HomeMy WebLinkAbout85 California Drive - Approval LetterCITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
May 22, 2009
Kent Putnam
3 California Drive
Burlingame, CA 94010
Re: 85 California Drive
Dear Mr. Putnam,
G1T
� �,�� ��
� � �
.
•?�Q i�' 6
*�01i.�Ti D
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the May 11, 2009 Planning
Commission approval of your application for Commercial Design Review became effective May 21,
2009. This application was for fa�ade changes to an existing commercial building at 85 California
Drive, zoned C-2, Sub Area D, Burlingame Avenue Commercial Area.
The May 11, 2009 minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped April 2, 2009, sheets A.101, D.201, D.301, A.201, A.203 and A.301; any changes to
the exterior materials shall require review by the Planning Commission;
2. that the conditions of the Chief Building Official's March 19, 2009 memo, the City Engineer's
iJarch i 7, 2009 r�i�etriG ai id t� e NPDES Cacr��nater's March 1 �, 2Q09 memo shall be met;
3. that prior to approval of the final inspection, the applicant shall record a cross-access
easement with the San Mateo County Clerk-Recorder for the drive aisi� located on the
adjacent property (APN: 029-242-040) which provides access to the disabled-accessible
parking spaces at 85 California Drive;
4. that any changes to the size or envelope of building, which would include changing or adding
exterior walls or parapet walls, shall require an amendment to this permit;
5. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff);
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org a:
May 22, 2009
85 California Drive
Page 2
6. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
8. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
9. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
10. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2007 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details such
as window locations and bays are built as shown on the approved plans; if there is no
licensed professional involved in the project, the property owner or contractor shall provide
the certification under penalty of perjury. Certifications shall be submitted to the Building
Division;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building
Department. This approval is valid for one year during which time a building permit must be issued.
One extension of up to one year may be considered by the Planning Commission if application is
made before the end of the first year.
�m Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::
May 22, 2009
85 California Drive
Page 3
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must
do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or
federal law.
Sincerely,
/
�%/,�//�'�
William Meeker
Community Development Director
c. Chief Deputy Valuation, Assessor's Office
(53.50 FT X 120.12 FT ON CALIFORNIA DR COM 53.50 FT FRM BAYSWATER AVE PTN OF
LOT 5 BLOCK 13 SUPP TO TOWN OF BURLINGAME MAP NO 1 RSM B/28 CITY OF
BURLINGAME; APN: 029-242-050) (PARCEL 1.87 AC MOL PARCEL MAP VOL 60/5;
APN:029-242-250)
Chief Building Official, Community Development DepartmenUBuilding Division
Hugh Hynes, designer
Proto Inc.
118A Tiffany Avenue
San Francisco, CA 94110
File