Loading...
HomeMy WebLinkAboutReso - PC - 33b-2016t � REc;ORDINL� REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL T0: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2017-021990 9:58 am 03�14'17 R1 Fee: NO FEE Count oi Pa�es 2 Recurded in Official RPcords County of San Mateo �4ark Churr.h F-.�sessor-Ce+�cty Clerk-Recorder � �II'��','�'�'� �I�'�'I I�'�!'� �r'��'� ���s� � �� � �� �' � ���i''�!' I I II +� 0 0 0._�� � z 4� Resolution No. 33b - 2016 1580 BARROILHET AVENUE APN 028-295-140 TITLE OF DOCUMENT � 1 I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. Date: January 30 2017 05.09.16 PC Meeti�g Itera� 8c 1580 Barroilhet Av�. , � 1 � William Mee er, ommunity Development Director t "` RESOLUTION NO. RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF BURLINGAME FINDING THAT THERE IS NO SUBSTANTIAL EVIDENCE THAT THE APPROVAL OF A REQUEST FOR DESIGN REVIEW FOR A MAJOR RENOVATION AND FIRST AND SECOND STORY ADDITION TO AN EXISTING SINGLE FAMILY DWELLING LOCATED AT 1580 BARROILHET AVENUE WILL HAVE A SIGNIFICANT EFFECT ON THE ENVIRONMENT UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO ARTICLE 6 OF THE CEQA GUIDELINES follows: THE PLANNING COMMISSION OF THE CITY OF BURLINGAME hereby finds as Section 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and a Negative Declaration, per Negative Declaration ND-590-P, is hereby approved. Section 2. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. �' � 1;��`/ airman �, `�-'L�G��"�t-'L� �4��� , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 9`h dav of Mav 2016 by the following vote: 1580 BARROILHET AVE. - RESO 33b-201e aves: DeMartini, Gaul, Gum, Loftis, Sargent, Terrones �voes: None r�eseNr: Bandrapalli 4ecuseo: None RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF BURLINGAME, APPROVING A REQUEST FOR DESIGN REVIEW FOR A MAJOR RENOVATION AND FIRST AND SECOND STORY ADDITION TO AN EXISTING SINGLE FAMILY DWELLING AT 1580 BARROILHET AVENUE, ON PROPERTY SITUATED WITHIN THE R-1 ZONE RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, an application has been made for Desiqn Review for a maior renovation and first and second story addition to an existinq sinqle familv dwellinq at 1580 Barroilhet Avenue. Zoned R-1 Parviz Kamanqar. 1580 Barroilhet Avenue Burlinqame CA 94010 propertv owner APN 028 295 140; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 9 2016, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 2. It is further directed that a certified copy of this resolution be recorded irr the official records of the County of San Mateo. �� /���� l/`/ Chairman �, l,� cLc-t�� l'�., �? , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 9th dav of May. 2016 by the following vote: 1580 BARROILHET AVE. - RESO 33a-2016 aves: DeMartini, Gaui, Loftis, Terrones Noes: Gum, Sargent asseNr: Bandrapalli Recuseo: None S EXHIBIT "A" Conditions of Approval for Design Review. 1580 Barroilhet Avenue Effective May 19, 2016 Page 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 8, 2016, sheets A1.0 through A4.3; 2. that that the existing nonconforming wall and foundation, located within the right side setback at 1'-0" where 4'-0" is required per code and measuring 31'-1' in length, shall not be removed during construction; if any wall studs or foundation, or both, along the existing, nonconforming length are removed during construction, either an application for a Side Setback Variance will be required to replace the wall at the same location or an application for Design Review Amendment will be required showing compliance with current setback requirements; 3. that the applicant shall work with staff to comply with standards for landscaping and overhead/exterior lighting, and that revised plans shall be reviewed by the Planning Commission as an FYI item prior to issuance of a building permit; 4. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shail be subject to Pianning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 5. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 6. that the conditions of the Building Division's November 18, 2015 memo, the Parks Division's March 7, 2016, February 2, 2016 and November 19, 2015 memos, the Engineering Division's December 1, 2015 memo, the Fire Division's November 23, 2015 memo and the Stormwater Division's November 24, 2015 memo shall be met; 7. that any recycling containers, debris boxes or dumpsters for the construction project shall be piaced upon the private property, if feasible, as determined by the Community Development Director; 8. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 9. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; EXHIBIT "A" Conditions of Approval for Design Review. 1580 Barroilhet Avenue Effective May 19, 2016 Page 2 10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 11. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 13. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 14. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shail be submitted to the Building Division before the final framing inspection shall be scheduled; 15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 16. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. � Project Comments � Date 1� From: November 17. 2015 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Environmental Review and Design Review for a first and second story addition and major renovation to an existing single family dwelling at 1480 Barroilhet Avenue, zoned R-1, APN: 028-295-140 Staff Review: November 23, 2015 1) On the plans specify that this project will comply with the 2013 California Building Code, 2013 California Residential Code (where applicable), 2013 California Mechanical Code, 2013 California Electrical Code, and 2013 California Plumbing Code, including all amendments as adopted in Ordinance 1889. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2016 then this project must comply with the 2016 California Building Codes. 2) As of January 1, 2014, SB 407 (2009) requires non-compliant plumbing fixtures to be replaced by water-conserving plumbing fixtures when a property is undergoing alterations or improvements. This la�v applies to all residential and commercial property built prior to January 1, 1994. Details can be fotind at http�//�v�vw.leginfo.ca.gov/�ub�09-10/billJsenfsb 0401- 0450/sb 407 bill 20091011 chaptered.html. Revise the plans to sho�v compliance cvith this requirement. 3) Specify on the plans that this project will comply with the 2013 California Energy Efficiency Standards. Go to http://www.energy.ca.gov/title24/2013standards/ for publications and details. 4) Provide two completed copies of the attached Mandatory Measures with the submittal of your plans for Building Code compliance plan check. In addition, replicate this completed document on the plans. Note: On the Checklist you must provide a reference that indicates the page of the plans on which each Measure can be found. �lace the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:OOp: m_ (See City o�urli�ame Municipal Code, Section 13.�1-0( �ction hours in the City Public right-of-way are limited to ys and non-City Holidays between 8:00 a.m. and 5:00 p.m. Note: Construction hours for work in the public right of way must now be included on the plans. _ ____ ____� 6) On the irs page o e�plans specify the following�"Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to perForming the work. 7) Anyone who is doing business in the City must have a current City of Burlingame business license. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10)This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2013 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved plans. 11)Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12)Provide a complete demolition plan that includes a legend and indicates existing walls and features to remain, existing walls and features to be demolished, and new walls and features. INOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13)Show the distances from all exterior walls to property lines or to assumed property lines 14)Show the dimensions to adjacent structures. 15�Obtain a survey of the property lines. 4�-}�jn the plans specify that the roof eaves at the garage will not project within two feet of the property line. 7) rovide details on the plans which show that all roof projections at the garage which project beyond the point where fire-resistive construction would be required will be constructed of one-hour fire-resistance-rated construction per /2-�13 CBC §705.2. ,�i�ndicate on the floor plans that exterior bearing walls at the garage that are less than five feet from the property line will be built of one-hour fire-rated nstruction. (2013 CBC, Table 602) 19) ooms that could be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Rooms that could be used for sleeping purposes must have at least one window or door that complies with the egress requirements. On the elevation drawinps specify the location and the net clear opening height and width of all required egress windows. 2013 California Residential Code (CRC) �R310. ��he "Office" shown on the plans does not comply with the minimum requirements for a habitable room. On the plans, increase the size of this room to comply with the minimum room dimensions per 2013 CRC §R304. 21)Indicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 22)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 23)Provide handrails at all stairs where there are four or more risers. 2013 CBC §1009. 24)Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 5, 16, 17, 18, 19, and 20 must be re-submitted before this project can move forward for Planning Commission action. The written response must include clear direction reqardinq where the requested information can be fo�nd on the plans. _ __\ Reviewed by: Date: 11-18-2015 Joe , ,.� 6 0- 58-7270 � /> %� % Project Comments Date: To: FroEn January 26, 2016 0 Engineering Division (650) 5�8-7230 � Building Di�nsion (654j 558-7260 � Parks Division (650) 558-733? Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request �or Environmental Review and Design Review for a first and second story addi`uon and major renovation to an existing single family dv�eiling at 1580 Barroilhet Avenue, zoned R-1, APN: 028- 295-9 40 Staff Reviev✓: � Three {3) landscape tre�s require for final. Lemon tree and Juniper do not count as landscape trees Oniy one tr� will rzmain a�er 6' Acacia is removed as proposed. Landscapz trees must be single siem trees and not nut or fruit trees. :J� 7�� �F� -���� ��. ���� ��� Reviewed by: BD — � �z�,E.�t �GytCz�� Date: 2/2/16 Project Comments Date: To: From January 26, 2016 � Engineering Division (650) 558-7230 � Builtiing Division (650) 558-7260 � Parks Division (sso) s5s-73� � Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Environmental Reviev�i and Design Review for a first and second story add�tion and major renovation to an existing single family dwefling at 1580 Barroilhet Avenue, zoned R-1, APN: 028- 295-140 Staff Review: � Three (3) landscape trees require for final. Lemon tree and Juniper e�o not count as landscape trees Only one tree wili remain after 6� Acacia is removed as proposed. Landscap2 trees must be single st�m trees and not nut or fruit trees. Reviewed by: BD Date: 2/2/16 Project Comments Date: To: From: November 17, 2015 � Engineering Division (650) �5F�723c� 0 Building Division (650) 558-7260 X Parks Division (650) 558-7334 � Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Environmental Review and Design Review for a first and second story addition and major renovation to an existing single family d�ralfing at �480 Barroilhet Avenue, zoned R-1, APN: 028-295-140 Staff Review: November 23, 2015 1. No e�sting tree over �8 inches in circumference at 54 inches form base of tree may be removed without a Protected Tree Removal Permit from the Parfcs Division. (558-7330) � Please indicate on plans if landscape will remain or be rehabilitated. 3. Existing City Street Tree may not be cut, trimmed or removed without permi; from Parks Division (558-7330) Revi��r: �d b,�: BD Date: 11/19/15 0 Project Comments Date To: From November 17, 2015 X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Environmental Review and Design Review for a first and second story addition and major renovation to an existing single family dwelling at 1580 Barroilhet Avenue, zoned R-1, APN: 028-295-140 Staff Review: November 23, 2015 �Show the location of down spouts for the entire roof and that there is enough finish grade elevation around the perimeter of the property to demonstrate the direction of storm water runoff for the property. If the grade is not sufficient to prevent storm water runoff onto adjacent properties, show a drainage system design. Reviewed by: M. Quan Date: 12/1/15 . t, � �c R Proj�ct Comments T� i Date To: From: November 17, 2015 � Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 0 City Attorney (650) 55&-7204 Planning Staf Subjsct: P.?quest for Environm?ntal P.evi�w and Design Review for a first and second story addition and major renovation to an existing single family dwellinp at 1480 Barroilhet Avenue, zoned P.-1, APN: 028-295-140 �taff Review: November 23, 2015 Provid2 a residential fir2 sprinkl�r system throughou� th� residence: 'f. Provid� a minimum 1-inch wat�r met2r. 2. Provide a backflow prevention device/doubl? check valve ass�mbly — A schematic of wat�r lateral line afier meter shall be shown on Building permit plans prior to approvai indicating location of the device after the split between domestic and zife protection lines. 3. Drawings submittad to Building Department for revi2w and approval shall cl�arly indicate fire sprinklers shall be install?d under a separate deferred fire permit; ap�roved by the Fire Department prior to installation. N3te: Plans indic:te this addr2ss is 1580 Barroilhet. Rsviewed by: Christin� P,eed �` �� Date: 1 i -23-15 Project Comments Date To: From November 17, 2015 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 i� Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Environmental Review and Design Review for a first and second story addition and major renovation to an existing single family dwelling at 1�80 Barroilhet Avenue, zoned R-1, APN: 028-295-1405 Staff Review: November 23, 2015 Any construction project in the City, regardless of size, shall comply with the city's stormwater NPDES permit to prevent construction activity stormwater pollution. Project proponents shall ensure that all contractors implement appropriate and effective Best Management Practices (BMPs) during all phases of construction, including demolition. When submitting plans for a building permit, please include a list of construction BMPs as project notes, preferably, on a separate full size (2� x 3" or larger) plan sheet. A downloadable electronic file is available at http://w�r✓w.flowstobay.org/Construction Reviev�red: ��, :.� ��`i� Date: !!! � �il�, �