HomeMy WebLinkAbout1480 Vancouver Avenue - Resolution�
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2005-120292
09:50am 07l19/05 R1 Fee: NO FEE
Count of pages 13
Recorded in Official Records
County of San Mateo
Warren Slocum
•- :•;e�:�:,: -Gounty Clerk-Recorder
�` � i�� �� r����) ( �,I �� �'l��� I��'I�� ������'��� � III I'���
�� � J� 9 2.a R*
RESOLUTION NO. 062-2005
1480 VANCOUVER AVENUE, LOT 40; APN: 026-044-210
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
��
Date: �. 7/13/2005
t I�jL�
Marg ret Monroe, � y Planner
RESOLUTION 062-2005
RESOLUTION APPROVING CATEGORICAL EXEMPTION, CONDITIONAL USE
PERMIT AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
conditional use permit for re-emer�in� lots and desi�n review for construction of a new, two-
stor ���le family dwelling and detached .�ara�e at 1480 Vancouver Avenue, Lot 40, zoned
R-1 Robert and Cynthia Gilson, 30 Wood�ate Court, Hillsborou�h, CA 94010, property owners,
APN: 026-044-210 (LOT 40 BLK 45 EASTON ADD BURLINGAME NO 4 RSM A/45);
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
June 27, 2005, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19, Section 15303, Class 3—
(a) construction of a limited number of new, small facilities or structures including (a)
one single family residence or a second dwelling unit in a residential zone. In urbanized
areas, up to three single-family residences maybe constructed or converted under this
exeinption, is hereby approved.
2. Said conditional use permit and design review are approved, subject to the conditions set
forth in Exhibit "A" attached hereto. Findings for such conditional use permit and design
review are as set forth in the minutes and recording of said meeting.
It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo. �
I, ��.Yr,� bea.� , Secretary of the Planning Commission of the City o�`Burlingari
do hereby certify that the foregoing resolution was introduced and adopted at a regular meeti
of the Planning Cominission held on the 27`h day of June, 2005, by the following vo
AYES: COMMISSIONERS: Brownrigg, Cauchi, Deal, Osterling, Vistica
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
cretary
ABSTAIN: COMMISSIONERS: Auran, Keighran .
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit and design review.
1480 Vancouver Avenue — Lot 40
Effective July 7, 2005
1. that the project shall be built as shown on the plans submitted to the Planning Department
date stamped May 26, 2005, sheets A.1 through A.6, and date stamped June 15, 2005,
sheet L1.OA, and that any changes to building materials, exterior finishes, footprint or
floor area of the building shall require an amendment to this permit;
2. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), moving or changing windows and
architectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
3. that the tree protection measures for the protected-sized trees and street trees described in
the arborist report, dated April 11, 2005, shall be installed and inspected by the City
Arborist before issuance of a demolition permit and shall be complied with during
construction, and that the property owner shall maintain the trees after construction as
directed by the arborist report;
4. that prior to issuance of a building permit, the applicant shall submit to the City Arborist
for approval a Certified Arborist's report detailing tree protection measures for all
protected-sized trees on Lot 40 and all street trees;
5. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Department;
6. that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project
has been built according to the approved Planning and Building plans;
7. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans before
a Building permit is issued;
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit and design review.
1480 Vancouver Avenue — Lot 40
Effective July 7, 2005
Page 2
9. that the conditions of the City Engineer's, Fire Marshal's and NPDES Coordinator's May
2, 2005, memos, the Chief Building Official's April 29, 2005, memo, the Recycling
Specialist's May 16, 2005, memo, and the City Arborist's June 15, 2005, memo, shall be
met;
10. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2001 Edition, as amended by the City of Burlingame;
11. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
12. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm
Water Management and Discharge Control Ordinance;
13. that prior to scheduling the foundation inspection a licensed surveyor shall locate the
property corners and set the building footprint;
14. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation
of the new structure(s) and the various surveys shall be accepted by the City Engineer;
15. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site
sedimentation of storm water ntnoff;
16. that the project is subject to the state-mandated water conservation program, and a
complete Irrigation Water Management Plan must be submitted with landscape and
irrigation plans at time of permit application;
17. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management
District;
18. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site
sedimentation of storm water runoff;
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit and design review.
1480 Vancouver Avenue — Lot 40
Effective July 7, 2005
Page 3
19. that off-site runoff shall be diverted around the construction site and all on-site runoff
shall be diverted around exposed construction areas;
20. that fiber rolls and other erosion prevention products are installed around the construction
site as a barrier to prevent erosion and construction runoff into the storm drain;
21. that oils, fuels, solvents, coolants and other chemicals stored outdoors shall be protected
from drainage by structures such as berms and roof covers; bulk materials stored
outdoors shall be protected from drainage with berms and covers; equipment stored
outdoors shall be stored on impermeable surfaces, shall be covered and shall be inspected
for property functioning and leaks; all storage areas shall be regularly cleaned, including
sweeping, litter control and a spill cleanup plan; and
22. that landscape areas shall be designed to reduce excess irrigation run-off, promote surface
filtration and minimize the use of fertilizers, herbicides and pesticides.
Project Comments
Date:
To:
From:
04/29/2005
d City Engineer
❑ Chief Building Official
❑ Recycling Specialist
❑ Fire Marshal
❑ City Arborist
❑ City Attorney
Planning Staff
❑ NPDES Coordinator
Subject: Request for conditional use permit for emerging lots, design review
for a new single family dwelling and detached garage at 1480
Vancouver Avenue (LOT 40) , zoned R-1, APN: 026-044-210
Staff Review: 05/02/2005
1. See attached.
2. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 5/02/2005
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS
� �� �
Project Name: � ��^���/�a
� Project Address:_ � r/►t�k��vt. (t.�fz�
The following requirements apply to the project
1 _� A property boundary survey shall be preformed by a licensed land
building permit issuance.) i�Y �c, Pr� 5�+�� F� ��� ����
surveyor. The survey shall show all property lmes, property corners,
easements, topographical features and utilities. (Required prior to the
2 _� The site and roof drainage shall be shown on plans and should be made to
drain towazds the Frontage Street. (Required prior to the building permit
issuance.}
3.
4
The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 � A sanitary sewer lateral� is required for the project in accordance with
the City's standazds. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The tr�c study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Page 1 of 3
U:�private development\PLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closure/lot closure calculations shall be submitted with the' parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 ,�_ The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
r appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appeazs that the project may cause
adverse impacts during construction to vehiculaz traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that tt�e proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. T'he hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Pemuts.
19 No construction debris shall be allowed into the creek.
20 Y The project sha11 comply with the City's NPDES pernut requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 - The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development�PLANNING REVIEW COMNIENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle sha11 be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:\private development\PLANIVING REVIEW COMMENTS.doc
Project Comments
Date:
04/29/2005
To: ❑ City Engineer
❑ Chief Building Official
❑ City Arborist
❑ City Attorney
From: Planning Staff
❑ Recycling Specialist
[�( Fire Marshal
O NPDES Coordinator
Subject: Request for conditional use permit for emerging lots, design review
for a new single family dwelling and detached garage at 1480
Vancouver Avenue (LOT 40) , zoned R-1, APN: 026-044-210
Staff Review: 05/02/2005
1. Provide a minimum 1 inch water meter.
2. Provide double backflow prevention.
Reviewed by: �� `���!�
Date: Z ��? �''c,'�
Project Comments
Date:
To:
From:
04/29/2005
� City Engineer
� Chief Building Official
� City Arborist
� City Attorney
� Recycling Specialist
� Fire Marshal
✓ NPDES Coordinator
Planning Staff
Subject: Request for conditional use permit for emerging lots, design review
for a new single family dwelling and detached garage at 1480
Vancouver Avenue (LOT 40) , zoned R-1, APN: 026-044-210
Staff Review: 05/02/2005
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not limited
to ensuring that all contractors implement construction Best Management Practices
(BMPs) and erosion and sediment control measures during ALL phases of the
construction project (including demolition).
Ensure that sufficient amount of erosion and sediment control measures are
available on site at all times.
The public right of way/easement shall not be used as a construction staging and/or
storage area and shall be free of construction debris at all times.
Brochures and literatures on stormwater pollution prevention and BMPs are available
for your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed bv: ��
Date: 05/02/05
Project Comments
Date:
To:
From:
04/29/2005
❑ City Engineer
X Chief Building Official
❑ City Arborist
❑ City Attorney
Planning Staff
Subject: Request for conditional u
for a new single family
Vancouver Avenue (LOT
Staff Review: 05/02/2005
a Recycling Specialist
d Fire Marshal
❑ NPDES Coordinator
se permit for emerging lots, design review
dwelling and detached garage at 1480
40) , zoned R-1, APN: 026-044-210
1) All construction must comply with the 2001 California Building Codes (CBC),
the Burlingame Municipal and Zoning Codes, and all other State and Federal
requirements.
2) Provide fully dimensioned plans.
3} Prior to applying for a Building Permit the applicant must either confirm that
the address is 1480 Vancouver Avenue or obtain a change of address from
the Engineering Department. Note: The correct address must be referenced
on all pages of the plans.
4) Obtain a survey of the property lines for any structure within one foot of the
property line.
5) Roof eaves must not project within two feet of the property line.
6) Exterior bearing wafls less than three feet from the property line must be
constructed of one-hour fire-rated construction and no openings are allowed.
7) Rooms that can be used for sleeping purposes must have at teast one window
or door that complies with the egress requirements.
8) Provide guardrails at all landings.
9) Provide handrails at all stairs where there are more thar� two risers.
10)Provide lighting at all exterior landings.
11)The fireplace chimney must terminate at least two feet above any roof surface
within ten feet.
Date: 1���/�
� ��
Project Comments
Date:
To:
From:
04/29/2005
� City Engineer
� Chief Building Official
� City Arborist
� City Attorney
X Recycling Specialist
� Fire Marshal
� NPDES Coordinator
Planning Staff
Subject: Request for conditional use permit for emerging lots, design review
for a new single family dwelling and detached garage at 1480
Vancouver Avenue (LOT 40) , zoned R-1, APN: 026-044-210
Staff Review: 05/02/2005
Applicant shall submit a Recycling and Waste Reduction Plan for approval, and
pay a recycling deposit for this and all covered projects prior to demolition,
construction or permitting.
Reviewed by:
�
t9-'
Date: 5���/� S