Loading...
HomeMy WebLinkAbout821 Cowan Road - Staff Report (2)City of Burlingame Condominium Conversion Permit and Conditional Use Permit for Existing Office/Warehouse Building Address: 821 Cowan Road Item # Lf Study Item Meeting Date: 3/27/06 Request: Condominium conversion permit and conditional use permit to convert a five-unit, 25,377 SF office/warehouse building (currently under construction for a first floor remodel and second floor addition) to five office/waxehouse condominium units. Property Owner: Konstantinos Dokos Applicant: One Stop Desigii, Inc. Engineer: Dominguez Associates General Plan: Commercial Uses — Office Use APN: 024-401-560 Zoning: IB Lot Area: 42,300 SF (0.97 Acres) Inner Bayshore Area — Office and Warehouse Uses (Burlingame Bayfront Specific Plan and Design Guidelines) Adjacent Development: Office, office/warehouse and auto rental parking Current Use: Two-story office/warehouse building addition under construction Proposed Use: Conversion of existing building to office/warehouse condominium building Allowable Use: Office/warehouse condominium with condominium conversion permit History: On February 28, 2005, the Planning Commission approved an application for a mitigated negative declaration, conditional use permits, parking and side setback variances to allow for a first floor remodel and second floor addition to an existing office warehouse building at 821 Cowan Road, zoned O-M (since this action the zoning has been changed to IB — Inner Bayshore) (February 28, 2005, P.C. Minutes). At that time, the proj ect was also reviewed for compliance with the Design Guidelines of the Bayfront Specific Plan. The following applications were approved: . � Mitigated negative declaration (required for this project because the proposed addition to the existing office/warehouse building exceeds 10,000 SF (11,825 SF proposed) and therefore does not qualify for an exemption); � Conditional use permits to exceed the Specific Area Plan lancl use density (0.6 FAR for warehouse where 0.5 is allowed) and to vary from the design guidelines for Bayfront Development (CS 25.43.030, 1); � Parking variance for the aisle width at the north and south ends of the parking lot (12'-0" and 13'-6" proposed where 18'-0" is the minimum required for traffic moving in two directions) (CS 25.70.025,1, fl; and � Side setback variance along the left side property line (as measured to new architectural column features on first and second floors) (9'-3 existing, 8'-3" proposed, where 10'-0" is the minimum required) (CS 25.43.055, 3). The proj ect approved by the Commission in February, 2005, included remodeling the existing first floor (13,552 SF) and adding a new second story (11,825 SF). The approved 25,377 SF office/warehouse building contains 13,552 SF of warehouse space on the first floor and 11,825 SF of office space on the second floor in a total of five office/warehouse units. The project also included improvements to the exterior of the building, including stucco walls on the exterior, new vinyl windows throughout the building, and a new pitched s-tile roof. In addition, uncovered decks with wrought iron railing were approved on the second floor at the front and rear of the building. r Condominium Conversion Permit 821 Cowan Road A building permit was issued on September 23, 2005, and construction is underway. The project being built will be in compliance with building code requirements in effect at the time the permit was issued. The property owner is now applying to convert the five office/warehouse spaces to condominium units. Project Summary: The property owner has submitted an application for a condominium conversion permit to convert an existing five-unit, 25,377 SF office/warehouse building to five condominium units. An application for a condominium conversion permit is allowed for an office/warehouse building if it contains at least 20,000 SF of building area (existing building contains 25,377 SF) (CS 26.32.025). An application for a condominium conversion permit is evaluated and processed pursuant to the procedural requirements set forth for conditional use permits (CS 26.32.020). With this application, there are no changes proposed to the February, 2005 approved project, with the exception of converting the office/warehouse units to condominiums. The February, 2005 project was approved when the O-M District Regulations were in effect. At that time, the Design Guidelines of the Bayfront Specific Plan had been adopted so the proj ect was reviewed for compliance with those standards. Conditional use permits were granted to exceed the Specific Area Plan land use density (0.6 FAR for warehouse where 0.5 is allowed) and to vary from the design guidelines for Bayfront Development (refer to attachment - Compliance with Bayfront Design Guidelines — Inner Bayshore Area). Since the project was approved, the new IB District Regulations were adopted. Therefore, with this application for a condominium conversion, the project must comply with the IB District Regulations. The proposed project complies with the standaxds in the IB zone with the exception of floor area (see below). The following applications are required for the proposed condominium conversion: Condominium conversion permit to convert a five-unit, 25,377 SF office/warehouse building (currently under construction for a first floor remodel and second floor addition) to five office/warehouse condominium units (CS 026.32.020); and • Conditional use permit to exceed the maximum floor area (0.60 FAR (25,377 SF) proposed where 0.50 FAR (21,150 SF) is the maximum allowed) (CS 25.43.030). In a letter dated February 24, 2006, the property owner notes that initially his intent and cost estimates were based on leasing the office/warehouse units. However, because of current market rental conditions and cost overnans of the project (increase in cost of materials and labor), the property owner has decided it would be best to convert the units to individual office/warehouse condominiums. Each of the five units will contain warehouse space on the first floor and associated office space on the second floor. Units range in size from 3,611 SF to 4,593 SF (office and warehouse). Please refer to Table 2 on page 5 for a breakdown of office/warehouse space for each unit. Units 1,2,4 and 5 have access to 273 SF balconies on the second floor. However, there is no requirement to provide private open space or common open space for an office/warehouse condominium. Chapter 26.32, Condominium Conversion Permits, which includes application requirements and minimum requirements, is included in the staff report for reference. Draft declaration of the covenants, conditions and restrictions (CC&R's), specific information concerning the demographic characteristics of the project and a physical elements report are required as part of this application submittal. The physical elements report and demographic characteristics report, submitted by the applicant and date stamped December 27, 2005, is included in the staff report for reference. Planning staff would note that the City Attorney reviewed the draft CC&R's and has accepted them with one minor suggestion to change the wording in the Animals section from "guide dogs" to "service dogs" since it is a protected right under the Americans with Disabilities Act (see attached merno from Larry Anderson, City Attorney, dated February 3, 2006). 2 � Condominium Conversion Permit 821 Cowan Road Parking: The two-story office/warehouse building currently under construction was approved with 53 on-site parking spaces (43 standard, 8 compact and 2 disabled-accessible spaces) where 53 are required, including disabled-accessible parking. The approved parking configuration provides a 24'-0" clear back-up space for all parking spaces. A parking variance was approved for the aisle width at the north and south ends of the parking lot (12'-0" and 13'-6" provided where 18'-0" is the minimum required for traffic moving in two directions). The approved parking lot layout requires traffic to travel in a counter clockwise direction through the parking area. The City's traffic engineer reviewed the on-site traffic circulation and accepted the design. A shared access driveway exists between this property and 837 Cowan Road (property to the south). Landscaping: There are no on-site landscaping requirements for an office/warehouse condominium conversion. However, the February, 2005, proj ect was approved with on-site landscaping to comply with the O-M zoning district regulations in effect at that time. The proj ect will provide 15.9% (6,750 SF) on-site landscaping where 15% (6,345 SF) is the minimum required. Although front setback landscaping was not required, Planning staff would note that 90% (3,300 SF) of the front setback is landscaped (including walkways). The Landscape Plan (sheet L.1) provides details on the proposed plantings throughout the site. The three existing sycamore trees (10 to 12 inches in diameter) at the front of the site will remain. The applicant notes the vines to grow on the walls of the building will be incorporated in the final landscape design, but this landscape feature is not shown on the landscape plan. For a condominium conversion the code requires several issues be addressed at the public hearing (CS 26.32.100). Commission should ask questions at the study meeting to clarify these issues in your mind. (a) The opinions of the tenants of the project as to whether the proposed conversion protects their interests; (b) Whether or not the amount and impact of the displacement of tenants, if the conversion is approved, would be detrimental to the health, safety or general welfare of the community; (c) The role that the commercial, industrial, office or apartment structure plays in the existing rental market for that use and whether this role is substantially altered by the proposed conversion in the light of the tenant protection provisions in this code. Particular emphasis should be placed on the evaluation of rental structures to determine if the existing building is serving low and moderate income tenants, or special , groups of tenants such as elderly or handicapped; (d) If applicable, whether or not lower cost home ownership opportunities will be increased by the conversion of apartments to condominiums, stock cooperatives or community apartments; and (e) Whether tenants will have substantial difficulty in obtaining comparably priced facilities. Further specific findings must be made for a condominium conversion which are different from those required for planning permits (CS 26.32.110): (a) All provisions of this chapter are met; (b) The proposed conversion is consistent with the city's general plan; (c) The proposed conversion will conform to this code and other applicable code provisions, if any, in effect at the time of tentative map approval, except as otherwise provided in this chapter or specifically excepted by the planning commission; and 3 , Condominium Conversion Permit 821 Cowan Road (d) The overall design and physical condition of the condominium conversion achieves a high degree of appearance, quality, and safety. At the study meeting the Commissioners should identify any additional information you might require in order to be able to evaluate these required findings. Staff Comments: See attached. A tentative condominium map has been submitted in order to create the parcel for the condominiums. The tentative and final parcel map is being processed concurrently with the planning application. Table 1 below provides a comparison of the project to the IB District development standards. Table 2 on page 5 provides a comparison of the project to the condominium conversion requirements for an office/warehouse building. Table 1 Lot Area: 42,300 SF Com liance with IB Re ulations Proposed { Allowed/Required Floor Area Ratio: 0.602 0.50 25,377 SF � 21,150 SF Setbacks Front: 19'-4" 10'-0" Left Side: 8'-3"' 10'-0" Right Side: 16'-0" 10'-0" Rear: 66'-2" none Parking: 53 spaces � 53 spaces (43 standard) (8 compact) (8 compact) 1:300 SF office (2 disabled-accessible) 1:1000 SF warehouse . ......._ .................................__. .__..��..�._...............�.�.....�.._.._._...................�............................._._—__�__._................................................��......�..__ ____........_..�_...,..............�.�_.........,........................................................................................ .Aisle Width: 12'-0" and 13'-6"3 ( 18'-0" _._ .__��_...___.._........._........�.........�......�.. _..___.........� ............._ �.... .�..............................._�......_.....�.............._...__.._..------ ---- ----- Building Height: 32'-4" � 35'-0" Front Setback Landscaping: 90% 60% (3300 SF) (2200 SF) 1 Side setback variance approved in February, 2005 (8'-3" proposed where 10'-0" is required). Z Conditional use permit to exceed the maximum floor area (0.60 FAR (25,377 SF) proposed where 0.50 FAR (21,150 SF) is the maximum allowed) (CS 25.43.030). 3 Parking variance approved in February, 2005, for the aisle width at the north and south ends of the parking lot (12'-0" and 13'-6" proposed where 18'-0" is the minimum required for traffic moving in two directions). L! f Condominium Conversion Permit Table 2 821 Cowan Road Com liance with Condominium Conversion Re uirements Proposed Allowed/Required Unit Size: Unit 1: 2118 SF office �a 2475 SF warehouse 4593 SF total I Unit 2: 1879 SF office � 2637 SF warehouse � 4516 SF total � Unit 3: 1717 SF office 1894 SF warehouse 3611 SF total Unit 4: 1740 SF office 2637 SF warehouse 4377 SF total , Unit 5: 2121 SF office 2447 SF warehouse 4568 SF total .�.�.�._ ............................................................................................._______.._..._ _____...............................................................................................__..�___............__...................._._..._------....._._....._._._._.�_—._________..._.�...__.__..........._..........................��...................... � Parking: 53 spaces � 53 spaces (43 standard, 8 compact, 2 disabled � (8 compact) accessible) ADA Parking: 2 disabled accessible spaces 2 disabled accessible spaces Right Side Setback: 16'-0" 10'-0" Left Side Setback: 8'-3"' 10'-0" Front Setback 90% none required Landscaping: 3,300 SF (including walkways) Private Open Space: 273 SF in Units 1,2,4 and 5 none required . _____._.�_.� ......................................................�,......�._._....�_�....�.....��__.........��_........�........_.....�......_.__._.��....�....�.._.,.._ ..__._..........................�.............�._.�.......... Commo�z Open Space: outdoor seating area at main � none required entrance to building 1 Side setback variance approved in February, 2005 (8'-3" proposed where 10'-0" is required). Ruben Hurin Planner c. One Stop Design, Inc., applicant Konstantinos Dokos, property owner 5