should be accessed in a safe, attracti�-e tnanner and should not signihcantl�� detract from pedestrian flo�v, nor interfere with the orderly flow of traffic on public streets and �vithin parking lots. ��'here possible, parking garage access should be from the side streets or alle��s. In soine cases, �ceess to on-site J�arking could be pro��ided from city-o�vned parl:ing lots. FIGURE :i-G: Downtown Burlingame is characterized by relatively narrow building increments, predominantly 15 to 50 feet in width. 5.2.2.1 Building Scale "1'ablc 3-2 in Chapter 3 specihes basic building standards such as setblcks and height. I3e��ond conforming to tlle basic buildin� mass, new de��elopment should preser��e tl�e rhythtn and fine- grained pedestrian scale of e�isting buildin�s �vithin the commercial districts by respecung tlie relatively narrow buildin� increinents, wlucli t}�pically ratige from 15 feet to no more tlia�i 50 feet in widdl. "Ib be consistent with the esisting character of Downtown I3iirlingame, to pcovide a�velcotning retail environinent, and ro accommociare a r1n�;e of potential uses over the lifeume of the building, fixst ftoors should iiave a ftoor to finislied ceiling height of at least 1 S feet. New dec�elo�ment should also be sensitive to the human scale of Do�vnto�vn �vith sensitivity to building lleight. Buildings sllould not over�vl�clm the pedestrian experience on the street ancl should account for tl�e rclatio�iship bctween building heiglit and street width. VZ'l�ere building mass and height inight ovenvl�elm the pedestrian eaperience on the street, design strategies sticli as upper floor setbacks and articulated building mass should be considered to ensi�re comfortablc humail scale. FIGURE 5-7: Buildings should not ovenvhelm the pedestrian experience on tlie street and should account for tl�e relationship Uet�veen Uuilding height and street width. lipPer Hoors ma}' hace widcr bat•s as part of an o��erall composition :�finimum 15' Hoor-to-ceiling heighr �>n �;round floor �C'icicr T 8�" - ('! I I. . ;�; �: l� S�� �� � Ground Hoor bay°s wirh narrow; pedestrian-scaled increments FIGURE 5-8: Building scale should preserve he rhythm and fine-�rained pedestrian character of do�vnto�vn, particularly at the pedestrian level. 5.2.2 ARCHITECTURAL COMPATIBILITY � , �� '.Aarrow �� —� �.(1 l�esi�;n Sc Cl�aractcr . _ . _-- In[cresun� Rooflinc ur Vr��filc ..-_.. �„�_�, � ..._.�': r �� �` � Cormcc ;md Ornamenta�uin ;C, � � I _. �- Rccesscd \C ind�ncs Crca�c tihadc and tihaJnu� � � , �� � j ! �� Buildm}; ( )rnamcnt � . i _.'� . i � �. . � �� , �..I �'� �. '"�,�- Rccccses m I�aatdc (:rca�c Imcrest anal I)cp�h l-t"I � �.�I ' / , �. �� �' �� I�nnsom \C indows I / � � . � �� � � I I�};h (Zunhty Storcfront Gl�zmti ti � '„ �.!� , A�cnmgs \\'ithin Ruddmq Rars Strcet I•:ntrancc llnors I�n�cp� �II Pcc[ i� � til:���mum, IS-^� Pcc[ PrcicrrrJ . Si},ma�;c tu bc Intcy�nl wiih l�uilJin� llcsi,�n (lrnamcn[al ftasc, IR" tu 3i1" I Ici�ht Cnmposmonal Chxn};c in Pacadc I�:��cn' I� to �II Pect FIGURE 5-12: Facades on Uoth new and rehaUilitated buildings should include the elements that make up a complete storefront including doors, display windows, bulkheads, signage areas and awnings. Large \Space r +� ,, �, ,, I�' So . ,�, ,;�� i1 �o � �5" ,� 50 ; 56 Large Space , 5.2.3 ARCHITECTURAL DESIGN CONSISTENCY 5.23.1 Facade Design 'I'o maiiitain the present sc11e and cl�aractex of buildings in Do�vntown, large uninterrupted expanses of horuontal and vertical �vall surface should be avoided. I3uilding Fa�ades should respotid to the relauvely� narrow increments of development (1 � to SO feet) �vith variation in fenestration, building materials and/or buildin�; planes. Facades sliould have geiierous reveals sucli as inset door���a��s and �vindows. Doors, windo�vs, and details should be in keeping «ith pedestrian scale, as opposed to a rnonumental scale that is out of proportion to the surrounding contest. Desi�i details should be authentic and have purpose, rather than being appiied or strictly decorative. I�acades sliould l�a�-e a variation of botli positive space (massing) and negative space (plaz;�s, inset door�va��s and windo�vs). I�acades on both new and rehabilitated buildings should include the elements that make up a complete storefront including doors, displa�� �vindo�vs, bulkheads, signage areas and awnings. Ne�v buildings need not cnimic an "liistoric" architectural st��le (and in fact sl�ould a�-oid imitation that results in caricatures) but shotiild inchide a level of archi- tectuxal detailing and quality of materials that complements esisting buildings. ��here older esiting buildings are renovated, preservation of existing architectural details aiid materials is encouraged. rven if separate businesses Fu�lction �vitllici the same btulding, the overall design of the Ea�ade sliould be consistent. Individual busuiesses should not break the basic lines, material and concept of the fa�ade. Storcfronts can be demarcated from eacli other witliin the same build- in� by� subtle variations in tlie colox ar Pattern of surEaces of doors, tiling, signage or entries. Corner parcels are encouraged to incorporate feahires suc11 as roundeci �r cut corners, corner entrances, displa�� �vin- do�vs, cortier roof feahires, �vrap-around a�vnings/o��erhangs, blade FIGURE 5-13: Even if seParate businesses function within the same building, signs, etc. the overall design of the fa�ade should be consistent. Individual businesses should not break the basic lines, material and concept of the facade. 5.2.3.2 Windo�vs Gener�r! �Vindows are important Eor providin� "e�•cs on the street° and enli�-en- ing streetscapes I3uilding �valls sl�ould be punctuated bt� well-propor- tioned openings that provide relief, detail and variation on the Ea�ade. ��'indows sliould be inset from the Utiilding wall to create shade and shado«� detail. '1'he use of high-qualit�� �vindow products that contrib- ute to the richness and detail of the fa�ade is encouxaged. Reflective glass is considered aii undesirable material because of its tendenc�� to Cre1CC UI]COTTlt()I'i1lilC �?11if' COri(jit1011S 1ri(� 1 fOrlil(I(�IR� aIJ�e1C1ttCe. "1'he use of materials that 1re reflected in the hisroric arclutecture pres- cnt iii the Downtown area is encouraged. Di.rplcr}� 1('"indozv.r Dis�la�� windows should be desigtied to enli��en the street 1nd providc pedestii�n views into the interior of the storefront. Size, division and sha�r c�f �lispla�� �vindows should maintain the established rli��thm of the streetscape. (;lass used in the displa�- windows should be clear so it is possible to sc� inside, ancl displav cases that block vic�vs into stores are strongly ciiscouraged. Noticably tinted �lazing is discouraged and �nirrored/reflectiae glass is �lot �ernutted. 5.2.3.3 Awnings �1�vnings should be designecl to be decorative, cc>mpliinentary to d1e overall Eacade design, aiid provide efEective �veather arid suii �rot�c- tion. "1'lie placetnent of a���nings should relate to tlie major architcc- tural elemc�its of tl�e facade, avoiduig covezing any� txansoin wuido�es or architecrural elements sucll as belt courses, decorative trim and simi- lar features. "The position of awnings should also rel�te to die pedes- trian and pro��ide a sense of shcl[er, �vith a��-nin�s situated to corre- s�ond ro the tops of doorway�s and scale of pedestrians rather than high up on die facade with a monumental scale. Separate� awnings sl�oulc� be used over individual storefront ba��s as detined b�� the col- umns or pilasters rathcr than placin� a contiuuous a�vning across the i "� � �� : : :I �: � � �' �2 • ,� �': y �: h� k-' ' . . ___,�`:,,��I, �:�:'� FIGURE 5-14: Size, division and shape of display windows should maintain the established rhythm of the streetscape I�:, . ■ � � �-- -.-. PIGURE 5-1�: Awuings should be designecl to be decorative, complimentar}' to the overall facade design, and provide effective weather and sun protection. �.0 llesii;n ��c (;h.tr.icter building feontage. I3acklit awnings that visually appear as laxge light sources will not be �ermitted. 5.2.3.3 1�Iaterials FIGURE 5-17: Service facilities such as trash enclosures and mechanical eqiiipment sl�ould be screened with enclosures and devices consistent with the building arcl�itecture in form, material and detail. I3uilding enaterials should be richly detailed to provide visual interest; reference should be made to materials used 'ui notable examples of his- toric Downtown architecture. I�-tetal siding and large expanses oE stuc- co or �vood siding are also to be avoideci, except in the I�f�rtle �ti.�ed Use area. Roofing materials and accenting feanires such as canopies, cornices, and tile accents should also offer color variation. Character and richness in Downtown can be enhanced from the incor- poxation of details and ornamentation into the design of the buildings. "I'hese elements can include elements that have been traditionall�- used such as corniccs, brackets or moldings. 5.23.4 Rear and Side Facades I3ecause the side streets and alleys in Do�vntown arc highiy visible and are used for both pedestrian access and veliicular access, rear anci side fa4ades that are visible from the public realm sl�ould eshibit sophisti- cated levels of design and materials. Rear and side fa�ades of existing buildings should be improved with design featttres atid qualin- materi- als where possible. I3uildings should have windows and doors oriented to the alleys and side streets. Fntrj� doors, garage doors and windows sliould be attractive and durable. �Y/here btuldings abut �ublic parl�ing lots, the}' are strongly encouraged to have rear entrances in �ddiuon to their principal street entrances. Rear facades may� look like the back of a building, but still be pleasant and inviting. Service facilities such as trash enclosures and mechanical eqLu�tnent sliould be screened �vith enclosures and devices consistent witli the building architecttire in form, material 1nd detail. Roofs and treilises are recommended for screenuig vie�vs from above. ��/henever possible, trash and recyclin� enclosures should be consolidated and designed to serve several adjacent businesses �rovided the�� do not become oeer- 5- l li PIGURE 5-1C: Rear and side facades tl�at are visible from tl�e puUlic realm sliould exhibit sophisticated levels of design and materials of a qt�ality similar to front facades. Buildings facing public parking lots are strongly encouraged to have rear entrances in addition to their principal street entrances. sizecl c�r too ungainl��. C:are should be taken to ensure rc fuse areas do not become no�ious or stnelly. \�'hcre security devices are desired c>r warranted, designs sllould be art- ful ��;itl� decorative grillwork tl�at enl�ances the overall building desi�,m. rllle}• areas should be well lit but should be designed so tlie}• are attrac- tive aud do not adversely impact adjacent properaes and detract from tl�e ambiance of Do�vntown. 5.2.4 SITE DESIGN AND AMENITIES 5.2.4.1 Building Coverage In order to create �vell-dehned streeC spaces consistent widi the scale of I�o�vnt�wn I3urlingame, side vards are �;enerall}• discourageci in favor of contiguous building fa�ades along the street. I Iowever, narro�v mid-block pedestrian passages that encourage through- block pedestrian circulation and/or arcaded spaces that create wider side���alk areas for cafcs, ete. are encouraged. 5.2.4.2 Open Space Private open spacc: withiu Downto�vn is not intended to provide recreational or largc landscaped areas, since this is a more urban environinent F Iowe��er, open space is an important element and sl�oiild be used to articulate building forms, pxomote lccess to light and tresll air, anci maintain prielcy- Eor powntown residents. In r�sidcntial mi�ed-use developments, most open spacc sl�ould be used t<� provide attractive amenities Eor residents, including interior courtt'ards and perimeter landscaping. I3alconies and rooftop terraces are encouraged. Commercial deeelopment should typically l�ave less open space in order to inaintaui a direct pedestrian relauonship and continuous storeEront streetscape. l;ntry alcoves, court��ards, and emplovee open s�ace are e�amples. Open space for nonresidential projccts sliould �rovide a visual amenitt� for tl�e development and ati attractive buffer to adjacent residential iises �vhere applicable. FIGli RL ;-18: Open spaces such as retail plazas and outdoor seating areas should be located at building entries, or along or near well- traveled pedestrian routes to encourage frequent and spontaneous use. FIGURE 5-19: In residential mixed-use developmen[s, most open space should be used to provide attractive a�nenities for residents, including interioc courtyards and perimeter landscaping. S.0 Design �c Character Open spaces such as retail plazas and outdoor seating areas sliould be located at building entries, or along or near well-tra�-eled pedestrian routes to encourage frequent and spontaneous use. :lmenities sliould be Eunctional as ���ell as �•isually� appealing, �vith seating, tables, canopies nnd covering trellises. Plaias and open spaces should be generousl�� 1lndscapeci with trees, planters and vines. Permeable paeing and/or creative site planning elements such as rain gardens are encouraged to alleviate the impacts of �aved areas on drainage. Lo�v �valls may be used to screen service and mechanical areas, crelte spatial definition and to provide seatiiig. Lo�v walls shoulcl be designed of quality materials that are complementar`� to the architecturc: of the primary structtire(s) on the property. 5.2.5 RESIDENTIAL MIXED-USE DEVELOPMENTS WITHIN COMMERCIAL AREAS standards for commercial projects. 5.2.5.1 SetUacks 10 reiiiforce the Do�vnto�vn commercial character of Downto�vti Burlingarne, mixed-use buildings witli a residential component sliall conform to the setUack standards for commercial projects (outlined in Table 3-1 in Cl�apter 3). The Community Development Director rnay allow increased side and rear setbacks to enhance the residential portion of a miYed-use project proeided the setbacks do not detract Erom the commercial storefront character of the Downtown district. Setbacks and overall btulding form should maintain the human scale of Downtown and be in keeping with the character of the surro�md- in�s, �vith etnphasis on mainintainin� an active street edge and sidewalk boundar��. 5.2.5.2 Noise and Ground Vibrations Projects with a residential component on California Drive should be designed ro minimize noise impacts on residents from die Caltrain 5-1� FIGURE 5-20: To reinforce the Downtown commercial character of Downtown Burlingame, mised-use Uuildings with a residential component shall conform to tl�e setback �.0 llesit;n & Cl�ara<�tcr 5.4 ADDITIONAL DESIGN STANDARDS FOR ALL AREAS OF DOWNTOWN 5.4.1 LAND USE TRANSITIONS \�'here appropriate, wlien ne�v projects are built adjacent to eaisting lo���er-scale residential developmc:nt, care shall be taken to respect the scale and privac�� of adjacent properties. 5.4.1.1 Massing and Scale Transitions "I'ransitions of de��elo�ment intensin� from higher deiisiri• development Uuilding t��pes to lo�ver can be done through different building sizcs or inassing treatments that are cotnpatible �vith tlie lo�i�er intensin� surrouiidin�; uses. i�fassing and orientation of ne�v buildi�igs should respcct tl�e massing of neighboring stcuctures b}• var��ing the inassing �vithin a project, stePpiiig back upper stories, reducin� mass b5� composition oE solids and voids, and varying si�es of elements to transiuon to smaller scale buildin�s. 5.4.1.2 Privacy Pri�-ac�� of neighboring structures should be maintained ���idi �vitido�vs and upper floor bllconies positioned so thev rninimizc views into neighboring properties, minimizing sight lines into and from neighboring proPerties, and limiting sun and shade itnpacts on abutting proPexties. 5.4.1.3 Boundaries �1'here appropriate, when different land uses or building scales are adjacent, boundaries sliould be establislied b�- pxo�•idulg pedestrian paseos and me�vs to create separation, rather than �valls or Eences. FIGURE S-3G: Transitions of development intensity from higher density development Uuildin� types to lower can be done though building rypes or treatments that are compatible with the lower intensity si�rrounding uses. Boundaries can be established by providing pedestrian paseos and mews to create separation, rather than �valls or fences. FIGURE 5-37: Transitions can also be made by stepping massing down within a project, with lower building elements providing a buffer between taller elements and adjacent lower-density development. PIGURE 5-38: Following a cooperative, rather than defensive design approach for the spaces between buildings results in a more coherent downtown feel, as opposed to a collection of imrelated projects. common paseo path�vay. FIGURE 5-39: Example of hvo different land use intensities joined with a 5.0 llesi�n Sc Cl�aracter 9am March 21 st June 21 st __� Propo:ea���` Projett \� � ` �. Proposed �\, Project September 27 st September 21 st December 21st December 27st December 27st FIGURE 5-40: Sample shado�v analysis shows the range of shading conditions through the year. 12 noon vmPo:ed \ Project . 3pm March 21 st March 21 st � \ S, � �1 Proposed \. \ Proje<[ '� /� \ i'�" ` ♦ June 21 st 5.4.2 SHADOW IMPACTS I:�-ery building invarilblj• casts some shado�vs on adjoining parcels, public streets, and/or open spaces. Flo�ve�-er, as the design of a project is develoPed, consideration should be given to the potential shading iinpacts on surroundings. Site plans, massing, and buildin� desigil should xespond to potential shading issues, inininlizing sliading impacts «�here they would be undesirable, or conversel�� ma�imicing shading where it is desired. As part of the design re�-iew process, de�•elopment in the �pecific Plan Area that is proposed to be taller than esisting surrounding stxuctures shoulci be evaluated for potetitial to create ne�v shado�vs/ S�1�CjE OIl �11li11C 811C��Or CiL11S1-�JL1lil1C O�eri S�1CCS 1riCj CT11jOY pedesttian routes. ;\t a minimum, shado�v diagrains sliould be preParecl for 9 A1�1, 12 noon, and 3 P�1 on 1�larch �l st, June 21 st, SepTember 21 st, and December 2lst (approximatele corresponding ro the solstices and equinoxes) to identift� extreme conditions and trends. IE warranted, dia�r:tms could also be prepared for ke�� dates or times oE day — for esample, whether a side�valk or public space would be shaded at lunchtime dtiring �varmer months. June 21 st 5.4.3 SUSTAINABILITY AND GREEN BUILDING DESIGN Project design and materials to achie�e sustainability and �reen building design should be iiicorporated into projects. Greeii builditig dcsi�� considers tl�e environment during desi�i �nd construction and aims for compatibilitv �vith die local environment to protect, respect and benefit fro�i� it. In geiieral, sustainaUle buildings are energ�� efficieiit, �vater conserving, durable and nonto�ic, witli liigli-yuality spaces and l�igh rec��cled content inaterills. 'I'he follo�ving considerations should be included in site and Uuilding design: • Resilient, durable, sustainable materials and finishes. • l�lesibility o�rer time, to allow for re-use and adaptation. • C�primizc building orientation for heat gain, sliading, dayligliung, and natural �-entilauon. • Desi�i landsca�ing to create comfortable iiucro-climates and reduce hcar island effects. • Desi�n for easy redestrian, bicvcle, and transit access, and pro�•ide on-site bicy�de parking. • Maximize on-site stormwlter mana�ement throu�h landscaping and permeable paeement. • C)n flat roofs, utilize cool/white roofs to tnini�nize heat gain. • Desi�n lighting, plumbing, and equipment Eor efhcient energy use. • Create healthy- indoor environments. • Pursue adaptive re-use of an existing building or portion of a building as an alternative to demolition and rebuilding. • t'se creativit�� and innovation to build more sustainable environments. One csatnple is establishing gardens with edible fruits, vegetahlcs or other plants as part of project open space, or providing garden plots to residents for urban agriculture. To reduce carbon footprint, ne�v projects are encouraged to follow the standards and guidelines of the Leadership in I:nergy and 1?nvironmental Design (I.I:L;D) C7reen Building Ratin�; Sy-stem, developed by� the U.S. Green I3uilding Council (L'SGBC), and pursue LFI?D certification iE appropriate. tiouth facing �� indows �cith shading tiummcr �ic� icrs ro c��ntrol o��cnc�ating in s��� '..+ tiummcr � �,�;r,«< s�,� I)ircct ,unli};ht dvuu}�h suuth tacing �cindrnrs woul�l im��ro��c �assi��c hcatiag in v���„r�r FIGURE 5-41: Use of shading devices to control solar loads in summer and gain passive heat in winter. .. =_-�---' }t.��",;��i `-, ,_`_ � . , �? ... ' . � � � i �� , � e , { - ,,t � �j; FIGURE 5-42: Minimize stormwater runoff to impecmeable areas with landscaping, green roofs, and rain gardens when possible. �.0 Design Sc Characcer 5.4.4 LANDSCAPE TREES Tlie Cit�� of 13uclingame has a lon� lustor�� of proactive txce planting and pro�er trce care. I�rom the late 1800's �vhen trees were planted along rl Camino Real and I:aston Dri��e to the current dav I3urlingame has enjoyed the man�� benetits trees provide to an urban area. I3urliiigame's longtime cominitment to trees is evidenced by reco�ni- tion as a"'1'ree Ciry L'S�1° for 30 consecutive }�ears. 1'lus is the longest streak in the Counn•, Sth longest in tl�e 5tate and one of the longest in the Country for receiving this a�vard. In Do�vnto�vn Burlingaine, trees include stre�t trees lining side�valks and road�vays (typically witl�in the public right-of-�vay), as �vell as txees on private propert}' in settin�s such as landscaped setback areas, court- yards, and roof �ardens. Cllapter -l: Streetscapes & Open Space) provides �,niidance for street trees within the public right-of-�va��. Landscape trees on prieate prop- ern� liave equ;il icnportance as part of tlie "urban forest," in contrib- uting em-ironmental and aesthetic benefits to downtown. Trees are iinportant for tlieir beaury, shade and coolness, economic benefits, arid role in reducing energv use, pollution, and noise. 'I'he City- of Burlingame has an Urb1n Porest �Zanagement P11n that itidudes �olicies and management practices for both cit�' and private trees. :�laintainin� esisting trees is a priorin�, and large trees on prieate properri• are protected by City� Orditiance. �1n� tree witli a circumfer- ence of -�8 inches or more when measured �-4 inches above the grotmd is a"Protected Tree." 1� percnit is required to xemove or heavily prune a protected tree. Consistent �vith I3urlingame's st;�ttis as "'1'rec City� CS.1," ne�ti• projects are required to incorporate trees into landscape and �ri��are o�en space plans. Propert} o�vners sliould consult the 13urlingame L'rban Forest Management Plan for design considerations, �lantin� technic�ues, and maintenance �;uidance. 5-2G FIGURE 5-43: Consistent �vidi Bi�rlingame's status as ""I'rec Cit�� t1SA," new projects are required to incorporate trees into landscape and private open space plans. Project Comments Date: January 20, 2016 To: � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Subject: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 Staff Review: All previous comments have been addressed , .� , Revie���ed by: t/ L`-''� l��'� Date: January 20, 2016 Rick Garo III, CBO 650-558-7270 Project Comments Date: � From: Subject: Staff Review: December 29, 2015 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 1) Plans subinitted for any commercial project must be designed, wet-stamped, and signed by a licensed architect. 1997 Uniform Administrative Code §302.2 and �302.3. 27) Specify the accessible path of travel from the public right of �vay, through the main entrance, to the area of alteration. 28 Specify an accessibfe E�ath of travel from all required exits to the public right of way. 38 Provide an exit plan showing the paths of travel NOTE: A�vritten response to tlie items noted here and plans that specifically acldress items 1, 27, 28 Sc 38 must be re-submitted before this project can move forward for Planning Commission action. The �vritten response must include clear direction reaardina where the requcsted information can be found on the pl�ns. /�. D / // Re��iewed by: /_�(,�f.�, l� Date: December 29, 201 � Rick Caro III, CBO 650-558-7270 Project Comments Date: To: From: Subject: Staff Review: April 10, 2015 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 April 13, 2015 j 1),) Plans submitted for any commercial project must be designed, wet-stamped, and � signed by a licensed architect. 1997 Uniform Administrative Code §302.2 and §302.3. � On the plans specify that this project will comply with the 2013 California Building Code, 2013 California Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 California Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California Building Codes. �As of January 1, 2014, SB 407 (2009) requires non-compliant plumbing fixtures to be replaced by water-conserving plumbing fixtures when a property is undergoing alterations or improvements. This law applies to all residential and commercial property built prior to January 1, 1994. Details can be found at http: j/www.leginfo.ca.gov/pub/09-10 f bill/sen f sb 0401- 0450Jsb 407 bill 20091011 chaptered.html. Revise the plans to show compliance with this requirement. NOTE: This includes plumbing fixtures in other buildings on the same ,- parcel. �pecify on the plans that this project will comply with the 2013 California Energy Efficiency Standards. Go to http://www.enerqy.ca.qov/title24/2013standards/ for publications and details. 5) Provide two completed copies of the attached Mandatory Measures with the submittal of your plans for Building Code compliance plan check. In addition, replicate this completed document on the plans. Note: On the Checklist you must provide a reference that indicates the page of the plans on which each Measure can be found. � Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) Construction hours in fhe City Public right-of-way are limited to weekdays and non-City Holidays between 8:00 a.m. and 5:00 p.m. Note: Construction hours for work in the public right of way must now be included on the plans. � On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 8) Anyone who is doing business in the City must have a current City of Burlingame business license. 9) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 10)Provide existing and proposed elevations. 11)Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12)Provide a complete demolition plan that includes a leqend and indicates existing walls and features to remain, existing walls and features to be demolished, and new walls and features. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of � building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13)When you submit your plans to the Building Division for plan review provide a completed Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 14)Show the distances from all exterior walls to property lines or to assumed property lines 15)Show the dimensions to adjacent structures. 16)Obtain a survey of the property lines. �dicate on the plans that exterior bearing walis less than ten feet from the property line will be built of one-hour fire-rated construction. (2013 CBC, Table 602) �Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 19)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 20)Provide handrails at all stairs where there are four or more risers. 2013 CBC § 1009. 21�Provide lighting at all exterior landings. �2?yOn your plans provide a table that includes the following: a. Occupancy group for each area of the building b. Type of construction c. Allowable area d. Proposed area e. Allowable height f. Proposed height g. Proposed fire separation distances h. Exterior wall and opening protection i. Allowable ii. Proposed i. Indicate sprinklered or non-sprinklered 23)Provide a complete furniture / movable fixture plan for the tenant space. 24 Acknowledge that, when plans are submitted for building code plan check, they will include a complete underground plumbing plan including complete details for the location of all required grease traps and city-required backwater prevention �levices. ��Illustrate compliance with the minimum plumbing fixture requirements described in the 2013 California Plumbing Code, Chapter 4, Table 422.1 Minimum ,�Plumbing Facilities and Table A- Occupant Load Factor. ��Specify on the plans the location of all required accessible signage. Include references to separate sheets on the plans which provide details and graphically illustrates the accessible signage requirements. 27 � pecify the accessible path of travel from the public right of way, through the main entrance, to the area of alteration. �Specify an accessible path of travel from all required exits to the public right of way. �Specify the path of travel from on-site parking, through the main entrance, to the . area of alteration �)Specify a level landing, slope, and cross slope on each side of the door at all required entrances and exits. ���)Specify accessible countertops where service counters are provided. Include the Parts counter as well as the Service Writer counter. C�Provide complete dimensioned details for accessible bathrooms 33 Specify the total number of parking spaces on site. ��'rovide complete, dimensioned details for accessible parking. � 35 �Provide an exit plan showing the paths of travel. 36)Please Note: Architects are advised to specify construction dimensions for accessible features that are below the maximum and above the minimum dimension required as construction tolerances generally do not apply to accessible features. See the California Access Compliance Manual — Interpretive Regulation 118-8. 37)Sewer connection fees must be paid prior to issuing the building permit. NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 3, 4, 6, 7, 17, 18, 22, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, and 35 must be re-submitted before this project can move forward for Planning Commission action. The written response must include clear direction reqardinq where the requested information can be found on the Ip ans• _. _. _._ =�i - : Reviewed by: C� -- J Date: 4-14-2015 �, Project Comments Date: December 29, 2015 To: � Engineering Division (s5o� s�72so � Building Division (65�) 558-7250 X Parks Division tsso) ss8-73sa From Subject: Staff Review: Planning Staff � Fire Division �s5o� �5s-�soo � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Request for Commercial Design Review for new service facility at 85 Catifomia Drive, zoned R-1, APN: 029-242-050 �1 Contaci Park Division for tree removal permits. � Two new 24"box Pyrus calleryana `Red Spire" approved for Calif Dr_ Reviewed by: BD Date: 1/5/16 Project Comments Date: To: From Subject: Staff Review: April 10, 2015 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 X Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 April 13, 2015 1. Permit required for removal of City owned street trees on Bayswater. O2. Remove existing Pyrus kawakamii (Evergreen Pear) street trees on Bayswater and replace with Gingko biloba_ 03. Include 3 additional irrigated trees with grate in City sidewalk on California Dr.. � Trees will be 24in box size Pyrus calleryana `Red Spire'. O5. Grates and IrrigatioNplanting details attached. Reviewed by: BD Date: 4/17/15 Project Comments Date: To: ��%7 i i1� Subject: Staff Review: December 28, 2015 X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558- 7334 Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 January 8, 2016 � r- �� � Sheet A.003 existing site plan shows the proposed. Please correct. Please provide a preliminary title report for all the parcels (appears to be 5) that will be merged. Please explain why the proposed property will be angled on the California Drive frontage. Please show the removal and replacement of the entire sidewalk surrounding the property (California and Bayswater). Where a curb cut exist and is no longer necessary, replace with vertical curb. Please show all existing and proposed utility connections (PG&E, water, sewer, etc). �j The proposal will reduce the number of street parking with the addition of a V curb cut. How will the project mitigate the loss of street parking? ��On sheet D.101, the proposed outline of new building appears to encroach beyond the property line. Please explain. Reviewed by M. Quan Date: 1/8/16 Project Comments Date: To: From: Subject: Staff Review: April 10, 2015 X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 April 13, 2015 � The survey and demolition plan does not match the property limits. Please dimension all parcel(s). Please show Highland Avenue and surrounding sidewalk on the demolition plan. �2> Please show the vehicle circulation for the new service area. � (3 � Will the existing carport for the Mazda area in the rear connect to the Subaru � area? This is not clear on the drawings. �4. �he total removal and replace area is over 10,000 sf. The project must ��omply and meet stormwater treatment measures, also known as c3 requirements. More information can be found at: http://www.flowstobay. orq/newdevelopment 5. Please be aware that because this is demo and new construction, the applicant may not be able to use the existing fire service connection. A new fire service connection with a double check backflow preventer (DCBP) will be required. All sheets showing a new fire service connection to the water main needs to be removed from the plans and submitted separately for an Underground Fire Service Building Permit. Reviewed by: M. Quan Date: 4/14/15 Project Comments Date: To: From: Subject: Staff Review April 10, 2015 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558-7334 ♦ Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 April 13, 2015 1. Extend the fire sprinkler system to new construction area. 2. Verify sprinkler system Backflow Prevention Device is aboveground or move to aboveground. 3. The applicant shall ensure proper drainage in accordance with the City of Burlingame Engineering Standards is available for the fire sprinkler main drain and inspector test on the building plumbing drawings. These items may drain directly to landscape or in the sewer with an air gap. 4. Verify the sprinkler system is monitored by the fire alarm system and a Central Receiving company. Reviewed by: �, Date: � 3 ���- Project Comments Date: February 5, 2016 To: City Engineer (650) 558-7230 Chief Building Official (650) 558-7260 City Arborist (650) 558-7254 From: Subject: Staff Review Planning Staff Recycling Specialist (650) 558-7273 Fire Marshal (650 558-7600 --� NPDES Coordinator (650) 342-3727 City Attorney Request for Commercial Design Review for a new service facility at 85 California Drive, zoned CAR, APN: 029-242-050 � �S�%� �/�-,��„ �C�� �s/i � . l G�t,,S il U, e 3-(-' (o ��� �; (�l�-ry� f''z� �<_'�- �,�f' y,,��1 � �.ati..,-� �., V.,,d'�- f�2 c�``/z � �`�`� 1 (� �_� c��, c.�c-(�J"� �,( �/s/�co, C�-�,� C/'� /f (�'-,'c_.G-.i��' c�l� Sh �/L�',rc�z�,,t,, �-�Q_ C� r V� � , a ��j-✓ f-- u F � (�r�� � c_--�-. N�.}- , I U�,�� {i,� � Y���.�r �7-�e�-f- �.�,.1 �p�- �J` c' ��' � � / � � �h�,� �f �; �!� 4 �k,��, � f J t/C�n � � � J,��P-2 � 6�1'I � � c.� ' � � ��'-'z � �j u 1 l �-� � �'' � �-� ; f - �� �� � C �,�,-�'" ,' V � �'i ��. d by: �i � G�L,�, �. ''� ( `;� � 1 a-� �Z�L<> -��- Date: � I�S/� �'/ (�� Project Comments Date: To: From: Subject: Staff Review: April 10, 2015 � Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 � Fire Division (650) 558-7600 X Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Request for Commercial Design Review for new service facility at 85 California Drive, zoned R-1, APN: 029-242-050 April 13, 2015 ��Stormwater requirements are required to be implemented at stand-alone single family home projects that create and/or replace 2,500 square feet or more of impervious surface. These requirements are in addition to any other city requirements. In order to determine if the noted project is subject to the above requirements, please complete, sign, date and return the attached "Stormwater Checklist for Small Projects." For additional information regarding these requirements, please refer to the attached flyer "New Stormwater Control Requirements Effective 12/01/12. For Projects that Create and/or Replace 2,500 to 10,000 sq.ft. of Impervious Surface." Also visit the San Mateo Countywide Stormwater Pollution Prevention Program (SMCWPPP) website at: http://flowstobay.orq/files/newdevelopment/flyersfactsheets/newregsmallprojSep2012 � 2. Any construction project in the City, regardless of size, shall comply with the city's stormwater NPDES permit to prevent construction activity stormwater pollution. Project proponents shall ensure that all contractors implement appropriate and effective Best Management Practices (BMPs) during all phases of construction, including demolition. When submitting plans for a building permit, please include a list of construction BMPs as project notes, preferably, on a separate full size (2'x 3' or larger), plan sheet. A downloadable electronic file is available at: http://www.flowstobay.org/Construction Please contact Kiley Kinnon, NPDES Stormwater Coordinator, for assistance at (650) 342-3727. Reviewed by: KJK Date: 04/22/15 �� ,� SAN M�'EO COU�;TYWID"c WaterPollution Prevention Program Stormwater Checklist for Small Projects Municipal Regional Stormwater Permit (MRP) Order No. R2-2009-0074 ; Order No. R2-2011-0083 NPDES No.CAS612008 City of Burlingame Office of Environmental Compliance 1103 Airport Blvd Burlingame, CA 94010 (650) 342-3727 Complete this form for individual single family home projects of any size, other projects that create and/or replace /ess than 10, 000 square feet of impervious surface, and projects in the following categories that create and/or replace less than 5, 000 square feet of impervious surface: restaurants, retail gasoline outlets, auto service facilities', and parking lots (stand-alone or part of another use). A. Project Information A.1 Project Name: q,2 Project Address: A.3 Project APN: B. Select Appropriate Site Design Measures B.1 Does the project create and/or replace 2,500 square feet or more of impervious surfacez? ❑ Yes ❑ No � If yes, and fhe project will receive �nal discretionary approval on or after December 1, 2012, the project must include one of Site Design Measures a through f.3 Fact sheets regarding site design measures a through f may be downloaded at http://www.flowstobay.org/bs new development.php#flyers. := If no, or the project will receive final discretionary approval before December 1, 2012, the project is encouraged to implement site design measures4, which may be required at municipality discretion. Consult with municipal sta(f about requirements for your project. B.2 Is the site design measure included in the project plans? a. Direct roof runoff into cisterns or rain barrels and use rainwater for irrigation or other non-potable use. b. Direct roof runoff onto vegetated areas. Plan Yes No Sheet No. ❑ ❑ ❑ ❑ ❑ ❑ c. Direct runoff from sidewalks, walkways, andlor patios onto vegetated areas. d. Direct runoff from driveways and/or uncovered parking lots onto vegetated areas. e. Construct sidewalks, walkways, and/or patios with permeable surfaces. f. Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ g. Minimize land disturbance and impervious surface (especially parking lots). h. Maximize permeability by clustering development and preserving open space. i. Use micro-detention, including distributed landscape-based detention. j. Protect sensitive areas, including wetland and riparian areas, and minimize changes to the natural topography. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ k. Self-treating area (see Section 4.2 of the C.3 Technical Guidance) I. Self-retaining area (see Section 4.3 of the C.3 Technical Guidance) m. Plant or preserve interceptor trees (Section 4.1, C.3 Technical Guidance) � See Standard Industrial Classification (SIC) codes here. , - Complete the C.3/C.6 Development Review Checklist if the project is not an individual single family home, and it creates and/or replaces 10,000 square feet or more of impervious surface; or if it is a restaurant, retail gasoline outlet, auto service facility, or parking lot project that creates and/or replaces 5,000 square feet or more of impervious surface. ' See MRP Provision C.3.i. ' See MRP Provision C.3.a.i.(6). 1 Approved December 4, 2012 Stormwater Checklist for Small Projects C. Select appropriate source controls (Encouraged for all projects; may be required af municipa! discretion. Consult municipal staff.5) Are these Features that features in require source project? control measures Source control measures (Refer to Local Source Control List for detailed requirements) Is source control measure included in project plans? Plan Yes No Sheet No. �� �� �� �� ��■ Storm Drain Floor Drains Parking garage Landscaping ❑ ❑ Pool/Spa/Fountain ❑ ❑ Food Service Equipment (non- residential) ❑ � ❑ � Refuse Areas '�■ ■��■ ■��■ ■��■ Outdoor Process Activities � Outdoor EquipmenU Materials Storage Vehicle/ Equipment Cleaning Vehicle/ Equipment Repair and Maintenance ❑ ❑ Fuel Dispensing Areas ❑ � ❑ � Loading Docks ❑ � ❑ � Fire Sprinklers ■ Mark on-site inlets with the words "No Dumping! Flows to Bay" or equivalent. • Plumb interior floor drains to sanitary sewer [or prohibitj. ■ Plumb interior parking garage floor drains to sanitary sewer.s ■ Retain existing vegetation as practicable. • Select diverse species appropriate to the site. Include plants that are pest- and/or disease-resistant, drought-tolerant, and/or attract beneficial insects. ■ Minimize use of pesticides and quick-release fertilizers. ■ Use efficient irrigation system; design to minimize runoff. • Provide connection to the sanitary sewer to facilitate draining.s Provide sink or other area for equipment cleaning, which is: • Connected to a grease interceptor prior to sanitary sewer discharge.s � Large enough for the largest mat or piece of equipment to be cleaned. • Indoors or in an outdoor roofed area designed to prevent stormwater run-on and run-off, and signed to require equipment washing in this area. ■ Provide a roofed and enclosed area for dumpsters, recycling containers, etc., designed to prevent stormwater run-on and runoff. � Connect any drains in or beneath dumpsters, compactors and tallow bin areas serving food service facilities to the sanitary sewer.� ■ Perform process activities either indoors or in roofed outdoor area, designed to prevent stormwater run-on and runoff, and to drain to the sanitary sewer.s ■ Cover the area or design to avoid pollutant contact with stormwater runoff. ■ Locate area only on paved and contained areas. • Roof storage areas that will contain non-hazardous liquids, drain to sanitary sewers, and contain by berms or similar. ■ Roofed, pave and berm wash area to prevent stormwater run-on and runoff, plumb to the sanitary sewers, and sign as a designated wash area. • Commercial car wash facilities shall discharge to the sanitary sewer.s ■ Designate repair/maintenance area indoors, or an outdoors area designed to prevent stormwater run-on and runoff and provide secondary containment. Do not install drains in the secondary containment areas. • No floor drains unless pretreated prior to discharge to the sanitary sewer. 6 • Connect containers or sinks used for pa�ts cleaning to the sanitary sewer. 6 • Fueling areas shall have impermeable surface that is a) minimally graded to prevent ponding and b) separated from the rest of the site by a grade break. ■ Canopy shall extend at least 10 ft in each direction from each pump and drain _away from fueling area. • Cover and/or grade to minimize run-on to and runoff from the loading area. ■ Position downspouts to direct stormwater away from the loading area. • Drain water from loading dock areas to the sanitary sewer.s • Install door skirts between the trailers and the building. • Design for discharge of fire sprinkler test water to landscape or sanitary sewers ❑ ❑ Miscellaneous • Drain condensate of air conditioning units to landscaping. Large air Drain or Wash conditioning units may connect to the sanitary sewer.s Water • Roof drains shall drain to unpaved area where practicable. ■ Drain boiler drain lines, roof top equipment, all washwater to sanitary sewer 6. ❑ ❑ Architectural • Drain rinse water to landscaping, discharge to sanitary sewer 6, or collect and Copper dispose properly offsite. See flyer "Requirements for Architectural Copper." �� �� �� nn ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 5 See MRP Provision C.3.a.i(7). G Any connection to the sanitary sewer system is subject to sanitary district approval. � Businesses that may have outdoor process activities/equipment include machine shops, auto repair, industries with pretreatment facilities. 2 Approved December 4, 2012 Stormwater Checklist for Smal1 Projects D. Implement construction Best Management Practices (BMPs) (Required for a!1 projects.) D.1 Is the site a"High Priority Site"? (Municipal staff will make this determination; if the answeris yes, Yes ❑ No ❑ the project will be referred to construction site inspection staff for monthly stormwater inspections during the wet season, October 1 through April 30.) ■"High Priority Sites" are sites that require a grading permit, are adjacent to a creek, or are otherwise high priority for stormwater protection during construction per MRP Provision C.6.e.ii(2). D2 All projects require appropriate stormwater BMPs during construction, indicate which BMPs are included in the project, below. Yes No Best Management Practice (BMP) ❑ ❑ Attach the San Mateo Countywide Water Pollution Prevention Program's construction BMP plan sheet to project plans and require contractor to implement the applicable BMPs on the plan sheet. ❑ ❑ Temporary erosion controls to stabilize all denuded areas until permanent erosion controls are established. ❑ ❑ Delineate with field markers clearing limits, easements, setbacks, sensitive or critical areas, buffer zones, trees, and drainaQe courses. ❑ ❑ Provide notes, specifications, or attachments describing the following: ■ Construction, operation and maintenance of erosion and sediment controls, include inspection frequency; ■ Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared material; ■ Specifications for vegetative cover & mulch, include methods and schedules for planting and fertilization; ■ Provisions for temporary and/or permanent irriqation. � � ■ ■ ■ ■ ■ ■ Perform clearing and earth moving activities only durinq dry weather. Use sediment controls or filtration to remove sediment when dewatering and obtain all necessary permits. Protect all storm drain inlets in vicinity of site using sediment controls such as berms, fiber rolls, or fiiters. Trap sediment on-site, using BMPs such as sediment basins or traps, earthen dikes or berms, silt fences, check dams. soil blankets or mats, covers for soil stock �iles. etc. ❑ ❑ Divert on-site runoff around exposed areas; divert off-site runoff around the site (e.g., swales and dikes). ❑ ❑ Protect adjacent properties and undisturbed areas from construction impacts using vegetative buffer strips, sediment barriers or filters, dikes, mulchinq, or other measures as appropriate. ❑ ❑ Limit construction access routes and stabilize desiqnated access points. ❑ ❑ No cleaning, fueling, or maintaining vehicles on-site, except in a designated area where washwater is contained and treated. ❑ ❑ Store, handle, and dispose of construction materials/wastes properly to prevent contact with stormwater. ❑ ❑ Contractor shall train and provide instruction to all employees/subcontractors re: construction BMPs. � � Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, washwater or sediments, rinse water from architectural copper, and non-stormwater discharges to storm drains and watercourses. Name of applicant completing the form: Signature: E. Comments (for municipal staff use only): F. NOTES (for municipal staff use only): Section A Notes: Section B Notes: Section C Notes: Section D Notes Approved December 4, 2012 � /1� ,AH `dAi[.,0!�NT��;'/ICC Water Pollution Prevention Pragram LICan Watec Fcal•hy "a�nmuoi•y rnvscFlowsrobay ;rg New Stormwater Control Requirements Effective 12/1/12 For Projects that Create and/or Replace 2,500 to 10,000 sq.ft. of ImPervious Surface New stormwater requirements go into effect on December I, 2012, for the following categories of development projects: ■ Projects that create and/or replace at least 2,500 square feet, but less than 10,000 square feet, of impervious surface; ■ Stand-alone single family home projects that create and/or replace 2,500 square feet or more of impervious surface. These requirements are in the San Francisco Bay Region Municipal Regional Stormwater Permit (MRP)� and are described below. What Is an Impervious Surf�ce? Ri«�off is direct�cl �o Icindscuping. An impervious surface is a surface covering or pavement of a developed parcel of land that prevents the land's natural ability to absorb and infiltrate rainfall. Impervious surfaces include, but are not limited to: rooftops, walkways, patios, driveways, parking lots, storage areas, impervious concrete and asphalt, and any other continuous watertight pavement or covering. Does Pervious Paving Count as Impervious Surface? Pervious paving, including pavers with renneable openings and seams, is not considered impervious if it is underlain with pervious soil or pervious storage material, such as a gravel layer that is sized to hold 80 percent of the average annual runoff. (This is the volume of stormwater runoff specified in Provision C.3.d of the MRP.) Guidance for calculating this amount of runoff is provided in Section 5.1 of the C.3 Technical Guidance. See "For More Information", below, for information on downloading. What Are the New Requirements? Beginning December l, 2012, applicable projects must incorporate one ofthe follo�vin� site desi�n measures: • rf x . , .�;, Direct roof runoff into cisterns or rain barrels for use. �x,� ;�. � � ^� ■ Direct roof runoff onto vegetated areas. � ,. n. ., ),i� �."-` ? Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas. �,� . - --.i ■ Direct runoff from driveways/uncovered parking lots onto vegetated areas : .., � '' ■ Construct sidewalks, walkways, and/or patios with permeable surfaces.2 �;��,b�„�,*'�r��"`��� ���,,, � ■ n t 5` � ?"��' Construct bike lanes, driveways, and/or uncovered parking lots with �;�=r r�, �_�, " :�°ti„ � � . . . _ ;� permeable Surfaces.` Pe�rneabl��oint putie�s nre one For More Information option for permenble sa�rfaces. The following resources are available on the Countywide Program's website, �v�v��.flo�.vstobay.or��. Click on "Business", then scroll down and click on'`New Development". Site design fact sheets listed below (go to the section `'Flyers and Fact Sheets"): o Managing Stonmvater in Landscaping o Pervious Paving o Rain Barrels and Cisterns o Rain Gardens Sections of tlle C.3 Technical Guidance (go to "Table of Contents of the C.3 Technical Guidance"): o Pervious paving (Section 6.7) o Rainwater harvesting and use (Section 6.10) For a list of municipal contacts who can provide information on stormwater compliance for development projects, click on the `local permittin� a�ency' link near the top of the Ne�v Development webpage. ' The MRP may be do�vnloaded at ����a Ilo��;toh;i� �x�� (click on "titunicipalities"). These requirements are in Provision C.3.i ofthe MRP. ' Penneable surfaces include pervious concrete, porous asphalt, permeable joint unit pavers, and eranular materials. Smi �t/afeo Cotrntvlcide {i'nter Polhrtror: Preventio�t Progrnm Lnst upcinred Septeniber !-1. 20/2 SAN MAiE�10[ Water Pollution Prevention Program Qean Waier. Healchy Community. Construction Best Management Practices (BMPs ) Constniction projects are required to implement the stormwater best management practices (BMP) on this page, as they apply to your project, all year long. N[aterials & V1'aste blanagement ,�' ,i, j `a� �y; �i � ,.��, .. ��;', f� �, .y � {�; ,' r� , .� ��' Y Nnn-fl�aordous My�u�ials ❑ Bvm o�M caver siockpilez of und, din or aher conzttuclion materinl �eid� umf r'hcn min i� formisl or ifrwl xlivclp hcine usaJ wilhin l4 dn. ❑ Uic (but don't o.�enue) �cclnimed �rn�cr for dusl comrol. FluarAnus hlukri:�e ❑ I.�6ol all harnrdous mnteriob ond 6vudous o•asma (sncl� u pesucides, vninu. U�innen. sol.-��u. luel. ail. wid anii4eczcl in .,«am�< <,•�m un•. ����r. n,m,� r�a�„�i.�s�i�do��,. ❑ Swm huardou� molcriuls end waslcs in o�a¢r iiglu �vnlainers, norc n�ppmpr7�ic sccm�dary coN�inmcnC and co�cr ihen iu ihe e�d of rork dav or Auring rvtt weniher or ��J�cn nin is forecast. ❑ Follm. nunufua�uer i.pplicmion inswc�ions forhwnb,.s ma� riale and be wePol not �o ux mort tlun neusserv- Da na� appl�' chemicols ouiduors �vhen raiu is fwecan w�iAiin 2/ Iwurs. ❑•4rru�gc � � nppmpna�e disposal of nll L�r�rdo�u wvin. N'nslc Managcmrnl ❑ Covcr..rsm Jisynml conlaincrs ttcwclp wiih urys at ihc rnd o! n•m� worl day n�d during �vc� ��nnilror. O ChccA x�u�o disposal conminers frequendy fw leaks wid lo mnAe surc ihey em nw ocaGllcd N<ver Iwse do.m a dm�ps�er p� the wluvuuion aim_ ❑ Cleen or rcplare portahlc laikts, and iiupeci Wem ficqumth• for �enl;s ana avlu:. ❑ Disirose of ull �vusles wW debris pmpeAe. Recycle wwrinls o�d rasles thnt cM he recvded (sueli os aspholl, concrele. aggrcyme 6a.c maenwis, �vood ssP 6�4 p�P0. cro.) ❑ Dispase of IiQuld rcsidues fiom painu, ihimmrs..ol.�ems, glu�s. enJ clw�ting Onids as ha�rdo�u �v;uie. Con�lrunlon Entr:uicn antl Perimeler ❑ F_slablish mid mniniain cRcclivc perimcicr ca�lrole wd subilii.c ell conswc�ian enlnnces nnd c.dls m suRci<utlr amwl emaion ind aediment disclarges hnn� si�e and vocking o?ei1e. ❑ Sweep or encuum am• ztrul vxking unmediolcl�� and secme sedimem sawce m preven� CunLer vackm�. Nccer Iwse dmrn sveau �o cleun up Irac.Ainy. �quipment hlanagemcnt & Spill Control . �_ � _ C� MuiNenancc and Pnrkine ❑ DesiSmle un ueti 6ned �viiL eppmpfinc eMPs. !w rxAicle u�d equipxient µvkLie md siongr,. ❑ Per(ofm m jw nyin�rnurce. apairjoM. �nd �xAick and eqnipmrnt n'uhin� aRsih. ❑ 1lref�Kliug or velticie nuu�iu�u�ce mus� be doue �uiiq i�ro�A in � benned uea a���ay from smrtn drniru and orcr a drip pan 6ig rnougL �o rolltti Ouids. Re�cle ar dispose of Duidi as hezordw� �casle. ❑ If veLick or eyuip�nenDclu�nin� musl be dune onsiie, cle�n x�idi wa�mo�Jp in n 6umed am th�i �vfll �rot ollow� rins< wa1<r �o mu into gutters. sbeen, stonu ar.in,. o.:wr .wmrs. ❑ Do no� cleun �rAiicle or equipinant onsile using soaps, soi.��, a�a2o:�rs. s«.n� �i�ao�g ��,�����< <��. Splll Prc�•cmion nnd Can�ml � ❑ Keep spll ekmup mmerid� (np. �Morbems. em.) ��ailahk u �hc wnslruc�on �iie a� alllimcs. O Iropact �eLiGes and equipmax hcq��y fw md �rywv Inks promql��. Use drippd�� � a�d� Iwka until mpin �re mede. a ci.� �,��i� � i�.0 ��m�im�iy �a mspo�e or clunup mnenale properlp. ❑ Da �wt Iwse domn sur(xea v6ue fluid� hnc spillcd. Use dn• clm�xip meWode (�y�oryenl mnterials. u� Iincr. aMl/w ns�). ❑ Srv<ep uv �pilled dry mueri.is immcdiuelc, Do na vy w nvh ihem m�a�� wiw aamc or buq- Wem. ❑ Clcon up spilb o� din uca� M N=gi�� up uW poperiJ� dispoiug ofconwmmaied eoil. O Repartaiyuificanr spills Immalimel.. Yrn� w mpuired b�• 6ry In rcport ell �iEni6cam �eboxs oflumrdou� maicruk irc4dlnp oil. To mpon s spill: p Did 711 or your 1«W enwyea:�� �cspo(ue numEv. 2) GII �he C�xmor'e 016ce of Emerga�ry Smvic<c Wmning Cenler, (800) 652-7530 (2i haurs). Garthtirork & Paving/Asphalt\Vork Contaminated Soils �4 -- - • °� _ �� � ' � . ' h� "'��,y�_,ir: ni � �' - — . .i,.r . . . �� Efusion Canlml ❑ Schedule gnding aid c<uvetiou i�orYlw d.y weuthv ml��, ❑ S��bilixe �II Aenuded are�c, uirmll �nd maiwnin lunpon�r efvsfon wnvols (aieh n emsia� wntrol febric or booJed fiber maui�) unril �•egem�iwi ie esublished. ❑ Sccd w plum �egeurian f wsion control on sloyes or niefe co�utrvction iz na immediucly pianncd, SMimem Cun�ml � Proeec� norm drein inteis, juuen, di�cLeq ond dmin.te counn w�i�h aVp�oPria�e BMPe. aud� u gn�xl.Lepa, fber mUs. bem�s. etc. ❑ Prtvurt sediment froni mipotint o9'ailc by ina.11ing md moin�ai�un¢ �edimem ronvols, such e. Gba nllq sih fcnces, w sedimcpl Msins. U Kap e<cavNcd soil oe �hc sim �vhcm ii rcill nd wlkq inlo tim �treeL ❑ TmisCa e<awlcJ malcriala to dnmp Cucks un We sile, nol in tl�e sheel. ❑ Contemu�aled Solls ❑ 1f enp oflho follaoin wnditiwu �m obsarvaG, teel fa wm�min.uon end comacl thc Retiannl Womr Qualin Coxool Boud: ■ Unnmd �oii wndilbns. discolo�Wion, ar pdor. ■ Abandoned wwkryow�d ianks. ■ Abandoncd �velle ■ Buried bvml., Jebri:, or uosh. ❑ M�dd povmg md sal codiup in wN .aw,, a an� ��� u r�.:� n�r �� f sh pnrxne�n rvill Mm iime m cme. ❑ Corc. slom� Anin inlc�s and m�nholes �vLen opplying swl coal. �ck eoot slum- wI, fag �u� ea. ❑ Coll<ct uid req�cle «opprop���elv di�wse ofeacess ah�sire En�e� or su�d. Uo NCJT sareep or �vnsh j1 jmo �uttcrc � Do na uu �ru�v ro n�nsli do�rn frcsli asphalt wnucie puremen� S.rccunin� ,Y A�phal✓Cnncrtic Acmo�•�I LJ CwupletNy co��w or borriudc slami Jrain uileb.rhrn sa�v rnnine. Uac filicr fnluic, n�c6 Msin inlel f Imr.. m �nvel bogs �o lecy ciwry uul of ��e uom� drein sysmm. O Sho.'el�, oMsor6. o�ucuum se..• cut slnrty M dispose o(ell u�um u soon �e you aic 6nlsLrd in ace Iouiian or N tlK ad af each �vork day (w•hichecu is saonerl). ❑ ICeuncW slunp cmrss � caKh bosin. ckan il np immcdi�lcip. Concrete, Grout & 1liortar Applicalion ❑ Swrt wiwelc, yroul and manu ui�dcr ucaeron p.11cts end vn�a�' fmm dniiinsc These mmeriaLs mua uercr mach a cmnu dnin. � WaS�1W1Ua�UC1ce[�ILpmcnUWcAi � ii< a in a contoiued arw, so ih<re u w Jischarge inro du underlr�ng mil to Surtauodine a�cas. Let ca�cre�c Imrdcn niJ dispasc of u garbagc. ❑ CMlec� ihe �rosh n•uu (mm n•ashinQ �.�:�a .�er�q,�� w�2m .�a ,�mo� � ;, for app�opriete disposol ol�sile. Dewatering FLi%:,� �'I�� ( i -��r�io lFc' 'ii;, . ,�;��,,. � `. � ���. s;� . h ❑ ERecliveh� mnn�ge.11 rvnbn, all tioon ,�;m�,� m� .��c v�a,u �oirm.� dimhnrgcz f�om tlie sile. Dia�en rw��on �r�mr fmm oRsim av�v from nll Jislurbed orcos or ol6crn�iac enswe complionce. ❑ Whcn dew�icnng, ooiifi• ond obtau� appmvd froin Ilmlocal municipJily bcl"a�e Ji�cluvginp w�im �o a sirtel smlu or nomi Anin. Filir�nan w di.rnion Uvoneh � ba.in. mnl. or udimem trap mq� 6c �eq�irtd. ❑ In meas of k�ro�vn comuniuuion, icsuug is required prior b reiiu or disctu`pe of gmund��nlcr. Co�ul� with Wc Eeyuwa Io deiumine �vl¢tli« tesling is rcqo' a and I101�•lo InlcfprCl(crul[s.Conlnn��iu�d gmundwa�er must be Ven�cd w hnWtd off•dte (w proper disposnl. Storin drain polluters may be liable for fines of up to $10,000 per day! Painting & Paint Removal �, � �i.��'. � i ;>: - I `� . _---' r.�����R a�a��� ❑ Nn•er dcon bmslw� or nnsc paim wnloinus inlo a sUcel, 6uncr, slorth Am111.O! SY!(OCC u�plClS. ❑ For �cncr-pued painls. painl oul b�vshcs Io the e.�icn1 possible. Rinsc io the unilap� u�cer once rau L�.c jaincd pennission l�wn Jm local ���astervulcr Irenlmen� �ullwrilv. Nc�'o paur peinl do��n u drnin. ❑ for o�l-y�wd poinu. pcini ou� brusl�a io J�e e.�eui possiblc and cicon �ciJ� i�mmv or soh�nu in a qupu mnuincr. Filier wid muse �hinncrs and sol��cnit. Disposoof msiduc end unusable ihumcr;soh<nu os Lazvaaus,vnae. P�in� mmu�:il ❑ Chcmiul pain� ytripp�nC msiduc oM chiy� and dun Gan nurirc paims or paints w�ucinin� �cad or triLuh�l�n must 6c dispos� ohs horudouz u�.s�c. ❑ r,���� �i��i,. e� a��:� r m �w�-nn>a�ao��. dn� sRiq�ing und amd binstui� mo�• 6c m�cp� np or colleacJ in plu�ic dmp clotlu u�d dispoicd ofu uosh. Landscape hiaterials � z.� , � i�� E;.t � :: Y'!; ❑ Conrain smekpiled landsc�pin� ma�e��ls �� sioriuy J�cm wdcr mr�u �.�Lrn il��� � noi uli.�cl�• bcing uir.d. ❑ Srock �dihlc Innd�cape mo�criol on pallets. Co�cr ar sbm Ihcse malcnals �ehen ii�ey nre no� acueeh� Ging used or opplicd. ❑ Discantinue appliution of a�p� erodi6le lundscape melCnoll�'i�iin 2 dDe6 befCrc a � mras� ,on� �c�m o, d���s ,,.n ,..�.��c�. . CITY OF BURLINGAME ''� COMMUNITY DEVELOPMENT DEPARTMENT BURLINGAME 501 PRIMROSE ROAD �+,;:_ ' BURLINGAME, CA 94010 � "'''m��� '� PH: (650) 558-7250 • FAX: (650) 696-3790 www.burlingame.org Site: 85 CALIFORNIA DRIVE The (ity of Burlingame Planning Commission announces the following public hearing on MONDAY, FEBRUARY 22, 2016 at 7:00 P.M. in the City Hall Council Chambers, 501 Primrose Road, Burlingame, CA: Application for Environmental Scoping, Rezoning, General Plan Amendment, Lot Merger and Commercial Design Review for a new automobile service facility at an existing automobile dealership at 85 CALIFORNIA DRIVE zoned CAR and R-4. APNs 029-242-020, -030, -040 AND -050 Mailed: February 12, 2016 (Please refer to other side) Ci� of Burlinaame PUBLIC HEARING NOTICE A copy of the application and plans for this project may be reviewed prior to the meeting at the Community Development Department at 501 Primrose Road, Burlingame, California. If you chalienge the subject application(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in the notice or in written correspondence delivered to the city at or prior to the public hearing. Property owners who receive this notice are responsible for informing their tenants about this notice. For additional information, please call (650) 558-7250. Thank you. William Meeker Community Development Director PUBLIC HEARING NOTICE (Please refer to other side) � �� �����°� ��'�"�.�� �.� ,� r �.'��`,�,, � ,, , ny;l � ���� �� � � �p �L �: 1 , I A ,l � ► � "�t ''��'� �� �` ` �"�,M. ' .F'= �'� ' � , w � � � �1 �,'? �'�` �'' �it� �,,� ��� ,�„ ��'� ��� ;�} ,r►i r`` _ a�`" , ,,, "� � � �, . ,!'�'' ,��- .� ��'� � �V y�,� � " �r �:. � �,�t �r ,'. ��� �+`. � � ♦ �f .�, f #,, � �`' � , � � �. � � ►_ � ` j�� ,� �. ,-;�:'; , � � � , „� 5� �,.��, �<s . � �' . ��' .,, ry '� r +a �� �.'�r� ' , •• r �!� . �� s :' f t , ' q. . . � � � r , +; ;- . o.. �� � �� ��' � R t�t � � ���' " .:� !, � � � � .y N � : � �;� '� '� , � .�- � �f�',� ` / r�� yr � ( �� `. i,�f+ ��Y 4:"': �,�,�/�. ^� `1 �/,r� , , � " £, , -,.� � . _ �, p � �� �" � �je`r�'�� o r+�� �- ;;.�� `� � , ,�� �� ' " � � o # ;�` � �? � ,� ��` r �; . � � � � , ' � , Y ,r+ � \ �, � .�� 85 California Drive (CAR) ?r�� �,* w„ k ��a� ' � , . � �,` �,,," - . !` y � '!':' �' h� ,,/� " A �``�4 ./ ��. � � . � � r =�� �� ° °� .� ,_�!t`.If',�'�'�"�, > � � ��' `� �'� . ¢ � � � � \ �.,,� - . �; ti y ,� wp � ��try�� ` ;�'�1 � ��,%��� �. � � +��!' , �"'•��,.� , -�, �,"�`' �-a '� ��-�� , �v� � .r�,� � . � . � +1�,� �������,��� ! '"' �► �"^�a � ,. 1 � y� . . f , . �� � - ������° . ,, ,4+�+ t r�... . � ' '' ��^;��a. ! " ^�,� ' ;� i `'� `�"� i � � � ;� �.',��,,,. �' �; � _.�� _..._ _ . � �� : �:'��: , ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BURLINGAME AMENDING THE CITY'S ZONING MAP BY REZONING PROPERTY FROM HIGH DENSITY MULTI-FAMILY RESIDENTIAL (R-4) TO CALIFORNIA DRIVE AUTO ROW (CAR) The City Council of the City of Burlingame hereby ordains as follows: Division 1. Factual Background WHEREAS, on April 9, 2015, Kent Putnam filed an application with the City of Burlingame Community Development Department — Planning Division requesting approval of a new automobile service facility at an existing automobile dealership, which included Assessor's Parcel 029-242-020 (the easterly 50-feet of Lot 6, Block 13, Supplementary Map No. 1 of the Town of Burlingame) and the easterly ten-feet of Assessor's Parcel 029-242-230 (the easterly 60-feet, excepting therefrom the easterly 50-feet, of Lot 6, Block 13, Supplementary Map No. 1 of the Town of Burlingame) from High Density Multi-Family Residential (R-4) to California Drive Auto Row (CAR); and WHEREAS, the rezoning is appropriate and consistent with the intent of the Zoning Ordinance in that the from High Density Multi-Family Residential (R-4) to California Drive Auto Row (CAR) will bring the entire combined site into one zoning designation and would be consistent with the proposed California Drive Mixed Use District designation represented in the Burlingame Downtown Specific Plan; and WHEREAS, the City of Burlingame Zoning Regulations indicate that service of automobiles is a permitted use within the California Drive Auto Row (CAR) zone and that the proposed project conforms to all development regulations for the California Drive Auto Row (CAR) zone; and WHEREAS, after considering all written and oral testimony presented at the December 12, 2016 public hearing regarding the proposed amendment, the Planning Commission voted 7-0-0-0 to recommend to the City Council, adoption of an ordinance amending the City's zoning map as described herein; and WHEREAS, at its regular meeting of January 3, 2017 the Burlingame City Council conducted a duly noticed public hearing to consider the Planning Commission's recommendation to amend the City's zoning map and following conclusion of the public hearing and consideration of all written and oral testimony provided during the hearing, introduced an ordinance, by title only, waiving further reading, amending the City's zoning map as described herein. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BURLINGAME DOES ORDAIN AS FOLLOWS: 1 ORDINANCE NO. Division 2. The Burlingame zoning map is hereby amended as follows: Changing the zoning designation of Assessor's Parcel 029-242-020 (the easterly 50-feet of Lot 6, Block 13, Supplementary Map No. 1 of the Town of Burlingame) and the easterly ten-feet of Assessor's Parcel 029-242-230 (the easterly 60-feet, excepting therefrom the easterly 50-feet, of Lot 6, Block 13, Supplementary Map No. 1 of the Town of Burlingame) from High Density Multi-Family Residential (R- 4) to California Drive Auto Row (CAR) Division 3. This ordinance, or a summary as applicable, shall be published as required by law and shall become effective 30-days thereafter. Ricardo Ortiz, Mayor I, Meaghan Hassel-Shearer, City Clerk of the City of Burlingame, do hereby certify that the foregoing ordinance was introduced at a regular meeting of the City Council held on the 3rd day of January, 2017, and adopted thereafter at a regular meeting of the City Council held on the 17th day of January, 2017, by the following vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: Meaghan Hassel-Shearer, City Clerk 2